P5504mew SWK 08 FP V Dat 001 - 0

Download as pdf or txt
Download as pdf or txt
You are on page 1of 10

Code-1

Contract No. MEW/C/5504-2020/2021


Page No.
Contractor HOT ENGINEERING AND CONSTRUCTION COMPANY
1 of 10
Client MINISTRY OF ELECTRICITY & WATER

Equipment Data Sheet & Curve for Closed Drain


Pump
Document Number: P5504MEW-SWK-08-FP-V-DAT-001

:- Contractor to include all missing notes from document.


:-Please check the viscosity as per FEED document and change the value.

PROCUREMENT, CONSTRUCTION, COMMISSIONING AND MAINTENANCE FOR UPGRADATION


OF FUEL SUPPLY SYSTEM INFRASTRUCTURE WITHIN SHUWAIKH POWER STATION

0 01.OCT.2022 Issued for Final Implementation A.V. P.O. BM JRM


Re-issued for
B 18.JUL.2022 A.V. P.O. BM JRM
Approval
Issued for Review /
A 12.APR.2022 A.V. P.O. BM JRM
Approval
PREPARED APPROVED CHECKED APPROVED
REV DATE DESCRIPTION
FINDER POMPE HOTECC
INSPECTION AND TEST PLAN FOR Doc No : P5504MEW-SWK-08-FP-V-DAT-001
CLOSED DRAIN PUMP Rev. No. : 

PROCUREMENT, CONSTRUCTION, Pages : 2 of 10


COMMISSIONING AND MAINTENANCE FOR
UPGRADATION OF FUEL SUPPLY SYSTEM
INFRASTRUCTURE WITHIN SHUWAIKH POWER
STATION

REVISION LOG
Notes:
i) Revisions after Rev. A are denoted by a vertical line in the left-hand margin against the revised text, with the revision number
displayed next to the revision line as shown on the left.
1
1

ii) Revision numbers are A,B,C, etc up to the issued for client approval and Rev. 0 for implementation. Subsequent revisions
are 1,2,3 etc.

REV REV. DATE REVISED PAGE REVISION DESCRIPTION


A 12.APR.2022 - Issued for Review/Approval
B 18.JUL.2022 - Re-issued for Approval
C 0.2&7.2022 - ,ssued for )LQDOApproval
INSPECTION AND TEST PLAN FOR Doc No : P5504MEW-SWK-08-FP-V-DAT-001
CLOSED DRAIN PUMP Rev. No. : 0

PROCUREMENT, CONSTRUCTION, Pages : 3 of 10


COMMISSIONING AND MAINTENANCE FOR
UPGRADATION OF FUEL SUPPLY SYSTEM
INFRASTRUCTURE WITHIN SHUWAIKH POWER
STATION

TABLE OF CONTENTS

SL. NO OF REMARKS
DESCRIPTION
No. PAGES
1 GENERAL DATA 2
2 CONSTRUCTION 3
3 INSTRUMENTATION 4
4 SEAL SUPPORT SYSTEM MOUNTING 4
5 MECHANICAL SEAL 4
6 HEATING AND COOLING 4
7 PIPING AND APPURTENANCES 4
8 SURFACE PREPARATION AND PAINT 5
9 TEST 5
10 WEIGHTS 5
11 OTHER PURCHASER REQUIREMENTS 5
12 VERTICAL PUMP SUPPLEMENTAL DATA SHEET 6
13 CLOSED DRAIN VESSEL - TRANSFER PUMP /
7
MOUNTING ARRANGEMENT SKETCH
DATASHEET FOR CLOSED DRAIN PUMP Doc No: P5504MEW-SWK-08-FP-V-DAT-001

Rev. No. : 0

PROCUREMENT, CONSTRUCTION, COMMISSIONING AND


MAINTENANCE FOR UPGRADATION OF FUEL SUPPLY
SYSTEM INFRASTRUCTURE WITHIN SHUWAIKH POWER
STATION

CONTRACT REQUIREMENT
GENERAL DATA

NOTE APPLICABLE TO INQUIRY APPLICABLE NATIONAL / INTERNATINAL STANDARDS API 610


FOR MEW UNIT
SITE Shuwaikh Power Station, Kuwait SERVICE CLOSED DRAIN PUMP
NO REQ'D ONE (1) PUM P SIZE TYPE VERTICAL No. of STAGES 11
M ANUFACTURER FINDER POMPE division of Gruppo Aturia S.p.A M ODEL HPVT 80-110 /11 SERIAL No.

1 LIQUID CHARACTERISTICS
2 UNITS M AXIM UM M INIM UM NOTE SERVICE
3 LIQUID TYPE OR NAM E CONDENSATE DRAIN NO. OF STARTS (IF INTERM ITTENT)
Check the
4 VAPOUR PRESSURE bara ATM PUM PS OPERATE IN
value and
5 RELATIVE DENSITY - 0,968 0,640 CORROSION DUE TO (6.12.1.9) H2S, WATER
o
change as
6 SPECIFIC HEAT kJ/(kg· C) 1,963 EROSION DUE TO (6.12.1.9)
per FEED.
7 VISCOSITY cP 5,43 0,33 H2S CONCENTRATION (6.12.1.12) [ppm] 50>ppm *

8 OPERATING CONDITIONS CLORIDE CONCENTRATION [ppm]


9 UNITS M AXIM UM RATED NORM AL M INIM UM PARTICULATE SIZE (DIAM ETER) [μm]
10 DISCHARGE PRESS. DATUM PARTICULATE CONCENTRATION [ppm]
11 PUM PING TEM PERATURE ºC 55 15 5 * mol fraction WET
12 FLOW m³/h 8 5 0
13 DISCHARGE PRESSURE (6.3.2) bara 5,51 3 1
14 SUCTION PRESSURE bara 4,51 1,146
15 DIFFERENTIAL PRESSURE (flange) bara 1 2
16 DIFFERENTIAL HEAD (flange) m/c 20
17 NPSHA m
18 HYDRAULIC POWER kW 0,3

19 SITE AND UTILITY DATA


20 LOCATION COOLING WATER INLET RETURN DESIGN
21 Shuwaikh Power Station, Kuwait TEM P. [ºC] M AX
22 MOUNTED AT TROPICALIZATION REQ'D YES NO PRESS [barg] M IN
23 ELECTRIC AREA CLASSSIFICATION (6.1.22) ZONE 1 SOURCE Cooling Water not available
24 GROUP IIB TEM P. CLASS T3 COOLING WATER CHLORIDE CONSENTRATION [ppm]:
25 SITE DATA
26 ELEVATION (M SL) [m]: BAROM ETER [mmHg]: INSTRUMENT AIR [barg] M AX M IN
27 RANGE OF AM BIENT TEM PERATURES [ºC]: -19 / +55
28 RELATIVE HUM IDITY [%]M IN / M AX: 1 / 100 STEAM DRIVERS HEATING
29 UNUSUAL CONDITIONS: DUST, FUMES, DESERT TEM PERATURE [ºC] M AX
30 M IN
31 UTILITY CONDITIONS DESIGN.
32 ELECTRICITY DRIVERS LV DRIVERS MV HEATING CONTROL PRESSURE [barg] M AX
33 VOLTAGE [V] 415 + 6% N/A N/A M IN
34 PHASE 3 N/A N/A DESIGN.
35 HERTZ 50 + 4% N/A N/A

36 PERFORMANCE DRIVER (7.1.5)

37 PROPOSAL CURVE No. CVA10A2A RPM 1420 DRIVER TYPE INDUCTION MOTOR
38 TESTED CURVE No. GEAR
39 IM PELLER DIA. [mm] RATED 105,3 M AX. 110 M IN. 95 VARIABLE SPEED REQUIRED NOT APPLICABLE
40 RATED POWER [kW] 0,6 EFFICIENCY [%] 54 SOURSE OF VARIABLE SPEED
41 BEP FLOW (@RATED IM PELLER DIAM ETER) 3,5 [m³/h]: 5 OTHER
42 M INIM UM FLOW [m³/h] THERM AL 2,5 STABLE 2,5 M ANUFACTURER MARELLI
43 PREFERRED OPERATING REGION [m³/h] FROM TO 6 NAM EPLATE POWER [kW] 4
44 ALLOWABLE OPERATING REGION [m³/h] FROM TO 7,2 NOM INAL SPEED [RPM ] 1425
45 M AX. HEAD @RATED IM PELLER [m] 29,5 RATED LOAD SPEED [RPM ]
46 M AXIM UM POWER @RATED IM PELLER [kW] 0,65 FRAM E OR M ODEL D6C 132SA4
47 NPSHR @ RATED FLOW [m] 0,47 ORIENTATION VERTICAL
48 CENTERLINE TO U/S BASEPLATE [m] LUBE GREASE
49 NPSH M ARGIN @ RATED FLOW (min. 1m) [m] 1 BEARING TYPE
50 SPECIFIC SPEED (6.1.9) 5,7 RADIAL TYPE ANTIFRICTION M ODEL
51 SUCTION SPECIFIC SPEED LIM IT SI units 11.000 THRUST TYPE ANTIFRICTION M ODEL
52 SUCTION SPECIFIC SPEED SI units 4821 STARTING M ETHOD DOL
53 M AX. ALLOW. SOUND PRESS. LEVEL REQ'D (6.1.14) [dBa] 85 SEE DRIVER DATA SHEET P5504MEW-SWK-08-FP-V-DAT-002
54 ESTIM ATED M AX. SOUND PRESS. LEVEL. [dBa] 80
55 M AX. SOUND POWER LEVEL REQ'D (6.1.14) [dBa] M OTOR EXPLOSION PROTECTION Ex-d IIB T4 Gb
56 ESTIM ATED M AX. SOUND POWER LEVEL [dBa]

Engineer Doc. Number : 1393-00-1311A Page 1 of 6


DATASHEET FOR CLOSED DRAIN PUMP Doc No: P5504MEW-SWK-08-FP-V-DAT-001
Rev. No. : 0

PROCUREMENT, CONSTRUCTION, COMMISSIONING AND


MAINTENANCE FOR UPGRADATION OF FUEL SUPPLY
SYSTEM INFRASTRUCTURE WITHIN SHUWAIKH POWER
STATION

1 NOTE 2. CONSTRUCTION
2 API PUMP TYPE (BASED ON API 610 DEFINITIONS) VS1 CASING MOUNTING SUMP COVER PLATE
3 CASING TYPE (6.3.10) DIFFUSER
4 NOZZLE CONNECTIONS CASING SPLIT MIXED FLOW RADIAL

5 SIZE FACING RATING POSITION OH3 BACK PULLOUT LIFTING DEVICE REQ'D (9.1.2.6)

6 SUCTION BOTTOM CASING PRESSURE RATING (6.3.6)

7 DISCHARGE 3" RF, Smooth Finish #150 END MAWP 16 [barg] @ 55 [ºC]

8 HYDROTEST
2xMAWP 24 [barg] @ [ºC]
9 PRESSURE CASING AUXILIARY CONNECTIONS (6.4.3.2)

10 No SIZE TYPE FACING RATING POSITION HYDROTEST OH PUMP AS ASSEMBLY


11 BALANCE/LEAKOFF SUCTION PRESS. REGIONS DESIGNED FOR MAWP
12 DRAIN ROTATION (VIEWED FROM COUPLING END)
13 VENT IMPELLERS INDIVIDUALLY SECURED
14 PRESSURE GAUGE BOLT OH 3/4/5 PUMP TO PAD FOUNDATION
15 TEMP. GAUGE PROVIDE SOLEPLATE FOR OH 3/4/5 PUMPS
16 WARM-UP LINE
17 ROTOR
18 DRAIN VALVE SUPPLIED BY SHAFT FLEXIBILITY INDEX (SFI) (9.1.1.3)
19 DRAINS MANIFOLDED BY 1ST CRITICAL SPEED - WET (MULTISTAGE PUMPS ONLY)
20 VENT VALVE SUPPLIED BY COMPONENT BALANCE TO ISO 1940 G1.0 YES
21 VENTS MANIFOLDED BY SHRINK FIT - LIMITED MOVEMENT IMPELLERS (9.2.2.3)

22 THREADED CON'S FOR PIPELINE SERVICE &< 50ºc (6.4.3.2)

23 SPECIAL FITTING FOR TRANSITIONING (6.4.3.3) COUPLING (7.2.3), (7.2.13.f)

24 CYLINDRICAL THREADS REQUIRED (6.4.3.8) MANUFACTURER J. CRANE


25 GUSSET SUPPORT REQUIRED MODEL METASTREAM TSKS
26 MACHINED AND STUDDED CONNECTIONS (6.4.3.12) RATING (POWER/100RPM) [kW] 250
27 TYPE VS6 PUMP DRAIN REQUIRED SPACER LENGTH [mm] 80
28 VENT AND DRAIN TO SKID EDGE REQUIRED SERVICE FACTOR 1,5 MIN
29 MATERIAL (6.12.1.1) RIGID
30 APPENDIX 'H' MATERIAL CLASS A8 COUPLING WITH HYDRAULIC FIT (7.2.10) N/A
31 MINIMUM DESIGN METAL TEMPERATURE (6.12.4.1) [ºC] 0 COUPLING BALANCED TO ISO 1940-1 G6.3 (7.2.3) YES
32 REDUCED HARDNESS MATERIALS REQ'D (6.12.1.12.1) YES, sour service COUPLING WITH PROPRIETY CLAMPING DEVICE (7.2.11) N/A
33 APPLICABLE HARDNESS STANDARD (6.12.1.12.3) COUPLING IN COMPLIANCE WITH (7.2.4) N/A
34 STUDS / NUTS FOR MAIN CASING A4-70 COUPLING GUARD STANDARD PER (7.2.13.a) N/A
35 BARREL WINDOW ON COUPLING GUARD N/A
36 COLUMN PIPE SS 316L NON-SPARKING COUPLING GUARD BRASS
37 DIFFUSERS / SUC. BELL SS 316L BASEPLATE
38 IMPELLER CF8M API BASEPLATE NUMBER N/A
39 IMPELLER WEAR RING N/A BASEPLATE CONSTRUCTION (7.3.14)
40 CASE WEAR RING ASTM A182 F53 BASEPLATE DRAINAGE (7.3.1)
41 SHAFT ASTM A182 F51 MOUNTING
42 BOWL (IF VS-TYPE) CF8M NON-GROUT CONSTRUCTION (7.3.13)

43 INSPECTION CLASS Level 1 VERTICAL LEVELING SCREWS


44 STRAINER SS316 LONGITUDINAL DRIVER SCREWS
45 BEARINGS AND LUBRICATION (6.10.1.1) SUPPLIED WITH - GROUT AND VENT HOLES
46 BEARING (TYPE / NUMBER) (6.11.4) - DRAIN CONNECTION
47 RADIAL / MOUNTING PADS SIZED FOR BASEPLATE LEVELING (7.3.5)

48 THRUST BALL / 3310 ATN9 MOUNTING PADS TO BE MACHINED (7.3.6)

49 REVIEW AND APPROVE THRUST BEARING SIZE (9.2.5.2.4) PROVIDE SPACER PLATE UNDER ALL EQUIPMENT FEET
51
52 PRESSURE LUBEDATA
ISO 10438 SYSTEM TO ISO
SHEETS 10438-
ATTACHED
53 PRESSURIZED LUBE OIL SYSTEM MOUNTED ON BASEPLATE REMARKS
54 LUBRICATION FLOOD 1. WATER IS EITHER A MIXTURE OF WWT PLANT EFFLUENTS OR SEA WATER
55 INTERCONNECTING PIPING PROVIDED BY
56 ENGINNERING BY
57 OIL VISCOSITY ISO GRADE VG- 46
58 CONSTANT LEVEL OILER YES
59
60

Engineer Doc. Number : 1393-00-1311A Page 2 of 6


DATASHEET FOR CLOSED DRAIN PUMP Doc No: P5504MEW-SWK-08-FP-V-DAT-001

Rev. No. : 0

PROCUREMENT, CONSTRUCTION, COMMISSIONING AND


MAINTENANCE FOR UPGRADATION OF FUEL SUPPLY
SYSTEM INFRASTRUCTURE WITHIN SHUWAIKH POWER
STATION

1 NOTE 3. INSTRUMENTATION 4.SEAL SUPPORT SYSTEM MOUNTING


2 SEE SEPARATE API-670 DATA SHEET SEAL SUPPORT SYSTEM MOUNTED (7.5.1.4)

3 ACCELEROMETER (7.4.2.1) ON BASEPLATE SEPARATELY MOUNTED


4 NUMBER OF ACCELEROMETERS IDENTIFY LOCATION ON BASEPLATE
5 MOUNTING LOCATION OF ACCELEROMETERS
6 INTERCONNECTING PIPING BY PUMP VENDOR
7 PROVISION FOR MOUNTING ONLY (6.10.2.10)

8 NUMBER OF ACCELEROMETERS 5. MECHANICAL SEAL (6.8.1)


9 MOUNTING LOCATION OF ACCELEROMETERS SEE ATACHED ISO 21049 (API 682) DATA SHEET
10 MECHANICAL SEALING SYSTEM MANUFACTURER FLOWSERVE
11 FLAT SURFACE REQUIRED (6.10.2.11) YES ADDITIONAL CENTRAL FLUSH PORT
12 NUMBER OF ACCELEROMETERS HEATING JACKET REQUIRED
13 MOUNTING LOCATION OF ACCELEROMETERS MECHANICAL SEAL PER API 682 YES
14 SEAL CATEGORY 2 API PUMPS
15 VIBRATION PROBES (7.4.2.2) SEAL TYPE A PUSHER TYPE
16 PROVISION FOR VIBRATION PROBES SEAL ARRANGEMENT 3 DUAL WET SEAL
17 NUMBER PER RADIAL BEARING SEAL FLUSHING PLAN 13/53B
18 NUMBER PER AXIAL BEARING SEAL CONFIGURATION
19 MONITORS AND CABLES SUPPLIED BY (7.4.2.4) FORMER API 610 SEAL CODE
20 see NOTE 5
21 TEMPERATURE (7.4.2.3)

22 PROVISION FOR TEMPERATURE PROBES Flowserve Double Mechanical seal QBB


23 RADIAL BEARING TEMPERATURE API PLAN 13/53B
24 NUMBER PER RADIAL BEARING
25 THRUST BEARING TEMPERATURE
26 NUMBER PER RADIAL BEARING - ACTIVE SIDE Note-5 missing
27 NUMBER PER RADIAL BEARING - INACTIVE SIDE
28 TEMPERATURE GAUGES (WITH THERMOWELLS) (9.1.3.6)
29
30 PRESSURE
31 PRESSURE GAUGE TYPE DIAPHRAGM
32
33
34 REMARKS 6. HEATING AND COOLING (6.1.17)
35 COOLING REQUIRED
36 COOLING WATER PIPING PLAN
37 COOLING WATER PIPING FITTINGS
38 COOLING WATER PIPING MATERIAL
39 COOLING WATER REQUIREMENTS
40 BEARING HOUSING [m³/h]
41 HEAT EXCHANGER [m³/h]

42 TOTAL COOLING WATER REQUIRED [m³/h]

43
44 HEATING MEDIUM
45 HEATING PIPING
46 OTHER
47
48
49 7. PIPING AND APPURTENANCES
50 MANIFOLD PIPING FOR PURCHASER CONNECTION (7.5.1.6)
51 VENT
52 DRAIN
53 COOLING WATER
54 OTHER
55
56 TAG ALL ORIFICES (7.5.2.4)

57 SOCKET WELD CONNECTION ON SEAL GLAND (7.5.2.8)

58

Engineer Doc. Number : 1393-00-1311A Page 3 of 6


DATASHEET FOR CLOSED DRAIN PUMP Doc No: P5504MEW-SWK-08-FP-V-DAT-001
Rev. No. : 0

PROCUREMENT, CONSTRUCTION, COMMISSIONING


AND MAINTENANCE FOR UPGRADATION OF FUEL
SUPPLY SYSTEM INFRASTRUCTURE WITHIN
SHUWAIKH POWER STATION

1 NOTE 8. SURFACE PREPARATION AND PAINT 9. TEST


2 MANUFACTURER'S STANDARD SHOP INSPECTION (8.1.1)

3 OTHER (SEE BELOW) 11802-CMN-SPC-ME-11 PUMP CURVES & DATA APPROVAL PRIOR TO SHIPMENT YES
4 SPECIFICATION No. TEST WITH SUBSTITUE SEAL (8.3.3.2.b)

5 MATERIAL CERTIFICATION REQUIRED FOR (6.12.1.8)

6 PUMP P5504MEW-SWK-08-FP-V-PPR-006 CASING YES


7 PUMP SURFACE PREPARATION IMPELLER YES
8 PRIMER SHAFT YES
9 FINISH COAT OTHER ALL WETTED PARTS
10 CASTING REPAIR WELD PROC. APPR. (6.12.2.5) (6.12.3.1)

11 BASEPLATE N/A INSPECTION FOR CONNECTION WELDS (6.12.3.4.d & e)

12 BASEPLATE SURFACE PREPARATION MAGNETIC PARTICLE YES


13 PRIMER RADIOGRAPHY YES
14 FINISH COAT LIQUID PENETRANT YES
15 DETAILS OF LIFTING DEVICES ULTRASONIC
16 INSPECTION FOR CASTINGS
17 SHIPMENT (8.4.1) MAGNETIC PARTICLENA /SS 316 material) YES
18 EXPORT BOXING REQUIRED YES RADIOGRAPHY only on discharge elbow NA for socket welded
19 OUTDOOR STORAGE OVER 6 MONTHS YES LIQUID PENETRANT YES
20 ULTRASONIC
21 SPARE ROTOR ASSEMBLY PACKAGED FOR HARDNESS TEST (8.2.2.7) NOTE 2
22 ROTOR STORAGE ORIENTATION (9.2.8.2) VERTICAL ADDTNL SUB-SURFACE EXAMINATION (6.12.1.5) (8.2.1.3)

23 SHIPPING/STORAGE CONTAINER FOR VERT. STORAGE (9.2.8.3) FOR ALL SHAFTS


24 N2 PURGING (9.2.8.4) METHOD ULTRASONIC TEST WITH TEST CERTIFICATE
25 PMI TEST (8.2.2.8) YES
26 SPARE PARTS: START-UP YES COMPONENTS TO BE TESTED ALLOY PARTS
27 NORMAL MAINTENANCE (2 YEARS) YES
28 RESIDUAL UNBALANCE TEST (J.4.1.2)
29 10. WEIGHTS NOTIF. OF SUCCESSFUL SHOP PERF. TEST (8.1.1.c) (8.3.3.5)

30 ITEM No PUMP DRIVER GEAR BASE TOTAL BASEPLATE TEST (7.3.21)


31 HYDROSTATIC TEST WITNESSED
32 HYDROSTATIC TEST OF BOWLS & COLUMN (9.3.13.2) WITNESSED
33 PERFORMANCE TEST WITNESSED

34 11. OTHER PURCHASER REQUIREMENTS TEST IN COMPLIANCE WITH (8.3.3.2)

35 COORDINATION MEETING REQUIRED (10.1.3) YES TEST DATA POINTS TO (8.3.3.3)

36 MAXIMUM DISCHARGE PRESSURE TO INCLUDE TEST TOLERANCES TO (8.3.3.4)


37 MAXIMUM SPECIFIC GRAVITY NPSH (8.3.4.3.1) (8.3.4.3.4) WITNESSED
38 OPERATION TO TRIP SPEED NPSH 1ST STAGE ONLY (8.3.4.3.2)
39 MAXIMUM DIAMETER IMPELLER AND/OR No OF STAGES NPSH TEST TO HI 1.6 OR ISO 9906 (8.3.4.3.3)

40 CONNECTION DESIGN APPROVAL (9.2.1.4) YES TEST LIMITED TO 110% OF NPSHA (8.3.3.6)
41 TORSIONAL ANALYSIS / REPORT (6.9.2.10) RETEST ON SEAL LEAKAGE (8.3.3.2.d) WITNESSED
42 PROGRESS REPORTS YES RETEST AFTER FINAL HEAD ADJUSTMENT (8.3.3.7.b)

43 OUTLINE OF PROCEDURES FOR OPTIONAL TESTS (10.2.5) COMPLETE UNIT TEST (8.3.4.4.1) WITNESSED
44 ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (8.2.1.1) SOUND LEVEL TEST (8.3.4.5) OBSERVED
45 LATERAL ANALYSIS REQUIRED (9.1.3.4) (9.2.4.1.3) CLEANLINESS PRIOR TO FINAL ASSEMBLY (8.2.2.6) OBSERVED
46 MODAL ANALYSIS REQUIRED (9.3.9.2) LOCATION OF CLEANLINESS INSPECTION
47 DYNAMIC BALANCE ROTOR (6.9.4.4) NOZZLE LOAD TEST OBSERVED
48 INSTALLATION LIST IN PROPOSAL (10.2.3.l) CHECK OF CO-PLANAR MOUNTING PAD SURFACES
49 VFD STEADY STATE DAMPED RESPONSE ANALYSIS (6.9.2.3) MECHANICAL RUN TEST UNTIL OIL TEMP. IS STABLE
50 TRANSIENT TORTIONAL RESPONSE (6.9.2.4) 4 HR. MECH. RUN AFTER OIL TEMP. STABLE (8.3.4.2.1)
51 BEARING LIFE CALCULATIONS REQUIRED (6.10.1.6) 4 HR. MECH. RUN TEST WITNESSED
52 IGNITION HAZARD ASSESMENT TO EN-13463-1 (7.2.13.e) BEARING HOUSING RESONANCE TEST (8.3.4.7)
53 CASING RETIREMENT THICKNESS DRAWING (10.3.2.3) STRUCTURAL RESONANCE TEST (9.3.9.2)
54 FLANGES REQ'D IN PLACE OF SOCKET WELD UNIONS (7.5.2.8) REMOVE/INSPECT HDYNAMIC BRNGS AFTER TEST (9.2.7.5)

55 INCLUDE PLOTTED VIBRATION SPECTRA (6.9.3.3) AUXILIARY EQUIPMENT TEST (8.3.4.6)


56 CONNECTION BOLTING (7.5.1.7) EQUIPMENT TO BE INCLUDED IN AUXILIARY TESTS
57 CADMIUM PLATED BOLTS PROHIBITED
58 VENDOR TO KEEP REPAIR AND H-TR RECORDS (8.2.1.1.c) LOCATION OF AUX. EQUIPMENT TESTS
59 VENDOR SUBMIT TEST PROCEDURES (8.3.1.1.) REQUIRED IMPACT TEST (6.12.4.3) PER EN-13445
60 SUBMIT INSPECTION CHECK LIST (8.1.5) REQUIRED PER ASME SECTION VIII
61 REMOVE CASING AFTER TEST

Engineer Doc. Number : 1393-00-1311A Page 4 of 6


DATASHEET FOR CLOSED DRAIN PUMP Doc No: P5504MEW-SWK-08-FP-V-
DAT-001 Rev. No. : 0

PROCUREMENT, CONSTRUCTION, COMMISSIONING AND


MAINTENANCE FOR UPGRADATION OF FUEL SUPPLY SYSTEM
INFRASTRUCTURE WITHIN SHUWAIKH POWER STATION

12. VERTICAL PUMP SUPPLEMENTAL DATA SHEET


1 Note VERTICAL TYPE (FIG 1.1) VS1
2 REMARKS
3
4
5
6 VERTICAL PUMPS VERTICAL PUMPS (CONT'D)

7 PUMP THRUST: (+) UP (-) DOWN LINE SHAFT: ENCLOSED


8 STATIC THRUST N N LINE SHAFT DIAMETER mm
9 AT MIN FLOW N N TUBE DIAMETER mm
10 AT RATED FLOW N N LINE SHAFT COUPLING:
11 AT MAX FLOW N N LINESHAFT CONNECTION
12 MAX THRUST N N
13 SOLEPLATE REQUIRED • SUCTION STRAINER TYPE Basket type Note-2 description missing.
14 SOLEPLATE Length x Width m X m • LEVEL CONTROL
15 SOLEPLATE THICKNESS mm IMPELLER COLLETS ACCEPTABLE NO
16 MOUNTING FLANGE REQUIRED YES HARDENED SLEEVES UNDER BEARINGS (9.3.10.5) Note 2
17 COLUMN PIPE: FLANGED RESONANCE TEST
18 DIAMETER mm STRUCTURAL ANALYSIS (9.3.5)
19 LENGTH m
20 NUMBER DRIVER ALIGNMENT SCREWS
21 SPACING m SUCTION CAN
22 GUIDE BUSHINGS: SUCTION CAN THICKNESS mm
23 NUMBER LENGTH m
24 LINE SHAFT BEARING SPACING <1500 (mm) DIAMETER mm
25 GUIDE BUSHING LUBE: PUMPAGE SEPARTATE MOUNTING PLATE (9.3.8.3.1)
26 PROVIDE SEPARATE SOLEPLATE (9.3.8.3.3)
27 DRAIN PIPED TO SURFACE (9.3.13.5)
28 BOWL HEAD CALCULATION REQUIRED

29 MATERIALS (additional)
30 SUCTION CAN / BARREL: LINESHAFT SLEEVES :
31 DISCHARGE HEAD : • BEARING RETAINER :
32 BOWL SHAFT : SHAFT ENCLOSING TUBE :
33 LINESHAFT : DISCHARGE COLUMN :
34 LINESHAFT HARDFACING : PRESSURE RATING: MAWP HYDRO
35 BELLMOUTH : HEAD
36 BOWL BEARING : COLUMN PIPE
37 LINESHAFT BEARING : BOWL

38 SUMP ARRANGEMENT
39 SUMP DIMENSIONS :
40 GRADE ELEVATION 1
41 LOW LIQUID LEVEL 2 1 2 3
42 C.L. OF DISCHARGE 3
43 SUMP DEPTH l1 2750
l3

44 PUMP LENGTH l2 2600


45 GRADE TO DISCH. l3 180
46 GRADE TO LOW LIQUID LVL l4 1760
l4

47 GRADE TO 1ST STG IMPL'R. l5 2395


l5

48 SUBMERGENCE REQ'D l6 840


l2

49 SUMP DIAMETER Fd 610


l1

l6

50
51
52
53 Fd
54

Engineer Doc. Number : 1393-00-1311A Page 5 of 6


DATASHEET FOR CLOSED DRAIN PUMP Doc No: P5504MEW-SWK-08-FP-V-DAT-001
Rev. No. : 0
PROCUREMENT, CONSTRUCTION,
COMMISSIONING AND MAINTENANCE FOR
UPGRADATION OF FUEL SUPPLY SYSTEM
INFRASTRUCTURE WITHIN SHUWAIKH POWER
STATION

1 13. CLOSED DRAIN VESSEL - TRANSFER PUMP / MOUNTING ARRANGEMENT SKETCH


2
CenterLine NOTES
3 of Pump / Motor TOP VIEW / PLAN VIEW 1. All dimensions are in "mm"
4 2. Pump Vendor to furnish all required
5 dimensions as marked - #.
6 3. Boot "vortex breaker" arrangement and
7 "type" details to be confirmed by
8 pump Vendor (if required)
D5
D6

10 DESCRIPTION DIMENSIONS
11 D1 1800
12 D2 175
Mounting flange +
13 D3 89
No. & dia of
14
bolt/hole details # D4 ID 580
15 D5 431,8
16 VESSEL D6 482,6
17 D7 304,8
H9

18 H1 Min. 300
19 H2 2314
20 H3 31,7
21 H4 180
H5 Min. 150
H2

22

23 H6 #
H7 #
H3

24
H4

25 2600
H8
26 CLOSED DRAIN Total Pump Length
H1

VESSEL
27
900
28 H9 (min distance required
D7 for maintenance)
29

30 D2
31
D3
32 pls refer to the preliminary drawing
D1

H8 (TPL)

33

34
Min. Submergence
35 level at rated flow
+LSLL
36

+0.000
H7

37

38

39
H6

40

41

42 D4
H5

43 HHLL = 1400
44 HLL = 1200
45 NLLL = 1000
46 LLL = 600
47 LSLL = 300
48
ELEVATION VIEW
49 NOTES:
50

Engineer Doc. Number : 1393-00-1311A Page 6 of 6


1

min. flow

rated flow

max flow