ASIS - User - Manual - VM - V 1.1
ASIS - User - Manual - VM - V 1.1
Project ASIS
Version 1.1
Release 1.0
Notice
Document details
This manual has been written to help you understand and use the variation
management module within the ASIS application. It provides the functional
capabilities and operational details of VM, and contains the procedures that you
should know for performing your business tasks using VM.
Intended Audience
This manual is primarily intended for hospital users, company users, and
treatment plant users who will use VM to record and maintain the hosptial
specific variation management related activities.
Pre-requisites for Use
The functional pre-requisites for understanding this manual would be the basic
understanding of the healthcare facilities and the type of variations, which arise
within the healthcare facilities.
Typographical Conventions
References
4 Report ...................................................... 81
4.1 Generating a Report ............................................ 81
Figure 16: Variation Month Closing Page (after fetching) - FEMS/BEMS ........... 44
Figure 17: Variation Month Closing Page (after fetching) – CLS ...................... 44
Figure 23: Verification of Variations (FEMS - Building & Systems) Page ........... 51
Figure 24: Verification of Variations (FEMS – Equipment & Vehicles) Page ....... 52
DW During Warranty
PW Post Warranty
VM Variation Management
If… Message
Any fields is empty or ‘Some fields are incorrect or have not been
filled incorrectly filled in. Please correct this to proceed’.
Deleting the only row ‘Sorry! You cannot delete all record(s)’.
or all rows in a detail
grid
Figure 1: VM – Dashboard
If any record exist for a particular status, the status and the count is
marked in blue colour, and if clicked on the status, it will show the details
of the asset with the specified status.
This manual provides further details about these main menu items in the
subsequent sections.
3.1.1 SNF
SNF stands for service start/stop notification form. Whenever a variation
needs to be proposed, SNF must be raised. It must be submitted, verified,
and approved, to implement the proposed variation. A variation can be
Hospital Engineer
Verify
Hospital Director
Reject
Approve /
SNF is Reject / More Info
rejected More Info
Approve
SNF is approved
-Or-
In the User Area Code auto-select field, enter the keyword, which
is part of the required text. The search function populates a list of
user area codes containing the keyword, which is obtained from
CLS>Master>User Area Details. You can also search all the
available field values by pressing down-arrow key. From the list
select the appropriate field value.
Notes:
o This field is enabled and is mandatory, only if the Variation
Status is selected as V4 or V8.
o In the User Area Name text box, the description of the user
area is displayed, based on the selected User Area Code.
o In the Cleanable Area (sqm), the portion of area to be cleaned
is displayed, based on the selected User Area Code.
Following are the fields that are displayed and entered:
o In the Contract No./LPO No. text box, enter the contract
number or LPO number for the specified facility, if the Variation
Status is selected as V3. This filed is displayed based on the
selected User Area Code, if the Variation Status is selected as
V4 or V8.
o In the Service Start Date field, the start date of the service is
displayed based on the date on when the Hospital Director
approves the SNF, for the variation Status V3 and V8. This field
is displayed based on the selected User Area Code for the
Variation Status V4.
Note: To delete the record, click the Delete icon corresponding to Delete
column, only when the SNF status is Open. If deleted, the status of the
SNF is changed to Cancelled. Once the record is submitted, the record
cannot be deleted and the delete icon is disabled.
Variation is re-
Hospital Engineer
submitted in
Rejection screen
No
Verify
Variation is
verified again by
Hospital Engineer Yes
in Rejection screen Hospital
Director
No
Approve
Yes
Summary report
on variations
Variation is
Hospital
rejected by
Engineer
Hospital
Engineer
No
Verify
Variation is
verified
again Hospital Director
Yes
No
Approve
Yes
Summary Report on
Variations
Summary Report on
Company variations
User
Summary of Company HQ
Variation is re- User
submitted in
Rejection screen
No
Verify
Summary of
Variations is Company
Yes
verified again by HQ
Company HQ in User
Rejection screen
Submit the summary
of variations
No
Approve
Yes
No
Verify
Variation is
verified again
MOH State
Yes Engineer
(JKN)
No
Approve
Yes
Tip: To export the above roll over fee report details, click ; from
the export drop-down menu, select any of the formats to export.
o Previous
o First
o Next
o Last
Building and Systems This report provides a summary, for which the
(FEMS) variations were verified and approved for FEMS
– building and systems.
The first level provides the total count of
building and systems along with their during
warranty and post warranty fee details for the
selected period of years.
The second level provides the total count of
building and systems with their respective
during warranty and post warranty fee details
for a given period.
The third level displays the Summary of
Variation instructions to the users, provides the
building details of the particular department,
with its respective Project Cost, Built-up Area,
Variation status, Start Date, Defect Liability
Expiry Date, Proposed Rate, and Fee details.
Along with this, the details of the Concerned
authorities who prepared, and Verified are
displayed.
Cleansing Area (CLS) This report provides a summary, for which the
variations were verified and approved for CLS –
Cleansing area.
The first level provides the total count of areas
along with the monthly proposed fee for the
selected period of years.
The second level provides the total count of user
areas with their respective monthly proposed fee
details for a given period.
The third level displays the Summary of
Variation instructions to the users, provides the
user area details of the particular Hospital, with
its respective Cleanable floor area, Variation
status, Start Date, Stop Date, Previous Usage,
Current Usage, Proposed Rate, and Monthly
Proposed Fee details. Along with this, the details
of the Concerned authorities who Prepared, and
Verified are displayed.