100% found this document useful (1 vote)
195 views10 pages

Primavera P6 Course Syllabus

The document outlines the content of a Primavera training course. The course covers 12 sections on topics like Primavera architecture, creating projects and activities, scheduling, resource management, cost management, risk management, project monitoring, schedule comparisons, reflections, and reporting. Learners will gain hands-on experience through practical exercises in each section to learn skills like setting up projects, assigning resources and costs, updating schedules, and generating reports. The goal is to provide expertise in using the Primavera P6 tool to plan, track, and control projects.

Uploaded by

Harsh Patel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
195 views10 pages

Primavera P6 Course Syllabus

The document outlines the content of a Primavera training course. The course covers 12 sections on topics like Primavera architecture, creating projects and activities, scheduling, resource management, cost management, risk management, project monitoring, schedule comparisons, reflections, and reporting. Learners will gain hands-on experience through practical exercises in each section to learn skills like setting up projects, assigning resources and costs, updating schedules, and generating reports. The goal is to provide expertise in using the Primavera P6 tool to plan, track, and control projects.

Uploaded by

Harsh Patel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

PRIMAVERA TRAINING COURSE CONTENT

Section 1: Introduction

➢ Introduction about Portfolio, Program and Projects


➢ Introduction to Project Management
➢ Introduction to Primavera
➢ History of Planning
➢ Skills required for Planning
➢ Project Phases & Life Cycle

Section 2: Primavera P6 Architecture

Learning Objective: In this Chapter, you can able to understand P6


Architecture in detail

Topics:

➢ Primavera P6 PPM vs EPPM vs Cloud


➢ Primavera Architecture in detail
➢ Database options in P6

Section 3: Portfolio Program & Project Structure Creation

Learning Objective: In this Chapter, you will be introduced to P6 tool


options and settings. Creating Portfolio, Program and Projects.

Topics:

➢ Setting up Enterprise Project Structure (EPS)


➢ Setting up Organizational Breakdown Structure (OBS)
➢ User Administration
➢ User control & Limited Access Provisions
➢ Setting User Preferences

www.credosystemz.com
➢ Creating a Project
➢ Defining Project Status
➢ Setting up Project Dates
➢ Setting up Project Codes
➢ Project Parameters

Hands-on Practicals:

➢ Creating Portfolio, Program and Project assigning responsible


managers
➢ Understanding the project information and details in depth
➢ Primary settings to be done in P6 tool in User Preference and
Admin Preferences

Section 4: Project Code and Calendars

Learning Objective: In this Chapter, you will be familiar in creating


Calendar and Project Codes.

Topics:

➢ Project Codes
➢ Calendar
➢ Global Calendar
➢ Project Calendar
➢ Resource Calendar

Hands-on Practicals:

➢ Creating Project Codes and performing it grouping option


➢ Creating all three types of Calendar – Work Week, Exception
and Holiday setup

Section 5: Project Time Management

Section 5.1: WBS & Activities

www.credosystemz.com
Learning Objective: In this Chapter, you will deep dive into WBS,
Activities, types and its relationship.

Topics:

➢ Creating Work Breakdown Structure (WBS)


➢ Defining Work Package & Creating Project Activities
➢ Activity Codes
➢ Activity Types
➢ Duration Types
➢ Percentage Completion Types
➢ Activity Resource units loading
➢ Applying activities relationships (Logical connection)
➢ Relationship Types
➢ Creating Activity Steps
➢ Feeding Activity information to Execution Team
➢ Activity Summary
➢ Notebooks

Hands-on Practicals:

➢ Creating WBS, Work Package and activities – Understanding


activity details
➢ Practicing on creating all types of activities
➢ Establishing relationship between activities – Four types
➢ Understanding duration types in activities and activity steps

Section 5.2: Scheduling and Constraints

Learning Objective: In this Chapter, you will get expertise in Scheduling


and applying constraints

Topics:

➢ Scheduling Types

www.credosystemz.com
➢ Retained Logic
➢ Progress Override
➢ Actual Dates
➢ Scheduling Option
➢ Scheduling Logs
➢ Applying Constraint
➢ Types of Constraints

Hands-on Practicals:

➢ Exercise for all scheduling types during out of sequence


➢ Applying different constraints in activities and understanding its
behaviour

Section 6: Project Resource management

Learning Objective: In this Chapter, you will get knowledge of creating


resources and mapping resources to project activities effectively

Topics:

➢ Types of Resources
➢ Units of Measures
➢ Creating Resource
➢ Default & Maximum units per time
➢ Resource Price revisions
➢ Resource Shift Creation
➢ Assigning the resource to activities
➢ Resource Codes
➢ Creating Roles
➢ Assigning roles to resources
➢ Assigning roles to activities
➢ Resource Loading
➢ Resource Curves

www.credosystemz.com
➢ Bucket Loading
➢ Project Resources Leveling and it types

Hands-on Practicals:

➢ Creating all three type of resources – Setting up appropriate


units and maximum units
➢ Assigning roles to user
➢ Mapping or loading resources to project activities
➢ Applying resource curves based on working pattern expected
➢ Apply all types of resource levelling to avoid over allocation

Section 7: Project Cost Management

Learning Objective: In this Chapter, you will be familiar in creating


costing and managing it.

Topics:

➢ Project Funding Sources


➢ Activity Costing
➢ Expenses
➢ Estimating Budgeted and Actual cost for Activities
➢ Establishing budgets for Work Packages
➢ Estimating Project Budgets
➢ Preparing Project Cash Flow
➢ Cost Comparison Analysis
➢ Cost Monitoring & Revisions
➢ Project Budget revisions

Hands-on Practicals:

➢ Creating Funding source and Cost accounts


➢ Working with Budget log, spending plan and summary
➢ Comparison of budgeted cost and actual cost of all activities
during execution

www.credosystemz.com
➢ Monitoring and revising cost after the comparison

Section 8: Project Risk Management

Objective: In this Chapter, you will get expertise in creating and


managing risk in P6.

Topics:

➢ Identifying Project Risk


➢ Categorizing Risk
➢ Risk Status
➢ Analysing Pre-Risk Impact
➢ Setting Risk control plan
➢ Post Risk Impact Analysis
➢ Finding Risk Cost
➢ Cause and Effect Analysis

Hands-on Practicals:

➢ Creating Risk – Categorize it, Updating Pre-risk, Control plan


and Post Risk Impact
➢ Mapping the risk to corresponding expected WBS or Activities

Section 9: Project Monitoring & Control

Learning Objective: In this Chapter, you will be familiar in updating


project and controlling it.

Topics:

➢ Setting up & Assigning Baselines


➢ Apply Actuals
➢ Progress Update
➢ Look Ahead Schedule
➢ Delay Impact Analysis

www.credosystemz.com
➢ Earned Value Analysis
➢ S-Curve Analysis
➢ Usage of Project Thresholds
➢ Project Issue Register
➢ Working in Project Issues
➢ Project Tracking

Hands-on Practicals:

➢ Baseline Creation &Assigning Baseline to the project –


Comparison of baseline vs Actual
➢ Updating Project Progress – Manual,Update Progress and Apply
Actuals
➢ Monitoring using Earned Value Graph and Tables – Percentage
completion
➢ Setting Threshold through different parameter and triggering
issues automatically
➢ Exercise for all four tracking layout views available in P6

Section 10: Schedule Comparison

Learning Objective: In this Chapter, you will be familiar in comparing the


Project schedules.

Topics:

➢ Importance of Schedule Comparison


➢ Visualizer Tool
➢ Comparing different version of projects
➢ Comparing different version of baselines
➢ Comparison general and advanced options in P6

Hands-on Practicals:

➢ Creating new comparison

www.credosystemz.com
➢ Creating new comparison report version using existing version
and opening the existing application version
➢ Analyzing the comparison report

Section 11: Reflections

Learning Objective: In this Chapter, you will be familiar in creating


reflections.

Topics:

➢ Copying Project and Reflections


➢ Difference between Project Copying and reflection
➢ Merging the changes to Source Project

Hands-on Practicals:

➢ Create reflection of existing project and make changes in the


copy
➢ Merging the changed version to the source

Section 12: Reporting

Learning Objective: In this Chapter, you will be familiar in working with


all types of reports in P6

Topics:

➢ Default Reports
➢ Global Reports
➢ Project reports
➢ Creating Report groups
➢ Creating Reports using Report Editor
➢ Creating Reports using Report Wizard
➢ Template Reporting
➢ Modifying existing reports
➢ Batch Reports – Creating and Running Batch Reports

www.credosystemz.com
➢ Procurement Report
➢ Project Progress Report
➢ Schedule Comparison Report
➢ Weekly Report
➢ Project Cost Report
➢ Project Closing Report
➢ Client Report

Hands-on Practicals:

➢ Creating reports using both Report editor and Wizard


➢ Utilizing the default reports
➢ Customizing any type of report
➢ Creating and executing batch reports
➢ Generating reports in different file formats

Section 13: Other Important Features

Learning Objective: In this Chapter, you will be familiar in all important


P6 tool features.

Topics:

➢ Managing Multiple Projects


➢ Project Work Products & Documents
➢ Creating Layouts and Maintaining layouts
➢ User Defined Fields
➢ Global Change
➢ Store Period Performances
➢ Recalculate Assignment Cost
➢ Import & Export the project data

www.credosystemz.com
Hands-on Practicals

➢ Global change usage in Calendar, Activity codes and Status


indicators.
➢ Creating and saving Layouts for Cost, Baseline, Earned Value
etc
➢ Import and Export for single and multiple projects

Section 14: Projects

Topics:

➢ Commercial Building Planning loaded with 50+ Activities


➢ Residential Building - Villa Type
➢ Residential Building - Apartment Type
➢ Bridge Construction
➢ Power Plant Construction
➢ Maintenance of Oil & Gas Plant

www.credosystemz.com

You might also like