PS Template Activity Relationship

This Gantt chart outlines the timeline for a project from May 22nd to June 27th. It involves 56 tasks related to designing, purchasing, producing, assembling, installing and commissioning a machine. Key milestones include receiving the letter of intent and purchase order on May 25th, advancing payment on May 31st, mechanical and electrical design approval from May 27-31, purchasing and receiving parts from June 1-2, assembly from June 3-14, machine dispatch from June 15-17, installation and commissioning from June 16-24, and warranty on June 27th. The critical path runs through design, purchasing, assembly, installation and commissioning.

Uploaded by

Tushar Kohinkar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views1 page

PS Template Activity Relationship

This Gantt chart outlines the timeline for a project from May 22nd to June 27th. It involves 56 tasks related to designing, purchasing, producing, assembling, installing and commissioning a machine. Key milestones include receiving the letter of intent and purchase order on May 25th, advancing payment on May 31st, mechanical and electrical design approval from May 27-31, purchasing and receiving parts from June 1-2, assembly from June 3-14, machine dispatch from June 15-17, installation and commissioning from June 16-24, and warranty on June 27th. The critical path runs through design, purchasing, assembly, installation and commissioning.

Uploaded by

Tushar Kohinkar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ID TaskTask Name Duration Start Finish Predecessors

May 22, '22 May 29, '22 Jun 5, '22 Jun 12, '22 Jun 19, '22 Jun 26, '22
Mode M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T
1 PS Templete 24 days Wed 5/25/22 Mon 6/27/22
2 LOI Receipt 0 days Wed 5/25/22 Wed 5/25/22 5/25

3 PO Receipt 0 days Wed 5/25/22 Wed 5/25/22 2 5/25

4 Project kick off 0 days Wed 5/25/22 Wed 5/25/22 3 5/25

5 Input data to start Design 0 days Wed 5/25/22 Wed 5/25/22 3 5/25

6 Advance Against PO / ABG 30% 0 days Tue 5/31/22 Tue 5/31/22 3FS+1 wk 5/31

7 FEASIBILITY STUDY / PRAPOSAL STUDY 1 day Wed 5/25/22 Wed 5/25/22 2SS
8 DAP 5 days Wed 5/25/22 Tue 5/31/22
9 DAP MECHANICAL 5 days Wed 5/25/22 Tue 5/31/22
10 Machine Concept Preparation 1 day Wed 5/25/22 Wed 5/25/22 5
11 Design Mech 1 day Thu 5/26/22 Thu 5/26/22 10
12 Mechanical Design Approval 1 day Fri 5/27/22 Fri 5/27/22 11
13 Mech 3D design 1 day Mon 5/30/22 Mon 5/30/22 12
14 Mech detailing & Drawings release for mfg 1 day Tue 5/31/22 Tue 5/31/22 13
15 DAP ELECT. CONTROL 3 days Thu 5/26/22 Mon 5/30/22
16 Electrical Control Design 1 day Thu 5/26/22 Thu 5/26/22 10
17 Electrical Design Approval 1 day Fri 5/27/22 Fri 5/27/22 16
18 Elect. Control release for execution 1 day Mon 5/30/22 Mon 5/30/22 17
19 PURCHASE AND PRODUCTION 4 days Wed 6/1/22 Mon 6/6/22
20 Mechanical CBO ordering 1 day Wed 6/1/22 Wed 6/1/22 13,6
21 Mechanical CBO Receipt 1 day Thu 6/2/22 Thu 6/2/22 20
22 Electrical CBO ordering 1 day Wed 6/1/22 Wed 6/1/22 17,6
23 Electrical CBO receipt 1 day Thu 6/2/22 Thu 6/2/22 22
24 Std Bought Out items Ordering 1 day Wed 6/1/22 Wed 6/1/22 14
25 Std Bought out items receipt 1 day Thu 6/2/22 Thu 6/2/22 24
26 Manufacturing Parts Ordering 1 day Wed 6/1/22 Wed 6/1/22 14
27 Manufacturing receipt 1 day Thu 6/2/22 Thu 6/2/22 26
28 INHOUSE PRODUCTION 2 days Wed 6/1/22 Thu 6/2/22
29 Mechanical parts mfg Inhouse 1 day Wed 6/1/22 Wed 6/1/22 14
30 Mechanical parts mfg Receipt 1 day Thu 6/2/22 Thu 6/2/22 29
31 INSPECTION /QUALITY 2 days Fri 6/3/22 Mon 6/6/22
32 Manufacturing Part Inspection 1 day Fri 6/3/22 Fri 6/3/22 27
33 Tooling fitments check 1 day Mon 6/6/22 Mon 6/6/22 32
34 ASSEMBLY MECH., ELECT., AND INHOUSE 8 days Fri 6/3/22 Tue 6/14/22
35 Fixture/Tooling / Mech. Assembly 1 day Tue 6/7/22 Tue 6/7/22 21,23,25,27,30,33
36 Electrical Control Panal Wiring 1 day Fri 6/3/22 Fri 6/3/22 23
37 Electrical Parts Assembly 1 day Mon 6/6/22 Mon 6/6/22 36
38 Field Wiring 1 day Wed 6/8/22 Wed 6/8/22 35
39 Integration & Testing 1 day Thu 6/9/22 Thu 6/9/22 38
40 Machine Auto testing & Validation 1 day Fri 6/10/22 Fri 6/10/22 39
41 Customer Inspection / MQ1 1 day Mon 6/13/22 Mon 6/13/22 40
42 Snag Points Completion 1 day Tue 6/14/22 Tue 6/14/22 41
43 M/C DISPATCH 3 days Wed 6/15/22 Fri 6/17/22
44 Machine Packing 1 day Wed 6/15/22 Wed 6/15/22 42
45 Transportation 1 day Thu 6/16/22 Thu 6/16/22 44
46 Unboxing 1 day Fri 6/17/22 Fri 6/17/22 45
47 INSTALLATION AND COMMISSIONING 7 days Thu 6/16/22 Fri 6/24/22
48 Team Travelling / Staff Welfare 1 day Thu 6/16/22 Thu 6/16/22 45SS
49 Machine Positioning in layout 1 day Mon 6/20/22 Mon 6/20/22 46
50 Machine Alignments 1 day Tue 6/21/22 Tue 6/21/22 49
51 Machine wiring and Power ON 1 day Wed 6/22/22 Wed 6/22/22 50
52 Machine Auto Trails/ MQ2 1 day Thu 6/23/22 Thu 6/23/22 51
53 1 day
Machine Production Trails / Handover to Production Fri 6/24/22 Fri 6/24/22 52
54 MACHINE WARRANTY 1 day Mon 6/27/22 Mon 6/27/22
55 FOC against wear out / breakdown 1 day Mon 6/27/22 Mon 6/27/22 53
56 Visits 1 day Mon 6/27/22 Mon 6/27/22 55SS

Task Summary External Milestone Inactive Summary Manual Summary Rollup Finish-only Manual Progress
Project: msproj11
Date: Wed 5/25/22 Split Project Summary Inactive Task Manual Task Manual Summary Deadline
Milestone External Tasks Inactive Milestone Duration-only Start-only Progress

Page 1