A 16 DIMM per CPU configuration runs warmer, so the bits will move faster.
More memory is always better.
A 12 DIMM per CPU configuration decreases the memory clock speed by 25%.
Incorrect! Please review the course content and try again.
(0/1) Points
2. The X9-2L can support 12 NVMe SFF drives. Which one of the following needs to
be installed to support all 12 of these drives?
Retimer card (*)
PCIe Switch card
Vail SAS RAID controller
ROT card
Incorrect! Please review the course content and try again.
(0/1) Points
3. Which one of the following OS versions is NOT supported by X9-2(L) servers?
Oracle Solaris 11.4
Windows Server 2016
Oracle Linux 8.2 (*)
Oracle Linux 7.9
Incorrect! Please review the course content and try again.
(0/1) Points
4. How many DIMMs per CPU do X9-2(L) systems support?
8
12
16 (*)
24
Incorrect! Please review the course content and try again.
(0/1) Points
5. Select the best option to complete the following: The X9 servers support _____
which provides _____ when compared to the previous version used in X7/X8 servers.
PCIe Gen4 / double the data rate (*)
PCIe Gen4 / double the PCIe lanes
PCIe Gen3 / double the fun
PCIe Gen3 / double the clock speed
Incorrect! Please review the course content and try again.
6. The X9-2L server has 10 PCIe slots for expansion. How many of these are x16
mechanical slots?
2
3
4 (*)
6
Correct !
(1/1) Points
7. Which one of the following does the server use to prevent over-temperature
when main power is off?
The Force
PSU Fans (*)
Rear Chassis Fans
System Fans
Incorrect! Please review the course content and try again.
(0/1) Points
8. Among the many changes and improvements that were made to UBOOT
diagnostics, the redesigned diagnostic interface is the most notable.
True
False (*)
Correct !
(1/1) Points
9. If a ROT card is installed in an X9-2L server, how many PCIe slots are left for use
by other cards?
9
8
11
10 (*)
Incorrect! Please review the course content and try again.
(0/1) Points
10. PCIe Hot-Plug is only supported on X9-2L servers if it is properly enabled in the
BIOS Setup
True (*)
False
Correct !
(1/1) Points
Previous
11. To how many bits per second is the X9 server's default Baud rate for ILOM serial
connection now set?
38400
9600
115200 (*)
19200
Incorrect! Please review the course content and try again.
(0/1) Points
12. The X9-2 server supports either 4 SAS drives or 4 NVME drives
True
False (*)
Incorrect! Please review the course content and try again.
(0/1) Points
13. Which one of the following statements is NOT correct about VROC (Virtual raid
on chip) on X9?
VROC supports both RAID 0 and 1 configurations
VROC supports up to 4 SAS drives (*)
VROC supports both M.2 SATA and NVMe
VROC allows for booting from a RAID 1 volume
Correct !
(1/1) Points
14. When upgrading a server by installing the Optional Motherboard Integrated CX5
at a customer site, which one of the following is required?
Installation of the PCIe data cable included in the ship kit
A driver with a T30 Torx bit
A Phillips #2 driver
None of the above, as this is configuration is not supported (*)
Incorrect! Please review the course content and try again.
(0/1) Points
15. The X9-2 server will support internal SAS drives only if the internal HBA slot 4 is
populated by a Vail raid controller.
True
False (*)
Incorrect! Please review the course content and try again.
(0/1) Points
Previous Page 3 of
16. Which one of the following options describes how the number of active CPU
cores used by the host can be configured?
Inserting jumpers on the system board according to the chart shown in apendix C
of the Service Manual
Setting the active cores value in the "Advanced - Processor Configration" section of
the BIOS (*)
Setting the active cores value in the "Main - CPU Adjustables" section of the BIOS
21. What should you do if you believe you have found an error in an EIS checklist?
Submit your concerns to My Oracle Support
Follow the feedback method on the last page of every checklist: email SUPPORT-
[email protected] (*)
Assume that the EIS team is already aware and the next version of the checklist will
be updated
Email Larry Ellison and recommend changes
Incorrect! Please review the course content and try again.
(0/1) Points
22. Who is involved in the Project Initiation phase?
(Choose all correct answers)
Storage (*)
ERP applications
OS and Cluster-related Software (*)
Servers (*)
Switches (*)
Engineered Systems (*)
Oracle Fusion Middleware
Incorrect! Please review the course content and try again.
(0/1) Points
25. You are assigned to an installation project in France in February to install 5 new
SPARC T5 servers. The servers, in their original packaging, are sitting in the
customer’s loading dock with a temperature of 8 degrees C (46 degrees F). The
customer’s data center is 20 degrees C (68 degrees F). What is the recommended
next step in acclimating these systems?
Move the systems (still packed) into the data center
Unpack the servers and store in the data center
Unpack the servers and store in the loading dock
Move the systems (still packed) into a room with a similar environment to the data
center (*)
Incorrect! Please review the course content and try again.
(0/1) Points
Previous
26. What are three factors that influence how long a system (server, storage,
engineered system) will require to be acclimatized after delivery to a customer,
before power can be applied without causing damage?
(Choose all correct answers)
temperature (*)
data center space
cleanliness (*)
humidity (*)
timezone
Incorrect! Please review the course content and try again.
(0/1) Points
27. Why it is important to do Installation planning, rather than just asking the
customer as you work through the installation process? (Select three)
(Choose all correct answers)
Continuing interruptions can detract from the professionalism of your work, and
lead to customer dissatisfaction (*)
Pricing for Installation Services is less expensive if planning in not included
Support Services will not engage on services requests if no installation planning was
done
Planning leads to more thoughtful consideration for a predictable outcome of the
installation process (*)
Customer technical contact may not be readily available (*)
Incorrect! Please review the course content and try again.
(0/1) Points
28. What are Oracle Standard System Installations (OSSI)?
Advanced professional services offered by IBM Global Services
Installation Services sold by 3rd party service providers
Field Delivery Support Services offered through certified partners
Installation Services sold by Oracle Advanced Customer Support (*)
Incorrect! Please review the course content and try again.
(0/1) Points
29. What if the customer has their own labeling methodology that differs from the
recommended one from EIS?
Submit a Service Request for Oracle approval on use of the customer labeling and
routing methods
Follow the customer's standard for cable labeling provided it meets with EIS
requirements for identification and port location. (*)
Ignore the customer’s standard and use the EIS standard
Redo cabling throughout the datacenter to meet the EIS standard
Correct!
(1/1) Points
30. Which four objectives are primary goals for an EIS Site Audit?
(Choose all correct answers)
Determine the environmental conditions at Customer's site including temperature,
humidity, cleanliness and such other assessments as are determined to be
necessary in Oracle's sole discretion (*)
Determine how frequently system backups will be completed
Determine the availability of required electrical power to run and maintain the
System (*)
Determine installation needs for the System, including such assessments as: the
suitability of access routes to the installation location, such as doors, elevators,
floor strengths and ramps (*)
Determine the floor weight load capacity at the location where the System will be
installed (*)
Determine how many logical domains need to be configured on the system
Incorrect! Please review the course content and try again.
(0/1) Points
Previous
EIS deliverables are used as a last step in the installation process to ensure the
installer provided everything that is required
EIS deliverables are included in the Oracle system shipping and packaging
documents near the start of an installation
EIS deliverables are an interim checklist to ensure that at the mid-way point of an
installation the project remains on track.
Incorrect! Please review the course content and try again.
(0/1) Points
32. What tasks occur during the operational handover phase of the EIS
methodology?
(Choose all correct answers)
Provide the customer the 20% installation service rebate that is required after a
successful installation
Collate the EISdocV4 documents pertaining to this customer installation, and
product documentation for handover (*)
Obtain customer signatures to successful close project
Document the serial number for the system(s) installed, as well as any comments
pertaining to the installation (*)
Incorrect! Please review the course content and try again.
(0/1) Points
33. Which two EIS documents are most useful during the Installation and
Configuration of Oracle Hardware and Software step?
(Choose all correct answers)
For ease of maintenance it should be unambiguously clear from the label on each
cable, where the cable has to be attached (*)
Labeling is not an EIS best practice
Cable routing should be done with rubber bands for ease of reconfiguration
Correct!
(1/1) Points
Previous
36. Why are EIS deliverables relevant for Partner installations too?
When partners use the EIS deliverables and submit documentation to that effect,
their customer gets a 25% discount on support
EIS deliverables provide flexibility when customers want to make ad-hoc
configuration changes
EIS deliverables describe the amount of time, materials and deliverables are in
scope for a standard installation (*)
Advanced Customer Services mandates that Partners use the EIS methodology for
installations
Correct!
(1/1) Points
37. What are the four key points covered in each test topic of the Test Procedures
Plan?
(Choose all correct answers)
41. Why should you typically complete the Installation Configuration Plan and
create your Test Procedures Plan at the same time?
As you work through the system configuration process with your customer, you
should state how you will test key items in the system’s configuration for having
been successfully completed. (*)
You should create the Test Procedures Plan after you have completed the system
installation and configuration.
Test Procedures plan is a standard document used in all generic system
installations.
Incorrect! Please review the course content and try again.
(0/1) Points
42. According to the EIS methodology, when issues are uncovered during the Site-
Audit, who should be notified?
(Choose all correct answers)
IP Address requirements
Operating System requirements
Operating Environment and Cooling requirements (*)
Facility Power requirements (*)
Access Route requirements (*)
Incorrect! Please review the course content and try again.
(0/1) Points
44. Which four documents are included as part of the Operational Handover?
(Choose all correct answers)
46. What is the mission statement for use of the Enterprise Installation Standards?
To use a methodology for support service that is from the field, created by the field
for the Field.
To drive the ongoing development and usage of Enterprise Installation Standards
(EIS), resulting in consistent, high quality, and cost effective installations that speed
time to deployment and provide the foundation for enhanced stability and
performance. (*)
To drive consistent best practices for Oracle Services field delivery
To manage communication and resolution of Services Requests in a timely and
customer-friendly manner
Correct!
(1/1) Points
47. Which three statements are true about EIS?
(Choose all correct answers)
EIS evolved from the field, is sustained by those closely involved with the field, and
is intended to assist the field (*)
EIS is a quick and dirty process for expediting Oracle system installations
EIS is a methodology designed to address issues before, during and after the actual
hands-on installation of Oracle systems (*)
EIS stands for “Enterprise Installation Standards” (*)
EIS stands for “Enterprise information Standards”
Incorrect! Please review the course content and try again.
(0/1) Points
48. Assuming a SPARC T5 Server installation on which you install Solaris 11, what
EIS documentation, at a minimum, is it recommended that you bring to support you
in the installation project?
(Choose all correct answers)
If the temperature is below 60 degrees F., warm the room first before power ON
If modifications involved any power supplies, distribution units or wiring, did
qualified personnel verify that the modification was was correct and did they test
the system to ensure that it doesn't pose any safety hazard? (*)
If qualified personnel did not test the safety of the modified system then proper
testing should be requested before Oracle and/or partner personnel will work on
the equipment (*)
Check whether the modification involved any power supplies, distribution units or
wiring? (*)
Determine whether the local electrician can support the installation process
Incorrect! Please review the course content and try again.
(0/1) Points
50. What two activities are accomplished during Installation Task Planning step in
the EIS Methodology?
(Choose all correct answers)
51. What should partners do before first using ESISdocV4? (Select two)
(Choose all correct answers)
Review the “EISdoc V4 Getting Started Cookbook” and “Success with EISdoc V4
Cookbook” (*)
Review the Openoffice presentation on EISdoc V4 found on the EIS Planning &
Documentation web page (*)
Submit their EIS Test Procedure Plan outcomes
Review Oracle product overview documentation
Incorrect! Please review the course content and try again.
(0/1) Points
52. Which three responses are true regarding EISdoc v4?
(Choose all correct answers)
Project Schedule
Test Procedures Plan (*)
Operational Hand-off Form
Site Audit Report (*)
Installation and Configuration Plan (*)
Acclimatization Report
Incorrect! Please review the course content and try again.
(0/1) Points
Previous
61. Name three of the problems that EIS was created to overcome?
(Choose all correct answers)
66. Why is the rate of temperature change when acclimatizing systems such an
important factor as described in the EIS methodology?
Systems should be warmed up and powered ON as quickly as possible to optimize
the installation project timeline
Variations in temperature should not exceed the approved gradient of
approximately 2° C (4° F) per hour, because ignoring this may could lead to long-
term damage (hair-cracks) on the boards (*)
Variations in temperature do not have as big an impact as do Service contract
considerations for how long an installation will take
It is actually not relevant or important
Correct!
(1/1) Points
67. What are two activities that take place during the System Test step of the EIS
methodology?
(Choose all correct answers)