The hazard analysis form ranks potential hazards for a school based on their probability and impact. Flood is ranked as the top hazard due to its high probability and large impact of causing deterioration to school properties. Tropical cyclones are the second highest risk due to potentially heavy rainfall and major flooding. Fire is third due to wiring installation issues possibly leading to high electricity consumption.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
62 views2 pages
CP Form 1
The hazard analysis form ranks potential hazards for a school based on their probability and impact. Flood is ranked as the top hazard due to its high probability and large impact of causing deterioration to school properties. Tropical cyclones are the second highest risk due to potentially heavy rainfall and major flooding. Fire is third due to wiring installation issues possibly leading to high electricity consumption.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2
CONTINGENCY PLANNING FORMS
CP Form 1: Hazard Analysis
HAZARD PROBABILITY IMPACT AVERAGE RANK
PROBABILITY + RATE REMARKS RATE REMARKS IMPACT 2 Flood 5 Flood 4 Flood caused 4.5 1 particularly huge occurs when deterioration there is a heavy to school rain properties.
Tropical Cyclone 3 When there is 4 Tropical 3.5 2
tropical cyclone cyclone in the brought heavy area heavy rainfall and flood occurs caused major floods in the area.
Fire 3 Installation of 3 High 3 3
classroom consumption of wirings. electricity Octopus during school wirings days.
Example: CP Form 1: Hazard Analysis
HAZARD PROBABILITY IMPACT AVERAGE RANK
PROBABILIT RATE REMARKS RATE REMARKS Y + IMPACT 2 Tropical Cyclone 5 Tropical cyclone and other 4 Previous tropical cyclone 4.5 1 weather disturbances brought heavy rainfall with wind frequently pass through the speed ranging from 185 kph to area 215 kph. The tropical cyclone caused major floods in the area. Earthquake 4 Area is proximal to a fault line. 4 Last major earthquake resulted to 4 2 30 deaths and 500 injuries. The area has been isolated for 24 hours. Fire 3 Some houses in the area are 3 There are available fire engines 3 4 made of light materials prone with firefighters who can readily to fire outbreaks. suppress fire outbreaks. Landslide 3 Some areas are declared as 2 Structural interventions to 2.5 5 landslide prone. prevent landslides are in place. Armed Conflict Situation 4 Based on intelligence reports, 3 Security measures are in place. 3.5 3 there is the presence of armed The Crisis Management rebel groups in the area. Committee is organized.