Complete Report - N-1 - TF Outage
Complete Report - N-1 - TF Outage
Complete Report - N-1 - TF Outage
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Transformer Impedance: Yes Individual
Apply Individual
Temperature Correction Adjustments /Global Degree C
Transmission Line Resistance: Yes Individual
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
AMPANG PARK LV1 0.400 2 100.0 0.0 1.363 0.845 0.341 0.211
AMPANG PARK LV2 0.400 2 100.0 0.0 0.873 0.541 0.218 0.135
BANDAR MSIA NORTH LV1 0.400 2 100.0 0.0 0.750 0.465 0.188 0.116
BANDAR MSIA NORTH LV2 0.400 2 100.0 0.0 0.568 0.352 0.142 0.088
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
CHAN SOW LINE LV1 0.400 2 100.0 0.0 0.994 0.616 0.249 0.154
CHAN SOW LINE LV2 0.400 2 100.0 0.0 1.004 0.622 0.251 0.156
DAMANSARA DAMAI LV1 0.400 4 100.0 0.0 0.680 0.421 0.170 0.105
EQUINE PARK LV1 0.400 8 100.0 0.0 0.680 0.421 0.170 0.105
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
KEPONG BARU LV1 0.400 4 100.0 0.0 0.680 0.421 0.170 0.105
KLCC EAST LV1 0.400 2 100.0 0.0 0.827 0.512 0.207 0.128
KLCC EAST LV2 0.400 2 100.0 0.0 1.124 0.697 0.281 0.174
Metro Prima LV1 0.400 4 100.0 0.0 0.510 0.316 0.128 0.079
PUTRAJAYA CENTRAL LV1 0.400 8 100.0 0.0 0.680 0.421 0.170 0.105
Project: ETAP Page: 8
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
SENTUL WEST UG LV1 0.400 4 100.0 0.0 1.189 0.737 0.297 0.184
SENTUL WEST UG LV2 0.400 4 100.0 0.0 0.871 0.540 0.218 0.135
SERDANG RAYA SOUTH LV1 0.400 8 100.0 0.0 0.680 0.421 0.170 0.105
SRI DAMAN WEST LV1 0.400 4 100.0 0.0 0.680 0.421 0.170 0.105
SRI DELIMA LV1 0.400 4 100.0 0.0 0.680 0.421 0.170 0.105
TMN PUTRA PERMAI-LV1 0.400 8 100.0 0.0 0.680 0.421 0.170 0.105
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
UPM BSS ET BUS2 0.400 8 100.0 0.0 0.054 0.034 0.082 0.051
Total Number of Buses: 470 102.756 45.275 11.866 7.354 0.000 0.000 0.000 0.000
0.000 0.000
Project: ETAP Page: 17
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Line/Cable Length
Line/Cable Length
37. UB15 SB - TPSS16 SB 33NCUN1 800 1259.5 10.0 1 75 0.021078 0.102000 0.0000350
38. TPSS12 NB- UB11 NB 33NCUN1 800 1449.8 10.0 1 75 0.021078 0.102000 0.0000350
39. UB11 NB - UB12 NB 33NCUN1 800 596.2 10.0 1 75 0.021078 0.102000 0.0000350
40. UB12 NB - TPSS13 NB 33NCUN1 800 941.6 10.0 1 75 0.021078 0.102000 0.0000350
41. TPSS13 NB - UB 13 NB 33NCUN1 800 948.2 10.0 1 75 0.021078 0.102000 0.0000350
42. UB13NB - TPSS14SB 33NCUN1 800 642.4 10.0 1 75 0.021078 0.102000 0.0000350
43. TPSS14NB - UB14SB 33NCUN1 800 1064.8 10.0 1 75 0.021078 0.102000 0.0000350
44. UB14-NB TPSS15-SB 33NCUN1 800 849.2 10.0 1 75 0.021078 0.102000 0.0000350
45. TPSS15-NB UB15-SB 33NCUN1 800 1237.5 10.0 1 75 0.021078 0.102000 0.0000350
46. UB15 NB - TPSS16 NB 33NCUN1 800 1259.5 10.0 1 75 0.021078 0.102000 0.0000350
47. BSS2 - TPSS16 SB 33NCUN1 800 2552.0 10.0 1 75 0.021078 0.102000 0.0000350
48. BSS2 - TPSS16 NB 33NCUN1 800 2332.0 10.0 1 75 0.021078 0.102000 0.0000350
49. BSS2 - TPSS17 33NCUS1 300 365.2 10.0 1 75 0.074871 0.112000 0.0000848
50. BSS2 - TPSS18 33NCUS1 300 2121.9 10.0 1 75 0.074871 0.112000 0.0000848
51. TPSS 17 - TPSS 19 33NCUS1 300 3929.2 10.0 1 75 0.074871 0.112000 0.0000848
52. TPSS 18 - TPSS19 33NCUS1 300 2172.5 10.0 1 75 0.074871 0.112000 0.0000848
53. TPSS 19 - UB 16 33NCUS1 300 1433.3 10.0 1 75 0.074871 0.112000 0.0000848
55. TPSS20 - UB 17 33NCUS1 300 1923.9 10.0 1 75 0.074871 0.112000 0.0000848
56. TPSS 20 - TPSS 21 33NCUS1 300 2883.1 10.0 1 75 0.074871 0.112000 0.0000848
57. UB17 - UB18 33NCUS1 300 3109.7 10.0 1 75 0.074871 0.112000 0.0000848
58. TPSS21 - BSS3 33NCUS1 300 2340.8 10.0 1 75 0.074871 0.112000 0.0000848
59. UB18 - BSS3 33NCUS1 300 344.3 10.0 1 75 0.074871 0.112000 0.0000848
61. BSS3 - TPSS22 33NCUN1 800 236.5 10.0 1 75 0.021078 0.102000 0.0000350
62. BSS3 - TPSS23 33NCUN1 800 2748.9 10.0 1 75 0.021078 0.102000 0.0000350
63. TPSS22 - UB 19 33NCUN1 800 5028.1 10.0 1 75 0.021078 0.102000 0.0000350
64. TPSS 23 - TPSS 24 33NCUN1 800 2960.1 10.0 1 75 0.021078 0.102000 0.0000350
65. UB19 - UB20 33NCUN1 800 1956.9 10.0 1 75 0.021078 0.102000 0.0000350
66. TPSS 24 - TPSS 25 33NCUN1 800 1773.2 10.0 1 75 0.021078 0.102000 0.0000350
67. UB20 - TPSS26 33NCUN1 800 2627.9 10.0 1 75 0.021078 0.102000 0.0000350
68. TPSS 25-TPSS 27 33NCUN1 800 4580.4 10.0 1 75 0.021078 0.102000 0.0000350
69. TPSS 26-TPSS 28 33NCUN1 800 3790.6 10.0 1 75 0.021078 0.102000 0.0000350
70. TPSS27 - UB 21 33NCUN1 800 2941.4 10.0 1 75 0.021078 0.102000 0.0000350
71. TPSS28 - UB 21 33NCUN1 800 1518.0 10.0 1 75 0.021078 0.102000 0.0000350
72. TPSS22- SERD 33NCUN1 800 3709.2 10.0 1 75 0.021078 0.102000 0.0000350
73. TPSS23 - TPSS SERD 33NCUN1 800 4402.2 10.0 1 75 0.021078 0.102000 0.0000350
74. TPSS23 - TMUNI 33NCUN1 800 295.9 10.0 1 75 0.021078 0.102000 0.0000350
Project: ETAP Page: 19
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Line/Cable Length
75. TMUNI - UB19 33NCUN1 800 2373.8 10.0 1 75 0.021078 0.102000 0.0000350
Line/Cable Length
TPSS SRDG T4 LV CABLE 1.0MCUN1 630 22.0 10.0 4 75 0.040059 0.086000 0.0002023
TPSS SRDG T5 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS SRDG T5 LV CABLE 1.0MCUN1 630 22.0 10.0 2 75 0.040059 0.086000 0.0002023
TPSS SRDG T6 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS SRDG T6 LV CABLE 1.0MCUN1 630 22.0 10.0 1 75 0.040059 0.086000 0.0002023
TPSS SRDG T7 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS SRDG T7 LV CABLE 1.0MCUN1 630 22.0 10.0 1 75 0.040059 0.086000 0.0002023
TPSS SRDG T8 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS SRDG T8 LV CABLE 1.0MCUN1 630 22.0 10.0 1 75 0.040059 0.086000 0.0002023
TPSS SRDG TF1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS SRDG TF2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS4 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS4 LV CABLE1 1.0MCUN1 630 22.0 10.0 1 75 0.040059 0.086000 0.0002023
TPSS4 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS4 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS5 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS5 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS5 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS6 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS6 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS6 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS7 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS7 LV CABLE1 1.0MCUN1 630 22.0 10.0 1 75 0.040059 0.086000 0.0002023
TPSS7 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS7 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS8 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS8 LV CABLE1 1.0MCUN1 630 22.0 10.0 1 75 0.040059 0.086000 0.0002023
TPSS8 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS8 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS9 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS9 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS9 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS 9- KAMPUNG BATU1 1.0MCUN1 630 119.9 10.0 2 75 0.040059 0.086000 0.0002023
TPSS10 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS10 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS10 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
Project: ETAP Page: 21
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Line/Cable Length
TPSS10- JALAN IPOH1 1.0MCUN1 630 143.0 10.0 6 75 0.040059 0.086000 0.0002023
TPSS11 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS11 HV CABLE2 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS11 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS11 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS12 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS12 HV CABLE2 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS12 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS12 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS13 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS13 HV CABLE2 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS13 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS13 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS14 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS14 HV CABLE2 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS14 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS14 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS15 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS15 HV CABLE2 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS15 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS15 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS16 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS16 HV CABLE2 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS16 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS16 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS17 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS17 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS17 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS17- KUCHAI LAMA 1 1.0MCUN1 630 22.0 10.0 2 75 0.040059 0.086000 0.0002023
TPSS18 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS18 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS18 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS18- TMN NAGA EMAS 1 1.0MCUN1 630 81.4 10.0 2 75 0.040059 0.086000 0.0002023
TPSS19 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS19 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS19 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
Project: ETAP Page: 22
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Line/Cable Length
TPSS19- SUNGAI BESI 1 1.0MCUN1 630 68.2 10.0 3 75 0.040059 0.086000 0.0002023
TPSS20 HV CABLE1 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS20 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS20 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
Line/Cable Length
TPSS28 RT1 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
TPSS28 RT2 HV CABLE 33NCUS1 185 22.0 10.0 1 75 0.122083 0.121000 0.0000690
UPM BSS INC CABLE2 33NCUS1 630 110.0 10.0 2 75 0.040059 0.108000 0.0001027
UPM HV CABLE2 132NCUS1 300 220.0 10.0 1 75 0.074394 0.147000 0.0000400
UPM LV CABLE1 1.0MCUN1 630 22.0 10.0 2 75 0.040059 0.086000 0.0002023
10. UB4 - TPSS 8 33NCUS1 300 939.4 10.0 1 75 0.074871 0.112000 0.0000848
27. UB10 NB - TPSS12 SB 33NCUS1 630 724.9 10.0 1 75 0.040059 0.108000 0.0001027
60. UB18 - TPSS22 33NCUS1 300 261.8 10.0 1 75 0.074871 0.112000 0.0000848
54. UB 16 - TPSS 20 33NCUS1 300 1629.1 10.0 1 75 0.074871 0.112000 0.0000848
AMPANG PARK TF1 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
AMPANG PARK TF2 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
BANDAR MSIA NORTH TF1 3-Phase 3.150 33.000 0.433 7.00 6.00 0 0 10.0 0 0 7.7000 Dyn 0.000
BANDAR MSIA NORTH TF2 3-Phase 3.150 33.000 0.433 7.00 6.00 0 0 10.0 0 0 7.7000 Dyn 0.000
CHAN SOW LINE TF1 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
CHAN SOW LINE TF2 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
DAMANSARA DAMAI TF1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
EQUINE PARK TF1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
HKL-UG TF1 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
HKL-UG TF2 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
INTERVENTION SHAFT1-TF1 3-Phase 1.250 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
INTERVENTION SHAFT1-TF2 3-Phase 1.250 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
JINJANG BSS TF2 3-Phase 50.000 132.000 33.000 12.50 45.00 0 0 7.5 0 0 13.4375 YNd 0.000
JINJANG ET2 3-Phase 0.160 33.000 0.433 4.00 1.50 0 0 10.0 0 0 4.4000 YNd 0.000
JINJANG TF1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
KENTONMEN TF1 3-Phase 0.630 33.000 0.433 6.00 1.50 0 0 10.0 0 0 6.6000 Dyn 0.000
KENTONMEN TF3 3-Phase 0.630 33.000 0.433 6.00 1.50 0 0 10.0 0 0 6.6000 Dyn 0.000
KEPONG BARU TF1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
KLCC EAST TF1 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
KLCC EAST TF2 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
KUCHAILAMA BSS TF2 3-Phase 50.000 132.000 33.000 12.50 45.00 0 0 7.5 0 0 13.4375 YNd 0.000
KUCHAILAMA ET2 3-Phase 0.160 33.000 0.433 4.00 1.50 0 0 10.0 0 0 4.4000 YNd 0.000
Metro Prima TF1 3-Phase 0.750 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
PUTRAJAYA CENTRAL TF1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
SENTUL WEST UG TF1 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
SENTUL WEST UG TF2 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
SERDANG RAYA SOUTH TF1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
SGBD T1 3-Phase 0.500 33.000 0.433 6.00 1.50 0 0 10.0 0 0 6.6000 Dyn 0.000
SRDG ADM1 3-Phase 0.800 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
SRDG ADM2 3-Phase 0.800 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
SRDG INFWRKSHP1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
SRDG INFWRKSHP2 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
SRDG RLGSTK1 3-Phase 2.000 33.000 0.433 6.00 6.00 0 0 10.0 0 0 6.6000 Dyn 0.000
SRDG RLGSTK2 3-Phase 2.000 33.000 0.433 6.00 6.00 0 0 10.0 0 0 6.6000 Dyn 0.000
SRDG TPSS1 3-Phase 0.630 33.000 0.433 6.00 1.50 0 0 10.0 0 0 6.6000 Dyn 0.000
SRDG TPSS2 3-Phase 0.630 33.000 0.433 6.00 1.50 0 0 10.0 0 0 6.6000 Dyn 0.000
SRI DAMAN WEST TF1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
SRI DELIMA TF1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
Project: ETAP Page: 25
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
T PARK TF1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
T UNIVERSITY TF1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
TMN PUTRA PERMAI-TF1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
TPSS4-T1 3-Phase 0.160 33.000 0.433 4.00 1.50 0 0 10.0 0 0 4.4000 Dyn 0.000
TPSS5-T1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
TPSS6-T1 3-Phase 1.250 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
TPSS7-T1 3-Phase 0.160 33.000 0.433 4.00 1.50 0 0 10.0 0 0 4.4000 Dyn 0.000
TPSS8-T1 3-Phase 0.160 33.000 0.433 4.00 1.50 0 0 10.0 0 0 4.4000 Dyn 0.000
TPSS9-T1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
TPSS10-T1 3-Phase 3.000 33.000 0.433 7.00 6.00 0 0 10.0 0 0 7.7000 Dyn 0.000
TPSS11-T1 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
TPSS11-T2 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
TPSS12-T1 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
TPSS12-T2 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
TPSS13-T1 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
TPSS13-T2 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
TPSS14-T1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
TPSS14-T2 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
TPSS15-T1 3-Phase 1.250 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
TPSS15-T2 3-Phase 1.250 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
TPSS16-T1 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
TPSS16-T2 3-Phase 4.000 33.000 0.433 8.00 8.50 0 0 10.0 0 0 8.8000 Dyn 0.000
TPSS17-T1 3-Phase 1.250 33.000 0.433 6.00 3.50 0 0 10.0 -1.250 0 6.6000 Dyn 0.000
TPSS18-T1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 -2.500 0 6.6000 Dyn 0.000
TPSS19-T1 3-Phase 1.250 33.000 0.433 6.00 3.50 0 0 10.0 -1.250 0 6.6000 Dyn 0.000
TPSS20-T1 3-Phase 1.250 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
TPSS21-T1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
TPSS22-T1 3-Phase 0.160 33.000 0.433 4.00 1.50 0 0 10.0 0 0 4.4000 Dyn 0.000
TPSS23-T1 3-Phase 1.600 33.000 0.433 6.00 6.00 0 0 10.0 0 0 6.6000 Dyn 0.000
TPSS24-T1 3-Phase 0.160 33.000 0.433 4.00 1.50 0 0 10.0 0 0 4.4000 Dyn 0.000
TPSS25-T1 3-Phase 0.160 33.000 0.433 4.00 1.50 0 0 10.0 0 0 4.4000 Dyn 0.000
TPSS26-T1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
TPSS27-T1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
TPSS28-T1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
TRX TF1 3-Phase 1.500 33.000 0.433 6.00 6.00 0 0 10.0 0 0 6.6000 Dyn 0.000
TRX TF2 3-Phase 1.500 33.000 0.433 6.00 6.00 0 0 10.0 0 0 6.6000 Dyn 0.000
UPM BSS ET2 3-Phase 0.160 33.000 0.433 4.00 1.50 0 0 10.0 0 0 4.4000 YNd 0.000
UPM BSS TF2 3-Phase 40.000 132.000 33.000 12.50 45.00 0 0 7.5 0 0 13.4375 YNd 0.000
UPM TF1 3-Phase 1.000 33.000 0.433 6.00 3.50 0 0 10.0 0 0 6.6000 Dyn 0.000
Project: ETAP Page: 26
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
SGBD RT1 Primary: 3.500 33.000 0 Zps = 6.00 10.00 3.500 10.0 0 0
Secondary: 1.750 0.585 0 Zpt = 6.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
Tertiary: 1.750 0.585 0 Zst = 12.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
Secondary: 1.750 0.585 0 Zpt = 6.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
Tertiary: 1.750 0.585 0 Zst = 12.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
TPSS SRDG TF1 Primary: 3.500 33.000 0 Zps = 6.00 10.00 3.500 10.0 0 0
Secondary: 1.750 0.585 0 Zpt = 6.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
Tertiary: 1.750 0.585 0 Zst = 12.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
TPSS SRDG TF2 Primary: 3.500 33.000 0 Zps = 6.00 10.00 3.500 10.0 0 0
Secondary: 1.750 0.585 0 Zpt = 6.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
Tertiary: 1.750 0.585 0 Zst = 12.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
TPSS4 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS4 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS5 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Project: ETAP Page: 27
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
TPSS5 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS6 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS6 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS7 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS7 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS8 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS8 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS9 RT1 Primary: 3.500 33.000 0 Zps = 6.00 10.00 3.500 10.0 0 0
Secondary: 1.750 0.585 0 Zpt = 6.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
Tertiary: 1.750 0.585 0 Zst = 12.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
TPSS9 RT2 Primary: 3.500 33.000 0 Zps = 6.00 10.00 3.500 10.0 0 0
Secondary: 1.750 0.585 0 Zpt = 6.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
Tertiary: 1.750 0.585 0 Zst = 12.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
TPSS10 RT1 Primary: 3.500 33.000 0 Zps = 6.00 10.00 3.500 10.0 0 0
Secondary: 1.750 0.585 0 Zpt = 6.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
Tertiary: 1.750 0.585 0 Zst = 12.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
Project: ETAP Page: 28
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
TPSS10 RT2 Primary: 3.500 33.000 0 Zps = 6.00 10.00 3.500 10.0 0 0
Secondary: 1.750 0.585 0 Zpt = 6.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
Tertiary: 1.750 0.585 0 Zst = 12.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
TPSS11 RT1 Primary: 3.500 33.000 0 Zps = 6.00 10.00 3.500 10.0 0 0
Secondary: 1.750 0.585 0 Zpt = 6.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
Tertiary: 1.750 0.585 0 Zst = 12.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
TPSS11 RT2 Primary: 3.500 33.000 0 Zps = 6.00 10.00 3.500 10.0 0 0
Secondary: 1.750 0.585 0 Zpt = 6.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
Tertiary: 1.750 0.585 0 Zst = 12.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
TPSS12 RT1 Primary: 3.500 33.000 0 Zps = 6.00 10.00 3.500 10.0 0 0
Secondary: 1.750 0.585 0 Zpt = 6.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
Tertiary: 1.750 0.585 0 Zst = 12.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
TPSS12 RT2 Primary: 3.500 33.000 0 Zps = 6.00 10.00 3.500 10.0 0 0
Secondary: 1.750 0.585 0 Zpt = 6.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
Tertiary: 1.750 0.585 0 Zst = 12.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
TPSS13 RT1 Primary: 3.500 33.000 0 Zps = 6.00 10.00 3.500 10.0 0 0
Secondary: 1.750 0.585 0 Zpt = 6.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
Tertiary: 1.750 0.585 0 Zst = 12.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
TPSS13 RT2 Primary: 3.500 33.000 0 Zps = 6.00 10.00 3.500 10.0 0 0
Secondary: 1.750 0.585 0 Zpt = 6.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
Tertiary: 1.750 0.585 0 Zst = 12.00 10.00 3.500 10.0 Std Pos. Seq. 0.000
TPSS14 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS14 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS15 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Project: ETAP Page: 29
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
TPSS15 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS16 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS16 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS17 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS17 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS18 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS18 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS19 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS19 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS20 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Project: ETAP Page: 30
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
TPSS20 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS21 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS21 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS22 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS22 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS23 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS23 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS24 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS24 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS25 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Project: ETAP Page: 31
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
TPSS25 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS26 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS26 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS27 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS27 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS28 RT1 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
TPSS28 RT2 Primary: 2.300 33.000 0 Zps = 6.00 10.00 2.300 10.0 0 0
Secondary: 1.150 0.585 0 Zpt = 6.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Tertiary: 1.150 0.585 0 Zst = 12.00 10.00 2.300 10.0 Std Pos. Seq. 0.000
Project: ETAP Page: 32
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Branch Connections
AMPANG PARK TF1 2W XFMR AMPANG PARK1 Bus96 25.71 218.49 220.00
AMPANG PARK TF2 2W XFMR AMPANG PARK2 Bus95 25.71 218.49 220.00
BANDAR MSIA NORTH TF1 2W XFMR BANDAR MSIA NORTH1 Bus110 40.19 241.12 244.44
BANDAR MSIA NORTH TF2 2W XFMR BANDAR MSIA NORTH2 Bus109 40.19 241.12 244.44
CHAN SOW LINE TF1 2W XFMR CHAN SOW LINE1 Bus107 25.71 218.49 220.00
CHAN SOW LINE TF2 2W XFMR CHAN SOW LINE2 Bus108 25.71 218.49 220.00
DAMANSARA DAMAI TF1 2W XFMR DAMANSARA DAMAI HV1 Bus63 181.32 634.61 660.00
EQUINE PARK TF1 2W XFMR EQUINE PARK1 Bus123 181.32 634.61 660.00
HKL-UG TF1 2W XFMR HKL-UG1 Bus89 25.71 218.49 220.00
HKL-UG TF2 2W XFMR HKL-UG2 Bus90 25.71 218.49 220.00
INTERVENTION SHAFT1-TF1 2W XFMR INTERVENTION SHAFT1-1 Bus80 145.05 507.68 528.00
INTERVENTION SHAFT1-TF2 2W XFMR INTERVENTION SHAFT1-2 Bus79 145.05 507.68 528.00
JINJANG BSS TF2 2W XFMR JINJANG BSS TF HV2 JINJANG BSS TF2 SEC 0.57 25.86 25.87
JINJANG ET2 2W XFMR JINJANG BSS TF2 SEC JINJANG ET BUS2 1525.43 2288.14 2750.00
JINJANG TF1 2W XFMR JINJANG1 Bus71 181.32 634.61 660.00
KENTONMEN TF1 2W XFMR KENTONMEN1 Bus75 581.11 871.67 1047.62
KENTONMEN TF3 2W XFMR KENTONMEN2 Bus77 581.11 871.67 1047.62
KEPONG BARU TF1 2W XFMR Kepong Baru1 Bus69 181.32 634.61 660.00
KLCC EAST TF1 2W XFMR KLCC EAST1 Bus60 25.71 218.49 220.00
KLCC EAST TF2 2W XFMR KLCC EAST2 Bus61 25.71 218.49 220.00
KUCHAILAMA BSS TF2 2W XFMR KUCHAILAMA BSS TF HV2 KUCHAILAMA TF2 SEC 0.60 26.87 26.88
KUCHAILAMA ET2 2W XFMR KUCHAILAMA TF2 SEC KUCHAILAMA ET BUS2 1525.43 2288.14 2750.00
Metro Prima TF1 2W XFMR Metro Prima1 Bus67 241.75 846.14 880.00
PUTRAJAYA CENTRAL TF1 2W XFMR PUTRAJAYA CENTRAL1 Bus127 181.32 634.61 660.00
SENTUL WEST UG TF1 2W XFMR SENTUL WEST UG1 Bus87 25.71 218.49 220.00
SENTUL WEST UG TF2 2W XFMR SENTUL WEST UG2 Bus88 25.71 218.49 220.00
SERDANG RAYA SOUTH TF1 2W XFMR SERDANG RAYA SOUTH1 Bus117 181.32 634.61 660.00
SGBD T1 2W XFMR SGBD B2 Bus181 732.20 1098.31 1320.00
SRDG ADM1 2W XFMR Bus42 Bus128 226.64 793.26 825.00
SRDG ADM2 2W XFMR Bus58 Bus134 226.64 793.26 825.00
SRDG INFWRKSHP1 2W XFMR Bus44 Bus130 181.32 634.61 660.00
SRDG INFWRKSHP2 2W XFMR Bus57 Bus133 181.32 634.61 660.00
SRDG RLGSTK1 2W XFMR Bus55 Bus131 54.25 325.51 330.00
SRDG RLGSTK2 2W XFMR Bus56 Bus132 54.25 325.51 330.00
SRDG TPSS1 2W XFMR Bus2 Bus129 581.11 871.67 1047.62
SRDG TPSS2 2W XFMR Bus59 Bus135 581.11 871.67 1047.62
Project: ETAP Page: 33
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
SRI DAMAN WEST TF1 2W XFMR SRI DAMAN WEST HV1 Bus65 181.32 634.61 660.00
SRI DELIMA TF1 2W XFMR SRI DELIMA1 Bus74 181.32 634.61 660.00
T PARK TF1 2W XFMR T PARK1 Bus83 181.32 634.61 660.00
T UNIVERSITY TF1 2W XFMR T UNIVERSITY1 Bus120 181.32 634.61 660.00
TMN PUTRA PERMAI-TF1 2W XFMR TMN PUTRA PERMAI-1 Bus124 181.32 634.61 660.00
TPSS4-T1 2W XFMR Bus3 Bus85 1525.43 2288.14 2750.00
TPSS5-T1 2W XFMR Bus5 Bus82 181.32 634.61 660.00
TPSS6-T1 2W XFMR Bus7 Bus99 145.05 507.68 528.00
TPSS7-T1 2W XFMR Bus9 Bus91 1525.43 2288.14 2750.00
TPSS8-T1 2W XFMR Bus11 Bus93 1525.43 2288.14 2750.00
TPSS9-T1 2W XFMR Bus13 Bus101 181.32 634.61 660.00
TPSS10-T1 2W XFMR Bus15 Bus103 42.20 253.17 256.67
TPSS11-T1 2W XFMR Bus17 Bus106 25.71 218.49 220.00
TPSS11-T2 2W XFMR Bus18 TPSS11-LV2 25.71 218.49 220.00
TPSS12-T1 2W XFMR Bus19 Bus111 25.71 218.49 220.00
TPSS12-T2 2W XFMR Bus20 Bus112 25.71 218.49 220.00
TPSS13-T1 2W XFMR Bus21 Bus113 25.71 218.49 220.00
TPSS13-T2 2W XFMR Bus22 Bus114 25.71 218.49 220.00
TPSS14-T1 2W XFMR Bus23 Bus115 181.32 634.61 660.00
TPSS14-T2 2W XFMR Bus24 Bus136 181.32 634.61 660.00
TPSS15-T1 2W XFMR Bus25 Bus137 145.05 507.68 528.00
TPSS15-T2 2W XFMR Bus26 Bus138 145.05 507.68 528.00
TPSS16-T1 2W XFMR Bus27 Bus145 25.71 218.49 220.00
TPSS16-T2 2W XFMR Bus28 Bus146 25.71 218.49 220.00
TPSS17-T1 2W XFMR Bus29 Bus147 143.24 501.34 521.40
TPSS18-T1 2W XFMR Bus31 Bus149 176.78 618.74 643.50
TPSS19-T1 2W XFMR Bus33 Bus151 143.24 501.34 521.40
TPSS20-T1 2W XFMR Bus35 Bus153 145.05 507.68 528.00
TPSS21-T1 2W XFMR Bus37 Bus155 181.32 634.61 660.00
TPSS22-T1 2W XFMR Bus39 Bus139 1525.43 2288.14 2750.00
TPSS23-T1 2W XFMR Bus41 Bus157 67.81 406.89 412.50
TPSS24-T1 2W XFMR Bus45 Bus141 1525.43 2288.14 2750.00
TPSS25-T1 2W XFMR Bus47 Bus143 1525.43 2288.14 2750.00
TPSS26-T1 2W XFMR Bus49 Bus159 181.32 634.61 660.00
TPSS27-T1 2W XFMR Bus51 Bus161 181.32 634.61 660.00
TPSS28-T1 2W XFMR Bus53 Bus163 181.32 634.61 660.00
TRX TF1 2W XFMR TRX1 Bus97 72.34 434.01 440.00
TRX TF2 2W XFMR TRX2 Bus98 72.34 434.01 440.00
UPM BSS ET2 2W XFMR UPM BSS TF2 SEC UPM BSS ET BUS2 1525.43 2288.14 2750.00
Project: ETAP Page: 34
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
UPM BSS TF2 2W XFMR UPM BSS TF HV2 UPM BSS TF2 SEC 0.75 33.59 33.59
UPM TF1 2W XFMR UPM1 Bus118 181.32 634.61 660.00
SGBD RT1 3W Xfmr SGBD B1 SGBD RT1 LV1 18.76 187.64 188.57
3W Xfmr SGBD B1 SGBD RT1 LV2 18.76 187.64 188.57
3W Xfmr SGBD RT1 LV1 SGBD RT1 LV2
SGBD T2 3W Xfmr SGBD B3 SGBD RT2 LV1 18.76 187.64 188.57
3W Xfmr SGBD B3 SGBD RT2 LV2 18.76 187.64 188.57
3W Xfmr SGBD RT2 LV1 SGBD RT2 LV2
TPSS SRDG TF1 3W Xfmr Bus1 TPSS SRDG TF1 LV1 18.76 187.64 188.57
3W Xfmr Bus1 TPSS SRDG TF1 LV2 18.76 187.64 188.57
3W Xfmr TPSS SRDG TF1 LV1 TPSS SRDG TF1 LV2
TPSS SRDG TF2 3W Xfmr Bus62 TPSS SRDG TF2 LV1 18.76 187.64 188.57
3W Xfmr Bus62 TPSS SRDG TF2 LV2 18.76 187.64 188.57
3W Xfmr TPSS SRDG TF2 LV1 TPSS SRDG TF2 LV2
TPSS4 RT1 3W Xfmr TPSS4 RT1 Primary TPSS4 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS4 RT1 Primary TPSS4 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS4 RT1 LV1 TPSS4 RT1 LV2
TPSS4 RT2 3W Xfmr TPSS4 RT2 Primary TPSS4 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS4 RT2 Primary TPSS4 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS4 RT2 LV1 TPSS4 RT2 LV2
TPSS5 RT1 3W Xfmr TPSS5 RT1 Primary TPSS5 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS5 RT1 Primary TPSS5 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS5 RT1 LV1 TPSS5 RT1 LV2
TPSS5 RT2 3W Xfmr TPSS5 RT2 Primary TPSS5 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS5 RT2 Primary TPSS5 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS5 RT2 LV1 TPSS5 RT2 LV2
TPSS6 RT1 3W Xfmr TPSS6 RT1 Primary TPSS6 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS6 RT1 Primary TPSS6 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS6 RT1 LV1 TPSS6 RT1 LV2
TPSS6 RT2 3W Xfmr TPSS6 RT2 Primary TPSS6 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS6 RT2 Primary TPSS6 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS6 RT2 LV1 TPSS6 RT2 LV2
TPSS7 RT1 3W Xfmr TPSS7 RT1 Primary TPSS7 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS7 RT1 Primary TPSS7 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS7 RT1 LV1 TPSS7 RT1 LV2
TPSS7 RT2 3W Xfmr TPSS7 RT2 Primary TPSS7 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS7 RT2 Primary TPSS7 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS7 RT2 LV1 TPSS7 RT2 LV2
TPSS8 RT1 3W Xfmr TPSS8 RT1 Primary TPSS8 RT1 LV1 28.55 285.53 286.96
Project: ETAP Page: 35
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
3W Xfmr TPSS8 RT1 Primary TPSS8 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS8 RT1 LV1 TPSS8 RT1 LV2
TPSS8 RT2 3W Xfmr TPSS8 RT2 Primary TPSS8 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS8 RT2 Primary TPSS8 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS8 RT2 LV1 TPSS8 RT2 LV2
TPSS9 RT1 3W Xfmr TPSS9 RT1 Primary TPSS9 RT1 LV1 18.76 187.64 188.57
3W Xfmr TPSS9 RT1 Primary TPSS9 RT1 LV2 18.76 187.64 188.57
3W Xfmr TPSS9 RT1 LV1 TPSS9 RT1 LV2
TPSS9 RT2 3W Xfmr TPSS9 RT2 Primary TPSS9 RT2 LV1 18.76 187.64 188.57
3W Xfmr TPSS9 RT2 Primary TPSS9 RT2 LV2 18.76 187.64 188.57
3W Xfmr TPSS9 RT2 LV1 TPSS9 RT2 LV2
TPSS10 RT1 3W Xfmr TPSS10 RT1 Primary TPSS10 RT1 LV1 18.76 187.64 188.57
3W Xfmr TPSS10 RT1 Primary TPSS10 RT1 LV2 18.76 187.64 188.57
3W Xfmr TPSS10 RT1 LV1 TPSS10 RT1 LV2
TPSS10 RT2 3W Xfmr TPSS10 RT2 Primary TPSS10 RT2 LV1 18.76 187.64 188.57
3W Xfmr TPSS10 RT2 Primary TPSS10 RT2 LV2 18.76 187.64 188.57
3W Xfmr TPSS10 RT2 LV1 TPSS10 RT2 LV2
TPSS11 RT1 3W Xfmr TPSS11 RT1 Primary TPSS11 RT1 LV1 18.76 187.64 188.57
3W Xfmr TPSS11 RT1 Primary TPSS11 RT1 LV2 18.76 187.64 188.57
3W Xfmr TPSS11 RT1 LV1 TPSS11 RT1 LV2
TPSS11 RT2 3W Xfmr TPSS11 RT2 Primary TPSS11 RT2 LV1 18.76 187.64 188.57
3W Xfmr TPSS11 RT2 Primary TPSS11 RT2 LV2 18.76 187.64 188.57
3W Xfmr TPSS11 RT2 LV1 TPSS11 RT2 LV2
TPSS12 RT1 3W Xfmr TPSS12 RT1 Primary TPSS12 RT1 LV1 18.76 187.64 188.57
3W Xfmr TPSS12 RT1 Primary TPSS12 RT1 LV2 18.76 187.64 188.57
3W Xfmr TPSS12 RT1 LV1 TPSS12 RT1 LV2
TPSS12 RT2 3W Xfmr TPSS12 RT2 Primary TPSS12 RT2 LV1 18.76 187.64 188.57
3W Xfmr TPSS12 RT2 Primary TPSS12 RT2 LV2 18.76 187.64 188.57
3W Xfmr TPSS12 RT2 LV1 TPSS12 RT2 LV2
TPSS13 RT1 3W Xfmr TPSS13 RT1 Primary TPSS13 RT1 LV1 18.76 187.64 188.57
3W Xfmr TPSS13 RT1 Primary TPSS13 RT1 LV2 18.76 187.64 188.57
3W Xfmr TPSS13 RT1 LV1 TPSS13 RT1 LV2
TPSS13 RT2 3W Xfmr TPSS13 RT2 Primary TPSS13 RT2 LV1 18.76 187.64 188.57
3W Xfmr TPSS13 RT2 Primary TPSS13 RT2 LV2 18.76 187.64 188.57
3W Xfmr TPSS13 RT2 LV1 TPSS13 RT2 LV2
TPSS14 RT1 3W Xfmr TPSS14 RT1 Primary TPSS14 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS14 RT1 Primary TPSS14 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS14 RT1 LV1 TPSS14 RT1 LV2
TPSS14 RT2 3W Xfmr TPSS14 RT2 Primary TPSS14 RT2 LV1 28.55 285.53 286.96
Project: ETAP Page: 36
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
3W Xfmr TPSS14 RT2 Primary TPSS14 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS14 RT2 LV1 TPSS14 RT2 LV2
TPSS15 RT1 3W Xfmr TPSS15 RT1 Primary TPSS15 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS15 RT1 Primary TPSS15 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS15 RT1 LV1 TPSS15 RT1 LV2
TPSS15 RT2 3W Xfmr TPSS15 RT2 Primary TPSS15 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS15 RT2 Primary TPSS15 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS15 RT2 LV1 TPSS15 RT2 LV2
TPSS16 RT1 3W Xfmr TPSS16 RT1 Primary TPSS16 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS16 RT1 Primary TPSS16 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS16 RT1 LV1 TPSS16 RT1 LV2
TPSS16 RT2 3W Xfmr TPSS16 RT2 Primary TPSS16 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS16 RT2 Primary TPSS16 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS16 RT2 LV1 TPSS16 RT2 LV2
TPSS17 RT1 3W Xfmr TPSS17 RT1 Primary TPSS17 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS17 RT1 Primary TPSS17 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS17 RT1 LV1 TPSS17 RT1 LV2
TPSS17 RT2 3W Xfmr TPSS17 RT2 Primary TPSS17 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS17 RT2 Primary TPSS17 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS17 RT2 LV1 TPSS17 RT2 LV2
TPSS18 RT1 3W Xfmr TPSS18 RT1 Primary TPSS18 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS18 RT1 Primary TPSS18 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS18 RT1 LV1 TPSS18 RT1 LV2
TPSS18 RT2 3W Xfmr TPSS18 RT2 Primary TPSS18 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS18 RT2 Primary TPSS18 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS18 RT2 LV1 TPSS18 RT2 LV2
TPSS19 RT1 3W Xfmr TPSS19 RT1 Primary TPSS19 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS19 RT1 Primary TPSS19 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS19 RT1 LV1 TPSS19 RT1 LV2
TPSS19 RT2 3W Xfmr TPSS19 RT2 Primary TPSS19 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS19 RT2 Primary TPSS19 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS19 RT2 LV1 TPSS19 RT2 LV2
TPSS20 RT1 3W Xfmr TPSS20 RT1 Primary TPSS20 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS20 RT1 Primary TPSS20 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS20 RT1 LV1 TPSS20 RT1 LV2
TPSS20 RT2 3W Xfmr TPSS20 RT2 Primary TPSS20 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS20 RT2 Primary TPSS20 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS20 RT2 LV1 TPSS20 RT2 LV2
TPSS21 RT1 3W Xfmr TPSS21 RT1 Primary TPSS21 RT1 LV1 28.55 285.53 286.96
Project: ETAP Page: 37
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
3W Xfmr TPSS21 RT1 Primary TPSS21 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS21 RT1 LV1 TPSS21 RT1 LV2
TPSS21 RT2 3W Xfmr TPSS21 RT2 Primary TPSS21 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS21 RT2 Primary TPSS21 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS21 RT2 LV1 TPSS21 RT2 LV2
TPSS22 RT1 3W Xfmr TPSS22 RT1 Primary TPSS22 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS22 RT1 Primary TPSS22 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS22 RT1 LV1 TPSS22 RT1 LV2
TPSS22 RT2 3W Xfmr TPSS22 RT2 Primary TPSS22 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS22 RT2 Primary TPSS22 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS22 RT2 LV1 TPSS22 RT2 LV2
TPSS23 RT1 3W Xfmr TPSS23 RT1 Primary TPSS23 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS23 RT1 Primary TPSS23 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS23 RT1 LV1 TPSS23 RT1 LV2
TPSS23 RT2 3W Xfmr TPSS23 RT2 Primary TPSS23 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS23 RT2 Primary TPSS23 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS23 RT2 LV1 TPSS23 RT2 LV2
TPSS24 RT1 3W Xfmr TPSS24 RT1 Primary TPSS24 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS24 RT1 Primary TPSS24 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS24 RT1 LV1 TPSS24 RT1 LV2
TPSS24 RT2 3W Xfmr TPSS24 RT2 Primary TPSS24 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS24 RT2 Primary TPSS24 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS24 RT2 LV1 TPSS24 RT2 LV2
TPSS25 RT1 3W Xfmr TPSS25 RT1 Primary TPSS25 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS25 RT1 Primary TPSS25 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS25 RT1 LV1 TPSS25 RT1 LV2
TPSS25 RT2 3W Xfmr TPSS25 RT2 Primary TPSS25 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS25 RT2 Primary TPSS25 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS25 RT2 LV1 TPSS25 RT2 LV2
TPSS26 RT1 3W Xfmr TPSS26 RT1 Primary TPSS26 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS26 RT1 Primary TPSS26 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS26 RT1 LV1 TPSS26 RT1 LV2
TPSS26 RT2 3W Xfmr TPSS26 RT2 Primary TPSS26 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS26 RT2 Primary TPSS26 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS26 RT2 LV1 TPSS26 RT2 LV2
TPSS27 RT1 3W Xfmr TPSS27 RT1 Primary TPSS27 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS27 RT1 Primary TPSS27 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS27 RT1 LV1 TPSS27 RT1 LV2
TPSS27 RT2 3W Xfmr TPSS27 RT2 Primary TPSS27 RT2 LV1 28.55 285.53 286.96
Project: ETAP Page: 38
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
3W Xfmr TPSS27 RT2 Primary TPSS27 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS27 RT2 LV1 TPSS27 RT2 LV2
TPSS28 RT1 3W Xfmr TPSS28 RT1 Primary TPSS28 RT1 LV1 28.55 285.53 286.96
3W Xfmr TPSS28 RT1 Primary TPSS28 RT1 LV2 28.55 285.53 286.96
3W Xfmr TPSS28 RT1 LV1 TPSS28 RT1 LV2
TPSS28 RT2 3W Xfmr TPSS28 RT2 Primary TPSS28 RT2 LV1 28.55 285.53 286.96
3W Xfmr TPSS28 RT2 Primary TPSS28 RT2 LV2 28.55 285.53 286.96
3W Xfmr TPSS28 RT2 LV1 TPSS28 RT2 LV2
1.UB1-TPSS 4 Cable TPSS4 HV1 DAMANSARA DAMAI HV1 0.70 1.05 1.27 0.0946744
2. UB1- UB2 Cable DAMANSARA DAMAI HV2 SRI DAMAN WEST HV1 1.44 2.15 2.58 0.1929041
3. TPSS 4-TPSS 5 Cable TPSS4 HV2 TPSS5 HV1 2.03 3.03 3.65 0.2722395
4. UB2 -TPSS 6 Cable TPSS6 HV1 SRI DAMAN WEST HV2 2.19 3.27 3.94 0.2938765
5. TPSS 5- UB3 Cable TPSS5 HV2 Metro Prima1 2.39 3.57 4.30 0.3206941
6. TPSS 6-TPSS 7 Cable TPSS6 HV2 TPSS7 HV1 1.94 2.91 3.50 0.2610655
7. UB3 -UB4 Cable Metro Prima2 Kepong Baru1 0.82 1.22 1.47 0.1096069
8. TPSS7- BSS1 Cable JINJANG BSS 33kV 1 TPSS7 HV2 0.95 1.42 1.71 0.1277901
9. UB4 - BSS1 Cable JINJANG BSS 33kV 1 Kepong Baru2 0.69 1.03 1.24 0.0926427
11. BSS1 - TPSS 8 Cable JINJANG BSS 33kV 2 TPSS8 HV1 0.09 0.25 0.27 0.0285417
12. BSS1 - UB 5 Cable JINJANG BSS 33kV 2 JINJANG1 0.18 0.49 0.52 0.0547458
13. TPSS 8- UB6 Cable TPSS8 HV2 SRI DELIMA1 0.60 1.63 1.73 0.1834293
14. UB5 - TPSS 9 Cable TPSS9 HV1 JINJANG2 0.95 2.57 2.74 0.2893532
15. UB6 - UB7 SB Cable SRI DELIMA2 KENTONMEN1 1.04 2.79 2.98 0.3149423
16. UB7 1-2 Cable KENTONMEN1 KENTONMEN2 0.14 0.37 0.40 0.0418283
17. TPSS 9-TPSS 10 Cable TPSS9 HV2 TPSS10 HV1 0.97 2.61 2.79 0.2946433
18. UB7 NB- UB8 NB Cable KENTONMEN2 SENTUL WEST UG2 0.87 2.36 2.51 0.2657326
19. TPSS 10-UB8-SB Cable TPSS10 HV2 SENTUL WEST UG1 0.49 1.31 1.40 0.1477522
20. UB8-SB - TPSS11 SB Cable SENTUL WEST UG1 TPSS11 HV1 0.62 1.66 1.77 0.1869970
21. TPSS11 SB - UB9-SB Cable HKL-UG1 TPSS11 HV1 0.34 0.93 0.99 0.1048167
22. UB9 SB - UB10 SB Cable HKL-UG1 INTERVENTION SHAFT1-1 0.27 0.72 0.76 0.0808270
23. UB8-NB - TPSS11 NB Cable SENTUL WEST UG2 TPSS11 HV2 0.57 1.55 1.65 0.1746946
24. TPSS11 NB - UB9 NB Cable TPSS11 HV2 HKL-UG2 0.34 0.93 0.99 0.1048167
25. UB9 NB - UB10 NB Cable HKL-UG2 INTERVENTION SHAFT1-2 0.23 0.61 0.65 0.0685246
26. UB10 SB - UB10 NB Cable INTERVENTION SHAFT1-1 INTERVENTION SHAFT1-2 0.06 0.15 0.16 0.0172234
28. TPSS12 1-2 Cable TPSS12 HV1 TPSS12 HV2 0.05 0.25 0.25 0.0100624
29. TPSS 12 SB- UB11 SB Cable TPSS12 HV1 AMPANG PARK1 0.28 1.36 1.39 0.0552591
30. UB11 SB - UB12 SB Cable KLCC EAST1 AMPANG PARK1 0.12 0.56 0.57 0.0227242
31. UB12 SB - TPSS 13 SB Cable TPSS13 HV1 KLCC EAST1 0.18 0.88 0.90 0.0358891
32. TPSS13 SB - UB13 SB Cable TPSS13 HV1 TRX1 0.18 0.89 0.91 0.0361406
33. UB13 SB - TPSS 14 NB Cable TPSS14 HV2 TRX1 0.21 1.01 1.04 0.0412557
Project: ETAP Page: 39
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
34. TPSS14-SB UB14-NB Cable CHAN SOW LINE2 TPSS14 HV1 0.29 1.41 1.44 0.0573555
35. UB14-SB TPSS15-NB Cable CHAN SOW LINE1 TPSS15 HV2 0.25 1.21 1.23 0.0491379
36. TPSS15-SB UB15-NB Cable TPSS15 HV1 BANDAR MSIA NORTH2 0.32 1.57 1.60 0.0639379
37. UB15 SB - TPSS16 SB Cable TPSS16 HV1 BANDAR MSIA NORTH1 0.24 1.18 1.20 0.0480059
38. TPSS12 NB- UB11 NB Cable TPSS12 HV2 AMPANG PARK2 0.28 1.36 1.39 0.0552591
39. UB11 NB - UB12 NB Cable AMPANG PARK2 KLCC EAST2 0.12 0.56 0.57 0.0227242
40. UB12 NB - TPSS13 NB Cable TPSS13 HV2 KLCC EAST2 0.18 0.88 0.90 0.0358891
41. TPSS13 NB - UB 13 NB Cable TPSS13 HV2 TRX2 0.18 0.89 0.91 0.0361406
42. UB13NB - TPSS14SB Cable TRX2 TPSS14 HV1 0.12 0.60 0.61 0.0244851
43. TPSS14NB - UB14SB Cable TPSS14 HV2 CHAN SOW LINE1 0.21 1.00 1.02 0.0405849
44. UB14-NB TPSS15-SB Cable CHAN SOW LINE2 TPSS15 HV1 0.16 0.80 0.81 0.0323673
45. TPSS15-NB UB15-SB Cable TPSS15 HV2 BANDAR MSIA NORTH1 0.24 1.16 1.18 0.0471673
46. UB15 NB - TPSS16 NB Cable TPSS16 HV2 BANDAR MSIA NORTH2 0.24 1.18 1.20 0.0480059
47. BSS2 - TPSS16 SB Cable KUCHAILAMA 33kV 1 TPSS16 HV1 0.49 2.39 2.44 0.0972695
48. BSS2 - TPSS16 NB Cable KUCHAILAMA 33kV 1 TPSS16 HV2 0.45 2.18 2.23 0.0888842
49. BSS2 - TPSS17 Cable KUCHAILAMA 33kV 2 TPSS17 HV1 0.25 0.38 0.45 0.0337252
50. BSS2 - TPSS18 Cable KUCHAILAMA 33kV 2 TPSS18 HV1 1.46 2.18 2.63 0.1959515
51. TPSS 17 - TPSS 19 Cable TPSS17 HV2 TPSS19 HV1 2.70 4.04 4.86 0.3628506
52. TPSS 18 - TPSS19 Cable TPSS18 HV2 TPSS19 HV2 1.49 2.23 2.69 0.2006243
53. TPSS 19 - UB 16 Cable TPSS19 HV2 T PARK1 0.99 1.47 1.77 0.1323612
55. TPSS20 - UB 17 Cable TPSS20 HV1 SERDANG RAYA SOUTH1 1.32 1.98 2.38 0.1776668
56. TPSS 20 - TPSS 21 Cable TPSS20 HV2 TPSS21 HV1 1.98 2.97 3.57 0.2662462
57. UB17 - UB18 Cable SERDANG RAYA SOUTH2 UPM1 2.14 3.20 3.85 0.2871721
58. TPSS21 - BSS3 Cable UPM BSS 33kV 1 TPSS21 HV2 1.61 2.41 2.90 0.2161663
59. UB18 - BSS3 Cable UPM BSS 33kV 1 UPM2 0.24 0.35 0.43 0.0317951
61. BSS3 - TPSS22 Cable UPM BSS 33kV 2 TPSS22 HV1 0.05 0.22 0.23 0.0090142
62. BSS3 - TPSS23 Cable UPM BSS 33kV 2 TPSS23 HV1 0.53 2.57 2.63 0.1047743
63. TPSS22 - UB 19 Cable TPSS22 HV2 EQUINE PARK1 0.97 4.71 4.81 0.1916460
64. TPSS 23 - TPSS 24 Cable TPSS23 HV2 TPSS24 HV1 0.57 2.77 2.83 0.1128242
65. UB19 - UB20 Cable EQUINE PARK2 TMN PUTRA PERMAI-1 0.38 1.83 1.87 0.0745873
66. TPSS 24 - TPSS 25 Cable TPSS24 HV2 TPSS25 HV1 0.34 1.66 1.70 0.0675855
67. UB20 - TPSS26 Cable TPSS26 HV1 TMN PUTRA PERMAI-2 0.51 2.46 2.51 0.1001624
68. TPSS 25-TPSS 27 Cable TPSS25 HV2 TPSS27 HV1 0.89 4.29 4.38 0.1745819
69. TPSS 26-TPSS 28 Cable TPSS26 HV2 TPSS28 HV1 0.73 3.55 3.63 0.1444787
70. TPSS27 - UB 21 Cable TPSS27 HV2 PUTRAJAYA CENTRAL2 0.57 2.76 2.81 0.1121115
71. TPSS28 - UB 21 Cable TPSS28 HV2 PUTRAJAYA CENTRAL1 0.29 1.42 1.45 0.0578586
72. TPSS22- SERD Cable TPSS22 HV2 TPSS SRDG 1 0.72 3.47 3.55 0.1413762
73. TPSS23 - TPSS SERD Cable TPSS23 HV1 TPSS SRDG2 0.85 4.12 4.21 0.1677899
74. TPSS23 - TMUNI Cable TPSS23 HV2 T UNIVERSITY1 0.06 0.28 0.28 0.0112782
Project: ETAP Page: 40
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
75. TMUNI - UB19 Cable T UNIVERSITY2 EQUINE PARK1 0.46 2.22 2.27 0.0904774
DAMANSARA DAMAI LV Cable Bus63 DAMANSARA DAMAI LV1 23.50 50.46 55.66 0.0000017
CABLE1
JINJANG CABLE1 Cable Bus71 JINJANG LV1 23.50 50.46 55.66 0.0000017
JINJANG HV CABLE2 Cable JINJANG BSS 132kV2 JINJANG BSS TF HV2 0.01 0.02 0.02 0.1533312
JINJANG INC CABLE2 Cable JINJANG BSS TF2 SEC JINJANG BSS 33kV 2 0.02 0.05 0.06 0.0246049
JINJANG TF1 LV CABLE4 Cable Bus123 EQUINE PARK LV1 23.50 50.46 55.66 0.0000017
KENTONMEN LV CABLE1 Cable Bus75 KENTONMEN LV1 47.00 100.91 111.32 0.0000008
KENTONMEN LV CABLE2 Cable Bus76 KENTONMEN LV1 47.00 100.91 111.32 0.0000008
KENTONMEN LV CABLE3 Cable Bus77 KENTONMEN LV2 47.00 100.91 111.32 0.0000008
KENTONMEN LV CABLE4 Cable Bus78 KENTONMEN LV2 47.00 100.91 111.32 0.0000008
KEPONG BARU LV CABLE1 Cable Bus69 KEPONG BARU LV1 15.67 33.64 37.11 0.0000025
KUCHAILAMA HV CABLE2 Cable KUCHAILAMA BSS 132kV2 KUCHAILAMA BSS TF HV2 0.01 0.02 0.02 0.1533312
KUCHAILAMA INC CABLE2 Cable KUCHAILAMA TF2 SEC KUCHAILAMA 33kV 2 0.02 0.05 0.06 0.0246049
LM3 Cable Cable LM3 Bus SGBD 1 0.18 0.28 0.33 0.0247860
Metro Prima LV CABLE1 Cable Bus67 Metro Prima LV1 23.50 50.46 55.66 0.0000017
PUTRAJAYA CENTR LV Cable Bus127 PUTRAJAYA CENTRAL LV1 23.50 50.46 55.66 0.0000017
CABLE1
SGBD Pri RT1 Cable SGBD 1 SGBD B1 0.02 0.02 0.03 0.0016531
SGBD Pri RT2 Cable SGBD 2 SGBD B3 0.02 0.02 0.03 0.0016531
SGBD Pri T1 Cable SGBD 1 SGBD B2 0.02 0.02 0.03 0.0016531
SGBD Sec C1 Cable Bus181 SGBD T1LV 47.00 100.91 111.32 0.0000008
SRAYA SOUTH LV CABLE1 Cable Bus117 SERDANG RAYA SOUTH LV1 23.50 50.46 55.66 0.0000017
SRI DAMAN LV CABLE1 Cable Bus65 SRI DAMAN WEST LV1 23.50 50.46 55.66 0.0000017
SRI DELIMA LV CABLE1 Cable Bus74 SRI DELIMA LV1 23.50 50.46 55.66 0.0000017
T PARK LV CABLE1 Cable Bus83 T PARK LV1 23.50 50.46 55.66 0.0000017
T UNIVERSITY LV CABLE1 Cable Bus120 T UNIVERSITY LV1 23.50 50.46 55.66 0.0000017
TMN PUTRA LV CABLE1 Cable Bus124 TMN PUTRA PERMAI-LV1 23.50 50.46 55.66 0.0000017
TPSS 5- SRIDAMAN EAST1 Cable Bus82 TPSS5-LV1 62.28 133.71 147.50 0.0000044
TPSS 6- KEPONG SENTRAL1 Cable Bus99 TPSS6-LV1 170.39 365.81 403.55 0.0000121
TPSS SRDG T1 HV CABLE Cable TPSS SRDG 1 Bus2 0.02 0.02 0.03 0.0016531
TPSS SRDG T1 LV CABLE Cable Bus129 TPSS SRDG T1 LV 47.00 100.91 111.32 0.0000008
TPSS SRDG T2 HV CABLE Cable TPSS SRDG 1 Bus42 0.02 0.02 0.03 0.0016531
TPSS SRDG T2 LV CABLE Cable Bus128 TPSS SRDG T2 LV 23.50 50.46 55.66 0.0000017
TPSS SRDG T3 HV CABLE Cable TPSS SRDG 1 Bus44 0.02 0.02 0.03 0.0016531
TPSS SRDG T3 LV CABLE Cable Bus130 TPSS SRDG T3 LV 23.50 50.46 55.66 0.0000017
TPSS SRDG T4 HV CABLE Cable TPSS SRDG 1 Bus55 0.02 0.02 0.03 0.0016531
TPSS SRDG T4 LV CABLE Cable Bus131 TPSS SRDG T4 LV 11.75 25.23 27.83 0.0000033
TPSS SRDG T5 HV CABLE Cable TPSS SRDG2 Bus56 0.02 0.02 0.03 0.0016531
TPSS SRDG T5 LV CABLE Cable Bus132 TPSS SRDG T5 LV 23.50 50.46 55.66 0.0000017
Project: ETAP Page: 41
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
TPSS SRDG T6 HV CABLE Cable TPSS SRDG2 Bus57 0.02 0.02 0.03 0.0016531
TPSS SRDG T6 LV CABLE Cable Bus133 TPSS SRDG T6 LV 47.00 100.91 111.32 0.0000008
TPSS SRDG T7 HV CABLE Cable TPSS SRDG2 Bus58 0.02 0.02 0.03 0.0016531
TPSS SRDG T7 LV CABLE Cable Bus134 TPSS SRDG T7 LV 47.00 100.91 111.32 0.0000008
TPSS SRDG T8 HV CABLE Cable TPSS SRDG2 Bus59 0.02 0.02 0.03 0.0016531
TPSS SRDG T8 LV CABLE Cable Bus135 TPSS SRDG T8 LV 47.00 100.91 111.32 0.0000008
TPSS SRDG TF1 HV CABLE Cable TPSS SRDG 1 Bus1 0.02 0.02 0.03 0.0016531
TPSS SRDG TF2 HV CABLE Cable TPSS SRDG2 Bus62 0.02 0.02 0.03 0.0016531
TPSS4 HV CABLE1 Cable TPSS4 HV1 Bus3 0.02 0.02 0.03 0.0016531
TPSS4 LV CABLE1 Cable Bus85 TPSS4-LV1 47.00 100.91 111.32 0.0000008
TPSS4 RT1 HV CABLE Cable TPSS4 HV1 TPSS4 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS4 RT2 HV CABLE Cable TPSS4 HV2 TPSS4 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS5 HV CABLE1 Cable TPSS5 HV1 Bus5 0.02 0.02 0.03 0.0016531
TPSS5 RT1 HV CABLE Cable TPSS5 HV1 TPSS5 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS5 RT2 HV CABLE Cable TPSS5 HV2 TPSS5 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS6 HV CABLE1 Cable TPSS6 HV1 Bus7 0.02 0.02 0.03 0.0016531
TPSS6 RT1 HV CABLE Cable TPSS6 HV1 TPSS6 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS6 RT2 HV CABLE Cable TPSS6 HV2 TPSS6 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS7 HV CABLE1 Cable TPSS7 HV1 Bus9 0.02 0.02 0.03 0.0016531
TPSS7 LV CABLE1 Cable Bus91 TPSS7-LV1 47.00 100.91 111.32 0.0000008
TPSS7 RT1 HV CABLE Cable TPSS7 HV1 TPSS7 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS7 RT2 HV CABLE Cable TPSS7 HV2 TPSS7 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS8 HV CABLE1 Cable TPSS8 HV1 Bus11 0.02 0.02 0.03 0.0016531
TPSS8 LV CABLE1 Cable Bus93 TPSS8-LV1 47.00 100.91 111.32 0.0000008
TPSS8 RT1 HV CABLE Cable TPSS8 HV1 TPSS8 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS8 RT2 HV CABLE Cable TPSS8 HV2 TPSS8 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS9 HV CABLE1 Cable TPSS9 HV1 Bus13 0.02 0.02 0.03 0.0016531
TPSS9 RT1 HV CABLE Cable TPSS9 HV1 TPSS9 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS9 RT2 HV CABLE Cable TPSS9 HV2 TPSS9 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS 9- KAMPUNG BATU1 Cable Bus101 TPSS9-LV1 128.09 274.99 303.36 0.0000091
TPSS10 HV CABLE1 Cable TPSS10 HV1 Bus15 0.02 0.02 0.03 0.0016531
TPSS10 RT1 HV CABLE Cable TPSS10 HV1 TPSS10 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS10 RT2 HV CABLE Cable TPSS10 HV2 TPSS10 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS10- JALAN IPOH1 Cable Bus103 TPSS10-LV1 50.92 109.32 120.60 0.0000325
TPSS11 HV CABLE1 Cable TPSS11 HV1 Bus17 0.02 0.02 0.03 0.0016531
TPSS11 HV CABLE2 Cable TPSS11 HV2 Bus18 0.02 0.02 0.03 0.0016531
TPSS11 RT1 HV CABLE Cable TPSS11 HV1 TPSS11 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS11 RT2 HV CABLE Cable TPSS11 HV2 TPSS11 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS12 HV CABLE1 Cable TPSS12 HV1 Bus19 0.02 0.02 0.03 0.0016531
Project: ETAP Page: 42
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
TPSS12 HV CABLE2 Cable TPSS12 HV2 Bus20 0.02 0.02 0.03 0.0016531
TPSS12 RT1 HV CABLE Cable TPSS12 HV1 TPSS12 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS12 RT2 HV CABLE Cable TPSS12 HV2 TPSS12 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS13 HV CABLE1 Cable TPSS13 HV1 Bus21 0.02 0.02 0.03 0.0016531
TPSS13 HV CABLE2 Cable TPSS13 HV2 Bus22 0.02 0.02 0.03 0.0016531
TPSS13 RT1 HV CABLE Cable TPSS13 HV1 TPSS13 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS13 RT2 HV CABLE Cable TPSS13 HV2 TPSS13 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS14 HV CABLE1 Cable TPSS14 HV1 Bus23 0.02 0.02 0.03 0.0016531
TPSS14 HV CABLE2 Cable TPSS14 HV2 Bus24 0.02 0.02 0.03 0.0016531
TPSS14 RT1 HV CABLE Cable TPSS14 HV1 TPSS14 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS14 RT2 HV CABLE Cable TPSS14 HV2 TPSS14 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS15 HV CABLE1 Cable TPSS15 HV1 Bus25 0.02 0.02 0.03 0.0016531
TPSS15 HV CABLE2 Cable TPSS15 HV2 Bus26 0.02 0.02 0.03 0.0016531
TPSS15 RT1 HV CABLE Cable TPSS15 HV1 TPSS15 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS15 RT2 HV CABLE Cable TPSS15 HV2 TPSS15 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS16 HV CABLE1 Cable TPSS16 HV1 Bus27 0.02 0.02 0.03 0.0016531
TPSS16 HV CABLE2 Cable TPSS16 HV2 Bus28 0.02 0.02 0.03 0.0016531
TPSS16 RT1 HV CABLE Cable TPSS16 HV1 TPSS16 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS16 RT2 HV CABLE Cable TPSS16 HV2 TPSS16 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS17 HV CABLE1 Cable TPSS17 HV1 Bus29 0.02 0.02 0.03 0.0016531
TPSS17 RT1 HV CABLE Cable TPSS17 HV1 TPSS17 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS17 RT2 HV CABLE Cable TPSS17 HV2 TPSS17 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS17- KUCHAI LAMA 1 Cable Bus147 TPSS17-LV1 23.50 50.46 55.66 0.0000017
TPSS18 HV CABLE1 Cable TPSS18 HV1 Bus31 0.02 0.02 0.03 0.0016531
TPSS18 RT1 HV CABLE Cable TPSS18 HV1 TPSS18 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS18 RT2 HV CABLE Cable TPSS18 HV2 TPSS18 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS18- TMN NAGA EMAS 1 Cable Bus149 TPSS18-LV1 86.96 186.69 205.95 0.0000062
TPSS19 HV CABLE1 Cable TPSS19 HV1 Bus33 0.02 0.02 0.03 0.0016531
TPSS19 RT1 HV CABLE Cable TPSS19 HV1 TPSS19 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS19 RT2 HV CABLE Cable TPSS19 HV2 TPSS19 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS19- SUNGAI BESI 1 Cable Bus151 TPSS19-LV1 48.57 104.28 115.03 0.0000078
TPSS20 HV CABLE1 Cable TPSS20 HV1 Bus35 0.02 0.02 0.03 0.0016531
TPSS20 RT1 HV CABLE Cable TPSS20 HV1 TPSS20 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS20 RT2 HV CABLE Cable TPSS20 HV2 TPSS20 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS21- SERI KEMBANGAN1 Cable Bus155 TPSS21-LV1 74.03 158.94 175.33 0.0000053
TPSS22 HV CABLE1 Cable TPSS22 HV1 Bus39 0.02 0.02 0.03 0.0016531
TPSS22 LV CABLE1 Cable Bus139 TPSS22-LV1 47.00 100.91 111.32 0.0000008
TPSS22 RT1 HV CABLE Cable TPSS22 HV1 TPSS22 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS22 RT2 HV CABLE Cable TPSS22 HV2 TPSS22 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS23 HV CABLE1 Cable TPSS23 HV1 Bus41 0.02 0.02 0.03 0.0016531
TPSS23 RT1 HV CABLE Cable TPSS23 HV1 TPSS23 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS23 RT2 HV CABLE Cable TPSS23 HV2 TPSS23 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS23- VENT SHAFT1 Cable Bus157 TPSS23-LV1 70.51 151.37 166.98 0.0000113
TPSS24 HV CABLE1 Cable TPSS24 HV1 Bus45 0.02 0.02 0.03 0.0016531
TPSS24 LV CABLE1 Cable Bus141 TPSS24-LV1 47.00 100.91 111.32 0.0000008
TPSS24 RT1 HV CABLE Cable TPSS24 HV1 TPSS24 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS24 RT2 HV CABLE Cable TPSS24 HV2 TPSS24 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS25 HV CABLE1 Cable TPSS25 HV1 Bus47 0.02 0.02 0.03 0.0016531
TPSS25 LV CABLE1 Cable Bus143 TPSS25-LV1 47.00 100.91 111.32 0.0000008
TPSS25 RT1 HV CABLE Cable TPSS25 HV1 TPSS25 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS25 RT2 HV CABLE Cable TPSS25 HV2 TPSS25 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS26 HV CABLE1 Cable TPSS26 HV1 Bus49 0.02 0.02 0.03 0.0016531
TPSS26 RT1 HV CABLE Cable TPSS26 HV1 TPSS26 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS26 RT2 HV CABLE Cable TPSS26 HV2 TPSS26 RT2 Primary 0.02 0.02 0.03 0.0016531
TPSS26-16 SIERRA 1 Cable Bus159 TPSS26-LV1 35.25 75.68 83.49 0.0000025
TPSS27 HV CABLE1 Cable TPSS27 HV1 Bus51 0.02 0.02 0.03 0.0016531
TPSS27 RT1 HV CABLE Cable TPSS27 HV1 TPSS27 RT1 Primary 0.02 0.02 0.03 0.0016531
TPSS27 RT2 HV CABLE Cable TPSS27 HV2 TPSS27 RT2 Primary 0.02 0.02 0.03 0.0016531
AMPANG PARK LV1 0.400 104.508 -9.0 0 0 1.736 1.076 Bus96 -1.736 -1.076 2820.2 85.0
AMPANG PARK LV2 0.400 105.699 -8.3 0 0 1.117 0.692 Bus95 -1.117 -0.692 1794.5 85.0
AMPANG PARK1 33.000 99.506 -7.0 0 0 0 0 TPSS12 HV1 2.695 1.073 51.0 92.9
KLCC EAST1 -4.443 -2.247 87.5 89.2
Bus96 1.747 1.173 37.0 83.0
AMPANG PARK2 33.000 99.514 -6.9 0 0 0 0 TPSS12 HV2 3.307 1.468 63.6 91.4
KLCC EAST2 -4.428 -2.200 86.9 89.6
Bus95 1.122 0.732 23.5 83.8
BANDAR MSIA NORTH 0.400 106.175 -7.8 0 0 0.961 0.596 Bus110 -0.961 -0.596 1537.6 85.0
LV1
BANDAR MSIA NORTH 0.400 106.711 -7.5 0 0 0.730 0.453 Bus109 -0.730 -0.453 1162.1 85.0
LV2
BANDAR MSIA NORTH1 33.000 99.964 -6.6 0 0 0 0 TPSS16 HV1 -14.763 -7.217 287.6 89.8
TPSS15 HV2 13.797 6.589 267.6 90.2
Bus110 0.967 0.628 20.2 83.9
BANDAR MSIA NORTH2 33.000 99.996 -6.6 0 0 0 0 TPSS15 HV1 13.963 6.686 270.9 90.2
TPSS16 HV2 -14.697 -7.157 286.0 89.9
Bus109 0.733 0.471 15.2 84.1
Bus1 33.000 100.057 -5.6 0 0 0 0 TPSS SRDG 1 -0.357 -0.105 6.5 95.9
TPSS SRDG TF1 LV1 0.357 0.105 6.5 95.9
Bus17 33.000 99.302 -6.4 0 0 0 0 TPSS11 HV1 -1.823 -1.229 38.7 82.9
Bus106 1.823 1.229 38.7 82.9
Bus18 33.000 99.370 -6.3 0 0 0 0 TPSS11 HV2 -1.340 -0.883 28.3 83.5
TPSS11-LV2 1.340 0.883 28.3 83.5
Bus19 33.000 99.483 -7.0 0 0 0 0 TPSS12 HV1 -1.111 -0.725 23.3 83.8
Bus111 1.111 0.725 23.3 83.8
Bus20 33.000 99.483 -7.0 0 0 0 0 TPSS12 HV2 -1.224 -0.802 25.7 83.6
Bus112 1.224 0.802 25.7 83.6
Bus21 33.000 99.559 -6.9 0 0 0 0 TPSS13 HV1 -1.530 -1.017 32.3 83.3
Bus113 1.530 1.017 32.3 83.3
Bus22 33.000 99.569 -6.9 0 0 0 0 TPSS13 HV2 -1.546 -1.028 32.6 83.3
Bus114 1.546 1.028 32.6 83.3
Bus23 33.000 99.669 -6.8 0 0 0 0 TPSS14 HV1 -0.158 -0.100 3.3 84.6
Bus115 0.158 0.100 3.3 84.6
Bus24 33.000 99.680 -6.8 0 0 0 0 TPSS14 HV2 -0.234 -0.149 4.9 84.3
Bus136 0.234 0.149 4.9 84.3
Bus25 33.000 99.845 -6.7 0 0 0 0 TPSS15 HV1 -0.174 -0.110 3.6 84.6
Bus137 0.174 0.110 3.6 84.6
Bus26 33.000 99.855 -6.7 0 0 0 0 TPSS15 HV2 -0.376 -0.241 7.8 84.2
Bus138 0.376 0.241 7.8 84.2
Bus27 33.000 100.085 -6.5 0 0 0 0 TPSS16 HV1 -1.147 -0.749 23.9 83.7
Bus145 1.147 0.749 23.9 83.7
Bus28 33.000 100.116 -6.5 0 0 0 0 TPSS16 HV2 -0.926 -0.598 19.3 84.0
Bus146 0.926 0.598 19.3 84.0
Bus29 33.000 100.348 -6.3 0 0 0 0 TPSS17 HV1 -1.108 -0.766 23.5 82.2
Bus147 1.108 0.766 23.5 82.2 -1.250
Bus31 33.000 100.286 -6.3 0 0 0 0 TPSS18 HV1 -0.893 -0.627 19.0 81.8
Bus149 0.893 0.627 19.0 81.8 -2.500
Bus33 33.000 100.253 -6.4 0 0 0 0 TPSS19 HV1 -1.109 -0.774 23.6 82.0
Bus151 1.109 0.774 23.6 82.0 -1.250
Bus35 33.000 99.977 -5.6 0 0 0 0 TPSS20 HV1 -1.105 -0.792 23.8 81.3
Bus153 1.105 0.792 23.8 81.3
Bus37 33.000 100.022 -5.6 0 0 0 0 TPSS21 HV1 -0.882 -0.620 18.9 81.8
Bus155 0.882 0.620 18.9 81.8
Bus39 33.000 100.113 -5.6 0 0 0 0 TPSS22 HV1 -0.143 -0.092 3.0 83.9
Bus139 0.143 0.092 3.0 83.9
Bus41 33.000 99.918 -5.7 0 0 0 0 TPSS23 HV1 -1.402 -1.011 30.3 81.1
Bus157 1.402 1.011 30.3 81.1
Bus42 33.000 100.057 -5.6 0 0 0 0 TPSS SRDG 1 -0.310 -0.201 6.5 83.8
Project: ETAP Page: 48
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Bus127 0.400 102.117 -8.6 0 0 0 0 PUTRAJAYA CENTRAL 0.858 0.536 1430.0 84.8
LV1
PUTRAJAYA CENTRAL1 -0.858 -0.536 1430.0 84.8
Bus128 0.400 105.848 -6.8 0 0 0 0 TPSS SRDG T2 LV 0.306 0.190 492.0 84.9
Bus42 -0.306 -0.190 492.0 84.9
Bus129 0.400 105.566 -6.3 0 0 0 0 TPSS SRDG T1 LV 0.220 0.137 353.6 84.9
Bus2 -0.220 -0.137 353.6 84.9
Bus130 0.400 105.772 -6.8 0 0 0 0 TPSS SRDG T3 LV 0.394 0.245 633.7 84.9
Bus44 -0.394 -0.245 633.7 84.9
Bus131 0.400 105.894 -7.0 0 0 0 0 TPSS SRDG T4 LV 0.839 0.522 1347.0 84.9
Bus55 -0.839 -0.522 1347.0 84.9
Bus132 0.400 103.020 -8.7 0 0 0 0 TPSS SRDG T5 LV 1.661 1.045 2749.2 84.7
Bus56 -1.661 -1.045 2749.2 84.7
Bus133 0.400 105.504 -7.0 0 0 0 0 TPSS SRDG T6 LV 0.394 0.246 635.4 84.8
Bus57 -0.394 -0.246 635.4 84.8
Bus134 0.400 105.582 -7.0 0 0 0 0 TPSS SRDG T7 LV 0.306 0.191 493.2 84.9
Bus58 -0.306 -0.191 493.2 84.9
Bus135 0.400 105.305 -6.4 0 0 0 0 TPSS SRDG T8 LV 0.219 0.136 354.1 84.9
Bus59 -0.219 -0.136 354.1 84.9
Bus136 0.400 106.422 -7.5 0 0 0 0 Bus24 -0.233 -0.144 371.7 85.0
TPSS14-LV2 0.233 0.144 371.7 85.0
Bus137 0.400 107.209 -7.1 0 0 0 0 Bus25 -0.173 -0.107 274.5 85.0
TPSS15-LV1 0.173 0.107 274.5 85.0
Bus138 0.400 106.186 -7.6 0 0 0 0 Bus26 -0.373 -0.231 596.6 85.0
TPSS15-LV2 0.373 0.231 596.6 85.0
Bus139 0.400 103.756 -6.7 0 0 0 0 TPSS22-LV1 0.138 0.086 226.2 84.9
Bus39 -0.138 -0.086 226.2 84.9
Bus141 0.400 103.445 -6.9 0 0 0 0 TPSS24-LV1 0.138 0.086 226.6 84.9
Bus45 -0.138 -0.086 226.6 84.9
Bus143 0.400 103.401 -6.9 0 0 0 0 TPSS25-LV1 0.138 0.086 226.7 84.9
Bus47 -0.138 -0.086 226.7 84.9
Bus145 0.400 106.283 -7.9 0 0 0 0 Bus27 -1.142 -0.708 1825.2 85.0
TPSS16-LV1 1.142 0.708 1825.2 85.0
Bus146 0.400 106.724 -7.6 0 0 0 0 Bus28 -0.923 -0.572 1467.9 85.0
TPSS16-LV2 0.923 0.572 1467.9 85.0
Bus147 0.400 104.258 -9.0 0 0 0 0 TPSS17-LV1 1.082 0.677 1767.2 84.8
Bus29 -1.082 -0.677 1767.2 84.8
Bus149 0.400 105.561 -8.9 0 0 0 0 TPSS18-LV1 0.872 0.555 1413.8 84.3
Bus31 -0.872 -0.555 1413.8 84.3
Project: ETAP Page: 52
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
DAMANSARA DAMAI 33.000 99.708 -6.1 0 0 0 0 TPSS4 HV1 0.056 -0.236 4.3 -23.2
HV1
Bus63 0.879 0.609 18.8 82.2
DAMANSARA DAMAI HV2 -0.935 -0.373 17.7 92.9
DAMANSARA DAMAI 33.000 99.708 -6.1 0 0 0 0 SRI DAMAN WEST HV1 -0.935 -0.373 17.7 92.9
HV2
DAMANSARA DAMAI HV1 0.935 0.373 17.7 92.9
DAMANSARA DAMAI 0.400 101.583 -9.0 0 0 0.855 0.530 Bus63 -0.855 -0.530 1430.0 85.0
LV1
EQUINE PARK LV1 0.400 101.811 -8.6 0 0 0.856 0.531 Bus123 -0.856 -0.531 1428.1 85.0
EQUINE PARK1 33.000 99.911 -5.7 0 0 0 0 TPSS22 HV2 -6.611 -3.022 127.3 90.9
T UNIVERSITY2 0.000 -0.090 1.6 0.0
Bus123 0.880 0.609 18.7 82.2
EQUINE PARK2 5.732 2.503 109.5 91.6
EQUINE PARK2 33.000 99.911 -5.7 0 0 0 0 TMN PUTRA PERMAI-1 5.732 2.503 109.5 91.6
EQUINE PARK1 -5.732 -2.503 109.5 91.6
Project: ETAP Page: 53
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
HKL-UG LV1 0.400 105.098 -7.9 0 0 1.316 0.815 Bus89 -1.316 -0.815 2125.6 85.0
HKL-UG LV2 0.400 105.617 -7.6 0 0 1.058 0.656 Bus90 -1.058 -0.656 1701.6 85.0
HKL-UG1 33.000 99.309 -6.4 0 0 0 0 TPSS11 HV1 0.868 0.270 16.0 95.5
INTERVENTION SHAFT1-1 -2.190 -1.141 43.5 88.7
Bus89 1.322 0.871 27.9 83.5
HKL-UG2 33.000 99.340 -6.3 0 0 0 0 TPSS11 HV2 -3.748 -1.903 74.0 89.2
INTERVENTION SHAFT1-2 2.685 1.212 51.9 91.1
Bus90 1.063 0.691 22.3 83.8
INTERVENTION SHAFT1-1 33.000 99.323 -6.4 0 0 0 0 HKL-UG1 2.190 1.062 42.9 90.0
INTERVENTION SHAFT1-2 -2.438 -1.219 48.0 89.4
Bus80 0.248 0.157 5.2 84.4
INTERVENTION SHAFT1-2 33.000 99.326 -6.4 0 0 0 0 HKL-UG2 -2.685 -1.279 52.4 90.3
INTERVENTION SHAFT1-1 2.438 1.202 47.9 89.7
27. UB10 NB - TPSS12 SB~ 0.000 -0.080 1.4 0.0
Bus79 0.247 0.157 5.2 84.4
INTERVENTION 0.400 106.260 -7.0 0 0 0.247 0.153 Bus80 -0.247 -0.153 394.3 85.0
SHAFT1-LV1
INTERVENTION 0.400 106.268 -7.0 0 0 0.246 0.152 Bus79 -0.246 -0.152 392.9 85.0
SHAFT1-LV2
JINJANG BSS 33kV 1 33.000 100.012 -6.0 0 0 0 0 TPSS7 HV2 6.283 1.998 115.3 95.3
Kepong Baru2 5.441 1.925 101.0 94.3
JINJANG BSS 33kV 2 -11.724 -3.923 216.3 94.8
JINJANG BSS 33kV 2 33.000 100.012 -6.0 0 0 0 0 TPSS8 HV1 12.849 5.330 243.3 92.4
JINJANG1 16.209 7.106 309.6 91.6
JINJANG BSS TF2 SEC -40.781 -16.359 768.7 92.8
JINJANG BSS 33kV 1 11.724 3.923 216.3 94.8
* JINJANG BSS 132kV2 132.000 100.000 0.0 41.050 21.515 0 0 JINJANG BSS TF HV2 41.050 21.515 202.7 88.6
JINJANG BSS TF HV2 132.000 99.992 0.0 0 0 0 0 JINJANG BSS 132kV2 -41.048 -21.665 203.0 88.4
JINJANG BSS TF2 SEC 41.048 21.665 203.0 88.4 -5.000
JINJANG BSS TF2 SEC 33.000 100.029 -5.9 0 0 0 0 JINJANG BSS 33kV 2 40.785 16.345 768.5 92.8
JINJANG BSS TF HV2 -40.932 -16.440 771.5 92.8
JINJANG ET BUS2 0.147 0.095 3.1 83.9
JINJANG ET BUS2 0.400 103.534 -7.1 0 0 0.142 0.088 JINJANG BSS TF2 SEC -0.142 -0.088 232.7 85.0
JINJANG LV1 0.400 101.853 -8.9 0 0 0.856 0.531 Bus71 -0.856 -0.531 1427.7 85.0
JINJANG1 33.000 99.948 -6.0 0 0 0 0 JINJANG BSS 33kV 2 -16.203 -7.145 310.0 91.5
Bus71 0.880 0.609 18.7 82.2
JINJANG2 15.323 6.536 291.6 92.0
JINJANG2 33.000 99.948 -6.0 0 0 0 0 TPSS9 HV1 15.323 6.536 291.6 92.0
JINJANG1 -15.323 -6.536 291.6 92.0
KENTONMEN LV1 0.400 100.081 -8.1 0 0 0.536 0.332 Bus75 -0.536 -0.332 908.9 85.0
Project: ETAP Page: 54
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
* LM3 Bus 33.000 100.000 0.0 1.162 0.480 0 0 SGBD 1 1.162 0.480 22.0 92.4
Metro Prima LV1 0.400 101.942 -8.9 0 0 0.642 0.398 Bus67 -0.642 -0.398 1070.2 85.0
Metro Prima1 33.000 99.898 -6.0 0 0 0 0 TPSS5 HV2 3.897 1.144 71.1 96.0
Bus67 0.660 0.456 14.0 82.3
Metro Prima2 -4.557 -1.600 84.6 94.4
Metro Prima2 33.000 99.898 -6.0 0 0 0 0 Kepong Baru1 -4.557 -1.600 84.6 94.4
Metro Prima1 4.557 1.600 84.6 94.4
PUTRAJAYA CENTRAL 0.400 101.576 -8.8 0 0 0.855 0.530 Bus127 -0.855 -0.530 1430.0 85.0
LV1
PUTRAJAYA CENTRAL1 33.000 99.702 -5.9 0 0 0 0 TPSS28 HV2 -0.358 -0.201 7.2 87.2
Bus127 0.879 0.609 18.8 82.2
PUTRAJAYA CENTRAL2 -0.521 -0.408 11.6 78.8
PUTRAJAYA CENTRAL2 33.000 99.702 -5.9 0 0 0 0 TPSS27 HV2 -0.521 -0.408 11.6 78.8
PUTRAJAYA CENTRAL1 0.521 0.408 11.6 78.8
SENTUL WEST UG LV1 0.400 104.753 -8.2 0 0 1.515 0.939 Bus87 -1.515 -0.939 2455.4 85.0
SENTUL WEST UG LV2 0.400 105.644 -7.6 0 0 1.114 0.690 Bus88 -1.114 -0.690 1790.8 85.0
SENTUL WEST UG1 33.000 99.342 -6.3 0 0 0 0 TPSS10 HV2 -4.249 -2.230 84.5 88.5
TPSS11 HV1 2.726 1.218 52.6 91.3
Bus87 1.523 1.013 32.2 83.3
SENTUL WEST UG2 33.000 99.459 -6.3 0 0 0 0 KENTONMEN2 -7.980 -3.796 155.4 90.3
TPSS11 HV2 6.861 3.066 132.2 91.3
Bus88 1.119 0.730 23.5 83.8
SERDANG RAYA SOUTH 0.400 101.932 -8.5 0 0 0.857 0.531 Bus117 -0.857 -0.531 1427.1 85.0
LV1
SERDANG RAYA SOUTH1 33.000 100.018 -5.6 0 0 0 0 TPSS20 HV1 1.986 0.618 36.4 95.5
Bus117 0.880 0.609 18.7 82.2
SERDANG RAYA SOUTH2 -2.866 -1.227 54.5 91.9
SERDANG RAYA SOUTH2 33.000 100.018 -5.6 0 0 0 0 UPM1 -2.866 -1.227 54.5 91.9
SERDANG RAYA SOUTH1 2.866 1.227 54.5 91.9
SGBD 1 33.000 99.997 0.0 0 0 0 0 LM3 Bus -1.162 -0.504 22.2 91.7
SGBD B1 0.357 0.104 6.5 96.0
SGBD B2 0.448 0.297 9.4 83.4
SGBD 2 0.357 0.104 6.5 96.0
SGBD 2 33.000 99.997 0.0 0 0 0 0 SGBD B3 0.357 0.104 6.5 96.0
SGBD 1 -0.357 -0.104 6.5 96.0
SGBD B1 33.000 99.996 0.0 0 0 0 0 SGBD 1 -0.357 -0.105 6.5 95.9
SGBD RT1 LV1 0.357 0.105 6.5 95.9
& SGBD B1
SGBD RT1 LV2 0.585 99.864 -0.2 0 0 0.179 0.052 SGBD B1 -0.179 -0.052 183.8 96.0
& SGBD B3
SGBD RT2 LV2 0.585 99.864 -0.2 0 0 0.179 0.052 SGBD B3 -0.179 -0.052 183.8 96.0
TMN PUTRA PERMAI-LV1 0.400 101.734 -8.7 0 0 0.856 0.530 Bus124 -0.856 -0.530 1428.7 85.0
TPSS SRDG 1 33.000 100.057 -5.6 0 0 0 0 TPSS22 HV2 -2.134 -1.256 43.3 86.2
Bus2 0.224 0.141 4.6 84.6
Bus42 0.310 0.200 6.4 84.0
Bus44 0.398 0.258 8.3 84.0
Bus55 0.845 0.553 17.7 83.6
Bus1 0.357 0.104 6.5 96.0
TPSS SRDG T1 LV 0.400 105.298 -6.4 0 0 0.219 0.136 Bus129 -0.219 -0.136 353.6 85.0
TPSS SRDG T2 LV 0.400 105.662 -6.8 0 0 0.306 0.190 Bus128 -0.306 -0.190 492.0 85.0
TPSS SRDG T3 LV 0.400 105.532 -6.9 0 0 0.394 0.244 Bus130 -0.394 -0.244 633.7 85.0
TPSS SRDG T4 LV 0.400 105.639 -7.1 0 0 0.838 0.519 Bus131 -0.838 -0.519 1347.0 85.0
TPSS SRDG T5 LV 0.400 101.979 -9.1 0 0 1.651 1.023 Bus132 -1.651 -1.023 2749.2 85.0
TPSS SRDG T6 LV 0.400 105.023 -7.2 0 0 0.393 0.244 Bus133 -0.393 -0.244 635.4 85.0
TPSS SRDG T7 LV 0.400 105.208 -7.1 0 0 0.306 0.189 Bus134 -0.306 -0.189 493.2 85.0
TPSS SRDG T8 LV 0.400 105.037 -6.5 0 0 0.219 0.136 Bus135 -0.219 -0.136 354.1 85.0
TPSS SRDG TF1 LV1 0.585 99.925 -5.8 0 0 0.179 0.052 TPSS SRDG TF1 LV2 -0.179 -0.052 183.7 96.0
& Bus1
TPSS SRDG TF1 LV2 0.585 99.925 -5.8 0 0 0.179 0.052 Bus1 -0.179 -0.052 183.7 96.0
& Bus62
TPSS SRDG TF2 LV2 0.585 99.687 -6.0 0 0 0.179 0.052 Bus62 -0.179 -0.052 184.2 96.0
TPSS8 HV1 33.000 99.986 -6.0 0 0 0 0 JINJANG BSS 33kV 2 -12.847 -5.354 243.5 92.3
Bus11 0.142 0.091 3.0 84.4
TPSS8 RT1 Primary 1.345 0.418 24.6 95.5
TPSS8 HV2 11.360 4.845 216.1 92.0
TPSS8 HV2 33.000 99.986 -6.0 0 0 0 0 SRI DELIMA1 10.015 4.427 191.6 91.5
TPSS8 RT2 Primary 1.345 0.418 24.6 95.5
TPSS8 HV1 -11.360 -4.845 216.1 92.0
TPSS8 RT1 LV1 0.585 99.212 -7.0 0 0 0.671 0.196 TPSS8 RT1 LV2 -0.671 -0.196 695.2 96.0
TPSS11 RT1 Primary 33.000 99.303 -6.4 0 0 0 0 TPSS11 HV1 -1.770 -0.548 32.6 95.5
TPSS11 RT1 LV1 1.770 0.548 32.6 95.5
TPSS19 RT2 Primary 33.000 100.253 -6.4 0 0 0 0 TPSS19 HV2 -0.875 -0.267 16.0 95.7
TPSS19 RT2 LV1 0.875 0.267 16.0 95.7
TPSS25 HV1 33.000 99.794 -5.8 0 0 0 0 TPSS24 HV2 -3.989 -1.580 75.2 93.0
Bus47 0.142 0.091 3.0 84.3
TPSS25 RT1 Primary 0.516 0.153 9.4 95.9
TPSS25 HV2 3.331 1.336 62.9 92.8
TPSS25 HV2 33.000 99.794 -5.8 0 0 0 0 TPSS27 HV1 2.815 1.184 53.5 92.2
TPSS25 RT2 Primary 0.516 0.153 9.4 95.9
TPSS25 HV1 -3.331 -1.336 62.9 92.8
TPSS25 RT1 LV1 0.585 99.502 -6.2 0 0 0.258 0.075 TPSS25 RT1 LV2 -0.258 -0.075 266.2 96.0
10. UB4 - TPSS 8~ 33.000 99.955 -6.0 0 0 0 0 Kepong Baru2 0.000 0.000 0.0 0.0
27. UB10 NB - TPSS12 SB~ 33.000 99.326 -6.4 0 0 0 0 INTERVENTION SHAFT1-2 0.000 0.000 0.0 0.0
60. UB18 - TPSS22~ 33.000 100.114 -5.6 0 0 0 0 UPM2 0.000 0.000 0.0 0.0
54. UB 16 - TPSS 20~ 33.000 100.240 -6.4 0 0 0 0 T PARK2 0.000 0.000 0.0 0.0
* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: ETAP Page: 74
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
* Indicates operating load of a bus exceeds the bus critical limit (100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).
Project: ETAP Page: 86
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
1.UB1-TPSS 4 Cable 512.00 4.25 0.83
2. UB1- UB2 Cable 512.00 17.67 3.45
3. TPSS 4-TPSS 5 Cable 512.00 29.96 5.85
4. UB2 -TPSS 6 Cable 512.00 34.72 6.78
5. TPSS 5- UB3 Cable 512.00 72.90 14.24
6. TPSS 6-TPSS 7 Cable 512.00 83.66 16.34
7. UB3 -UB4 Cable 512.00 84.58 16.52
8. TPSS7- BSS1 Cable 512.00 116.04 22.66
9. UB4 - BSS1 Cable 512.00 101.51 19.83
11. BSS1 - TPSS 8 Cable 752.00 243.53 32.38
12. BSS1 - UB 5 Cable 752.00 309.98 41.22
13. TPSS 8- UB6 Cable 752.00 192.92 25.65
14. UB5 - TPSS 9 Cable 752.00 293.62 39.05
15. UB6 - UB7 SB Cable 752.00 176.75 23.50
16. UB7 1-2 Cable 752.00 165.28 21.98
17. TPSS 9-TPSS 10 Cable 752.00 211.62 28.14
18. UB7 NB- UB8 NB Cable 752.00 155.44 20.67
19. TPSS 10-UB8-SB Cable 752.00 84.52 11.24
20. UB8-SB - TPSS11 SB Cable 752.00 53.98 7.18
21. TPSS11 SB - UB9-SB Cable 752.00 16.64 2.21
22. UB9 SB - UB10 SB Cable 752.00 43.50 5.78
23. UB8-NB - TPSS11 NB Cable 752.00 133.46 17.75
24. TPSS11 NB - UB9 NB Cable 752.00 74.03 9.84
25. UB9 NB - UB10 NB Cable 752.00 52.39 6.97
26. UB10 SB - UB10 NB Cable 752.00 48.02 6.39
28. TPSS12 1-2 Cable 898.00 5.24 0.58
29. TPSS 12 SB- UB11 SB Cable 898.00 51.37 5.72
30. UB11 SB - UB12 SB Cable 898.00 87.53 9.75
31. UB12 SB - TPSS 13 SB Cable 898.00 109.52 12.20
32. TPSS13 SB - UB13 SB Cable 898.00 172.55 19.21
33. UB13 SB - TPSS 14 NB Cable 898.00 177.67 19.78
34. TPSS14-SB UB14-NB Cable 898.00 214.68 23.91
35. UB14-SB TPSS15-NB Cable 898.00 233.64 26.02
Project: ETAP Page: 87
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
36. TPSS15-SB UB15-NB Cable 898.00 271.35 30.22
37. UB15 SB - TPSS16 SB Cable 898.00 287.61 32.03
38. TPSS12 NB- UB11 NB Cable 898.00 64.00 7.13
39. UB11 NB - UB12 NB Cable 898.00 86.93 9.68
40. UB12 NB - TPSS13 NB Cable 898.00 116.98 13.03
41. TPSS13 NB - UB 13 NB Cable 898.00 180.32 20.08
42. UB13NB - TPSS14SB Cable 898.00 186.46 20.76
43. TPSS14NB - UB14SB Cable 898.00 207.35 23.09
44. UB14-NB TPSS15-SB Cable 898.00 241.12 26.85
45. TPSS15-NB UB15-SB Cable 898.00 267.95 29.84
46. UB15 NB - TPSS16 NB Cable 898.00 286.01 31.85
47. BSS2 - TPSS16 SB Cable 898.00 336.84 37.51
48. BSS2 - TPSS16 NB Cable 898.00 330.59 36.81
49. BSS2 - TPSS17 Cable 512.00 107.37 20.97
50. BSS2 - TPSS18 Cable 512.00 70.73 13.81
51. TPSS 17 - TPSS 19 Cable 512.00 43.84 8.56
52. TPSS 18 - TPSS19 Cable 512.00 27.33 5.34
53. TPSS 19 - UB 16 Cable 512.00 17.33 3.39
55. TPSS20 - UB 17 Cable 512.00 37.42 7.31
56. TPSS 20 - TPSS 21 Cable 512.00 27.47 5.37
57. UB17 - UB18 Cable 512.00 54.53 10.65
58. TPSS21 - BSS3 Cable 512.00 79.90 15.61
59. UB18 - BSS3 Cable 512.00 70.74 13.82
61. BSS3 - TPSS22 Cable 898.00 197.26 21.97
62. BSS3 - TPSS23 Cable 898.00 234.17 26.08
63. TPSS22 - UB 19 Cable 898.00 127.30 14.18
64. TPSS 23 - TPSS 24 Cable 898.00 101.47 11.30
65. UB19 - UB20 Cable 898.00 110.05 12.26
66. TPSS 24 - TPSS 25 Cable 898.00 75.22 8.38
67. UB20 - TPSS26 Cable 898.00 92.36 10.28
68. TPSS 25-TPSS 27 Cable 898.00 54.79 6.10
69. TPSS 26-TPSS 28 Cable 898.00 54.21 6.04
70. TPSS27 - UB 21 Cable 898.00 11.61 1.29
71. TPSS28 - UB 21 Cable 898.00 7.21 0.80
72. TPSS22- SERD Cable 898.00 43.29 4.82
Project: ETAP Page: 88
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
73. TPSS23 - TPSS SERD Cable 898.00 61.69 6.87
74. TPSS23 - TMUNI Cable 898.00 18.74 2.09
75. TMUNI - UB19 Cable 898.00 1.58 0.18
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
TPSS SRDG T3 LV CABLE Cable 1877.19 633.66 33.76
TPSS SRDG T4 HV CABLE Cable 494.10 17.67 3.58
TPSS SRDG T4 LV CABLE Cable 2887.99 1346.99 46.64
TPSS SRDG T5 HV CABLE Cable 494.10 36.07 7.30
* TPSS SRDG T5 LV CABLE Cable 1444.00 2749.22 190.39
TPSS SRDG T6 HV CABLE Cable 494.10 8.34 1.69
TPSS SRDG T6 LV CABLE Cable 938.60 635.40 67.70
TPSS SRDG T7 HV CABLE Cable 494.10 6.47 1.31
TPSS SRDG T7 LV CABLE Cable 938.60 493.24 52.55
TPSS SRDG T8 HV CABLE Cable 494.10 4.65 0.94
TPSS SRDG T8 LV CABLE Cable 938.60 354.14 37.73
TPSS SRDG TF1 HV CABLE Cable 494.10 6.51 1.32
TPSS SRDG TF2 HV CABLE Cable 494.10 6.53 1.32
TPSS4 HV CABLE1 Cable 494.10 2.98 0.60
TPSS4 LV CABLE1 Cable 938.59 226.77 24.16
TPSS4 RT1 HV CABLE Cable 494.10 13.58 2.75
TPSS4 RT2 HV CABLE Cable 494.10 13.58 2.75
TPSS5 HV CABLE1 Cable 494.10 18.86 3.82
TPSS5 RT1 HV CABLE Cable 494.10 13.23 2.68
TPSS5 RT2 HV CABLE Cable 494.10 13.23 2.68
TPSS6 HV CABLE1 Cable 494.10 24.15 4.89
TPSS6 RT1 HV CABLE Cable 494.10 13.81 2.80
TPSS6 RT2 HV CABLE Cable 494.10 13.81 2.80
TPSS7 HV CABLE1 Cable 494.10 2.97 0.60
TPSS7 LV CABLE1 Cable 938.60 226.47 24.13
TPSS7 RT1 HV CABLE Cable 494.10 15.56 3.15
TPSS7 RT2 HV CABLE Cable 494.10 15.56 3.15
TPSS8 HV CABLE1 Cable 494.10 2.97 0.60
TPSS8 LV CABLE1 Cable 938.60 226.38 24.12
TPSS8 RT1 HV CABLE Cable 494.10 24.65 4.99
TPSS8 RT2 HV CABLE Cable 494.10 24.65 4.99
TPSS9 HV CABLE1 Cable 494.10 19.07 3.86
TPSS9 RT1 HV CABLE Cable 494.10 33.02 6.68
TPSS9 RT2 HV CABLE Cable 494.10 33.02 6.68
TPSS 9- KAMPUNG BATU1 Cable 1877.19 1453.47 77.43
Project: ETAP Page: 90
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
TPSS10 HV CABLE1 Cable 494.10 57.68 11.67
TPSS10 RT1 HV CABLE Cable 494.10 36.23 7.33
TPSS10 RT2 HV CABLE Cable 494.10 36.23 7.33
* TPSS10- JALAN IPOH1 Cable 3713.13 4395.85 118.39
TPSS11 HV CABLE1 Cable 494.10 38.75 7.84
TPSS11 HV CABLE2 Cable 494.10 28.25 5.72
TPSS11 RT1 HV CABLE Cable 494.10 32.64 6.61
TPSS11 RT2 HV CABLE Cable 494.10 32.61 6.60
TPSS12 HV CABLE1 Cable 494.10 23.33 4.72
TPSS12 HV CABLE2 Cable 494.10 25.74 5.21
TPSS12 RT1 HV CABLE Cable 494.10 33.75 6.83
TPSS12 RT2 HV CABLE Cable 494.10 33.75 6.83
TPSS13 HV CABLE1 Cable 494.10 32.29 6.53
TPSS13 HV CABLE2 Cable 494.10 32.62 6.60
TPSS13 RT1 HV CABLE Cable 494.10 31.74 6.42
TPSS13 RT2 HV CABLE Cable 494.10 31.73 6.42
TPSS14 HV CABLE1 Cable 494.10 3.28 0.66
TPSS14 HV CABLE2 Cable 494.10 4.88 0.99
TPSS14 RT1 HV CABLE Cable 494.10 25.49 5.16
TPSS14 RT2 HV CABLE Cable 494.10 25.48 5.16
TPSS15 HV CABLE1 Cable 494.10 3.60 0.73
TPSS15 HV CABLE2 Cable 494.10 7.83 1.58
TPSS15 RT1 HV CABLE Cable 494.10 27.24 5.51
TPSS15 RT2 HV CABLE Cable 494.10 27.24 5.51
TPSS16 HV CABLE1 Cable 494.10 23.95 4.85
TPSS16 HV CABLE2 Cable 494.10 19.26 3.90
TPSS16 RT1 HV CABLE Cable 494.10 26.15 5.29
TPSS16 RT2 HV CABLE Cable 494.10 26.15 5.29
TPSS17 HV CABLE1 Cable 494.10 23.48 4.75
TPSS17 RT1 HV CABLE Cable 494.10 21.59 4.37
TPSS17 RT2 HV CABLE Cable 494.10 21.59 4.37
TPSS17- KUCHAI LAMA 1 Cable 1877.19 1767.16 94.14
TPSS18 HV CABLE1 Cable 494.10 19.03 3.85
TPSS18 RT1 HV CABLE Cable 494.10 13.16 2.66
TPSS18 RT2 HV CABLE Cable 494.10 13.16 2.66
Project: ETAP Page: 91
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
TPSS18- TMN NAGA EMAS 1 Cable 1877.19 1413.83 75.32
TPSS19 HV CABLE1 Cable 494.10 23.60 4.78
TPSS19 RT1 HV CABLE Cable 494.10 15.96 3.23
TPSS19 RT2 HV CABLE Cable 494.10 15.96 3.23
TPSS19- SUNGAI BESI 1 Cable 2165.99 1775.90 81.99
TPSS20 HV CABLE1 Cable 494.10 23.80 4.82
TPSS20 RT1 HV CABLE Cable 494.10 20.93 4.24
TPSS20 RT2 HV CABLE Cable 494.10 20.93 4.24
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
TPSS27 RT2 HV CABLE Cable 494.10 12.92 2.61
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
* Metro Prima TF1 Transformer 0.750 0.802 106.9 0.759 101.2
* PUTRAJAYA CENTRAL TF1 Transformer 1.000 1.069 106.9 1.012 101.2
SENTUL WEST UG TF1 Transformer 4.000 1.829 45.7 1.782 44.6
SENTUL WEST UG TF2 Transformer 4.000 1.336 33.4 1.311 32.8
* SERDANG RAYA SOUTH TF1 Transformer 1.000 1.070 107.0 1.013 101.3
* SGBD T1 Transformer 0.500 0.538 107.6 0.503 100.6
SRDG ADM1 Transformer 0.800 0.369 46.2 0.361 45.1
SRDG ADM2 Transformer 0.800 0.369 46.2 0.361 45.1
SRDG INFWRKSHP1 Transformer 1.000 0.476 47.6 0.464 46.4
SRDG INFWRKSHP2 Transformer 1.000 0.476 47.6 0.464 46.4
SRDG RLGSTK1 Transformer 2.000 1.011 50.5 0.988 49.4
* SRDG RLGSTK2 Transformer 2.000 2.058 102.9 1.962 98.1
SRDG TPSS1 Transformer 0.630 0.265 42.1 0.259 41.1
SRDG TPSS2 Transformer 0.630 0.265 42.1 0.258 41.0
* SRI DAMAN WEST TF1 Transformer 1.000 1.069 106.9 1.012 101.2
* SRI DELIMA TF1 Transformer 1.000 1.070 107.0 1.012 101.2
* T PARK TF1 Transformer 1.000 1.071 107.1 1.014 101.4
* T UNIVERSITY TF1 Transformer 1.000 1.070 107.0 1.013 101.3
* TMN PUTRA PERMAI-TF1 Transformer 1.000 1.070 107.0 1.012 101.2
* TPSS4-T1 Transformer 0.160 0.170 106.0 0.162 101.4
* TPSS5-T1 Transformer 1.000 1.076 107.6 1.017 101.7
* TPSS6-T1 Transformer 1.250 1.377 110.2 1.299 103.9
* TPSS7-T1 Transformer 0.160 0.170 106.1 0.162 101.5
* TPSS8-T1 Transformer 0.160 0.170 106.1 0.163 101.6
* TPSS9-T1 Transformer 1.000 1.086 108.6 1.026 102.6
* TPSS10-T1 Transformer 3.000 3.277 109.2 3.081 102.7
TPSS11-T1 Transformer 4.000 2.199 55.0 2.130 53.3
TPSS11-T2 Transformer 4.000 1.605 40.1 1.568 39.2
TPSS12-T1 Transformer 4.000 1.326 33.2 1.302 32.5
TPSS12-T2 Transformer 4.000 1.464 36.6 1.434 35.8
TPSS13-T1 Transformer 4.000 1.837 45.9 1.790 44.7
TPSS13-T2 Transformer 4.000 1.857 46.4 1.808 45.2
TPSS14-T1 Transformer 1.000 0.187 18.7 0.185 18.5
TPSS14-T2 Transformer 1.000 0.278 27.8 0.274 27.4
TPSS15-T1 Transformer 1.250 0.206 16.4 0.204 16.3
Project: ETAP Page: 94
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
TPSS15-T2 Transformer 1.250 0.447 35.7 0.439 35.1
TPSS16-T1 Transformer 4.000 1.370 34.2 1.344 33.6
TPSS16-T2 Transformer 4.000 1.102 27.6 1.085 27.1
* TPSS17-T1 Transformer 1.250 1.347 107.7 1.276 102.1
* TPSS18-T1 Transformer 1.000 1.091 109.1 1.034 103.4
* TPSS19-T1 Transformer 1.250 1.352 108.2 1.281 102.5
* TPSS20-T1 Transformer 1.250 1.360 108.8 1.285 102.8
* TPSS21-T1 Transformer 1.000 1.078 107.8 1.020 102.0
* TPSS22-T1 Transformer 0.160 0.170 106.1 0.163 101.6
* TPSS23-T1 Transformer 1.600 1.729 108.0 1.643 102.7
* TPSS24-T1 Transformer 0.160 0.170 106.0 0.162 101.5
* TPSS25-T1 Transformer 0.160 0.170 106.0 0.162 101.5
* TPSS26-T1 Transformer 1.000 1.071 107.1 1.014 101.4
* TPSS27-T1 Transformer 1.000 1.089 108.9 1.028 102.8
* TPSS28-T1 Transformer 1.000 1.080 108.0 1.021 102.1
TRX TF1 Transformer 1.500 0.309 20.6 0.306 20.4
TRX TF2 Transformer 1.500 0.368 24.5 0.364 24.3
* UPM BSS ET2 Transformer 0.160 0.175 109.3 0.167 104.5
UPM BSS TF2 Transformer 40.000 35.028 87.6 33.326 83.3
* UPM TF1 Transformer 1.000 1.071 107.1 1.014 101.4
SGBD RT1 3W XFMR p 3.500 0.373 10.6
3W XFMR s 1.750 0.186 10.6
3W XFMR t 1.750 0.186 10.6
SGBD T2 3W XFMR p 3.500 0.373 10.6
3W XFMR s 1.750 0.186 10.6
3W XFMR t 1.750 0.186 10.6
TPSS SRDG TF1 3W XFMR p 3.500 0.373 10.6
3W XFMR s 1.750 0.186 10.6
3W XFMR t 1.750 0.186 10.6
TPSS SRDG TF2 3W XFMR p 3.500 0.373 10.6
3W XFMR s 1.750 0.186 10.6
3W XFMR t 1.750 0.186 10.6
TPSS4 RT1 3W XFMR p 2.300 0.774 33.6
3W XFMR s 1.150 0.385 33.5
3W XFMR t 1.150 0.385 33.5
Project: ETAP Page: 95
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
TPSS4 RT2 3W XFMR p 2.300 0.774 33.6
3W XFMR s 1.150 0.385 33.5
3W XFMR t 1.150 0.385 33.5
TPSS5 RT1 3W XFMR p 2.300 0.755 32.8
3W XFMR s 1.150 0.376 32.7
3W XFMR t 1.150 0.376 32.7
TPSS5 RT2 3W XFMR p 2.300 0.755 32.8
3W XFMR s 1.150 0.376 32.7
3W XFMR t 1.150 0.376 32.7
TPSS6 RT1 3W XFMR p 2.300 0.788 34.3
3W XFMR s 1.150 0.392 34.1
3W XFMR t 1.150 0.392 34.1
TPSS6 RT2 3W XFMR p 2.300 0.788 34.3
3W XFMR s 1.150 0.392 34.1
3W XFMR t 1.150 0.392 34.1
TPSS7 RT1 3W XFMR p 2.300 0.889 38.6
3W XFMR s 1.150 0.442 38.5
3W XFMR t 1.150 0.442 38.5
TPSS7 RT2 3W XFMR p 2.300 0.889 38.6
3W XFMR s 1.150 0.442 38.5
3W XFMR t 1.150 0.442 38.5
TPSS8 RT1 3W XFMR p 2.300 1.409 61.2
3W XFMR s 1.150 0.699 60.8
3W XFMR t 1.150 0.699 60.8
TPSS8 RT2 3W XFMR p 2.300 1.409 61.2
3W XFMR s 1.150 0.699 60.8
3W XFMR t 1.150 0.699 60.8
TPSS9 RT1 3W XFMR p 3.500 1.880 53.7
3W XFMR s 1.750 0.934 53.4
3W XFMR t 1.750 0.934 53.4
TPSS9 RT2 3W XFMR p 3.500 1.880 53.7
3W XFMR s 1.750 0.934 53.4
3W XFMR t 1.750 0.934 53.4
TPSS10 RT1 3W XFMR p 3.500 2.058 58.8
3W XFMR s 1.750 1.021 58.4
Project: ETAP Page: 96
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
TPSS10 RT1 3W XFMR t 1.750 1.021 58.4
TPSS10 RT2 3W XFMR p 3.500 2.058 58.8
3W XFMR s 1.750 1.021 58.4
3W XFMR t 1.750 1.021 58.4
TPSS11 RT1 3W XFMR p 3.500 1.852 52.9
3W XFMR s 1.750 0.920 52.6
3W XFMR t 1.750 0.920 52.6
TPSS11 RT2 3W XFMR p 3.500 1.852 52.9
3W XFMR s 1.750 0.920 52.6
3W XFMR t 1.750 0.920 52.6
TPSS12 RT1 3W XFMR p 3.500 1.919 54.8
3W XFMR s 1.750 0.953 54.5
3W XFMR t 1.750 0.953 54.5
TPSS12 RT2 3W XFMR p 3.500 1.919 54.8
3W XFMR s 1.750 0.953 54.5
3W XFMR t 1.750 0.953 54.5
TPSS13 RT1 3W XFMR p 3.500 1.806 51.6
3W XFMR s 1.750 0.897 51.3
3W XFMR t 1.750 0.897 51.3
TPSS13 RT2 3W XFMR p 3.500 1.806 51.6
3W XFMR s 1.750 0.897 51.3
3W XFMR t 1.750 0.897 51.3
TPSS14 RT1 3W XFMR p 2.300 1.452 63.1
3W XFMR s 1.150 0.720 62.6
3W XFMR t 1.150 0.720 62.6
TPSS14 RT2 3W XFMR p 2.300 1.452 63.1
3W XFMR s 1.150 0.720 62.6
3W XFMR t 1.150 0.720 62.6
TPSS15 RT1 3W XFMR p 2.300 1.555 67.6
3W XFMR s 1.150 0.771 67.0
3W XFMR t 1.150 0.771 67.0
TPSS15 RT2 3W XFMR p 2.300 1.555 67.6
3W XFMR s 1.150 0.771 67.0
3W XFMR t 1.150 0.771 67.0
TPSS16 RT1 3W XFMR p 2.300 1.496 65.0
Project: ETAP Page: 97
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
TPSS16 RT1 3W XFMR s 1.150 0.742 64.5
3W XFMR t 1.150 0.742 64.5
TPSS16 RT2 3W XFMR p 2.300 1.496 65.0
3W XFMR s 1.150 0.742 64.5
3W XFMR t 1.150 0.742 64.5
TPSS17 RT1 3W XFMR p 2.300 1.238 53.8
3W XFMR s 1.150 0.615 53.5
3W XFMR t 1.150 0.615 53.5
TPSS17 RT2 3W XFMR p 2.300 1.238 53.8
3W XFMR s 1.150 0.615 53.5
3W XFMR t 1.150 0.615 53.5
TPSS18 RT1 3W XFMR p 2.300 0.755 32.8
3W XFMR s 1.150 0.376 32.7
3W XFMR t 1.150 0.376 32.7
TPSS18 RT2 3W XFMR p 2.300 0.755 32.8
3W XFMR s 1.150 0.376 32.7
3W XFMR t 1.150 0.376 32.7
TPSS19 RT1 3W XFMR p 2.300 0.914 39.8
3W XFMR s 1.150 0.455 39.6
3W XFMR t 1.150 0.455 39.6
TPSS19 RT2 3W XFMR p 2.300 0.914 39.8
3W XFMR s 1.150 0.455 39.6
3W XFMR t 1.150 0.455 39.6
TPSS20 RT1 3W XFMR p 2.300 1.196 52.0
3W XFMR s 1.150 0.594 51.7
3W XFMR t 1.150 0.594 51.7
TPSS20 RT2 3W XFMR p 2.300 1.196 52.0
3W XFMR s 1.150 0.594 51.7
3W XFMR t 1.150 0.594 51.7
TPSS21 RT1 3W XFMR p 2.300 1.030 44.8
3W XFMR s 1.150 0.512 44.6
3W XFMR t 1.150 0.512 44.6
TPSS21 RT2 3W XFMR p 2.300 1.030 44.8
3W XFMR s 1.150 0.512 44.6
3W XFMR t 1.150 0.512 44.6
Project: ETAP Page: 98
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
TPSS22 RT1 3W XFMR p 2.300 0.762 33.1
3W XFMR s 1.150 0.379 33.0
3W XFMR t 1.150 0.379 33.0
TPSS22 RT2 3W XFMR p 2.300 0.762 33.1
3W XFMR s 1.150 0.379 33.0
3W XFMR t 1.150 0.379 33.0
TPSS23 RT1 3W XFMR p 2.300 0.746 32.4
3W XFMR s 1.150 0.371 32.3
3W XFMR t 1.150 0.371 32.3
TPSS23 RT2 3W XFMR p 2.300 0.746 32.4
3W XFMR s 1.150 0.371 32.3
3W XFMR t 1.150 0.371 32.3
TPSS24 RT1 3W XFMR p 2.300 0.681 29.6
3W XFMR s 1.150 0.339 29.5
3W XFMR t 1.150 0.339 29.5
TPSS24 RT2 3W XFMR p 2.300 0.681 29.6
3W XFMR s 1.150 0.339 29.5
3W XFMR t 1.150 0.339 29.5
TPSS25 RT1 3W XFMR p 2.300 0.538 23.4
3W XFMR s 1.150 0.268 23.3
3W XFMR t 1.150 0.268 23.3
TPSS25 RT2 3W XFMR p 2.300 0.538 23.4
3W XFMR s 1.150 0.268 23.3
3W XFMR t 1.150 0.268 23.3
TPSS26 RT1 3W XFMR p 2.300 0.596 25.9
3W XFMR s 1.150 0.297 25.8
3W XFMR t 1.150 0.297 25.8
TPSS26 RT2 3W XFMR p 2.300 0.596 25.9
3W XFMR s 1.150 0.297 25.8
3W XFMR t 1.150 0.297 25.8
TPSS27 RT1 3W XFMR p 2.300 0.736 32.0
3W XFMR s 1.150 0.367 31.9
3W XFMR t 1.150 0.367 31.9
TPSS27 RT2 3W XFMR p 2.300 0.736 32.0
3W XFMR s 1.150 0.367 31.9
Project: ETAP Page: 99
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Transformer
CKT / Branch Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
TPSS27 RT2 3W XFMR t 1.150 0.367 31.9
TPSS28 RT1 3W XFMR p 2.300 0.830 36.1
3W XFMR s 1.150 0.413 35.9
3W XFMR t 1.150 0.413 35.9
TPSS28 RT2 3W XFMR p 2.300 0.830 36.1
3W XFMR s 1.150 0.413 35.9
3W XFMR t 1.150 0.413 35.9
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
29. TPSS 12 SB- UB11 SB 2.695 1.073 -2.695 -1.127 0.2 -53.5 99.5 99.5 0.02
30. UB11 SB - UB12 SB -4.443 -2.247 4.443 2.225 0.3 -21.1 99.5 99.5 0.02
AMPANG PARK TF1 1.747 1.173 -1.736 -1.076 11.5 97.7 99.5 104.5 2.96
38. TPSS12 NB- UB11 NB 3.307 1.468 -3.306 -1.521 0.4 -52.9 99.5 99.5 0.03
39. UB11 NB - UB12 NB -4.428 -2.200 4.428 2.179 0.3 -21.1 99.5 99.5 0.02
AMPANG PARK TF2 1.122 0.732 -1.117 -0.692 4.7 39.6 99.5 105.7 1.87
37. UB15 SB - TPSS16 SB -14.763 -7.217 14.770 7.201 6.6 -16.2 100.0 100.1 0.12
45. TPSS15-NB UB15-SB 13.797 6.589 -13.791 -6.609 5.6 -19.9 100.0 99.9 0.11
BANDAR MSIA NORTH TF1 0.967 0.628 -0.961 -0.596 5.3 32.1 100.0 106.2 1.88
36. TPSS15-SB UB15-NB 13.963 6.686 -13.956 -6.712 7.8 -26.1 100.0 99.8 0.15
46. UB15 NB - TPSS16 NB -14.697 -7.157 14.703 7.141 6.5 -16.6 100.0 100.1 0.12
BANDAR MSIA NORTH TF2 0.733 0.471 -0.730 -0.453 3.1 18.3 100.0 106.7 1.42
TPSS SRDG TF1 HV CABLE -0.357 -0.105 0.357 0.104 0.0 -1.7 100.1 100.1 0.00
TPSS SRDG T1 HV CABLE -0.224 -0.143 0.224 0.141 0.0 -1.7 100.1 100.1 0.00
SRDG TPSS1 0.224 0.143 -0.220 -0.137 4.1 6.1 100.1 105.6 2.54
TPSS4 HV CABLE1 -0.142 -0.092 0.142 0.091 0.0 -1.6 99.7 99.7 0.00
TPSS4-T1 0.142 0.092 -0.138 -0.086 4.4 6.6 99.7 103.3 4.28
TPSS5 HV CABLE1 -0.881 -0.618 0.881 0.616 0.0 -1.6 99.8 99.8 0.00
TPSS5-T1 0.881 0.618 -0.860 -0.544 21.1 73.8 99.8 102.1 5.42
TPSS6 HV CABLE1 -1.109 -0.817 1.109 0.815 0.0 -1.6 99.8 99.8 0.00
TPSS6-T1 1.109 0.817 -1.082 -0.720 27.6 96.7 99.8 101.9 5.66
TPSS7 HV CABLE1 -0.142 -0.092 0.142 0.091 0.0 -1.7 99.9 99.9 0.00
TPSS7-T1 0.142 0.092 -0.138 -0.086 4.4 6.6 99.9 103.5 4.27
TPSS8 HV CABLE1 -0.142 -0.092 0.142 0.091 0.0 -1.7 100.0 100.0 0.00
TPSS8-T1 0.142 0.092 -0.138 -0.086 4.4 6.6 100.0 103.6 4.27
TPSS9 HV CABLE1 -0.883 -0.632 0.883 0.631 0.0 -1.6 99.6 99.6 0.00
TPSS9-T1 0.883 0.632 -0.861 -0.557 21.5 75.4 99.6 101.9 5.53
TPSS10 HV CABLE1 -2.627 -1.959 2.627 1.957 0.0 -1.6 99.4 99.4 0.00
TPSS10-T1 2.627 1.959 -2.581 -1.684 45.9 275.2 99.4 101.2 5.92
TPSS11 HV CABLE1 -1.823 -1.229 1.823 1.228 0.0 -1.6 99.3 99.3 0.00
TPSS11-T1 1.823 1.229 -1.811 -1.122 12.6 107.2 99.3 104.1 3.11
TPSS11 HV CABLE2 -1.340 -0.883 1.340 0.882 0.0 -1.6 99.4 99.4 0.00
TPSS11-T2 1.340 0.883 -1.333 -0.826 6.7 57.0 99.4 105.1 2.25
TPSS12 HV CABLE1 -1.111 -0.725 1.111 0.723 0.0 -1.6 99.5 99.5 0.00
Project: ETAP Page: 101
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
TPSS12-T1 1.111 0.725 -1.106 -0.686 4.6 38.8 99.5 105.7 1.85
TPSS12 HV CABLE2 -1.224 -0.802 1.224 0.801 0.0 -1.6 99.5 99.5 0.00
TPSS12-T2 1.224 0.802 -1.219 -0.755 5.6 47.3 99.5 105.5 2.05
TPSS13 HV CABLE1 -1.530 -1.017 1.530 1.016 0.0 -1.6 99.6 99.6 0.00
TPSS13-T1 1.530 1.017 -1.521 -0.943 8.8 74.4 99.6 105.0 2.58
TPSS13 HV CABLE2 -1.546 -1.028 1.546 1.027 0.0 -1.6 99.6 99.6 0.00
TPSS13-T2 1.546 1.028 -1.537 -0.952 8.9 76.0 99.6 105.0 2.61
TPSS14 HV CABLE1 -0.158 -0.100 0.158 0.098 0.0 -1.6 99.7 99.7 0.00
TPSS14-T1 0.158 0.100 -0.157 -0.098 0.6 2.2 99.7 106.9 0.92
TPSS14 HV CABLE2 -0.234 -0.149 0.234 0.148 0.0 -1.6 99.7 99.7 0.00
TPSS14-T2 0.234 0.149 -0.233 -0.144 1.4 4.9 99.7 106.4 1.37
TPSS15 HV CABLE1 -0.174 -0.110 0.174 0.108 0.0 -1.6 99.8 99.8 0.00
TPSS15-T1 0.174 0.110 -0.173 -0.107 0.6 2.2 99.8 107.2 0.81
TPSS15 HV CABLE2 -0.376 -0.241 0.376 0.240 0.0 -1.6 99.9 99.9 0.00
TPSS15-T2 0.376 0.241 -0.373 -0.231 2.9 10.2 99.9 106.2 1.76
TPSS16 HV CABLE1 -1.147 -0.749 1.147 0.747 0.0 -1.7 100.1 100.1 0.00
TPSS16-T1 1.147 0.749 -1.142 -0.708 4.8 40.9 100.1 106.3 1.90
TPSS16 HV CABLE2 -0.926 -0.598 0.926 0.597 0.0 -1.7 100.1 100.1 0.00
TPSS16-T2 0.926 0.598 -0.923 -0.572 3.1 26.5 100.1 106.7 1.53
TPSS17 HV CABLE1 -1.108 -0.766 1.108 0.764 0.0 -1.7 100.3 100.3 0.00
TPSS17-T1 1.108 0.766 -1.082 -0.677 25.5 89.2 100.3 104.3 4.04
TPSS18 HV CABLE1 -0.893 -0.627 0.893 0.625 0.0 -1.7 100.3 100.3 0.00
TPSS18-T1 0.893 0.627 -0.872 -0.555 20.4 71.4 100.3 105.6 2.77
TPSS19 HV CABLE1 -1.109 -0.774 1.109 0.773 0.0 -1.7 100.3 100.3 0.00
TPSS19-T1 1.109 0.774 -1.083 -0.684 25.7 90.1 100.3 104.1 4.08
TPSS20 HV CABLE1 -1.105 -0.792 1.105 0.791 0.0 -1.6 100.0 100.0 0.00
TPSS20-T1 1.105 0.792 -1.078 -0.698 26.8 93.9 100.0 102.2 5.52
TPSS21 HV CABLE1 -0.882 -0.620 0.882 0.619 0.0 -1.7 100.0 100.0 0.00
TPSS21-T1 0.882 0.620 -0.861 -0.547 21.1 73.8 100.0 102.4 5.43
TPSS22 HV CABLE1 -0.143 -0.092 0.143 0.091 0.0 -1.7 100.1 100.1 0.00
TPSS22-T1 0.143 0.092 -0.138 -0.086 4.4 6.6 100.1 103.8 4.27
TPSS23 HV CABLE1 -1.402 -1.011 1.402 1.009 0.0 -1.6 99.9 99.9 0.00
TPSS23-T1 1.402 1.011 -1.382 -0.889 20.3 121.8 99.9 102.8 4.93
TPSS SRDG T2 HV CABLE -0.310 -0.201 0.310 0.200 0.0 -1.7 100.1 100.1 0.00
SRDG ADM1 0.310 0.201 -0.306 -0.190 3.1 10.8 100.1 105.8 2.28
TPSS SRDG T3 HV CABLE -0.398 -0.260 0.398 0.258 0.0 -1.7 100.1 100.1 0.00
SRDG INFWRKSHP1 0.398 0.260 -0.394 -0.245 4.1 14.3 100.1 105.8 2.35
Project: ETAP Page: 102
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
TPSS24 HV CABLE1 -0.142 -0.092 0.142 0.091 0.0 -1.6 99.8 99.8 0.00
TPSS24-T1 0.142 0.092 -0.138 -0.086 4.4 6.6 99.8 103.4 4.27
TPSS25 HV CABLE1 -0.142 -0.092 0.142 0.091 0.0 -1.6 99.8 99.8 0.00
TPSS25-T1 0.142 0.092 -0.138 -0.086 4.4 6.6 99.8 103.4 4.27
TPSS26 HV CABLE1 -0.880 -0.612 0.880 0.610 0.0 -1.6 99.8 99.8 0.00
TPSS26-T1 0.880 0.612 -0.859 -0.538 20.9 73.2 99.8 102.2 5.38
TPSS27 HV CABLE1 -0.884 -0.636 0.884 0.634 0.0 -1.6 99.7 99.7 0.00
TPSS27-T1 0.884 0.636 -0.862 -0.560 21.6 75.6 99.7 101.9 5.55
TPSS28 HV CABLE1 -0.882 -0.624 0.882 0.622 0.0 -1.6 99.7 99.7 0.00
TPSS28-T1 0.882 0.624 -0.860 -0.550 21.3 74.5 99.7 102.0 5.47
TPSS SRDG T4 HV CABLE -0.845 -0.555 0.845 0.553 0.0 -1.7 100.1 100.1 0.00
SRDG RLGSTK1 0.845 0.555 -0.839 -0.522 5.5 33.2 100.1 105.9 2.23
TPSS SRDG T5 HV CABLE -1.684 -1.183 1.684 1.181 0.0 -1.6 99.8 99.8 0.00
SRDG RLGSTK2 1.684 1.183 -1.661 -1.045 23.1 138.4 99.8 103.0 4.65
TPSS SRDG T6 HV CABLE -0.398 -0.260 0.398 0.259 0.0 -1.6 99.8 99.8 0.00
SRDG INFWRKSHP2 0.398 0.260 -0.394 -0.246 4.1 14.4 99.8 105.5 2.36
TPSS SRDG T7 HV CABLE -0.309 -0.202 0.309 0.200 0.0 -1.6 99.8 99.8 0.00
SRDG ADM2 0.309 0.202 -0.306 -0.191 3.1 10.9 99.8 105.6 2.28
TPSS SRDG T8 HV CABLE -0.223 -0.143 0.223 0.141 0.0 -1.6 99.8 99.8 0.00
SRDG TPSS2 0.223 0.143 -0.219 -0.136 4.1 6.1 99.8 105.3 2.54
KLCC EAST TF1 -1.058 -0.656 1.063 0.691 4.2 35.4 105.8 99.5 1.77
KLCC EAST TF2 -1.435 -0.889 1.442 0.955 7.8 66.0 105.1 99.5 2.43
TPSS SRDG TF2 HV CABLE -0.357 -0.105 0.357 0.104 0.0 -1.6 99.8 99.8 0.00
DAMANSARA DAMAI LV 0.858 0.536 -0.855 -0.530 2.7 5.8 102.1 101.6 0.54
CABLE1
DAMANSARA DAMAI TF1 -0.858 -0.536 0.879 0.609 20.9 73.0 102.1 99.7 5.37
SRI DAMAN LV CABLE1 0.858 0.536 -0.856 -0.530 2.7 5.8 102.1 101.6 0.54
SRI DAMAN WEST TF1 -0.858 -0.536 0.879 0.609 20.8 73.0 102.1 99.7 5.37
Metro Prima LV CABLE1 0.644 0.401 -0.642 -0.398 1.5 3.2 102.3 101.9 0.40
Metro Prima TF1 -0.644 -0.401 0.660 0.456 15.6 54.5 102.3 99.9 5.35
KEPONG BARU LV CABLE1 0.859 0.535 -0.857 -0.531 1.8 3.8 102.4 102.1 0.36
KEPONG BARU TF1 -0.859 -0.535 0.880 0.608 20.7 72.6 102.4 100.0 5.35
JINJANG CABLE1 0.859 0.537 -0.856 -0.531 2.7 5.8 102.4 101.9 0.54
JINJANG TF1 -0.859 -0.537 0.880 0.609 20.8 72.8 102.4 99.9 5.36
SRI DELIMA LV CABLE1 0.859 0.536 -0.856 -0.530 2.7 5.8 102.3 101.7 0.54
SRI DELIMA TF1 -0.859 -0.536 0.879 0.609 20.8 72.8 102.3 99.9 5.36
KENTONMEN LV CABLE1 0.538 0.337 -0.536 -0.332 2.2 4.7 100.8 100.1 0.69
KENTONMEN TF1 -0.538 -0.337 0.565 0.377 27.0 40.5 100.8 99.6 6.55
Project: ETAP Page: 103
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
KENTONMEN LV CABLE2 0.000 0.000 0.000 0.000 0.0 0.0 100.1 100.1 0.00
KENTONMEN LV CABLE3 0.538 0.337 -0.536 -0.332 2.2 4.7 100.7 100.1 0.69
KENTONMEN TF3 -0.538 -0.337 0.565 0.377 27.0 40.5 100.7 99.6 6.55
KENTONMEN LV CABLE4 0.000 0.000 0.000 0.000 0.0 0.0 100.1 100.1 0.00
INTERVENTION SHAFT1-TF2 -0.246 -0.152 0.247 0.157 1.3 4.4 106.3 99.3 1.16
INTERVENTION SHAFT1-TF1 -0.247 -0.153 0.248 0.157 1.3 4.4 106.3 99.3 1.16
TPSS 5- SRIDAMAN EAST1 0.860 0.544 -0.852 -0.528 7.2 15.5 102.1 100.7 1.44
T PARK LV CABLE1 0.860 0.537 -0.857 -0.531 2.7 5.8 102.7 102.2 0.54
T PARK TF1 -0.860 -0.537 0.881 0.610 20.7 72.5 102.7 100.2 5.35
TPSS4 LV CABLE1 0.138 0.086 -0.138 -0.085 0.1 0.3 103.3 103.1 0.17
SENTUL WEST UG TF1 -1.515 -0.939 1.523 1.013 8.7 74.1 104.8 99.3 2.57
SENTUL WEST UG TF2 -1.114 -0.690 1.119 0.730 4.6 39.4 105.6 99.5 1.87
HKL-UG TF1 -1.316 -0.815 1.322 0.871 6.5 55.5 105.1 99.3 2.22
HKL-UG TF2 -1.058 -0.656 1.063 0.691 4.2 35.6 105.6 99.3 1.77
TPSS7 LV CABLE1 0.138 0.086 -0.138 -0.085 0.1 0.3 103.5 103.4 0.17
TPSS8 LV CABLE1 0.138 0.086 -0.138 -0.085 0.1 0.3 103.6 103.4 0.17
TRX TF1 -0.260 -0.161 0.261 0.166 0.7 4.2 106.9 99.6 0.91
TRX TF2 -0.309 -0.192 0.310 0.198 1.0 5.9 106.7 99.6 1.08
TPSS 6- KEPONG SENTRAL1 1.082 0.720 -1.049 -0.650 32.5 69.7 101.9 96.8 5.10
TPSS 9- KAMPUNG BATU1 0.861 0.557 -0.846 -0.524 15.2 32.7 101.9 98.9 3.01
TPSS10- JALAN IPOH1 2.581 1.684 -2.525 -1.565 55.3 118.8 101.2 97.6 3.63
CHAN SOW LINE TF1 -1.272 -0.788 1.278 0.839 6.0 51.3 105.7 99.8 2.13
CHAN SOW LINE TF2 -1.285 -0.796 1.291 0.849 6.2 52.4 105.7 99.8 2.16
SRAYA SOUTH LV CABLE1 0.859 0.537 -0.857 -0.531 2.7 5.8 102.5 101.9 0.54
SERDANG RAYA SOUTH TF1 -0.859 -0.537 0.880 0.609 20.8 72.7 102.5 100.0 5.36
UPM LV CABLE1 0.860 0.537 -0.857 -0.531 2.7 5.8 102.6 102.0 0.54
UPM TF1 -0.860 -0.537 0.880 0.609 20.7 72.6 102.6 100.1 5.35
T UNIVERSITY LV CABLE1 0.859 0.536 -0.856 -0.531 2.7 5.8 102.4 101.8 0.54
T UNIVERSITY TF1 -0.859 -0.536 0.880 0.609 20.8 72.8 102.4 99.9 5.36
JINJANG TF1 LV CABLE4 0.859 0.536 -0.856 -0.531 2.7 5.8 102.4 101.8 0.54
EQUINE PARK TF1 -0.859 -0.536 0.880 0.609 20.8 72.8 102.4 99.9 5.36
TMN PUTRA LV CABLE1 0.859 0.536 -0.856 -0.530 2.7 5.8 102.3 101.7 0.54
TMN PUTRA PERMAI-TF1 -0.859 -0.536 0.879 0.609 20.8 72.9 102.3 99.8 5.36
PUTRAJAYA CENTR LV 0.858 0.536 -0.855 -0.530 2.7 5.8 102.1 101.6 0.54
CABLE1
PUTRAJAYA CENTRAL TF1 -0.858 -0.536 0.879 0.609 20.9 73.0 102.1 99.7 5.37
TPSS SRDG T2 LV CABLE 0.306 0.190 -0.306 -0.190 0.3 0.7 105.8 105.7 0.19
Project: ETAP Page: 104
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
TPSS SRDG T1 LV CABLE 0.220 0.137 -0.219 -0.136 0.3 0.7 105.6 105.3 0.27
TPSS SRDG T3 LV CABLE 0.394 0.245 -0.394 -0.244 0.5 1.1 105.8 105.5 0.24
TPSS SRDG T4 LV CABLE 0.839 0.522 -0.838 -0.519 1.2 2.6 105.9 105.6 0.25
TPSS SRDG T5 LV CABLE 1.661 1.045 -1.651 -1.023 10.0 21.4 103.0 102.0 1.04
TPSS SRDG T6 LV CABLE 0.394 0.246 -0.393 -0.244 1.1 2.3 105.5 105.0 0.48
TPSS SRDG T7 LV CABLE 0.306 0.191 -0.306 -0.189 0.6 1.4 105.6 105.2 0.37
TPSS SRDG T8 LV CABLE 0.219 0.136 -0.219 -0.136 0.3 0.7 105.3 105.0 0.27
TPSS22 LV CABLE1 0.138 0.086 -0.138 -0.086 0.1 0.3 103.8 103.6 0.17
TPSS24 LV CABLE1 0.138 0.086 -0.138 -0.085 0.1 0.3 103.4 103.3 0.17
TPSS25 LV CABLE1 0.138 0.086 -0.138 -0.085 0.1 0.3 103.4 103.2 0.17
TPSS17- KUCHAI LAMA 1 1.082 0.677 -1.078 -0.668 4.1 8.9 104.3 103.6 0.67
TPSS18- TMN NAGA EMAS 1 0.872 0.555 -0.862 -0.534 9.8 21.0 105.6 103.6 1.99
TPSS19- SUNGAI BESI 1 1.083 0.684 -1.074 -0.666 8.6 18.5 104.1 102.7 1.39
TPSS20-SERDANGRAYA 1.078 0.698 -1.059 -0.656 19.6 42.0 102.2 99.1 3.10
NORTH1
TPSS21- SERI KEMBANGAN1 0.861 0.547 -0.852 -0.528 8.6 18.5 102.4 100.7 1.72
TPSS23- VENT SHAFT1 1.382 0.889 -1.361 -0.843 21.1 45.3 102.8 100.2 2.63
TPSS26-16 SIERRA 1 0.859 0.538 -0.855 -0.530 4.1 8.7 102.2 101.4 0.81
TPSS27-CYBERJAYA NORTH 0.862 0.560 -0.845 -0.524 16.8 36.1 101.9 98.6 3.32
1
TPSS28 -CYBERJAYA CC 1 0.860 0.550 -0.850 -0.527 10.8 23.1 102.0 99.9 2.14
SGBD Sec C1 0.427 0.266 -0.425 -0.264 1.4 2.9 101.2 100.7 0.54
SGBD T1 -0.427 -0.266 0.448 0.298 21.2 31.8 101.2 100.0 6.52
35. UB14-SB TPSS15-NB -11.928 -5.932 11.932 5.905 4.4 -27.4 99.8 99.9 0.10
43. TPSS14NB - UB14SB 10.650 5.093 -10.647 -5.119 2.9 -26.4 99.8 99.7 0.07
34. TPSS14-SB UB14-NB 11.005 5.308 -11.000 -5.344 4.4 -35.9 99.8 99.7 0.11
44. UB14-NB TPSS15-SB -12.295 -6.157 12.299 6.140 3.1 -17.2 99.8 99.8 0.07
1.UB1-TPSS 4 0.056 -0.236 -0.056 0.142 0.0 -94.1 99.7 99.7 0.00
2. UB1- UB2 -0.935 -0.373 0.935 0.182 0.1 -191.6 99.7 99.7 0.02
63. TPSS22 - UB 19 -6.611 -3.022 6.617 2.855 5.1 -167.0 99.9 100.1 0.20
75. TMUNI - UB19 0.000 -0.090 0.000 0.000 0.0 -90.3 99.9 99.9 0.00
65. UB19 - UB20 5.732 2.503 -5.730 -2.571 1.5 -67.2 99.9 99.8 0.07
21. TPSS11 SB - UB9-SB 0.868 0.270 -0.868 -0.374 0.0 -103.3 99.3 99.3 0.01
22. UB9 SB - UB10 SB -2.190 -1.141 2.190 1.062 0.2 -79.3 99.3 99.3 0.01
24. TPSS11 NB - UB9 NB -3.748 -1.903 3.749 1.802 0.6 -101.8 99.3 99.4 0.03
25. UB9 NB - UB10 NB 2.685 1.212 -2.685 -1.279 0.2 -67.1 99.3 99.3 0.01
26. UB10 SB - UB10 NB -2.438 -1.219 2.438 1.202 0.0 -16.9 99.3 99.3 0.00
27. UB10 NB - TPSS12 SB 0.000 -0.080 0.000 0.000 0.0 -80.0 99.3 99.3 0.00
Project: ETAP Page: 105
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
8. TPSS7- BSS1 6.283 1.998 -6.279 -2.120 4.2 -121.5 100.0 99.9 0.09
9. UB4 - BSS1 5.441 1.925 -5.438 -2.014 2.3 -89.2 100.0 100.0 0.06
11. BSS1 - TPSS 8 12.849 5.330 -12.847 -5.354 1.8 -23.6 100.0 100.0 0.03
12. BSS1 - UB 5 16.209 7.106 -16.203 -7.145 5.6 -39.5 100.0 99.9 0.06
JINJANG INC CABLE2 -40.781 -16.359 40.785 16.345 3.9 -14.1 100.0 100.0 0.02
JINJANG HV CABLE2 41.050 21.515 -41.048 -21.665 2.0 -149.3 100.0 100.0 0.01
JINJANG BSS TF2 41.048 21.665 -40.932 -16.440 116.1 5224.7 100.0 100.0 0.04
JINJANG ET2 0.147 0.095 -0.142 -0.088 4.6 7.0 100.0 103.5 4.39
14. UB5 - TPSS 9 15.323 6.536 -15.297 -6.752 26.6 -216.4 99.9 99.6 0.32
15. UB6 - UB7 SB -9.118 -4.267 9.128 3.981 10.4 -285.2 99.6 99.9 0.21
16. UB7 1-2 8.553 3.890 -8.552 -3.928 1.2 -38.2 99.6 99.6 0.03
18. UB7 NB- UB8 NB 7.987 3.551 -7.980 -3.796 6.8 -244.9 99.6 99.5 0.16
7. UB3 -UB4 4.559 1.493 -4.557 -1.600 1.9 -106.6 100.0 99.9 0.06
10. UB4 - TPSS 8 0.000 -0.087 0.000 0.000 0.0 -86.7 100.0 100.0 0.00
31. UB12 SB - TPSS 13 SB -5.505 -2.917 5.506 2.885 0.7 -32.1 99.5 99.6 0.04
40. UB12 NB - TPSS13 NB -5.871 -3.134 5.872 3.102 0.8 -31.6 99.5 99.6 0.04
47. BSS2 - TPSS16 SB 17.363 8.385 -17.345 -8.394 18.3 -9.3 100.4 100.1 0.29
48. BSS2 - TPSS16 NB 17.073 8.171 -17.057 -8.183 16.1 -11.5 100.4 100.1 0.26
49. BSS2 - TPSS17 5.775 2.110 -5.774 -2.143 0.9 -32.6 100.4 100.3 0.02
50. BSS2 - TPSS18 3.779 1.280 -3.777 -1.474 2.3 -193.7 100.4 100.3 0.08
KUCHAILAMA INC CABLE2 -43.990 -19.946 43.995 19.934 4.7 -12.2 100.4 100.4 0.02
KUCHAILAMA HV CABLE2 44.284 26.145 -44.281 -26.294 2.5 -148.4 100.0 100.0 0.01
KUCHAILAMA BSS TF2 44.281 26.294 -44.142 -20.029 139.2 6264.2 100.0 100.4 0.40
KUCHAILAMA ET2 -0.143 -0.088 0.147 0.095 4.7 7.0 103.9 100.4 4.39
LM3 Cable 1.162 0.480 -1.162 -0.504 0.0 -24.7 100.0 100.0 0.00
5. TPSS 5- UB3 3.897 1.144 -3.893 -1.457 4.0 -313.5 99.9 99.8 0.14
71. TPSS28 - UB 21 -0.358 -0.201 0.358 0.144 0.0 -57.5 99.7 99.7 0.00
70. TPSS27 - UB 21 -0.521 -0.408 0.521 0.296 0.0 -111.3 99.7 99.7 0.01
19. TPSS 10-UB8-SB -4.249 -2.230 4.250 2.087 1.1 -142.9 99.3 99.4 0.05
20. UB8-SB - TPSS11 SB 2.726 1.218 -2.725 -1.400 0.6 -182.9 99.3 99.3 0.04
23. UB8-NB - TPSS11 NB 6.861 3.066 -6.858 -3.229 3.3 -163.7 99.5 99.4 0.09
55. TPSS20 - UB 17 1.986 0.618 -1.985 -0.795 0.6 -176.8 100.0 100.0 0.04
57. UB17 - UB18 -2.866 -1.227 2.868 0.943 2.0 -284.5 100.0 100.1 0.10
SGBD Pri RT1 0.357 0.104 -0.357 -0.105 0.0 -1.7 100.0 100.0 0.00
SGBD Pri T1 0.448 0.297 -0.448 -0.298 0.0 -1.7 100.0 100.0 0.00
SGBD Pri RT2 0.357 0.104 -0.357 -0.105 0.0 -1.7 100.0 100.0 0.00
4. UB2 -TPSS 6 -1.814 -0.791 1.815 0.499 0.8 -291.2 99.7 99.8 0.06
Project: ETAP Page: 106
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
13. TPSS 8- UB6 -10.008 -4.591 10.015 4.427 7.3 -163.5 99.9 100.0 0.13
53. TPSS 19 - UB 16 -0.881 -0.459 0.881 0.326 0.1 -132.9 100.2 100.3 0.01
54. UB 16 - TPSS 20 0.000 -0.151 0.000 0.000 0.0 -151.2 100.2 100.2 0.00
74. TPSS23 - TMUNI -0.880 -0.609 0.880 0.598 0.0 -11.2 99.9 99.9 0.00
67. UB20 - TPSS26 4.851 1.961 -4.849 -2.054 1.4 -93.0 99.8 99.8 0.07
72. TPSS22- SERD -2.134 -1.256 2.134 1.116 0.4 -139.6 100.1 100.1 0.06
73. TPSS23 - TPSS SERD -2.972 -1.885 2.973 1.722 1.0 -162.4 99.8 99.9 0.10
TPSS4 RT1 HV CABLE 0.741 0.223 -0.741 -0.224 0.0 -1.6 99.7 99.7 0.00
3. TPSS 4-TPSS 5 -1.567 -0.678 1.568 0.408 0.6 -270.0 99.7 99.8 0.05
TPSS4 RT2 HV CABLE 0.741 0.223 -0.741 -0.224 0.0 -1.6 99.7 99.7 0.00
TPSS5 RT1 HV CABLE 0.722 0.217 -0.722 -0.219 0.0 -1.6 99.8 99.8 0.00
TPSS5 RT2 HV CABLE 0.722 0.217 -0.722 -0.219 0.0 -1.6 99.8 99.8 0.00
TPSS6 RT1 HV CABLE 0.754 0.227 -0.754 -0.229 0.0 -1.6 99.8 99.8 0.00
6. TPSS 6-TPSS 7 -4.432 -1.768 4.437 1.514 4.4 -253.8 99.8 99.9 0.13
TPSS6 RT2 HV CABLE 0.754 0.227 -0.754 -0.229 0.0 -1.6 99.8 99.8 0.00
TPSS7 RT1 HV CABLE 0.850 0.257 -0.850 -0.259 0.0 -1.6 99.9 99.9 0.00
TPSS7 RT2 HV CABLE 0.850 0.257 -0.850 -0.259 0.0 -1.6 99.9 99.9 0.00
TPSS8 RT1 HV CABLE 1.345 0.418 -1.345 -0.420 0.0 -1.6 100.0 100.0 0.00
TPSS8 RT2 HV CABLE 1.345 0.418 -1.345 -0.420 0.0 -1.6 100.0 100.0 0.00
TPSS9 RT1 HV CABLE 1.796 0.555 -1.796 -0.556 0.0 -1.6 99.6 99.6 0.00
17. TPSS 9-TPSS 10 10.822 5.012 -10.807 -5.266 14.0 -253.9 99.6 99.4 0.24
TPSS9 RT2 HV CABLE 1.796 0.555 -1.796 -0.556 0.0 -1.6 99.6 99.6 0.00
TPSS10 RT1 HV CABLE 1.965 0.611 -1.965 -0.612 0.0 -1.6 99.4 99.4 0.00
TPSS10 RT2 HV CABLE 1.965 0.611 -1.965 -0.612 0.0 -1.6 99.4 99.4 0.00
TPSS11 RT1 HV CABLE 1.770 0.546 -1.770 -0.548 0.0 -1.6 99.3 99.3 0.00
TPSS11 RT2 HV CABLE 1.770 0.546 -1.770 -0.548 0.0 -1.6 99.4 99.4 0.00
28. TPSS12 1-2 -0.249 -0.163 0.249 0.153 0.0 -10.0 99.5 99.5 0.00
TPSS12 RT1 HV CABLE 1.833 0.567 -1.833 -0.569 0.0 -1.6 99.5 99.5 0.00
TPSS12 RT2 HV CABLE 1.833 0.567 -1.833 -0.569 0.0 -1.6 99.5 99.5 0.00
32. TPSS13 SB - UB13 SB -8.762 -4.432 8.764 4.405 1.8 -27.2 99.6 99.6 0.06
TPSS13 RT1 HV CABLE 1.726 0.532 -1.726 -0.533 0.0 -1.6 99.6 99.6 0.00
41. TPSS13 NB - UB 13 NB -9.143 -4.661 9.145 4.634 1.9 -26.4 99.6 99.6 0.06
TPSS13 RT2 HV CABLE 1.726 0.532 -1.726 -0.533 0.0 -1.6 99.6 99.6 0.00
42. UB13NB - TPSS14SB 9.456 4.814 -9.455 -4.832 1.4 -17.5 99.7 99.6 0.04
TPSS14 RT1 HV CABLE 1.386 0.432 -1.386 -0.434 0.0 -1.6 99.7 99.7 0.00
33. UB13 SB - TPSS 14 NB 9.027 4.540 -9.025 -4.570 2.2 -30.5 99.7 99.6 0.07
TPSS14 RT2 HV CABLE 1.386 0.432 -1.386 -0.434 0.0 -1.6 99.7 99.7 0.00
Project: ETAP Page: 107
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
TPSS15 RT1 HV CABLE 1.483 0.465 -1.483 -0.466 0.0 -1.6 99.8 99.8 0.00
TPSS15 RT2 HV CABLE 1.483 0.465 -1.483 -0.466 0.0 -1.6 99.9 99.9 0.00
TPSS16 RT1 HV CABLE 1.428 0.446 -1.428 -0.447 0.0 -1.7 100.1 100.1 0.00
TPSS16 RT2 HV CABLE 1.428 0.446 -1.428 -0.447 0.0 -1.7 100.1 100.1 0.00
TPSS17 RT1 HV CABLE 1.183 0.364 -1.183 -0.366 0.0 -1.7 100.3 100.3 0.00
51. TPSS 17 - TPSS 19 2.301 0.649 -2.299 -1.012 1.6 -362.6 100.3 100.3 0.10
TPSS17 RT2 HV CABLE 1.183 0.364 -1.183 -0.366 0.0 -1.7 100.3 100.3 0.00
TPSS18 RT1 HV CABLE 0.722 0.217 -0.722 -0.218 0.0 -1.7 100.3 100.3 0.00
52. TPSS 18 - TPSS19 1.440 0.415 -1.440 -0.616 0.3 -201.2 100.3 100.3 0.03
TPSS18 RT2 HV CABLE 0.722 0.217 -0.722 -0.218 0.0 -1.7 100.3 100.3 0.00
TPSS19 RT1 HV CABLE 0.875 0.265 -0.875 -0.267 0.0 -1.7 100.3 100.3 0.00
TPSS19 RT2 HV CABLE 0.875 0.265 -0.875 -0.267 0.0 -1.7 100.3 100.3 0.00
TPSS20 RT1 HV CABLE 1.143 0.352 -1.143 -0.353 0.0 -1.6 100.0 100.0 0.00
56. TPSS 20 - TPSS 21 -1.406 -0.699 1.406 0.433 0.5 -265.6 100.0 100.0 0.04
TPSS20 RT2 HV CABLE 1.143 0.352 -1.143 -0.353 0.0 -1.6 100.0 100.0 0.00
TPSS21 RT1 HV CABLE 0.985 0.300 -0.985 -0.302 0.0 -1.7 100.0 100.0 0.00
58. TPSS21 - BSS3 -4.259 -1.653 4.262 1.441 3.3 -211.6 100.0 100.1 0.11
TPSS21 RT2 HV CABLE 0.985 0.300 -0.985 -0.302 0.0 -1.7 100.0 100.0 0.00
61. BSS3 - TPSS22 -10.352 -4.500 10.353 4.494 0.6 -6.2 100.1 100.1 0.01
TPSS22 RT1 HV CABLE 0.729 0.219 -0.729 -0.221 0.0 -1.7 100.1 100.1 0.00
TPSS22 RT2 HV CABLE 0.729 0.219 -0.729 -0.221 0.0 -1.7 100.1 100.1 0.00
62. BSS3 - TPSS23 -12.121 -5.651 12.131 5.592 9.5 -58.9 99.9 100.1 0.21
TPSS23 RT1 HV CABLE 0.714 0.214 -0.714 -0.216 0.0 -1.6 99.9 99.9 0.00
64. TPSS 23 - TPSS 24 5.437 1.893 -5.436 -1.996 1.9 -103.3 99.9 99.8 0.09
TPSS23 RT2 HV CABLE 0.714 0.214 -0.714 -0.216 0.0 -1.6 99.9 99.9 0.00
TPSS24 RT1 HV CABLE 0.652 0.195 -0.652 -0.197 0.0 -1.6 99.8 99.8 0.00
66. TPSS 24 - TPSS 25 3.990 1.516 -3.989 -1.580 0.6 -64.3 99.8 99.8 0.04
TPSS24 RT2 HV CABLE 0.652 0.195 -0.652 -0.197 0.0 -1.6 99.8 99.8 0.00
TPSS25 RT1 HV CABLE 0.516 0.153 -0.516 -0.154 0.0 -1.6 99.8 99.8 0.00
68. TPSS 25-TPSS 27 2.815 1.184 -2.815 -1.353 0.8 -169.6 99.8 99.7 0.08
TPSS25 RT2 HV CABLE 0.516 0.153 -0.516 -0.154 0.0 -1.6 99.8 99.8 0.00
TPSS26 RT1 HV CABLE 0.571 0.170 -0.571 -0.171 0.0 -1.6 99.8 99.8 0.00
69. TPSS 26-TPSS 28 2.828 1.105 -2.827 -1.245 0.7 -140.4 99.8 99.7 0.06
TPSS26 RT2 HV CABLE 0.571 0.170 -0.571 -0.171 0.0 -1.6 99.8 99.8 0.00
TPSS27 RT1 HV CABLE 0.705 0.212 -0.705 -0.213 0.0 -1.6 99.7 99.7 0.00
TPSS27 RT2 HV CABLE 0.705 0.212 -0.705 -0.213 0.0 -1.6 99.7 99.7 0.00
TPSS28 RT1 HV CABLE 0.794 0.239 -0.794 -0.241 0.0 -1.6 99.7 99.7 0.00
Project: ETAP Page: 108
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
TPSS28 RT2 HV CABLE 0.794 0.239 -0.794 -0.241 0.0 -1.6 99.7 99.7 0.00
59. UB18 - BSS3 3.749 1.497 -3.748 -1.528 0.4 -31.3 100.1 100.1 0.01
UPM BSS INC CABLE2 -30.494 -13.024 30.496 13.006 2.2 -18.7 100.1 100.1 0.01
UPM HV CABLE2 30.727 16.669 -30.725 -16.820 1.2 -151.0 100.0 100.0 0.01
UPM BSS ET2 -0.142 -0.088 0.147 0.095 4.6 7.0 103.7 100.1 4.39
UPM BSS TF2 30.725 16.820 -30.643 -13.101 82.7 3719.5 100.0 100.1 0.15
60. UB18 - TPSS22 0.000 -0.024 0.000 0.000 0.0 -24.2 100.1 100.1 0.00
SGBD RT1 0.357 0.105 -0.179 -0.052 0.1 1.3 100.0 99.9 0.13
SGBD RT1 0.000 0.000 -0.179 -0.052 100.0 99.9 0.13
SGBD T2 0.357 0.105 -0.179 -0.052 0.1 1.3 100.0 99.9 0.13
SGBD T2 0.000 0.000 -0.179 -0.052 100.0 99.9 0.13
TPSS SRDG TF1 0.357 0.105 -0.179 -0.052 0.1 1.3 100.1 99.9 0.13
TPSS SRDG TF1 0.000 0.000 -0.179 -0.052 100.1 99.9 0.13
TPSS SRDG TF2 0.357 0.105 -0.179 -0.052 0.1 1.3 99.8 99.7 0.13
TPSS SRDG TF2 0.000 0.000 -0.179 -0.052 99.8 99.7 0.13
TPSS4 RT1 0.741 0.224 -0.370 -0.108 0.9 8.6 99.7 99.3 0.42
TPSS4 RT1 0.000 0.000 -0.370 -0.108 99.7 99.3 0.42
TPSS4 RT2 0.741 0.224 -0.370 -0.108 0.9 8.6 99.7 99.3 0.42
TPSS4 RT2 0.000 0.000 -0.370 -0.108 99.7 99.3 0.42
TPSS5 RT1 0.722 0.219 -0.361 -0.105 0.8 8.2 99.8 99.3 0.41
TPSS5 RT1 0.000 0.000 -0.361 -0.105 99.8 99.3 0.41
TPSS5 RT2 0.722 0.219 -0.361 -0.105 0.8 8.2 99.8 99.3 0.41
TPSS5 RT2 0.000 0.000 -0.361 -0.105 99.8 99.3 0.41
TPSS6 RT1 0.754 0.229 -0.377 -0.110 0.9 8.9 99.8 99.4 0.43
TPSS6 RT1 0.000 0.000 -0.377 -0.110 99.8 99.4 0.43
TPSS6 RT2 0.754 0.229 -0.377 -0.110 0.9 8.9 99.8 99.4 0.43
TPSS6 RT2 0.000 0.000 -0.377 -0.110 99.8 99.4 0.43
TPSS7 RT1 0.850 0.259 -0.424 -0.124 1.1 11.3 99.9 99.4 0.48
TPSS7 RT1 0.000 0.000 -0.424 -0.124 99.9 99.4 0.48
TPSS7 RT2 0.850 0.259 -0.424 -0.124 1.1 11.3 99.9 99.4 0.48
TPSS7 RT2 0.000 0.000 -0.424 -0.124 99.9 99.4 0.48
TPSS8 RT1 1.345 0.420 -0.671 -0.196 2.8 28.3 100.0 99.2 0.77
TPSS8 RT1 0.000 0.000 -0.671 -0.196 100.0 99.2 0.77
TPSS8 RT2 1.345 0.420 -0.671 -0.196 2.8 28.3 100.0 99.2 0.77
TPSS8 RT2 0.000 0.000 -0.671 -0.196 100.0 99.2 0.77
TPSS9 RT1 1.796 0.556 -0.896 -0.261 3.3 33.4 99.6 99.0 0.68
TPSS9 RT1 0.000 0.000 -0.896 -0.261 99.6 99.0 0.68
Project: ETAP Page: 109
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
TPSS9 RT2 1.796 0.556 -0.896 -0.261 3.3 33.4 99.6 99.0 0.68
TPSS9 RT2 0.000 0.000 -0.896 -0.261 99.6 99.0 0.68
TPSS10 RT1 1.965 0.612 -0.981 -0.286 4.0 40.2 99.4 98.6 0.75
TPSS10 RT1 0.000 0.000 -0.981 -0.286 99.4 98.6 0.75
TPSS10 RT2 1.965 0.612 -0.981 -0.286 4.0 40.2 99.4 98.6 0.75
TPSS10 RT2 0.000 0.000 -0.981 -0.286 99.4 98.6 0.75
TPSS11 RT1 1.770 0.548 -0.883 -0.258 3.3 32.6 99.3 98.6 0.67
TPSS11 RT1 0.000 0.000 -0.883 -0.258 99.3 98.6 0.67
TPSS11 RT2 1.770 0.548 -0.883 -0.258 3.3 32.6 99.4 98.7 0.67
TPSS11 RT2 0.000 0.000 -0.883 -0.258 99.4 98.7 0.67
TPSS12 RT1 1.833 0.569 -0.915 -0.267 3.5 34.9 99.5 98.8 0.69
TPSS12 RT1 0.000 0.000 -0.915 -0.267 99.5 98.8 0.69
TPSS12 RT2 1.833 0.569 -0.915 -0.267 3.5 34.9 99.5 98.8 0.69
TPSS12 RT2 0.000 0.000 -0.915 -0.267 99.5 98.8 0.69
TPSS13 RT1 1.726 0.533 -0.861 -0.251 3.1 30.9 99.6 98.9 0.65
TPSS13 RT1 0.000 0.000 -0.861 -0.251 99.6 98.9 0.65
TPSS13 RT2 1.726 0.533 -0.861 -0.251 3.1 30.9 99.6 98.9 0.65
TPSS13 RT2 0.000 0.000 -0.861 -0.251 99.6 98.9 0.65
TPSS14 RT1 1.386 0.434 -0.691 -0.202 3.0 30.3 99.7 98.9 0.80
TPSS14 RT1 0.000 0.000 -0.691 -0.202 99.7 98.9 0.80
TPSS14 RT2 1.386 0.434 -0.691 -0.202 3.0 30.3 99.7 98.9 0.80
TPSS14 RT2 0.000 0.000 -0.691 -0.202 99.7 98.9 0.80
TPSS15 RT1 1.483 0.466 -0.740 -0.216 3.5 34.6 99.8 99.0 0.86
TPSS15 RT1 0.000 0.000 -0.740 -0.216 99.8 99.0 0.86
TPSS15 RT2 1.483 0.466 -0.740 -0.216 3.5 34.6 99.9 99.0 0.86
TPSS15 RT2 0.000 0.000 -0.740 -0.216 99.9 99.0 0.86
TPSS16 RT1 1.428 0.447 -0.712 -0.208 3.2 31.9 100.1 99.3 0.82
TPSS16 RT1 0.000 0.000 -0.712 -0.208 100.1 99.3 0.82
TPSS16 RT2 1.428 0.447 -0.712 -0.208 3.2 31.9 100.1 99.3 0.82
TPSS16 RT2 0.000 0.000 -0.712 -0.208 100.1 99.3 0.82
TPSS17 RT1 1.183 0.366 -0.590 -0.172 2.2 21.7 100.3 99.7 0.68
TPSS17 RT1 0.000 0.000 -0.590 -0.172 100.3 99.7 0.68
TPSS17 RT2 1.183 0.366 -0.590 -0.172 2.2 21.7 100.3 99.7 0.68
TPSS17 RT2 0.000 0.000 -0.590 -0.172 100.3 99.7 0.68
TPSS18 RT1 0.722 0.218 -0.361 -0.105 0.8 8.1 100.3 99.9 0.41
TPSS18 RT1 0.000 0.000 -0.361 -0.105 100.3 99.9 0.41
TPSS18 RT2 0.722 0.218 -0.361 -0.105 0.8 8.1 100.3 99.9 0.41
Project: ETAP Page: 110
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag
TPSS28 RT1 0.794 0.241 -0.396 -0.116 1.0 9.9 99.7 99.3 0.45
TPSS28 RT1 0.000 0.000 -0.396 -0.116 99.7 99.3 0.45
TPSS28 RT2 0.794 0.241 -0.396 -0.116 1.0 9.9 99.7 99.3 0.45
TPSS28 RT2 0.000 0.000 -0.396 -0.116 99.7 99.3 0.45
1824.0 11699.3
Project: ETAP Page: 112
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable 100.0 100.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 100.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0
Bus Voltage
OverVoltage 110.0 103.0
UnderVoltage 90.0 97.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0
Critical Report
DAMANSARA DAMAI TF1 Transformer Overload 1.000 MVA 1.069 106.9 3-Phase
EQUINE PARK TF1 Transformer Overload 1.000 MVA 1.07 107.0 3-Phase
JINJANG ET2 Transformer Overload 0.160 MVA 0.17 109.1 3-Phase
JINJANG TF1 Transformer Overload 1.000 MVA 1.07 107.0 3-Phase
KENTONMEN TF1 Transformer Overload 0.630 MVA 0.68 107.8 3-Phase
KENTONMEN TF3 Transformer Overload 0.630 MVA 0.68 107.8 3-Phase
KEPONG BARU TF1 Transformer Overload 1.000 MVA 1.07 106.9 3-Phase
KUCHAILAMA BSS TF2 Transformer Overload 50.000 MVA 51.50 103.0 3-Phase
KUCHAILAMA ET2 Transformer Overload 0.160 MVA 0.18 109.6 3-Phase
Metro Prima TF1 Transformer Overload 0.750 MVA 0.80 106.9 3-Phase
PUTRAJAYA CENTRAL TF1 Transformer Overload 1.000 MVA 1.07 106.9 3-Phase
SERDANG RAYA SOUTH TF1 Transformer Overload 1.000 MVA 1.07 107.0 3-Phase
SGBD Con1 Converter Overload 183.580 Amp 183.83 100.1 3-Phase
SGBD Con2 Converter Overload 183.580 Amp 183.83 100.1 3-Phase
SGBD Con3 Converter Overload 183.580 Amp 183.83 100.1 3-Phase
Project: ETAP Page: 113
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Critical Report
Critical Report
Critical Report
Critical Report
Marginal Report
AMPANG PARK LV1 Bus Over Voltage 0.400 kV 0.418 104.5 3-Phase
AMPANG PARK LV2 Bus Over Voltage 0.400 kV 0.42 105.7 3-Phase
BANDAR MSIA NORTH LV1 Bus Over Voltage 0.400 kV 0.42 106.2 3-Phase
BANDAR MSIA NORTH LV2 Bus Over Voltage 0.400 kV 0.43 106.7 3-Phase
Bus106 Bus Over Voltage 0.400 kV 0.42 104.1 3-Phase
Project: ETAP Page: 117
Location: 16.2.0C Date: 25-11-2017
Contract: SN: WSATKINSI2
Engineer: Revision: Base
Study Case: LF
Filename: 24112017 Config.: 2.Degraded T
Marginal Report
Marginal Report
Marginal Report
MW Mvar MVA % PF
Number of Iterations: 3