Cpa f1.1 - Business Mathematics & Quantitative Methods - Revision Guide
Cpa f1.1 - Business Mathematics & Quantitative Methods - Revision Guide
CPA
Certified Public Accountant Examination
Stage: Foundation F1.1
Subject Title: Business Mathematics &
Quantitative Methods
Revision Guide
LOSSARY
Title Page
Study Techniques 3
Examination Techniques 4
Assessment Strategy 9
Learning Resources 10
Page 2
BLANK
Page 3
STUDY TECHNIQUE
• Identify all available free time between now and the examinations.
• Rank your competence from Low to Medium to High for each topic.
• Change from one subject to another during the course of the day.
• Stick to your revision timetable to avoid spending too much time on one topic.
• Invite classmates of different strengths so that you can learn from one another.
Page 4
EXAMINATION TECHNIQUES
INTRODUCTION
Solving and dealing with problems is an essential part of learning, thinking and intelligence.
A career in accounting will require you to deal with many problems.
In order to prepare you for this important task, professional accounting bodies are placing
greater emphasis on problem solving as part of their examination process.
In exams, some problems we face are relatively straightforward, and you will be able to deal
with them directly and quickly. However, some issues are more complex and you will need to
work around the problem before you can either solve it or deal with it in some other way.
The purpose of this article is to help students to deal with problems in an exam setting. To
achieve this, the remaining parts of the article contain the following sections:
• Preliminary issues
• Conclusion.
Preliminaries
The first problem that you must deal with is your reaction to exam questions.
When presented with an exam paper, most students will quickly read through the questions
and then many will … PANIC!
Assuming that you have done a reasonable amount of work beforehand, you shouldn’t be
overly concerned about this reaction. It is both natural and essential. It is natural to panic in
stressful situations because that is how the brain is programmed.
Archaeologists have estimated that humans have inhabited earth for over 200,000 years. For
most of this time, we have been hunters, gatherers and protectors.
In order to survive on this planet we had to be good at spotting unusual items, because any
strange occurrence in our immediate vicinity probably meant the presence of danger. The
brain’s natural reaction to sensing any extraordinary item is to prepare the body for ‘fight or
flight’. Unfortunately, neither reaction is appropriate in an exam setting.
The good news is that if you have spotted something unusual in the exam question, you have
completed the first step in dealing with the problem: its identification. Students may wish to
use various relaxation techniques in order to control the effects of the brain’s extreme
reaction to the unforeseen items that will occur in all examination questions.
Page 5
However, you should also be reassured that once you have identified the unusual item, you
can now prepare yourself for dealing with this, and other problems, contained in the exam
paper.
PANIC!!
Remember that this is both natural and essential.
Pause
Take deep breaths or whatever it takes to help your mind and body to calm down.
Try not to exhale too loudly – you will only distract other students!
Do something practical
Look at the question requirements.
Note the items that are essential and are worth the most marks.
Start your solution by neatly putting in the question number and labelling each part of your
answer in accordance with the stated requirements.
Page 6
2. Define the Problem
Having dealt with the preliminary issues outlined above, you have already made a good start
by identifying the problem areas. Before you attempt to solve the problem, you should make
sure that the problem is properly defined. This may take only a few seconds, but will be time
well spent. In order to make sure that the problem is properly defined you should refer back
to the question requirements. This is worth repeating: Every year, Examiner Reports note that
students fail to pass exams because they do not answer the question asked. Examiners have a
marking scheme and they can only award marks for solutions that deal with the issues as
stipulated in the question requirements. Anything else is a waste of time. After you have re-
read the question requirements ask yourself these questions in relation to the problem areas
that you have identified:
What’s it worth?
Figure out approximately how many marks the problem item is worth. This will help you to
allocate the appropriate amount of time to this issue.
Page 7
you put in some of the parts that fit together, it is easier to see where the missing pieces
should go and what they look like.
Implement a solution
Go with your instinct and write in your solution. Leave extra space on the page for a change
of mind and/or supplementary information. Make sure the solution refers to your workings
that have been numbered.
4. Review
After dealing with each problem and question, you should spend a short while reviewing your
solution. The temptation is to rush onto the next question, but a few moments spent in
Page 8
reviewing your solution can help you to gain many marks. There are three questions to ask
yourself here:
Is my solution reasonable?
Look at the figures in your solution. How do they compare relative to the size of the figures
provided in the question?
For example, if Revenue were 750,000 and your Net Profit figure was more than 1 million,
then clearly this is worth checking.
If there were some extraordinary events it is possible for this to be correct, but more than
likely, you have misread a figure from your calculator. Likewise, the depreciation expense
should be a fraction of the value of the fixed assets.
Conclusion
In order to pass your exams you will have to solve many problems. The first problem to
overcome is your reaction to unusual items. You must expect problems to arise in exams and
be prepared to deal with them in a systematic manner. John Foster Dulles, a former US
Secretary of State noted that: The measure of success is not whether you have a tough
problem to deal with, but whether it is the same problem you had last year. We hope that, by
applying the principles outlined in this article, you will be successful in your examinations
and that you can move on to solve and deal with new problems.
Page 9
Stage: Foundation 1
Subject Title: F1.1 Business Mathematics and Quantitative
Methods
Examination Duration: 3 Hours
Assessment Strategy
Examination Approach
This subject deals with the collection and organisation of key business facts into meaningful
data and the presentation and analysis of this data into useful information. Questions are
framed in a business context, with each question having a number of sub-sections. The first
sub-section may require quantitative analysis, while others may require qualitative analysis,
that is, to provide an interpretation of the quantitative data.
Examination Format
The examination is unseen, closed
book and 3 hours’ in duration.
Students are required to answer 5
questions out of 6.
Marks Allocation
Each question carries 20 marks The
total for the paper is 100 marks.
Learning Resources
Core Texts
Curwin and Slater / Quantitative Methods for
Business Decisions, 6th Edition / Cengage
(2008) ISBN 1844805743
Clare Morris / Quantitative Approaches in
Business Studies, 7th Edition / Pearson
Education (2010) ISBN 027379417
Donald Waters / Quantitative Methods for
Business, 4th Edition / Pearson Education
(2007) ISBN 0273694588.
For greater depth on statistics, the following is
recommended:
W.M. Harper / Statistics, 6th Edition / Pearson
Education / ISBN 0273634267.
Manuals
Institute of Certified Public Accountants of Rwanda – F1.1 Business Mathematics &
Quantitative Methods
Page 10
Supplementary Texts and
Journals
Les Oakshott / Essential Quantitative Methods for
Business, Management and Finance, 4th Edition/
/Palgrave (2009)/ ISBN 9780230218185.
Lucy T. / Quantitative Techniques 6th ed. /
Continuum Publications (2002) / ISBN
0826458548.
Wisniewski M. / Quantitative Methods for
Decision Makers 5th ed / Pearson 2009 / ISBN
9780273712077 / ISBN 0273712071.
Buglear J. / Quantitative Methods for Business
Elsevier (2004) / ISBN 0750658983.
Buglear J. / Stats Means Business / Butterworth
Heinemann (2001) / ISBN 0750653647.
Soper J. / Mathematics for Economics and
Business / Blackwell (2004) / ISBN
1405111275.
Useful Websites
(as at date of publication)
http://www.icparwanda.com/services.php
http://ubalt.edu/ntsbarsh/Businessstat/
opre504.htm - Professor Hossein Arsham’s,
(FOR, FRSS, FWIF), Statistical Thinking for
Managerial Decisions.
Page 11
REVISION QUESTIONS AND
SOLUTIONS
Page 12
QUESTION 1
Two companies have provided tenders for the replacement of production machines for DIY Ltd.
Machine 1 will cost RWF25,000 and Machine 2 will cost RWF20,000. The financial
accountant estimates that the other cash flows for the machines over their four year lifetime
will be:
The loan rate charged by the bank is 14%. You may assume that the chosen machine is paid
for upon delivery on site (purchased now) and the other cash flows will occur at the end of
the year.
REQUIRED:
(a) Set out the net cash flows for each machine. (4 Marks)
(b) Derive the Net Present Value for each machine. (6 Marks)
(c) Based on your analysis advise the company which machine to purchase. (4 Marks)
(d) The supplier of Machine 1 has now offered to modify its payment terms. Instead of
requiring an initial payment of RWF25,000, they will accept an initial payment of
RWF15,000 with the balance of RWF10,000 payable in year 1. Which machine would
you now advise the company to purchase? Support your answer with relevant calculations.
(6 Marks)
[Total: 20 Marks]
Page 13
Page 14
QUESTION 2
To demonstrate that it is providing loans to small companies, the GV bank provided the
following data. This data summarises the number and level of loans to companies in both Kigali
and Butare.
REQUIRED:
(a) Compare the mean loan and standard deviation for both Kigali and Butare.
(10 marks)
(c) Explain the principles underpinning the calculations in (a) and (b) above.
(4 marks)
[Total: 20 Marks]
QUESTION 3
The local supermarket recently received a consignment of cereals from the national distributor.
The management accountant believed that the consignment is incorrectly packed and randomly
selected 49 bags to be sampled. The mean weight was found to be 42.4kgs with a standard
deviation of 4kgs. According to the distributor, the bags should have had a mean weight of
40kgs.
REQUIRED:
(a) Calculate the range of weights with a 95% confidence level. (10 Marks)
(b) Test if the population mean is greater than 40kg with a 95% confidence level.
(10 marks)
[Total: 20 Marks]
Page 15
QUESTION 4
The SME company wishes to establish a relationship between the costs of production and
the output of the company. The following data, on units of output and total costs, has been
collected over the last eight quarters:
1 10,000 32,000
2 20,000 39,000
3 40,000 58,000
4 25,000 44,000
5 30,000 52,000
6 40,000 61,000
7 50,000 70,000
8 45,000 64,000
REQUIRED:
(a) Using linear regression analysis, derive the relationship between the variables.
(10 Marks)
(b) Interpret the equation in terms of both fixed and variable costs of production. (6 Marks)
(c) Forecast the costs that should be incurred at an output level of 55,000 units (4 Marks)
[Total: 20 Marks]
QUESTION 5
(a) Your company is purchasing a Systems 102 shredder for RWF12,000. Estimate the
equal annual payments, if the machine is being purchased with a 5 year loan compounded
annually at 14%.
(6 Marks)
(b) You wish to purchase a forklift for your business. Your bank quotes you an annual
percentage rate (APR) of interest of 15% on a loan of RWF20,000 over 4 years.
Calculate the total interest paid. Assume that the interest is paid at the end of each year.
(6 Marks)
(c) Your company’s internal auditors have examined the debtors accounts. The data is
normally distributed with a mean value of RWF3,000 and a standard deviation of
RWF500. You consider that 5% of the accounts are ‘doubtful’. In this context you are
asked to determine the probability that, if an account is randomly chosen, its value will be
between RWF3,200 and RWF3,500.
Page 16
(8 Marks)
[Total: 20 Marks]
QUESTION 6
“Time series data can be used as a basis for estimating both trend and seasonal variation.
Such estimates can then be used as a basis for forecasting.”
In this context:
(a) Outline the structure of a time series including trend, seasonal, cyclical and irregular
components.
(8 Marks)
(b) Describe the moving average method for smoothing a time series. (6 Marks)
(c) Describe how the time series can be used for forecasting. (6 Marks)
[Total: 20 Marks]
QUESTION 7
CPAR Consultants Ltd. is undertaking an analysis of a proposal by Superior Products Ltd. The
company is investing in a moulding machine at a cost of RWF125,000. The machine will last
for 5 years and will be sold for scrap at the end of year 6 for RWF5,000. The machine will
require regular annual maintenance. At the end of year 1 this will amount to RWF1,500 and
will increase by 20% each year until the end of year 4. The revenue produced by the
machine is estimated at RWF30,000 at the end of year 1 and this will increase by 10% at the
end of each year over the life of the machine.
(i) Tabulate the net cash flows for the machine. (8 Marks)
(ii) Establish the Internal Rate of Return (IRR) on the investment. (8 Marks)
(iii) Interpret your result if the overdraft rate provided by the bank is 15%. (4 Marks)
[Total: 20 Marks]
Page 17
QUESTION 8
DIB Ltd. has two divisions with employees doing similar types of work. The data below gives
the distribution of earnings of a sample of employees from the two divisions.
(i) Calculate the average earnings and standard deviation for employees of both divisions
(12 Marks)
(ii) Determine if there is any significant difference between the earnings in both divisions.
Test at the 1% significance level. (8 Marks)
[Total: 20 Marks]
QUESTION 9
Fado Ltd is a training company which pays a Government allowance to trainees during various
stages of training. A recent notice by the Office of the Comptroller General has indicated that the
company will be subject to an audit in the near future. You have compiled the following data
from the company records.
Page 18
In order to prepare for the audit you have been requested by the financial controller to prepare
a report for the Board. As part of your report you are requested to:
[Total: 20 Marks]
QUESTION 10
A company is negotiating with Superior Products Ltd for the supply of batteries for its torches.
Superior Products needs to plan its production to meet the needs of the torch company. It uses the
companyʼs quarterly sales figures over the past three years to forecast future demand.
Year Q1 Q2 Q3 Q4
2007 350 285 197 390
2008 450 420 325 460
2009 550 530 415 615
(i) Derive the trend line equation using linear regression analysis (10 Marks)
(ii) Illustrate the data on a diagram and forecast the demand for the four quarters of 2010
(10 Marks)
[Total: 20 Marks]
QUESTION 11
As an independent financial adviser you are presented with the following problems from
clients
(i) The SPP Credit Union has launched a new saving scheme for investors. If your client
invests RWF10,000 now and RWF5,000 at the end of each year for the next 3 years,
he will receive 10% in year 1 and 15% in years 2 and 3. Advise your client of the sum
receivable at the end of year 3 and the overall return on the investment.
(6 Marks)
(ii) Mr P. Orr has been offered an encashment value of RWF10,000 now by the Bank of
Kigali on his endowment mortgage. However, he estimates that it will mature to
RWF13,500 in 5 years time applying an interest rate of 4%. Advise Mr P.Orr on the
best option.
(6 Marks)
(iii) “Paulʼs”, the local builderʼs provider, consults you regarding the weights of concrete
provided to construction sites. He believes that the quantities supplied exceed the required
Page 19
amounts. He wants to ensure that only 5% of any orders of concrete exceed the standard
order weight of 1,000kg. The specification of the automatic weighing machine states that
orders weigh with a standard deviation of
10kg. Advise Paul on the level that the machines average should be set to, assuming a
normal distribution. Provide a diagram to support your advice.
(8 Marks)
[Total: 20 Marks]
QUESTION 12
You are frequently asked by the financial director to make presentations to the management
team on modern business concepts. Discuss the following for inclusion in your next
presentation:
[Total: 20 Marks]
Page 20
SUGGESTED SOLUTIONS
SOLUTION 1
(a) and (b) Cash flows are set out in the table below.
Machine 1
Year Cash Inflows Cash Outflows Net Cash Flows Discount Factor Present Value
Page 21
c) The Net Present Value for machine 1 is a net loss of RWF86 while machine 2
provides a positive Net Present Value of RWF599. On this basis machine 2 is more
financially attractive and should be selected by the company.
However, the difference between the NPV for both machines is small. Machine 1 has larger
cash inflows during the early years while machine 2 has larger cash inflows during the latter
years. The basic difference between the two proposals is the initial cost. A more appropriate
analysis is to derive the internal rate of return which will provide a % return of both proposals
which can be compared with the rate provided by the bank.
(4 Marks)
d) Based on the offer of phased payments for Machine 1, the revised Net Present Value
for Machine 1 is a positive RWF1,144. Although Machine 2 also provides a positive Net
Present Value of RWF599, it is less positive than Machine 1. On this basis Machine 1 is the
more financially attractive and should be selected by the company.
(4 Marks)
Year Cash Inflows Cash Outflows Net Cash Flows Discount Factor Present Value
-1 -2 (1) - (2) -14%
0 --------- -15,000 -15,000 1 -15,000
1 18,000 -19,000 -1,000 0.877 -877
2 22,000 -12,000 10,000 0.769 7,690
3 12,000 -3,000 9,000 0.675 6,075
4 8,500 -3,000 5,500 0.592 3,256
Net Present Value 1,144
(2 Marks)
[Total: 20 Marks]
SOLUTION 2
(a) The mean loans and standard deviations are calculated below.
Kigali Region
Page 22
32 36 34 77 2618 - 2.03 156.31
36 40 38 90 3420 0.97 84.68
40 44 42 58 2436 4.97 1432.60
44 48 46 26 1196 8.97 2091.96
∑ 300 6765.10
Butare Region.
(c) From observations of the data from both series it is clear that the relative dispersion
between the distributions is not wide. This calculation is more appropriate where there is
substantial difference between the means of the distributions. The co-efficient is a measure that
enables us to quantify the relative dispersion.
(4 marks)
[Total: 20 Marks]
Page 23
SOLUTION 3
(a) Establish the hypothesis that the population mean weight, µ, is 40kgs, that is, the Null
Hypothesis (Ho). This means that we are assuming that there is no difference between the mean
and the sample mean and that any difference can be ascribed to chance. The Alternative
Hypothesis (H1) can be stated that the population mean does not equal 40kg.
Ho: µ = 40kg
H1: µ ≠ 40kg (2 marks)
or the z-score [(x – µ)/sx = (42.4 -40)/0.57 = 4.21] must fall outside ± 1.96
As the sample mean of 42.4kg falls outside the acceptance zone the null hypothesis is rejected
and H1 is accepted, that is, µ ≠ 40kg. The difference between the population and sample
means is significant at the 5% level. (4 marks)
(b) In this test it is necessary to test if the population mean is greater than the assumed
value of 40kgs, that is,
This is a one tailed test where the number of standard errors at the 5% level is 1.65. Since the
calculated z score is 4.21 and is outside the 5% value the Null Hypothesis is rejected.
(2 marks)
It can therefore be stated that the population mean is greater than 40kgs. (2 marks)
Page 24
(2 marks)
[Total: 20 Marks]
Page 25
SOLUTION 4
To determine the relationship between the variables, and the regression line Y = a + bX, we
solve the following equations
∑Y = na + b∑X
∑XY = a∑X + b∑X2 or substitute the above values into the following (2 Marks)
b = ∑XY - ∑X x ∑Y
n
2
∑X2 - (∑X)
n
a = ∑Y - b∑X
n n
X (000’s) Y (000’s) XY X
10 32 320 100
20 39 750 400
40 58 2320 1600
25 44 1100 625
30 52 1560 900
40 61 2440 1600
50 70 3500 2500
45 64 2880 2025
260 420 14900 9750
Page 26
Therefore, b = 14900 - 260 x 420/8 = 14900 - 13650
9500 - (260)/8 9750 - 8450
= 1250/1300
= 0.9615 (2 Marks)
Page 27
(b) Total Cost = Fixed cost + Variable cost per unit of production. (2 marks)
In the above equation the fixed cost is RWF21,250; this cost is independent of the
level of production. X represents the variable cost of production i.e. for each unit increase in
production the costs increases by a factor of 0.962. At some stage during the production
process the variable cost profile will intersect the fixed cost to give the breakeven value. The
sum of the fixed and variable costs gives the total cost profile.
(4 marks)
(c) The projected cost at 55,000 units: At output levels of 55,000 units, the likely incurred
costs are:
(2 marks)
= RWF21,250 + 0.962 (55,000) = RWF52,910
This projection is outside the boundaries of the relationship and the accuracy is predicated on
the principle that the linear relationship will continue. On the assumption that the linearity of
the relationship continues, the extrapolated figure can be accepted as being relatively accurate.
(2 marks)
[Total: 20 Marks]
SOLUTION 5
(a) In this case we are talking about an amortisation annuity over the 5 years, that is, the
amount borrowed (RWF12,000) is equal to the present value of the annual payments (say
A) over the 5 years at the interest rate of 14%.
RWF12,000 = A + A + A + A + A
1.14 (1.14)2 (1.14)3 (1.14)4 (1.14)5
(3 Marks)
= A (3.4331)
Page 28
(b) The interest will be compounded over the four years. The compound interest is
derived as follows (the total cost at the end of four years less the initial cost equals the interest
paid)
(3 Marks)
(c) Probability of more than RWF3,200 is given by
Z = (3200 - 3000)/500
= 0.4
Z = (3500 - 3000)/500
= 1.00
Therefore, probability is within the range 3200 to 3500, that is, 0.3446 – 0.1587, i.e. 0.1859.
(2 Marks)
[Total: 20 Marks]
Page 29
SOLUTION 6
A time is a set of results for a particular variable of interest taken over a period of time. There are
four separate elements to consider
- Trend component: in a set of time series data the measurements are taken at regular
intervals. However, there may be random fluctuations in the data but in some cases the
data will show a shift to lower or higher values over the time period in question. This
movement is called the trend and is usually the result of some long term factors such as
changes in expenditure, output, etc. There may be various trend patterns such as increasing
linear trends, decreasing linear trend, non-linear trend or no trend.
(2 Marks)
- Cyclical component: a time series may show a trend of some sort but may also show a
cyclical pattern of alternative sequences of observation above and below the trend line.
This moves from the medium to longer term around the trend line. Any pattern of this
type which lasts longer than a year is called a cyclical element for the time series. This is
generally a very common occurrence.
(2 Marks)
- Seasonal component: there may be a pattern of variability in regular cycles within a year.
The element of the time series which represents variability due to seasonal influences
is called the seasonal element. It normally refers to movements over a one year period
but it can also refer to any repeating pattern of less than one-year’s duration
(2 Marks)
- Irregular component: this is the element which cannot be explained by the trend,
cyclical and/or seasonal elements and is entirely unpredictable. It represents the random
variability in the time series, caused by unanticipated and non-recurring factors which
are unpredictable. It gives a dramatic and unexpected departure from trend.
(2 Marks)
Smoothing methods are used to smooth out the irregular element of time series where there are
no significant trends, cyclical or seasonal pattern.
Moving average: this method involves using the average of the most recent data values to
forecast the next period. The number of data values used can be selected in order to minimise
the forecasting error. To find the moving average, the simple average for a specified number
of items of data is found. For example, with quarterly data a simple average for four items of
data can be calculated and then move that average along. This is done by recalculating the
average having dropped the initial item of data and adding a subsequent item of data. This
gives the four quarter moving total. The moving totals fall in between the actual quarterly
data, that is, the first moving total falls between quarters 2 and 3. The respective four quarter
Page 30
moving totals are divided by 4 to find the four quarter moving average. The data is centred by
summing respective pairs of data and dividing by two. This smooths the data so that the trend
line can be derived. In this way moving averages are used to ‘smooth out’ fluctuations in the
data and obtain a trend line. This is the moving average trend which can be plotted to show
the direction. Since the trend does not vary significantly in short time periods the trend can
be projected to forecast future events.
However, there are limitations to the use of moving averages. Equal weighting is given to each
of the values used in the moving average calculation whereas the most recent data is more
relevant to current conditions. The moving average takes no account of data outside the period
of average so full use is not made of all the data. The use of the unadjusted moving average as a
forecast can cause misleading results when there is an underlying seasonal variation.
(6 Marks)
Forecasting from the time series lies in our knowledge of the behaviour of trend. Since the trend
does not vary significantly in short time periods, the trend can be projected to forecast future
events. A time series can be used to forecast where there are no significant trends, cyclical
or seasonal elements using the moving averages method as set out above. Using moving
averages, to get an accurate projection of trend without plotting the values, it is necessary to
derive the average rate of change of the trend. This can be done by deducting the first value
of the trend from the last trend value, taking the average (less one) and adding to the last
trend value. This can be done for a number of values to forecast for a number of periods into
the future. This is the moving average trend which can be plotted to show the direction. The trend
can be projected forward. However, the further the trend is projected the greater is the
possibility of inaccuracy.
However, if there are both trend and seasonal elements in the series there are other methods
which may be used. The first stage in such a forecasting technique is to calculate the seasonal
factors by smoothing out the time series using the moving averages method. If the seasonal
factors are quarterly then the moving average is calculate on groups of four data points. When
seasonal elements are involved it is necessary to work out the centred moving averages which
are averages of the moving averages. Dividing the original observation by the equivalent
centred moving average gives a seasonal factor for each observation. This is done for all
quarters.
If the time series shows a long term linear trend, linear regression may be used. A linear
regression equation linking dependent and independent variables can be derived but this
assumes that we have a linear trend and that the future will be like the past.
(6 Marks)
[Total: 20 Marks]
Page 31
SOLUTION 7
(ii) Calculation of the Internal Rate of Return. To calculate the IRR it is necessary to derive present
values. Taking discount values at 14% and 20% the following table is developed.
Net Cash Flows Discount Factor PV Discount Factor PV
Year
RWF @ 12% RWF @ 18% RWF
N1I2 - N2I1 , where discount rate I1 gives NPV N1 and discount rate I2 gives NPV N2
N1 - N2
Page 32
IRR = 810.9 x 0.18 - (17,356) x 0.12 = 2,229 = 12.3%
810.9 - (17,356) 18,167
(4 Marks)
Page 33
(iii) Interpretation of the result. The value of 12.2% can be interpreted as the rate of
return that the project will earn. On face value the NPV is positive at 12% and this
represents a positive result. However, if the cost of capital to the company, represented by
the rate of interest charged by the bank of 15%, is greater than this value, the project is not
viable. However, there are mechanisms for deriving the real cost of capital to the company
based on its equity and funds which may not be representative of the bank rates. The
decision of the company in this case is that the project, as a stand alone investment, will not
contribute the required return.
(4 Marks)
[Total: 20 Marks]
SOLUTION 8
(i) The average earnings and standard deviations for employees in both divisions.
Division 1
Lower Upper Freqf Mid point Fx fx2
Boundary Boundary (x)
400 420 11 410 4,510 1,849,100
420 440 20 430 8,600 3,698,000
440 460 35 450 15,750 7,087,500
460 480 40 470 18,800 8,836,000
480 500 25 490 12,250 6,002,500
500 520 10 510 5,100 2,601,000
∑ 141 65,010 30,074,100
Standard Deviation
Division 2
Page 34
∑ 227 105,970 49,650,700
Standard Deviation.
Summary
Division 1 Division 2
Mean RWF461.1 RWF466.8
Std Deviation RWF26.71 RWF28.23
Number 141 227
(ii) In order to test if there is a difference in the earnings between both divisions a hypothesis
can be used. In this case we are testing for the difference of means in a similar way as confidence
intervals for the difference of means. The difference between the sample estimates is first
calculated and the values given by the null hypothesis, transform the difference to a number of
standard errors, then compare with a critical value consistent with the alternative hypothesis. In
this way we are comparing if the two sample means have come from the same population,
The Z statistic is X1 - X2 , that is, the difference in means divided by the standard error
√S12 + S22
N1 N2
2 2 2 2
Since the calculated value is less than this level we accept the null hypothesis – the samples do
not provide evidence that there is a difference in the long-run earnings of employees.
Page 35
[Total: 20 Marks]
Page 36
SOLUTION 9
Frequency
16
14
12
10
0
260 280 300 320 340 360 380 400 420 Weekly allowance RWF
(8 Marks)
The modal value of the allowance is approximately RWF310, found from the histogram.
The median is the value of the 40.5 trainee in group 320 – 340.
From the formula the median value = 320 + (40.5 – 38)/15 x 20 = RWF323.33.
(6 Marks)
(iii) Comparison of the mode and median.
The mode is the greatest frequency of the distribution and is in the range RWF320 -
RWF340. The accurate value is derived from the histogram above.
Page 37
The median represents 50% of the data above and below the mid point. It means that 50% of
the trainees are receiving more than RWF323.23 and 50% less than RWF323.23 (8 Marks)
Page 38
SOLUTION 10
(i) The trend for this data can be developed using either a moving average technique or linear
regression analysis. A four quarter centred moving average could be derived allowing us to
decompose the data to isolate the trend by means of either additive or multiplicative models. In the
present case it may be substantially easier to develop the trend by means of linear regression without
smoothing the data, that is,
y = a + bx where
a= Σy - bΣx
n n
b = Σxy - (ΣxΣy)/n,
Σx - (Σx) /n
2 2
(5 Marks)
= 3530.5 = 24.69
143
Page 39
(ii) Plotting a graph of the points and projecting the data for 2010. (5 Marks)
Y Sales
600
300
Regression
Line
Time
Series
0 4 8 12 16
Quarters
The projected points for the four quarters of 2010 are calculated from the regression line for
quarters
13,14,15,16.
(Total: 20 Marks)
Page 40
SOLUTION 11
At end year 1
+10% RWF 1,000
RWF 5,000 RWF16,000
At end year 2
+15% RWF 2,400
RWF 5,000 RWF23,400
At end year 3
+15% RWF 3,510
RWF 5,000 RWF31,910 ---- Sum Receivable (3 Marks)
(3 Marks)
= RWF11,096
Since this value is greater than RWF10,000, the option to receive RWF13,500 in 5 years is
the best option.
(6 Marks)
µ = 1000 - 1.645 x 10
= 983.55kg
To ensure that only 5% of the orders are overweight the machine should be set to 983.55kg.
(4 Marks)
Page 41
Diagram (4 Marks)
100 kg
Area
= 0.05
gives z
= 1.645
[Total: 20 Marks]
Page 42
SOLUTION 12
(i) Structure of a time series. A time series is a set of results for a particular variable
taken over a period of time. There are four separate elements in the structure
- Trend: In many cases the data exhibits a shift either to lower or higher values over
the time period in question. This movement is called the trend and is usually the result
of some long-term factors such as changes in expenditure, sales, demographic factors, etc.
There may be many trend patterns – increasing linear trend, decreasing linear trend, non-
linear trend or no trend.
- Cyclical: A time series may display a trend of some form but may also show a cyclical
pattern of alternative sequences of observation above and below the trend line. Any regular
pattern which lasts longer than a year is the cyclical element of the time series. This is a
common occurrence represented by the retail sector of business.
- Seasonal: although the cyclical patter may be displayed over a number of years, there
may be a pattern of variability within one-year periods. The element of the time series which
represents variability due to seasonal influences is the seasonal element. While it normally
refers to patterns over a one-year period, it can also refer to any repeating pattern of less
than one-yearʼs duration.
- Irregular element: this is the element which cannot be explained by the trend, the
cyclical or seasonal elements. It represents the random variability in the time-series, caused
by unanticipated and non-recurring factors which are unpredictable. There are particular
methods used to smooth out the irregular element of time series where there are no
significant trends, cyclical or seasonal patterns such as moving averages or exponential
smoothing.
(5 Marks)
(ii) Investment Appraisal. Many use many quantitative techniques as an aid to
decision making. One of the most important applications is concerned with investment
decisions. Managers often have to make choices between alternative decisions, they need to
consider future costs and revenues and the importance of incremental changes in costs and
revenues. It is also critical to consider the time value of money because of time scales
involved. The managerʼs decision to invest is based on three important factors – the
estimate of the future based on forecasts of costs, revenues, inflation, and interest rates; the
alternatives available for investment: techniques to support the decision must be used; the
business attitude to risk: because of the uncertainty of the future and project uncertainty,
additional techniques must be used. A number of these techniques used in investment
appraisal are, the accounting rate of return; payback; discounted cash flow, such as net
present value and internal rate of return.
The accounting rate of return is the ratio of the average annual profits, after depreciation, to
the capital involved. Variations of this exist but it has some drawbacks – it does not allow
for the timing of cash flows and profit has subjective elements. Payback is a popular
technique which is defined as the period which it takes for the projects net cash flows to
recover the original investment. Payback favours quick return projects
Page 43
– the project with the shortest payback period is accepted. However, it does not measure
overall investment worth since it does not consider cash flows after the payback period or
the timing of cash flows. Net Present Value uses discounting principles and involves
calculating the present value of expected cash inflows and outflows and establishing
whether the present value of the net cash flows is positive. The internal rate of return is the
discount rate which gives zero NPV. If the calculated IRR is greater than the companyʼs
cost of capital the investment is accepted. However these two techniques do not necessarily
rank investment proposals in the same order of attractiveness. But the IRR technique is used
extensively in investment appraisal decisions.
(5 Marks)
(iii) Network Analysis. This deals with a range of techniques used to aid managers in the
planning and control of projects. These techniques show the inter-relationship of the
various jobs to be done to complete the project and clearly identify the critical parts of the
project. They provide planning and control information on the time, cost and resources
required. These techniques are of particular value where projects are large and contain many
related and interdependent activities, where many types of facilities, high capital
investments and a large number of staff are involved, where projects have to be completed
within target time and costs.
Path analysis. To develop the technique it is necessary to know the activities involved,
their logical relationship, an estimate of the time the activity is expected to take. It may be
necessary to have a range of estimates of times, costs, resources and probabilities. Once the
logic of the activities has been agreed and an outline network drawn, it can be completed by
inserting the activity duration times. These times may be estimated by using probabilities
(developing the expected time) or using basic time estimates. A basic feature of the analysis
is the calculation of the project duration which is the duration of the critical path. This is the
path through the network which gives the shortest time in which the whole project can be
completed. It is the chain of activities with the longest duration times. In a network there
may be more than one critical path. The activities along the critical path are vital activities
which must be completed on time otherwise the project will be delayed. If it is required to
reduce the overall project duration then the time of one or more of the activities on the
critical path must be reduced.
A further important feature of the analysis deals with the process of cost scheduling. This
implies that by using more resources the duration could be reduced but at the expense of
higher costs. The costs associated with delivery of the project, as designed, is the ʻnormalʼ
cost. It is possible to reduce the activities by means of extra wages, overtime, additional
facility costs which are higher than normal and are called crash costs. This is an element of
least cost scheduling which finds the least cost method of reducing the overall project
duration, time period by time period.
(5 Marks)
(iv) Measures of dispersion. Measures of dispersion represent a measure of the extent of
spread of data around the mean or average of the data. The simplest measure of
dispersion is to take the absolute difference between the highest and lowest value of the
raw data – ʻthe rangeʼ. The interquartile range is the absolute difference between the upper
and lower quartiles of a distribution. These measures of dispersion involve comparing two
different points on the frequency distribution such as the maximum and minimum points
(the range) or the upper and lower quartiles. However, other measures of dispersion which
compare all the points on the frequency distributions are more important. The ʻmean
Page 44
deviationʼ, that is, the average of the absolute deviations from the arithmetic mean, may be
used. However, if is the basis for the most common measures of dispersion – the variance
and the standard deviation. The variance is derived by squaring all the deviations from the
arithmetic mean. Rather than use squared units, it is more realistic to express solutions to
problems in terms of single units. The standard deviation takes the square root of the
variance. The standard deviation is then the square root of the average of the squared
deviation from the mean and is the most commonly used measure to explain the dispersion
of data. These various methods can be used for both grouped and ungrouped data.
(5 Marks)
Page 45