Project
Project
This assignment contains 2 tasks; Task 1 and Task 2. Answer all the questions given.
* Prepare cover page including the list of members and contribution of each member.
* Prepare presentation slides and submit in the Kalam as well
* Submit report in Word file, slides (.ppt) and for the Gantt Chart, please upload the Ms. Project
file
Table 1 required:
Additional information: -
• Project start date is 1st October 2023.
• Add milestones at activity codes: C and H.
a) Please establish the IT project from the given Table 1 by constructing a Gantt Chart
using the Microsoft Project. Refer to the below changes which are only applied for Gantt
Chart and not for Q1 b).
For the activity code: G, change the predecessor to B(FS3)
For the activity code: H, change the predecessor to G only
(10 Marks)
Year 0 1 2 3 4 5 6
Cost 43,000 18,00 33,00 35,00 20,000 29,00 24,00
0 0 0 0 0
Benefit 0 32,00 39,00 44,00 47,000 59,00 66,00
0 0 0 0 0
Table 2 required:
i. Develop a cost-benefit analysis table based on the table above. (Use 2 decimal
places in all calculations and all steps must show clearly.)
(9 Marks)
ii. Calculate the Return on Investment (ROI) of this information system project.
(2 Marks)
iv. Use the Present Value Factors (based on discount rate 13% p.a.) to analyse the Net
Present Value (NPV) of the new information system.
(9 Marks)
v. Analyze the project based on the calculated payback period and ROI
(3 Marks)
b) Earned Value Management (EVM) (25 Marks)
i. Estimate the project cost and durations for your proposed project by filling the
Table 3 as below (refer to the example and you are not allowed to use the same
figures/ number as example (Project IT). (Hint: give/ assume any relevant and
logical amount and duration for your proposed project).
(3 Marks)
i. Analyze EVM this project (hint: calculate PV, EV, CV, SV, CPI, SPI, EAC, ETC, VAC
and TCPI).
(20 Marks)
ii. Infer or summarize this project based on the calculated EVM in Q2b) ii. as above.
(2 Marks)