Enhanced Resource Leveling Technique For Project Scheduling
Enhanced Resource Leveling Technique For Project Scheduling
To cite this article: Jaejun Kim, Kyunghwan Kim, Namyong Jee & Yungsang Yoon (2005)
Enhanced Resource Leveling Technique for Project Scheduling, Journal of Asian Architecture
and Building Engineering, 4:2, 461-466, DOI: 10.3130/jaabe.4.461
1
Professor, Dept. of Architectural Engineering, Hanyang University, Seoul, Korea
2
Research Scientist, Construction Research Institute, Hanyang University, Seoul, Korea
3
Professor, Dept. of Architectural Engineering, Hanyang University, Seoul, Korea
4
Graduate Student, Dept. of Architectural Engineering, Hanyang University, Seoul, Korea
Abstract
Since a construction project involves a series of activities that utilize resources to achieve its goal within
a given time period, efficient resource management is a prerequisite for its success. Two major techniques
of resource management are resource constrained scheduling (RCS), which focuses on limited resource
availability, and resource leveling, which focuses on a smooth resource usage pattern for a fixed project
completion time. Although they can successfully generate schedules that accomplish their own objectives,
they have certain limitations. RCS assumes a single fixed resource supply, and resource leveling may not
improve the smoothness of resource usage beyond a certain level due to the fixed project completion time. In
order to overcome these limitations, this study proposes a model to enhance the minimum moment algorithm
of resource leveling for the efficient use of resources within an appropriate project completion time.