1) Payment –100% on Successful Delivery, Commissioning, Installation, and Training of the machine /

equipment. This is in supersession of GeM payment terms & conditions.

2) Certificate of Registration for GST - Bidder organization certificate

3) Pre-Delivery Inspection: (i). Prior intimation (minimum two weeks before) and co-ordination with
CIPET centres for pre-delivery inspection in all respect as per the technical specification of the
Tender at Original Equipment Manufacturer’s / Supplier’s site. (ii). Pre Delivery Inspection (PDI) will
be conducted at Supplier site in India, by CIPET officials on receipt of confirmation from the supplier
(iii)During the PDI, the raw material has to arrange by the Supplier.

4) Scope of supply including supply and installation, commissioning of the equipment.

5) Payment will be made as per actual.

6) Age of the Firm shall be More than 03 Years as on 31.03.2023.

7) Completion Period & Liquidated damages:

The entire work shall be completed within 30 days from the date of issue of Purchase Order. Failure
to complete the above work within 30 days as above will attract liquidated damages equivalent to
0.5 percent of the Purchase Order of the delayed goods or unperformed services for each week of
delay until actual delivery or performance, up to a maximum deduction of Max of 10% of the
delayed goods or services Contract price. Once the maximum is reached, the purchaser may consider
termination of the contract.

8) Warranty/Guarantee:

12 Months from the date of Installation.

The Supplier shall give warranty that goods to be supplied shall be new and free from all defects and
faults in material, workmanship, and manufacture and shall be of the highest grade and consistent
with the established and generally accepted standards for materials of the type ordered and shall
perform in full conformity with the specifications. The Supplier shall be responsible for any defects
that may develop under the conditions provided by the supplier and under proper use, arising from
faulty materials, design or workmanship such as corrosion of the equipment, inadequate contact
protection, deficiencies in circuit design and or otherwise and shall remedy such defects at his own
cost when called upon to do so by the Purchaser who shall state in writing in what respect goods are
faulty.

If it becomes necessary for the supplier to replace or repair any defective portion/portions of the
equipment under this clause, the provisions of the clause shall apply to the portion/portions of
equipment’s replaced or repaired. If any defect is not remedied within a reasonable time, the
Purchaser may proceed to get the work done at the Supplier’s risk and expenses, but without
prejudice to any other rights which the Purchaser may have against the Supplier in respect of such
defects.

Replacement under warranty clause shall be made by the Supplier free of all charges at site including
freight, insurance and other incidental charges.

In case the fault cannot be rectified at the premises and the system/equipment needs to be taken
out of the premises, vendor shall provide a standby system/equipment of similar/equivalent
configuration till the original system / equipment is replaced after rectification. Transportation
charges if any, shall be borne by the vendor. The vendor shall be responsible for routine and
breakdown maintenance of the equipment during warranty period.