PORTLAND-POZZOLANA CEMENT AS PER IS: 1489 (Pt-1)-2015
S.No. Parameter Requirements
Test Method IS: 1489 Results Conformity
(Pt-1)-2015
Physical Properties:
1. Fineness, m²/Kg IS:4031 (Pt-2)-1999 300 Min. 385 Yes
(RA – 2018)
2. Soundness: IS:4031 (Pt-3)-1988
(RA – 2019)
(a) Le-Chatelier Expansion, 10 Max. 1.17 Yes
mm
3. Setting Time (minutes) IS:4031 (Pt-5)-1988
(RA – 2019)
(a) Initial 30 Min. 155 Yes
(b) Final 600 Max. 260 Yes
4. Compressive Strength, IS:4031 (Pt-6)-1988
MPa (RA – 2019)
(a) At 72 ± 1H 16 Min. 24.5 Yes
(b) At 168 ± 2H 22 Min. 28.0 Yes
(c ) At 672 ± 4H 33 Min. Awaited ---
5. Standard Consistency, % IS:4031 (Pt-4)-1988 -- 28.5 --
(RA – 2019)
Note: - With respect to the above test sample complies with specification IS: 1489 (Pt – 1)-2015 and with
decision rule ATRL/MSF/7.8.6.2 C Continue…..
Page No.:-1/2
Authorized Signatory
Sunil Prajapati
Note: Terms & Conditions are Printed Overleaf (Technical Manager)
TEST REPORT
Issued To : M/s Office Director Maharaja Report No. : ATRL/BPL/2023/11/02/03
Matrind Singh Judev White ULR No. : TC406623000001083F
Tiger Safari & Zoo. Date of Receiving : 02/11/2023
MukundpurSatna (M.P.) Date of Testing Start : 03/11/2023
Date of Completion : 01/12/2023
Date of Reporting : 01/12/2023
Sample Condition : Packed
Environment Temperature Humidity
:
Condition 27±2°C 65±5%
Description : PPC Cement
Make : Ultratech
Reference No. : क्रमांक / मु. कु . ज़ू/1135 दिनांक: 01.11.2023
Construction work in Maharaja Martand Singh Judeo White Tiger Safari and Zoo
Name of Work :
Mukundpur in the Year 2023 - 2024.
TEST RESULTS
PORTLAND-POZZOLANA CEMENT AS PER IS: 1489 (Pt-1)-2015
S.No. Parameter Test Method Requirements As Per Results Conformity
IS: 1489 (Pt-1)-2015
Physical Properties:
4. Compressive IS:4031 (Pt-6)-1988
Strength, MPa (RA – 2019)
(c) At 672 ± 4H 33 Min. 41.8 Yes
Note: - With respect to the above test sample complies with specification IS: 1489 (Pt – 1)-2015 and
with decision rule ATRL/MSF/7.8.6.2 C
Page No.:-2/2
********End of Report********