Profile
Profile
Audit and analysis of the DSC system at Peñasquito mining in the grinding
process, Pebbles, and new projects PLP (Pyrite Leach Proyect), and CPP
(Carbon Pre-flotation Project). Revision and update of instrumentation and
electrical engineering. Reengineering in programming, standardization and
improvement in control logic, and in HMI according to the best practices
recommended by Rockwell Software. Documentation of equipment control
philosophies. Integration of instruments, electrical equipment, and equipment
packages to the DSC system. Responsible for the management of timesheets,
travel and accommodation of personnel in turn.
Page 1 of 3
Activities: Programming PLC for the control of electric room, conveyors and
their
subsystem. Test for software acceptation. Precomissioning and
comissioning control, instrumentation and electrical equipment. Startup of
the conveyors with resistive starters SRC and with frequency drivers
Rockwell, also auxiliary systems and the instrumentations involved.
Engineer review and modification of the drawings of the equipment.
M3 MEXICANA
Control System Integrator
julio de 2012 - agosto de 2016 (4 años 2 meses)
Sonora, México
Projects:
- Molybdenum Plant No. 2 (Cananea, Sonora.)
Programming: RsLogix 5000, RsLogix 500, Factory Talk View V7 Site
Edition, Machine Edition, and Factory Talk Historian.
Activities: Configuring workstations, engineer stations and servers for the HMI
network applications. Programming HMI screens and PLC for mining
process, review plans instrumentation engineer and network, and
integration of PLC's and HMI for commissioning of equipment.
Electromecánica Industrial
Control Engineer
junio de 2010 - julio de 2012 (2 años 2 meses)
Guadalajara y alrededores, México
Industrial Partner
Page 2 of 3
Control Technician.
agosto de 2009 - julio de 2012 (3 años)
Guadalajara y alrededores, México
Educación
Universidad Tecnologica de Jalisco
Technetronic Engineer · (2010 - 2012)
Page 3 of 3