Ruston tb5000 Gen
Ruston tb5000 Gen
Ruston tb5000 Gen
THERMOCOUPLES
NHP
1
NHP
2
NHP
3 GENERATOR
NST STARTER
PCD
THERMOCOUPLES AUTO
F SYNC WT
E (BP EGT)
IGV RAM E
D
B
HYDRAULIC A
POWER C
UNIT SERVO K
VALVE
SERVO
CONTROLLER
I/E
BYPASS
VALVE
GAS LIQUID
FUEL FUEL
SPEED STOP GAS FUEL STOP
FUEL
RATIO VALVE CONTROL VALVE
PUMP
VALVE FUEL VALVE
FLOW
DIVIDER
4-20 mA 4-20 mA
FUEL PRESSURE INPUT LIQUID FUEL FLOW INPUT
4-20 mA 4-20 mA
SRV OUTPUT LCV VALVE OUTPUT
4-20 mA
GCV OUTPUT BP EGT THERMOCOUPLE
4-20 mA INPUTS
INLET GUIDE VANE OUTPUT
4-20 mA RAISE
PCD INPUT
FREQUENCY SYNCHRONIZING INPUT
NST INPUT LOWER
FREQUENCY
4-20 mA
WATTS INPUT
FREQUENCY SPEED INPUTS
2oo3 VOTE EGT THERMOCOUPLE mV
FREQUENCY INPUTS
Simplified schematic showing a Petrotech Ruston TB-5000 gas turbine generator drive application control
package integrated into an advanced PLC-based control system. Shown with dual fuel system.
PRODUCT BULLETIN 08008 - RUSTON TB-5000® GAS TURBINE GENERATOR DRIVE APPLICATION CONTROL PACKAGE - Page 2
This document is a Petrotech, Inc. copyrighted intellectual property and may be changed at any time without notice.