AVANTIS
POLICY
Avantis will take all reasonable steps to reduce the risk of hearing damage caused by noise and, where possible,
this will be achieved by means other than the use of personal protective equipment.
The company will also take all reasonable steps to minimise the escape of noise and the disturbance caused from
our premises to the environment and persons in the neighbourhood.
ARRANGEMENTS
RISK ASSESSMENT
An assessment of noise levels will be undertaken by a competent person and a corresponding safe working
procedure developed.
Assessments and surveys will be recorded and updated regularly, particularly when changes in work practices
cause changes in the noise exposure levels of employees.
All downloaded and printed copies of this document are considered as Uncontrolled
Page 2 of 3
AVANTIS
RECORDS
Records will be kept of:
All downloaded and printed copies of this document are considered as Uncontrolled
Page 3 of 3