Budget Report Fy 2018 19 Final

Download as pdf or txt
Download as pdf or txt
You are on page 1of 236

Orange County Water

District

Budget Report
FY 2018-19
Orange County Water District
Budget Report
Fiscal Year 2018-19
Board of Directors

Denis Bilodeau
President
Philip Anthony Shawn Dewane
1st Vice President 2nd Vice President

Cathy Green

Dina Nguyen

Vicente Sarmiento

Stephen Sheldon

James Vanderbilt

Bruce Whitaker

Roger Yoh

♦ ♦ ♦ ♦ ♦ ♦ ♦

Michael R. Markus, P.E.


General Manager
Table of Contents

ORANGE COUNTY WATER DISTRICT


BUDGET REPORT
FISCAL YEAR 2018-19

OCWD HISTORY AND CHARACTER

SECTION 1 - GENERAL MANAGER’S MESSAGE

SECTION 2 - SUMMARIES
COMBINED SUMMARY
SOURCES AND USES OF FUNDS
GENERAL FUND BUDGET SUMMARY
GENERAL FUND BUDGET COMPARISON
DISTRICT MEMBERSHIPS
OCWD STAFFING HISTORY
KEY FINANCIAL METRICS

SECTION 3 - OPERATIONS AND COST CENTER DESCRIPTIONS


OCWD ORGANIZATIONAL STRUCTURE
COST CENTER PROFILES
SECTION 4 - DEBT SERVICE

SECTION 5 - OTHER POST EMPLOYMENT BENEFITS

SECTION 6 - WATER PURCHASE

SECTION 7 - BASIN EQUITY ASSESSMENT

SECTION 8 - CAPITAL IMPROVEMENT PROGRAM

SECTION 9 - NEW EQUIPMENT (FIXED ASSETS) SUMMARY


NEW EQUIPMENT BUDGET FUNDED BY OPERATING REVENUES
SECTION 10 - REPLACEMENT AND REFURBISHMENT

SECTION 11 - COST CENTER DETAIL


GENERAL FUND BUDGET COST CENTER DETAIL
ACRONYMS AND ABBREVIATIONS

Orange County Water District FY 2018-19 Budget Report


ORANGE COUNTY WATER DISTRICT
HISTORY AND CHARACTER

The District receives an average of only 13 to The groundwater basin was used by early
15 inches of rainfall annually, yet sustains a settlers to supplement flows from the Santa
population of approximately 2.5 million Ana River.
people. The residents and businesses within
the District have two primary sources of As the area developed into a thriving
drinking water. One source is a natural agricultural center, the increased demand
underground reservoir, called the Orange upon the subsurface water by the county’s
County groundwater basin. The other source, many wells resulted in a gradual lowering of
referred to as imported water, comes from the water table. In response, the Orange
Colorado through the Colorado River County Water District was formed in 1933 by
Aqueduct and from the Sacramento/San a special act of the California State
Joaquin Delta in Northern California through Legislature. OCWD manages the
the State Water Project. groundwater basin that underlies the
northwest half of the county, supplying a
significant percentage of the District’s total
water demand. The remaining demand is
obtained through the Colorado River
Aqueduct and State Water Project via the
Metropolitan Water District of Southern
California and the Municipal Water District of
Orange County.

DISTRICT VITAL STATISTICS

Date of Enactment: 1933


Form of Government: Special District of the State of California
Area (square miles): 381
Employees (full-time equivalent): 220.5

Major Groundwater Producing Agencies:


Anaheim, City of Mesa Water District
Buena Park, City of Newport Beach, City of
East Orange County Water District Orange, City of
Fountain Valley, City of Santa Ana, City of
Fullerton, City of Seal Beach, City of
Garden Grove, City of Serrano Water District
Golden State Water Company Tustin, City of
Huntington Beach, City of Westminster, City of
Irvine Ranch Water District Yorba Linda Water District
La Palma, City of
Section 1
General Manager’s Message
Board of Directors
March 7, 2018
Page 2 of 8

 A two percent cost of living adjustment and three percent merit


increase based upon employee performance have been budgeted.
 Budgeted full time employee headcount maintained at 220½.
 The groundwater basin’s projected June 30, 2018 accumulated
overdraft is estimated at approximately 287,000 acre-feet (af) and is
expected to reduce by approximately 6,000 af to 281,000 af by end of
the fiscal year.

Table 1
PROPOSED CHANGES TO DRAFT FY 2018-19 BUDGET
ITEM ADDITION NOTES
(REDUCTION)
Water $4,517,500 Payment to Metropolitan water district for 6500
Budget acer-feet of water received during fiscal year
2017-18.
Capital $(2,500,000) Deferment of Prado sediment management
Project demonstration project.
PAYGO $(4,000,000) Lower the PAYGO contribution from $8 million to
Fund $4 million.

The recommended budget would require an increase in the Replenishment


Assessment (RA) to $462 per acre-foot for FY 2018-19 from the current year’s
RA of $445. Table 1A provides a summary of the proposed budget:
Table 1A
2018-19 PROPOSED BUDGET
BUDGETED PROPOSED
EXPENDITURES FY 17-18 FY 18-19
($ MILLIONS) ($ MILLIONS)
General Fund 66.1 69.9
Debt Service 36.0 36.9
Water Purchases 49.7 61.6
New Equipment 0.2 0.3
Capital Improvement Program 34.4 47.1
Refurbishment and Replacement Expenditures 16.7 22.6
Retiree Health Insurance Trust 1.3 1.3
Total $204.4 $239.7
Board of Directors
March 7, 2018
Page 3 of 8

BUDGET DETAILS
The Orange County Water District strives to improve the efficiency of all aspects
of its operations in its continuing efforts to increase the water quality and
reliability of Orange County’s local water resources at the lowest possible cost.
The FY 2018-19 budget reflects the wide range of programs necessary to
accomplish the District's primary mission of proactively managing the Orange
County groundwater basin. The following sections provide highlights of the
budget.
EXPENDITURES
GENERAL FUND BUDGET - $69.9 MILLION
The District has 21 cost centers and their proposed activities for the year are
provided in detail in later sections of this document.
The District continually attempts to minimize increases to the General Fund by
taking actions such as limiting administrative personnel, reviewing operations,
maximizing outside funding opportunities, and reviewing all vacant positions
before they are refilled. The General Fund budget contains the expenses of
operating a number of facilities including:
 The GWRS Advanced Water Purification Facility
 Green Acres Project (GAP)
 Talbert seawater barrier injection facilities
 Water quality monitoring well maintenance and sampling
 Laboratory
 Recharge operations in Anaheim and Orange
 Alamitos seawater barrier injection facilities
 Prado Wetlands and water conservation programs
The District’s total salary and benefit costs are projected to be $34.9 million,
which is allocated as follows: $34.5 million to the General Fund and $0.4 million
to capital projects. As described in the Work Plans, the budget proposes a
headcount of 220½.
WATER PURCHASE BUDGET - $61.6 MILLION
The proposed water budget calls for purchasing 65,000 acre-feet of MWD
untreated full service water. Additionally the District would pay for 13,000 acre-
feet of in-lieu water that was received in FY2017-18 under the MWD Cyclic
Program. The total water budget is $61.6 million. Any money not spent in the
annual water budget would remain in the water reserve fund. The basin’s
Board of Directors
March 7, 2018
Page 4 of 8

accumulated overdraft is estimated to be 287,000 acre-feet as of June 30, 2018.

Debt Service Budget - $36.9 Million


The District will have more than $593 million in outstanding debt at the start of
the budget year. This year’s total debt service budget will be $36.9 million,
comprised of $8.14 million of fixed rate debt, $3.58 million of variable rate debt,
$1.27 million of swap payments, $18.03 million in SRF debt payments, $4.93
million of commercial paper debt and $0.96 million for debt administration.
Variable rate debt interest cost has been budgeted at 2.75 percent.
The District holds very high credit ratings of AAA from Standard & Poor’s and
Fitch along with an Aa1 rating from Moody’s. The ratings assigned by these three
agencies have a direct impact on the District’s ratepayers. The District’s high
credit ratings translate into lower annual interest payments and reduced letter of
credit fees on its variable rate debt and commercial paper.
RETIREE HEALTH INSURANCE TRUST FUND - $1.3 MILLION
The District conducted a biennial actuarial study in 2015 to determine the
estimated accrued liability of providing the retiree medical benefit which is $16.2
million. The annual cost to fund this liability (Annual Required Contribution or
ARC) was estimated in the report at $1.3 million. At the end of FY 2018-19, the
trust fund is expected to have a value of approximately $10.4 million. The
recommended FY 2018-19 budget includes $1.3 million to continue fully funding
the District’s ARC. This cost is also referred to as Other Post Employment
Benefits (OPEB).
Replacement and Refurbishment (R&R) Fund Budget - $22.6 Million
The District has over one billion in existing plant and equipment. These facilities
annually depreciate and require replacement and refurbishment to maintain their
capabilities. In October 1998, the District formally established an R&R Fund.
In 2004 the R&R program was downsized to only include infrastructure type
assets. The amount of money annually transferred into the R&R program was
reduced from $4.5 million to $2.8 million with this change. The annual transfer
amount has been growing by seven percent annually to provide sufficient funds
to meet future expected R&R expenditures. The annual contribution also
increased by $4.5 million with the construction of the GWR System.
The total contribution in FY 2018-19 would be $16.7 million. The R&R program
and model was formally reviewed and updated in 2011.
Actual expenditures from the fund vary significantly each year depending upon
which District assets have reached the end of their useful life and need to be
replaced or which assets can have their lives extended by refurbishing them. In
FY 2018-19, the proposed R&R expenditures are $22.6 million.
Board of Directors
March 7, 2018
Page 5 of 8

The R&R Program Fund balance is expected to decrease from $59.2 million on
June 30, 2018 to $53.3 million on June 30, 2019.
Capital Projects Budget - $47.1 Million
The District prepares a multi-year CIP budget to support its mission. The CIP
budget spans five years and provides expected capital expenditures over the
5-year period. The CIP budget is comprised of eleven projects totaling
$47.1 million in FY 2018-19. These projects are funded through long-term debt,
grants and the District will be funding $4 million of the CIP budget with RA
revenue or current revenue (PAYGO) rather than borrowed funds. Details of the
CIP are provided in Section 8 of the budget book.
The projects are necessary to:
 Support basin production by increasing recharge capacity and
operational flexibility.
 Protect the coastal portion of the basin.
The CIP program and the capitalization of expenditures comply with the adopted
District policy in October 2000, which: (1) defines the types of expenditures that
can be capitalized; and (2) uses long-term debt to fund the projects. Each
project included in the CIP must be individually reviewed and approved by the
Board prior to design and construction.
NEW CAPITAL EQUIPMENT ITEMS - $0.3 MILLION
This budget includes small equipment items such as laboratory equipment,
machines, tools, automobiles, computers and software, pumps, equipment, etc.
These items are funded using current revenues.
A detailed list of these items is provided in Section 9 of this document.
REVENUES
ASSESSMENTS - $148.7 MILLION RA; $1.8 MILLION BASIN EQUITY ASSESSMENT
All water pumped out of the groundwater basin will be assessed the RA on a
dollar per acre-foot basis of $462. The RA is expected to generate $148.7 million
in revenue for FY 2018-19 based on 322,300 acre-feet of total anticipated basin
production at a 77 percent BPP.
The Basin Equity Assessment (BEA) rate is calculated for each Producer based
on the treated full service MWD water rate and each Producer’s individual energy
cost to pump groundwater. The BEA is assessed annually in September for all
groundwater production above the BPP. For FY 2018-19, $1.8 million of BEA
revenue is expected to be received.
Board of Directors
March 7, 2018
Page 6 of 8

AD VALOREM PROPERTY TAXES – $25.4 MILLION


The District expects to receive approximately $25.4 million in property taxes
collected within the service area.
The County of Orange assesses and collects the taxes and transfers them to the
District at various times during the year. This revenue source is dedicated to the
District’s debt service expenditure.
INVESTMENT REVENUE – $1.5 MILLION
The District’s cash reserves generate investment revenues. The majority of cash
reserves are invested in short-term securities.
Investment revenues have been estimated at $1.2 million for the General Fund.
Approximately $0.2 million of the investment revenues are generated by and for
the R&R program, another $0.1 million of the investment revenues are generated
by and for the PAYGO/CIP program.

MISCELLANEOUS REVENUES – $13.6 MILLION

MISCELLANEOUS REVENUES ARE COMPRISED OF NUMEROUS ITEMS INCLUDING:


Water sales from the GAP $1.5 M
GWRS MWD LRP Subsidy $7.9 M
Annexation fees $2.3 M
Producer well loan repayments $0.4 M
Rents & leases $1.2 M
Other minor misc. items $0.3 M
TOTAL $13.6 M
RESERVES
The District maintains cash reserves to ensure its financial integrity so that the
groundwater basin can be successfully managed and protected. Cash reserves
ensure that:
 The District has sufficient funds for cash flow purposes.
 Funds are available for unexpected events such as contamination
issues.
 Funds are available to make necessary replacements and
refurbishments to the District’s infrastructure.
 The District has access to debt programs with very low interest cost.
Board of Directors
March 7, 2018
Page 7 of 8

• A financial hedge is in place to balance the amount of outstanding


variable rate debt the District has issued in case interest rates rise.

The District has developed policies which result in the establishment of the
reserve and operating fund levels shown in Table 2. The net effect of the
proposed budget would be an increase of $0.7 million to total District reserves
with $5.7 million decrease in the Replacement and Refurbishment fund, an
increase of $3.6 million in the Operating Reserve fund, and a $2.8 million
increase in the Operating fund.

Table 2
Operating Reserves Levels
Beginning Projected Year-end Projected Year-end
FY17-18 FY 17-18 FY 18-19
Reserve ($/million) ($/million) ($/million)
R&R Fund 54.0 59.2 53.5
Toxic Cleanup Reserve Fund 4.0 4.0 4.0
Contingencies Reserve Fund 3.0 3.0 3.0
SRF Loan Reserve Fund 9.9 10.2 10.2
Water Reserve Fund 0 0 0
Paygo Fund 26.2 33.8 33.8
Operating Reserve Fund 25.3 25.3 28.9
(15% of operating budget)
Sub-total 122.4 135.5 133.4
Operating Fund
Operating Fund 23.2 15.6 18.4
TOTAL 145.6 151.1 151.8

COST CUTTING EFFORTS


Staff has been and will continue to work to reduce District costs to minimize rate
increases. Recent examples of cost cutting efforts include:

• Locked in low electricity cost with power supplier via Direct Access.
• Utilize interns more to avoid hiring fulltime employees.
• The District continues negotiating payment term discounts with vendors.
• Extended the life of membranes from 5 to 7 years.
Section 2
Summaries
Combined Summary
Sources and Uses of Funds
General Fund Budget Summary
General Fund Budget Comparison
District Memberships
OCWD Staffing History
Key Financial Metrics
Section 2
Summaries

Orange County Water District


Combined Summary
Fiscal Year 2018-19

Revenues
Property Taxes $ 25,400,000
Replenishment Assessment $ 148,687,347
Basin Equity Assessment $ 1,750,000
Facility Revenue from Other Agencies ( GAP & GWRS LRP ) $ 9,392,280
Project Reimbursement Revenue $ 10,269,095
Investment Revenues $ 1,500,000
Rent, Royalties and Others $ 4,257,778
Appropriation from R&R reserves $ 5,710,465
Draw from Construction Fund/SRFLoans $ 32,694,905
Total Revenues/Others $ 239,661,870

Appropriations
General Fund $ 69,916,000
New Equipment $ 272,500
Water Purchases $ 61,574,002
Retiree Health Trust $ 1,303,931
Debt Service $ 36,901,837
Capital Projects (Debt & PAYGO funded) $ 47,089,000
R&R Fund Expenditures $ 22,604,600
Total Appropriations $ 239,661,870

Orange County Water District 2-1 FY 2018-19 Budget Report


Section 2
Summaries

Sources and Uses of Funds


Fiscal Year 2018-19

Uses Sources
GAP Revenues
Replenishment Basin Equity Conjunctive Use Reserve Fund Project Debt
Total Taxes & LRP Investment Revenue Rent & Others Total
Assessment Assessment Program Drawdown Reimbursement Proceeds
(GWR/GAP)

General Fund $ 69,916,000 $ 55,523,720 $ 9,392,280 $ 1,200,000 $ 3,800,000 $ 69,916,000

New Equipment $ 272,500 $ 272,500 $ 272,500

Water Purchases $ 61,574,002 $ 59,824,002 $ 1,750,000 $ 61,574,002

Debt Service $ 36,901,837 $ 11,044,059 $ 25,400,000 $ 457,778 $ 36,901,837

Retiree Health Trust $ 1,303,931 $ 1,303,931 $ 1,303,931


Capital Projects (Debt &
PAYGO funded) $ 47,089,000 $ 4,000,000 $ 125,000 $ 10,269,095 $ 32,694,905 $ 47,089,000

R&R Fund Expenditures $ 22,604,600 $ 16,719,135 $ 175,000 $ 5,710,465 $ 22,604,600


$ 239,661,870 $ 148,687,347 $ 1,750,000 $ 25,400,000 $ - $ 9,392,280 $ 1,500,000 $ 4,257,778 $ 5,710,465 $ 10,269,095 $ 32,694,905 $ 239,661,870

Orange County Water District 2-2 FY 2018-19 Budget Report


Section 2
Summaries

General Fund Budget Summary


Fiscal Year 2018-19

FY 18-19
Cost Salaries & Services & Proposed
Center # Cost Center Benefits Supplies Budget
1010 General Manager’s Office 793,900 1,718,119 2,512,019
1012 Public Affairs 1,128,503 852,000 1,980,503
1016 Information Services 1,680,650 916,000 2,596,650
1018 Board Administration 978,770 215,340 1,194,110
1022 Purchasing 721,661 36,650 758,311
1024 Finance 1,924,923 129,800 2,054,723
1030 Human Resources 882,449 244,300 1,126,749
1034 Safety & Risk Management 364,133 1,190,100 1,554,233
1036 Water Quality 1,606,680 341,100 1,947,780
1038 Laboratory 4,248,410 1,460,800 5,709,210
1040 Research & Development 1,335,133 246,770 1,581,903
1044 Planning and Watershed Management 879,189 859,100 1,738,289
1045 Local Resources 273,548 53,250 326,798
1046 Regulatory Affairs 618,865 215,800 834,665
1050 Water Production/GWR System 10,022,452 21,416,687 31,439,139
1060 Recharge Operations 2,638,913 1,552,890 4,191,803
1062 Wetland Operations 495,695 227,000 722,695
1069 Property Management 117,820 131,046 248,866
1070 Engineering 992,984 115,200 1,108,184
1075 Hydrogeology 2,103,291 2,726,900 4,830,191
1080 Natural Resources 680,924 778,653 1,459,577
Total (Rounded) $ 34,489,000 $ 35,428,000 $ 69,916,000

Orange County Water District 2-3 FY 2018-19 Budget Report


Section 2
Summaries

General Fund Budget Comparison


Fiscal Year 2018-19
FY 2018-19 % Increased
Cost Proposed FY 2017-18 Difference or
Center # Cost Center Budget Budget Over(Under) (Decreased)

1010 General Manager’s Office 2,512,019 2,570,820 (58,801) -2.29%

1012 Public Affairs 1,980,503 1,918,702 61,801 3.22%

1016 Information Services 2,596,650 2,484,442 112,208 4.52%

1018 Board Administration 1,194,110 1,187,444 6,666 0.56%

1022 Purchasing 758,311 735,839 22,472 3.05%

1024 Finance 2,054,723 1,994,255 60,469 3.03%

1030 Human Resources 1,126,749 892,640 234,110 26.23%

1034 Safety & Risk Management 1,554,233 1,363,668 190,565 13.97%

1036 Water Quality 1,947,780 2,197,989 (250,209) -11.38%

1038 Laboratory 5,709,210 5,425,281 283,929 5.23%

1040 Research & Development 1,581,903 1,392,691 189,212 13.59%

1044 Planning & Watershed Management 1,738,289 1,408,806 329,483 23.39%

1045 Local Resources 326,798 364,841 (38,043) -10.43%

1046 Regulatory Affairs 834,665 741,838 92,827 12.51%

1050 Water Production/GWR System 31,439,139 31,083,783 355,356 1.14%

1060 Recharge Operations 4,191,803 3,990,753 201,049 5.04%

1062 Wetland Operations 722,695 726,803 (4,108) -0.57%

1069 Property Management 248,866 244,775 4,091 1.67%

1070 Engineering 1,108,184 896,612 211,572 23.60%

1075 Hydrogeology 4,830,191 3,222,431 1,607,760 49.89%

1080 Natural Resources 1,459,577 1,249,007 210,570 16.86%


Total (rounded) $ 69,916,000 $ 66,093,000 $ 3,823,000 5.78%

Orange County Water District 2-4 FY 2018-19 Budget Report


Section 2
Summaries

DISTRICT MEMBERSHIPS
FISCAL YEAR 2018-19
ORGANIZATION AMOUNT
AMERICAN GROUNDWATER TRUST 500
AMERICAN MEMBRANE TECHNOLOGY ASSOCIATION 825
AMERICAN WATER WORKS ASSOCIATION (AWWA) 1,700
ASSOCIATION OF CALIFORNIA CITIES - ORANGE COUNTY (ACC-OC) 5,000
ASSOCIATION OF CALIFORNIA WATER AGENCIES (ACWA) 33,000
ASSOCIATION OF METROPOLITON WATER AGENCIES (AMWA) 18,600
BUILDING INDUSTRY ASSOCIATION OF SOUTHERN CALIFORNIA 650
CAL DESAL 5,000
CAL STATE FULLERTON DEMOGRAPHICS 4 x $11,761 47,044
CALIFORNIA SPECIAL DISTRICTS ASSOCIATION (CSDA) 6,900
CALIFORNIA GROUNDWATER COALITION 9,500
CHAMBERS OF COMMERCE 5,000
GROUNDWATER GUARDIAN 2,500
GROUNDWATER FOUNDATION 100
GROUNDWATER RESOURCES ASSOCIATION (GRA) 200
INDEPENDENT SPECIAL DISTRICTS ASSOCIATION (ISDOC) 250
INTERNATIONAL UV ASSOCIATION 250
PROFESSIONAL MEMBERSHIPS (ASCE & WEF) 650
REGIONAL STORMWATER TASK FORCE 1,000
SANTA ANA RIVER FLOOD PROTECTION AGENCY (SARFPA) 1,300
SOUTHERN CALIFORNIA ALLIANCE OF PUBLICLY OWNED TREATMENT WORKS 3,000
SOUTHERN CALIFORNIA SALINITY COALITION (NWRI) 10,000
SOUTHERN CALIFORNIA WATER COMMITTEE 5,000
SOUTHWEST MEMBRANE OPERATORS ASSOCIATION 300
UTILITY BRANDING NETWORK 5,000
WATER ADVISORY COMMITTEE OF ORANGE COUNTY (WACO) 100
WATER EDUCATION FOUNDATION 5,500
WATER RESEARCH FOUNDATION 100,000
WATEREUSE ASSOCIATION 10,200
WATER ENVIRONMENT & REUSE FOUNDATION 35,000
TOTAL 314,069

Orange County Water District 2-5 FY 2018-19 Budget Report


Section 2
Summaries

OCWD Headcount
Proposed
Cost Center FY13-14 FY14-15 FY15-16 FY16-17 FY17-18 FY18-19
General Manager’s Office 5 5 5 6 6 3
Public Affairs 6 6 7 7 7 7
Information Services 8 8 8 9 10 10
Board Administration 3 3 3 3 3 3
Purchasing 6 7 7 6 6 6
Finance 13 13 13 13 13 13
Human Resources 4 4 4 4 4 7
Safety & Risk Management 2 2 3 3 2 2
Water Quality 12 12 12 12 12 12
Laboratory 29 29 29 29 30 30
Research & Development 6 6 6 7 7 7
Planning & Watershed Management 4 4 4 4 4 4
Local Resources 2 1 1 1 1 1
Regulatory Affairs 2.5 2.5 2.5 2.5 2.5 2.5
Water Production/GWR System 61 63 65 64 64 64
Recharge Operations 22 22 21 20 20 20
Wetland Operations 3 3 3 3 3 3
Property Management 1 1 1 1 1 1
Engineering 9 9 8 8 8 8
Hydrogeology 13.5 13.5 12.5 12.5 13.5 13.5
Natural Resources 3.5 3.5 3.5 3.5 3.5 3.5
215.5 217.5 218.5 218.5 220.5 220.5

OCWD Headcount

250

200

150

100

50

Orange County Water District 2-6 FY 2018-19 Budget Report


Section 2
Summaries

ORANGE COUNTY WATER DISTRICT


KEY FINANCIAL METRICS
JUNE 30, 2015 THROUGH JUNE 30, 2019

2015 2016 2017 2018 Budget 2019 Budget

TOTAL CASH AND INVESTMENTS (UNRESTRICTED) $ 151,992,498 $ 134,629,610 $ 145,547,170 $ 151,100,000 $ 151,800,000
TOTAL OPERATING EXP. AND DEBT SVE FROM BELOW 86,525,901 86,441,969 99,752,609 103,347,928 108,121,768
DAYS CASH IN HAND RATIO 641 568 533 534 512

COVERAGE RATIO:
Replenishment assessments $ 89,137,337 $ 88,464,250 $ 120,120,803 $ 134,287,529 $ 148,687,347
CUP revenue 3,340,270 3,085,226 41,500 - -
Reclaimed water revenue 10,656,131 10,699,470 10,606,006 10,100,000 9,392,280
Property tax 22,924,595 24,198,690 25,432,803 24,200,000 25,400,000
Legal settlement revenue 4,222,585 700,000 691,036 - -
Rental income, net of expenses 1,214,630 985,796 1,153,435 956,397 936,711
Investment revenue 1,745,947 1,524,348 1,402,267 1,450,000 1,500,000
Other revenues 1,442,484 2,448,558 2,978,286 3,390,862 3,321,067
Total YTD revenues 134,683,978 132,106,337 162,426,136 174,384,788 189,237,405
Budgeted annual revenue less YTD revenue - - - - -

Operating expenses including litigation expenses $ 62,260,205 65,811,722 68,672,269 67,396,931 71,219,931
Operating expenses budgeted for the rest of the FY - - - - -
Total Expenditures 62,260,205 65,811,722 68,672,269 67,396,931 71,219,931

Net revenues 72,423,773 66,294,615 93,753,867 106,987,857 118,017,474

Annual debt service 24,265,696 20,630,247 31,080,340 35,950,997 36,901,837

ALL-IN ADS COVERAGE RATIO 3.0 3.2 3.0 3.0 3.2

Orange County Water District 2-7 FY 2018-19 Budget Report


Section 3
Operations and Cost Center
Descriptions
Organizational Structure
Cost Center Profiles
SECTION 3
TABLE OF CONTENTS

OPERATIONS AND COST CENTER DESCRIPTIONS


TABLE OF CONTENTS

PAGE
OCWD ORGANIZATIONAL STRUCTURE

COST CENTER PROFILES:


GENERAL MANAGER
OFFICE OF THE GENERAL MANAGER ........................................................................... 3-1
PUBLIC AFFAIRS ........................................................................................................ 3-5
ENGINEERING & LOCAL RESOURCES
BOARD ADMINISTRATION .......................................................................................... 3-10
LOCAL RESOURCES .................................................................................................. 3-13
HUMAN RESOURCES ................................................................................................ 3-17
SAFETY & RISK MANAGEMENT ................................................................................. 3-20
ENGINEERING ......................................................................................................... 3-23
INFORMATION SERVICES ........................................................................................... 3-27
PROPERTY MANAGEMENT ........................................................................................ 3-33
PLANNING & NATURAL RESOURCES
PLANNING & W ATERSHED MANAGEMENT .................................................................. 3-37
NATURAL RESOURCES ............................................................................................. 3-42
FINANCE
FINANCE ................................................................................................................. 3-47
PURCHASING .......................................................................................................... 3-53
WATER QUALITY
WATER QUALITY ..................................................................................................... 3-56
ADVANCED W ATER QUALITY ASSURANCE LABORATORY ............................................. 3-68
RESEARCH & DEVELOPMENT.................................................................................... 3-77
HYDROGEOLOGY ..................................................................................................... 3-97
REGULATORY AFFAIRS .......................................................................................... 3-102
OPERATIONS
WETLANDS OPERATIONS ....................................................................................... 3-108
WATER PRODUCTION............................................................................................. 3-112
RECHARGE OPERATIONS ....................................................................................... 3-119

Orange County Water District FY 2018-19 Budget Report


SECTION 3
TABLE OF CONTENTS

This page intentionally left blank

Orange County Water District FY 2018-19 Budget Report


OCWD Organizational Structure

Board of Directors

General Counsel

Mike Markus
General Manager

Mike Wehner
Assistant General
Manager

John Kennedy Jason Dadakis Greg Woodside


Bill Dunivin Randy Fick
Executive Director Executive Director Executive Director
Executive Director Treasurer/CFO
Engineering & Water Quality & Planning and
Operations
Local Resources Technical Resources Natural Resources

Mehul Patel
Janice Durant William Hunt Roy Herndon Vishav Sharma Eleanor Torres
GWRS/Water Regulatory Affairs
District Secretary Local Resources Special Projects Hydrogeology Planning Finance Public Affairs
Production

Stephanie. Dosier Scott Nygren


Lee Yoo Dick Zembal Melissa Ochoa
Human Resources/ Recharge
Laboratory Natural Resources Accounting
Risk & Safety Operations

Chris Olsen Scott Nygren Patrick Versluis Bonnie Howard


Engineering Wetland Operations Water Quality Purchasing

Bruce Dosier Megan Plumlee


IS/Property Research &
Management Development
OFFICE OF THE GENERAL MANAGER

OFFICE OF THE GENERAL MANAGER

Summary Information

Existing Staff – 3 FTEs


1 – General Manager
1 – Executive Assistant
1 – Director of Special Projects

Mission
Implement the policies of the Board of Directors.

Key issues for FY 2018-19


 Continue work on the Prado Basin CA feasibility study to increase water
conservation at Prado Dam to elevation 505 year-round
 Continue to provide analysis for the proposed Huntington Beach
Desalination project
 Completion of the final design of the Groundwater Replenishment System
(GWRS Final Expansion)
 Continued implementation of the clean-up strategies for the North & South
Basin Groundwater Protection projects
 Secure funding for capital projects through State or Federal programs

Orange County Water District 3-1 FY 2018-19 Work Plan


OFFICE OF THE GENERAL M ANAGER

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actual Budget Proposed Budget
Salaries and Benefits 1,049,170 992,460 793,900
Services and Supplies 1,707,031 1,578,360 1,718,119
Total $2,756,201 $2,570,820 $2,512,019

I FY 2018-19 Major New Initiatives/Programs


With Board approval, commence strategic planning workshops with Directors and
staff on major initiatives for the next five years.

II Core Activities
The General Manager’s Office is charged with directing the activities of 220.5 full
time employees in their efforts to manage and protect the Orange County
groundwater basin, which supplies the majority of the water used by 2.5 million
people living in northern Orange County.
Core activities include:
♦ Implementing and communicating the policies of the Board of Directors
♦ Supporting and preparing for Board and Committee meetings
♦ Managing organizational issues
♦ Managing outside legal services
♦ Coordinating legislative activities
♦ Providing external communications
♦ Coordinating with the Groundwater Producers
♦ Participation in WateReuse CA and the WateReuse Association to help
support District initiatives and policy development for indirect and direct
potable reuse
♦ Attending Santa Ana Water Project Authority (SAWPA) meetings and
engaging the member agencies general managers in upper Santa Ana
watershed activities
♦ Coordination with the Municipal Water District of Orange County (MWDOC)
on Metropolitan Water District of Southern California (MWD) issues

III Non-Core Activities


♦ Numerous requests for presentations and tours of District facilities

Orange County Water District 3-2 FY 2018-19 Work Plan


OFFICE OF THE GENERAL M ANAGER

IV Group Goals for FY 2018-19


Lawsuits – Actively manage and pursue legal actions and settlements regarding:
♦ MTBE litigation
♦ North Basin Groundwater Protection Project
♦ South Basin Groundwater Protection Project
♦ Irvine Ranch Water District litigation
Legislation - Advocate for the District’s legislative interests at the federal, state,
and local levels. Actively monitor and aggressively support/oppose legislation
impacting the District’s operations as necessary.
♦ Federal: Work with the Army Corps of Engineers (ACOE) to pursue
additional water conservation, develop a sediment removal project behind
Prado Dam and study Forecast Informed Reservoir Operations (FIRO) as a
tool for water conservation. Work with the Environmental Protection Agency
to secure additional State Revolving Funds for California and support an
National Priorities List (NPL) listing for the North Basin Groundwater
Protection Project. Continue working with federal legislators to secure
funding for District projects and visit legislators and legislators’ staff in
Washington D.C.
♦ State: Work with Association of California Water Agencies (ACWA),
SAWPA, California Special Districts Association (CSDA), WateReuse CA,
and others to: monitor potential legislation concerning water quality, prevent
shifting property tax revenue, and oppose legislating local issues; support
good governance measures; monitor and apply for infrastructure/resources
bond funding opportunities; monitor State Regional Board movement to
change recycled water policy; and monitor and take positions on legislation
of importance to the District; and visit legislators and legislators’ staff in
Sacramento.
♦ Local: Work with local agencies, organizations, (including the Orange
County Business Council [OCBC],Orange County Association of California
Cities [ACC-OC] and Orange County Council of Government [OCCOG]),
elected officials and their staff members to protect the District’s interests
and operations. Meet with county supervisors and local city
councilmembers.
GWRS Operation – Achieve production of 103,000 acre-feet
Organizational – Work to improve recruitment and retention of employees
Metropolitan Water District of Southern California (MWD) – Actively participate in
development of new policies dealing with groundwater issues which should
include an establishment of a permanent in-lieu program, a change in the Water
Supply Allocation Plan to allow groundwater purchases to be included, determine
terms for early termination of the Conjunctive Use Program and change in policy

Orange County Water District 3-3 FY 2018-19 Work Plan


OFFICE OF THE GENERAL M ANAGER

to allow pumping of non-MWD potable supplies to be pumped into MWD


pipelines.
Grant Funding – Actively pursue any source of grant funding for selected projects

V Pending Activities
♦ Active participation in WateReuse CA, WateReuse Association, The Water
Research Foundation and ACWA
♦ Actively pursue operational efficiencies and explore additional opportunities
for supply to the groundwater basin
♦ Continue to develop relationships with both SAWPA and non-SAWPA upper
Santa Ana River watershed agencies

VI Staff Addition Needed for FY 2018-19


None

VII Future Issues


None

Orange County Water District 3-4 FY 2018-19 Work Plan


PUBLIC AFFAIRS

PUBLIC AFFAIRS

Summary Information

Existing Staff –7 FTEs


1 – Director of Public Affairs
1 – Legislative Affairs Liaison
1 − Principal Communications Specialist
2 – Senior Communications Specialist
1 – Community Outreach & Education Coordinator
1 − Senior Administrative Support Specialist

Mission
To demonstrate OCWD’s value to community stakeholders; to inform stakeholders
about District projects and highlight programs, projects and achievements that
demonstrate the District’s commitments to water quality, water supply and reliability,
sound financial management, industry leadership and innovation, sound planning,
transparency and environmental stewardship; provide communications support for
OCWD Board, General Manager and staff; and, forge and maintain relationships and
partnerships with Producers, elected officials, related professional membership
associations, key community organizations, media, and other stakeholders.

Orange County Water District 3-5 FY 2018-19 Work Plan


PUBLIC AFFAIRS

Key Issues for FY 2018-19


 National Contingency Plan and groundwater cleanup communications
 85th Anniversary of OCWD
 Implementing the board-adopted legislative strategy
 Water bond and other funding for District projects
 Prado Basin Feasibility Study
 Continued marketing of bottled GWRS water and 10-year anniversary of the
GWRS
 Implementation of Next Generation Water Leaders program
 Crisis communications
 Exploration of desalination and GWRS final expansion
 Social media engagement
 Rebrand of Children’s Water Education Festival

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actual Budget Proposed Budget
Salaries and Benefits 945,126 1,047,578 1,128,503
Services and Supplies 771,212 871,124 852,000
Total $1,716,338 $1,918,702 $1,980,503

I FY 2018-19 MAJOR NEW INITIATIVES/PROGRAMS


 Assess the Next Generation Water Leaders program and adjust as needed.
 Seek funding and start design for a wildlife and watershed exhibit featuring
the District’s collection of taxidermy.
 Work with legislators, legal counsel and legislative consultants to secure and
maintain support for District groundwater contamination clean-up projects and
other District projects.
 Produce regular communications regarding District groundwater cleanup
efforts.
 OCWD innovations video series and communications that highlight R&D.
 Assist planning in submitting funding applications and securing support for
water bond and other funding opportunities.
 Provide support as needed for ocean desalination exploration.
 Provide support as needed for the GWRS final expansion.
 Increase social media engagement.
 Create new crisis communications plan integrating social media.
 Awards submittals for the bottling of GWRS water and 10-year anniversary
commemoration.

Orange County Water District 3-6 FY 2018-19 Work Plan


PUBLIC AFFAIRS

II CORE ACTIVITIES
♦ Continue to build awareness and support for OCWD’s programs and projects
by communicating to key elected officials, community leaders, stakeholders,
businesses, environmental groups, etc.
♦ Manage editorial calendars for websites, social media and publications to
keep information timely.
♦ Work with state and federal elected regarding groundwater contamination
remediation and other priorities.
♦ Continue to advocate for Prado Basin Feasibility Study.
♦ Market and maintain Water Hero Program.
♦ Create and implement a legislative platform.
♦ Continue to increase social media presence through GWRS bottled water
campaign and tour program.
♦ Continue proactive media relations program, including distributing press
releases, contacting and meeting with new local reporters, coordinating media
tours and monitoring news media.
♦ Distribute weekly Water Lines media feed and produce monthly
Hydrospectives newsletter.
♦ Continue to survey 25-35% of tour guests; Surveys are part of water reuse
global research projects.
♦ Continue construction outreach – provide support to all departments doing
new and/or regular maintenance projects.
♦ Apply for grants for Children's Water Education Festival, H2O Learning
Center, Water Hero, and Tour Program.
♦ Continue to assist other departments in applying for grants involving
construction, studies, water capture, water quality, etc.
♦ Video production and graphics for corporate digital and print collateral.
♦ Organize District photo, video and graphics library with high definition images.
♦ Work with WateReuse Research Foundation and Association to advance
Direct Potable Reuse.
♦ 12th Annual Water Summit.
♦ Continue to produce monthly press releases and guest columns.
♦ Award submittals.
♦ Review monthly committee write-ups for communications opportunities.
♦ Plan monthly WACO meetings.
♦ Continue to participate in and lead various water associations’ working
groups/committees (ACWA, WRA, CSDA, ISDOC, SAWPA, etc.).
♦ Maintain and update hallway interactive displays and videos as needed.

Orange County Water District 3-7 FY 2018-19 Work Plan


PUBLIC AFFAIRS

♦ Conduct annual Groundwater Adventure Tour of OCWD facilities for


groundwater producers, general managers, elected and community members.
♦ Work with city councils, city managers and water boards to be more informed
and supportive of OCWD’s commitments, goals and objectives.
♦ Assist OCWD Board members in their communication efforts with their
stakeholders.
♦ Improve communications for and between OCWD Public Affairs Department
and groundwater producers’ public information representatives to generate a
positive, mutually beneficial relationship and increase clarity of
wholesaler/retailer messages.
♦ Be responsive to needs of community neighbors impacted by OCWD
construction, operations or projects, so that they understand the need for the
work and so that impacts are mitigated as much as possible.
♦ Ensure OCWD’s innovations are noted in trade publications by developing
relationships with key trade press.
♦ Keep elected officials and their staff members up-to-date and supportive of
OCWD issues and needs.
♦ Build recognition, trust and awareness of OCWD in leading community
organizations.
♦ Continue to support communication efforts of other OCWD departments
including water quality and emerging contaminants outreach, legislative
support, and water rights.
♦ Inform stakeholders about District projects and highlight programs, projects
and achievements that demonstrate the District's commitments to water
quality, water supply and reliability, sound financial management, industry
leadership and innovation, and environmental stewardship.
♦ Provide communications support to OCWD Board, General Manager, and
staff.
♦ Communicate effectively, both internally and externally, about OCWD and its
mission.
♦ Forge and maintain relationships and partnerships with Producers, elected
officials, related professional membership associations, businesses, key
community organizations, environmental groups, media and other
stakeholders.
♦ Additional functions and key tasks include crisis management, marketing,
media relations, community relations, reputation management, outreach and
education.
♦ Other related activities.

III NON-CORE ACTIVITIES


♦ Support of outside water industry agencies (American Water Works
Association Research Foundation [AWWARF], WateReuse, the Clean Water

Orange County Water District 3-8 FY 2018-19 Work Plan


PUBLIC AFFAIRS

Alliance, Water Environment Research Foundation, ACWA, National Water


Research Institute [NWRI], etc.) for research support, conference support,
etc.

IV GROUP GOALS FOR FY 2018-19


• Reach new audiences and strengthen and build upon existing
relationships.
• Demonstrate value/importance of OCWD groundwater management to
cities, producers, policy makers, media, residents, and businesses.
• Secure legislative, business and community trust and support for District
projects.
• Set OCWD apart from other special districts.
• Continue to execute a marketing plan for GWRS bottled water that
generates positive media attention and increases presence on social
media platforms.
• Apply for funding to support a wildlife and watershed exhibit.
• Communicate regularly and effectively with stakeholders regarding
groundwater cleanup efforts.
• Update the crisis communications plan integrating social media and new
technologies

V PENDING ACTIVITIES
None

VI STAFF ADDITION NEEDED FOR FY 2018-19


None

VII FUTURE ISSUES


None

Orange County Water District 3-9 FY 2018-19 Work Plan


BOARD ADMINISTRATION

BOARD ADMINISTRATION

Summary Information

Existing Staff - 3 FTE


1  District Secretary
1 – Assistant District Secretary
1  Records Coordinator

Mission
Maintain and manage official District documents and records, compile and prepare
Board and Committee agendas and minutes. Perform other statutory duties as set forth
in the District Act, including Conflict of Interest filings and publication of required legal
notices.

Key Issues for FY 2018-19


None

Orange County Water District 3-10 FY 2018-19 Work Plan


BOARD ADMINISTRATION

Account Information FY 2016-17 FY 2017-18 FY 2018-19


Actual Budget Proposed Budget
Salaries and Benefits 827,282 972,104 978,770
Services and Supplies 435,374 215,340 215,340
Total $1,262,656 $1,187,444 $1,194,110

I FY 2018-19 Major New Initiatives/Programs


Continued scanning and indexing of District records into the Electronic Document
Imaging/Records Management System (EDI/RMS).
Core Activities
 The primary function of the Board Administration Department is to maintain all
official District documents and records, to compile and prepare Board and
Committee agendas and minutes to ensure compliance with all applicable
state and federal laws, and to perform other statutory duties as set forth in the
District Act, including Conflict of Interest filings and publication of required
legal notices.
 Another prime function is Records Management, which includes recording,
filing, indexing, and maintaining database of Board records for District-wide
use.

II Non-Core Activities
Non-core activities (secondary priority compared to core activities) conducted by
Board Administration include:
 Director’s support – travel, expense reporting, and meeting scheduling, mail
processing.
 Management support – assist with research and preparation of submittals for
Board consideration.
 Maintenance of Board Policy Manual and District Act.

III Group Goals for FY 2018-19


 Scanning and indexing Board/Committee Agenda packets: The department is
focused on scanning Board/Committee Agenda packets as well as other
District files into the electronic records management system (RMS).
 Expanding and integrating the RCO database: The Department will continue
to link the Board agenda packets and minutes databases to legal documents
database.
 Updating of Records Retention Policy: The Department will review and
recommend, if necessary, updating the records retention policy to ensure
compliance with current regulations.
 Training of District personnel on use of Records Management System: The
Department will continue to train District staff in ways to access records
through the RMS.

Orange County Water District 3-11 FY 2018-19 Work Plan


BOARD ADMINISTRATION

IV Pending Activities

None

V Staff Addition Needed for FY 2018-19


None

VI Future Issues
 Continuation of development of a work plan for District-wide implementation
of departmental central filing utilizing the electronic records management
system and establishing District-wide procedures for key staff related to
scanning, accessing and transmitting electronic records.
 Archival of District historical records.

Orange County Water District 3-12 FY 2018-19 Work Plan


LOCAL RESOURCES

LOCAL RESOURCES

Summary Information

Existing Staff – 1 FTEs


1 – Executive Director of Engineering and Local Resources

Mission
Coordinate and manage basin management programs with the Groundwater Producers.
Assist with managing the financial and water budgets of the District. Coordinate water
purchases from other agencies. Recommend the annual Replenishment Assessment,
Basin Production Percentage, Production Limitation and the Basin Equity Assessment.
Monitor and represent the District at MWD and MWDOC meetings. Coordinate MWD
storage programs. Assist with the annual budget preparation. Manage grant/loan
activities with appropriate funding agencies (Department of Water Resources, State
Water Resources Control Board, MWD through MWDOC and others). Assist with
issues related to projects creating new water supplies.

Key Issues for FY 2018-19


♦ Provide analysis on key issues related to the Poseidon Resources Huntington
Beach ocean desalination project.
♦ Determine the optimum plan for distributing Poseidon water.
♦ Determine how the District should participate with the MWD Regional
Recycling Project in the City of Carson.
♦ Obtain a state SRF loan to assist in funding the GWRSFE
♦ Determine how new potential state regulations will impact future water
demands for OCWD.
♦ Develop a plan to phase out the Additional Replenishment Assessment
charge.

Orange County Water District 3-13 FY 2018-19 Work Plan


LOCAL RESOURCES

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actual Budget Proposed Budget
Salaries and Benefits 299,507 261,591 273,548
Services and Supplies 126,530 103,250 53,250
Total $426,037 $364,841 $326,798

I FY 2018-19 Major New Initiatives/Programs


None

II Core Activities
The Local Resources Department is primarily responsible for managing various
local and imported water programs. The core activities of the group are:
♦ Interacting, representing, and processing agreements with outside agencies
such as the MWD, MWDOC, the local groundwater producers (i.e., water
retailers), State of California (State Water Resources Control Board and
Department of Water Resources) and others.
♦ Administering any funding programs for current and future phases of the
GWR System.
♦ Administering and/or developing special programs such as basin
management programs with groundwater producers.
♦ Attend MWD Committee meetings and represent the District.
♦ Administer the Coastal Pumping Transfer Program.
♦ Monitor MWD available water supplies for purchase and water rates.
♦ Annually establish the Replenishment Assessment, Basin Production
Percentage and Basin Equity Assessment collections.
♦ Meet with Groundwater Producers as necessary to update District activities.
♦ Evaluating new water supply projects
♦ Processing annexation requests.
♦ Help process and administer Basin Equity Assessment exemption projects.
♦ Preparing and administering the water purchase budget and in-lieu water
purchase program.
♦ Administer monthly and special groundwater producers’ meetings.
♦ Providing long-term RA, BPP, and capital project projections.

Orange County Water District 3-14 FY 2018-19 Work Plan


LOCAL RESOURCES

♦ Prepare invoices, pertinent billing documents and reports for the GWR
System in compliance with the Local Resources Program financial incentive
contribution by MWD.
♦ Manage the MWD Conjunctive Use Storage and Cyclic Storage programs
with MWD and MWDOC.
♦ Act as liaison with MWDOC.
♦ Represent the District at the Association of Groundwater Agencies meetings.
♦ Assist with the production of monthly in-lieu invoices and annual Basin Equity
Assessment reports.
♦ Administer MWDOC/OCWD Joint Planning Committee meetings.
♦ Manage and oversee the preparation of Board and Committee agendas and
packets.

III Non-Core Activities


None

IV Group Goals for FY 2018-19


♦ Assist the Board in determining the best option for Distributing water from the
Poseidon Resources ocean desalination project.
♦ Support the preparation of a WIFIA Loan for the GWRSFE.
♦ Develop a West Orange County Well Field Project.
♦ Complete the design of the GWRSFE.
♦ Assist legal counsel in preparing all necessary documents for the IRWD
litigation.
♦ Review options and issues with potential South Orange County storage
accounts.
♦ Complete the Mid Basin Centennial injection well project.
♦ Develop a remediation plan for the Sunset GAP seawater intrusion issue.
♦ Begin the Poseidon EIR supporting the District’s distribution plan.
♦ Maximize Proposition 1 funding.
♦ Rate Projections – Update the District’s five-year RA and BPP projections.

V Pending Activities
♦ Major activities that are not being implemented include water conservation
activities and financial incentive program to further enhance water
conservation efforts within the District’s service area.

Orange County Water District 3-15 FY 2018-19 Work Plan


LOCAL RESOURCES

♦ Developing projects and programs to reduce groundwater basin salinity


levels.

VI Staff Addition Needed for FY 2018-19


None

VII Future Issues


None

Orange County Water District 3-16 FY 2018-19 Work Plan


HUMAN RESOURCES

HUMAN RESOURCES

Summary Information

Existing Staff - 7 FTEs


1 ─ Director of Human Resources
1 – Senior Human Resources Specialist
1 – Human Resources Specialist
1 – Administrative Support Technician/Receptionist
3 – Administrative Support Technician (mail/office services)

Mission
Manage the District’s Human Resources program to integrate human value with water
management objectives.

Key Issues for FY 2018-19


♦ Continue required training programs for managers and supervisors. This
effort will be ongoing.

Orange County Water District 3-17 FY 2018-19 Work Plan


HUMAN RESOURCES

♦ Review of the retirement plan recordkeeping vendor and possible RFP to


ensure best provider and services are utilized.
♦ Performance evaluation process.
♦ Successional Planning.

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actual Budget Proposed Budget
Salaries and Benefits 604,974 618,015 882,449
Services and Supplies 279,947 274,625 244,300
Total $884,921 $892,640 $1,126,749

I FY 2018-19 Major New Initiatives/Programs


♦ Review of Performance Evaluation Process and online systems.
♦ Succession Planning.

II Core Activities
The Human Resources Department is primarily responsible for the District
programs that integrate human value with water management objectives.
Core activities include:
♦ Negotiations with OCEA.
♦ District recruitment efforts - This includes placements, resume reviews,
interviews, background investigation and coordinating pre-employment
physicals and drug testing.
♦ Safety and Risk Management oversight.
♦ HRIS and Timekeeping System administration and implementation – ongoing.
♦ Implement new programs to meet new mandates.
♦ Policy development and management - Staff must monitor federal and state
employment related laws and regulations to ensure the business practices
and polices stay current and the District is fully compliant.
♦ Benefit Administration - Work with brokers to ensure competitive health
insurance programs. Act as liaison on all benefit issues between employees
and the carriers.
♦ Retirement program administration.
♦ Compensation Administration - This includes market surveys and
compensation policy development and administration.
♦ Mandated Programs - This includes programs mandated by federal and state
guidelines. Unemployment insurance benefit program, Department of
Transportation drug and alcohol program, training programs, among others.

Orange County Water District 3-18 FY 2018-19 Work Plan


HUMAN RESOURCES

♦ Employee Relations - This includes employee discipline, employee


documentation, employee counseling, and representing the District at
employment related hearings.
♦ General Personnel Administration - This includes keeping all required
documentation on all employees, filing appropriate federal and state reports.
Also, participation in surveys and special reports as requested by managers.
♦ Employee morale programs such as Employee of the Quarter and Year
Program, and Employee Recognition Program.

III Non-Core Activities


None

IV Group Goals for FY 2018-19


♦ RFP process for the retirement plan recordkeeping services.
♦ Update the retirement summary plan descriptions.
♦ Continue to expand on the training program for managers and supervisors.
♦ Implementation of the changes to the HR/Payroll System with the new HTML
changes by Dayforce.

V Pending Activities
♦ Modify the department filing system, including the Employee Personnel files.

VI Staff Addition Needed for FY 2018-19


1 – HR Assistant

VII Future Issues


None

Orange County Water District 3-19 FY 2018-19 Work Plan


SAFETY AND RISK M ANAGEMENT

SAFETY AND RISK MANAGEMENT

Summary Information

Existing Staff - 2 FTEs


1 – Risk & Safety Manager
1 – Health & Safety Specialist

Mission
It is the mission of the Risk & Safety Department to support all functions of the Orange
County Water District to help ensure a safe and healthful workplace. This is
accomplished through collaborative, team-oriented methods that identify the optimum
compliance strategies in harmony with the activities of the District.
Implement the District’s Risk & Safety Programs to ensure a safer workplace and
compliance with regulatory requirements.

Key Issues for FY 2018-19


♦ Communicate the revised Injury Illness Prevention Program (IIPP) to all
employees.
♦ Communicate the revised Incident Investigation & Reporting to all employees.
♦ Provide Risk & Safety updates to Board Members twice/year.
♦ Update and submit Fountain Valley’s Spill Pollution Control and Counter
Measure (SPCC) Plan.
♦ Review and update safety programs.
♦ Update Emergency Response Plan.
♦ Schedule and conduct EOC tabletop drill.

Orange County Water District 3-20 FY 2018-19 Work Plan


SAFETY AND RISK M ANAGEMENT

♦ Implement Fall protection program and action items.


♦ Implement Silica program.
♦ Implement Video Monitoring Design Services.
♦ Cal EPA revision of Hazardous Material Reporting from 5 to 24 new hazard
categories.

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actual Budget Proposed Budget
Salaries and Benefits 328,998 341,868 364,133
Services and Supplies 654,746 1,021,800 1,190,100
Total $983,744 $1,363,668 $1,554,233

I FY 2018-19 Major New Initiatives/Programs


♦ Focus on the following programs/Initiatives:
o Emergency Response Plan
o Silica Program & monitoring
o EOC Training & Drill
o Video Monitoring Design Services
o FHQ Anaheim Hills Patrol Security Services
o WEROC Hazard Mitigation
o Develop a self-learning safety training manual for R & D’s vendors.

II Core Activities
♦ Prepare, schedule and conduct Health & Safety training for New Hires.
♦ Prepare, schedule and conduct refresher Health & Safety training for OCWD
personnel.
♦ Complete and post OSHA 300A log.
♦ Compile and complete the annual Hazardous Materials Business Plan for all
three locations.
♦ Complete and submit the annual NIMS Data Collection Report.
♦ Conduct Inspections and audits.
♦ Organize and conduct Safety Review Team meetings.
♦ Organize and conduct Emergency Response Team (ERT) training & drills.
♦ Respond to on-going Environmental, Health, Safety & Security issues.
♦ Schedule, organize and conduct hands-on fire extinguisher training
♦ Schedule, organize and conduct annual fire drill.
♦ Schedule Rigging training for applicable staff.
♦ Review & update Fountain Valley’s SPCC plan. Provide training for applicable
staff.

Orange County Water District 3-21 FY 2018-19 Work Plan


SAFETY AND RISK M ANAGEMENT

♦ Complete and submit EPA ID reports for all three EPA ID numbers.
♦ Conduct Ergonomic assessments. Provide equipment and recommendations
to reduce risk of injuries.
♦ Manage the Safety Shoe Program to ensure applicable employees receive
safety shoes.
♦ Review contractors’ safety forms and conduct periodic inspections.
♦ Schedule and conduct annual respiratory medical questionnaire, fit testing
and training.
♦ Manage Workers’ Compensation program.
♦ Evaluate and procure needed safety supplies/equipment.
♦ Oversee security companies at Fountain Valley and at Field Headquarters.
♦ Update Risk & Safety website information to include Risk & Safety
procedures and applicable forms & reports.
♦ Conduct monthly security alarm testing.

III Non-Core Activities


Non-core activities (secondary priority compared to core activities) include:
♦ Participate in PASMA (Public Agency Safety Management Association)
meetings and conferences.
♦ Participate in ASSE (American Society of Safety Engineers) meetings and
conferences.
♦ Participate in WUSMA (Water Utilities Safety Managers’ Association).

IV Group Goals for FY 2018-19


♦ Conduct Inspections & Audits.
♦ Review & update safety programs.
♦ Follow up on work related incidents.
♦ Comply with regulatory updates.
♦ Provide training & communication to staff.

V Pending Activities
♦ Video Monitoring Security System

VI Staff Addition Needed for FY 2018-19


None

VII Future Issues


None

Orange County Water District 3-22 FY 2018-19 Work Plan


ENGINEERING

ENGINEERING

Summary Information

Existing Staff - 8 FTE


1 –Director of Engineering
1 – Principal Engineer
1 – GWRS Program Manager
1 – Senior Engineer
1 – Engineer
1 – Assistant Engineer
1 – Associate Engineer
1 – Senior Administrative Support Specialist

Mission
Plan, design, and manage the construction of the District’s improvement projects.

Orange County Water District 3-23 FY 2018-19 Work Plan


ENGINEERING

Key issues for FY 2018-19


Mid Basin Expansion Project - Construction of four injection wells and a
conveyance pipeline located in Santa Ana’s Centennial Park began in FY
17/18. The new wells are each anticipated to inject two millions gallons per
day of GWRS water into the groundwater basin. Construction is scheduled to
be complete towards the end of FY 18-19.
♦ Upper and Lower Five Coves Rehabilitation Project– Design of these facilities
is complete and construction activities will include rehabilitation of the Lower
Five Coves (LFC) drain tube, the construction of a new inlet structure and
flow control gate for the LFC drain tube, the replacement of the Upper Five
Coves (UFC) drain tube, the construction of a new inlet structure, flow control
gate and outlet structure for the UFC drain tube, the removal and
reconstruction of a new transfer structure between UFC and LFC, the
rehabilitation of the Santa Ana River (SAR)/UFC intertie flow control gates,
the rehabilitation of the Off River flow control gates and the construction of
new, Off River, flow measurement structure.
♦ Alamitos Barrier Improvements – This is a joint project between Engineering,
Hydrogeology and Planning departments to develop improvements to the
Alamitos Barrier to strengthen the control of seawater intrusion. The injection
and monitoring wells have been drilled and constructed. Construction of the
well equipping phase began in FY 17-18 and will be complete at the
beginning of FY 18/19.

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actual Budget Proposed Budget
Salaries and Benefits 933,262 832,813 992,984
Services and Supplies 40,248 63,799 115,200
Total $973,510 $896,612 $1,108,184

I FY 2018-19 Major New Initiatives/Programs


♦ GWR System Final Expansion – Design of the expansion of the Advanced
Water Purification Facility began in FY 2017/18. Design will be completed
during FY 18/19 with construction activities to follow.
♦ Talbert Seawater Intrusion Barrier Pipeline Replacement – The project
includes replacing two segments of pipe. The first location is at the
intersection of Ellis Avenue and Ward Street. This location requires the
replacement and/or upgrade of approximately 800 feet of 30-inch diameter
concrete cylinder pipe and injection well I-5 lateral piping. The second
location is a 24-inch diameter asbestos cement (ACP) pipeline segment
crossing beneath the Talbert Channel). Design began in FY 17/18.
♦ Smith Basin Reconfiguration – Smith Basin is located on the Santiago Creek,
immediately upstream of the Santiago Basins. High flows in Santiago Creek

Orange County Water District 3-24 FY 2018-19 Work Plan


ENGINEERING

have caused erosion along the walls of Smith Basin that could impact
adjacent properties with continued high flows in Santiago Creek. Evaluation
of the erosion in Smith Basin and stabilization and/or replacement of the
eroded dirt slopes are necessary to protect adjacent roads and properties.
CEQA and engineering design will take place in FY 17-18.
♦ Cathodic Protection – Cathodic protection design for the Green Acres Project
(GAP) Newport Beach and Southeast Loop pipelines is expected to be
completed in FY 17/18. Construction is anticipated to occur in FY 18/19.

II Core Activities
The Engineering Department is responsible for planning, design and construction
management of the District’s improvement projects. Projects range from small
in-house modifications for existing facilities to major water treatment, pumping
and conveyance facilities including the GWR System. Engineering staff may
perform the planning, design and construction management or may manage
outside consultants performing these functions. Departmental staff provides
engineering support as needed for the daily operations of the District, including
Water Production, Forebay Recharge, Prado Operations, Seawater Barrier
Operations and Property Management. Engineering staff also review proposed
projects of other agencies that may impact District operations or lands.
Core activities include:
♦ Implementing the Capital Improvement Program.
♦ Implementing the repair and replacement of District infrastructure.
♦ Planning new projects to increase the yield of the basin and protect water
quality.
♦ Supporting operations of Forebay, Prado Wetlands, Green Acres Plant,
GWRS, and Seawater Intrusion Barriers.
♦ Data analysis of operations.
♦ Permit compliance support.
♦ Operational improvement input.
♦ Facility improvement construction.
♦ Utility conflict analysis and research.
♦ Preparation of Annual Engineer’s Report.
♦ Manage District’s as-built drawings.
♦ Support for the Recharge Enhancement Working Group (REWG).

III Non-Core Activities


Non-core activities (secondary priority compared to core activities) conducted by
the Engineering group include:
♦ Monitoring outside water reuse project operational activities.

Orange County Water District 3-25 FY 2018-19 Work Plan


ENGINEERING

♦ Monitoring regulations and legislative affairs activities of WateReuse


Organization.
♦ Publishing operational data in journals and conference proceedings.
♦ Participation in technical review committees.

IV Group Goals for FY 2018-19


♦ GWRS Pipe Lining – Based on recent inspections and in order to protect
existing cement mortar lining, it has been determined that lining the pipeline is
necessary to preserve the life span. Lining will occur in sections of the
pipeline during planned shutdowns over the next few years with the first
section (Unit I) planned for the fall of 2018.
♦ Conrock – Warner Transfer Tube Replacement – The lower transfer tubes
convey water from Conrock to Warner Basin during basin refills and allow
quick draining of Conrock Basin during dewatering events. The tubes have
deteriorated, are undersized and in need of replacement. Design work began
in FY 15-16 and construction will require coordination to drain Warner Basin
which has been scheduled for the summer of 2019.

V Pending Activities
None

VI Staff Addition Needed for FY 2018-19


None

VII Future Issues


♦ Implementation of Recharge Enhancement Working Group Projects.

Orange County Water District 3-26 FY 2018-19 Work Plan


INFORMATION SERVICES

Information Services

SUMMARY INFORMATION

Existing Staff - 10 FTEs


1 − Director of Information Services
1 – Principal Programmer Analyst
4 − Senior Programmer/Analysts
1 – Principal Network Administrator
2 − Network Administrators
1 − Information Services Specialist

Mission
Manage and support information systems (IS), services, and communications assets
used by District staff and third parties in support of basin management goals and
objectives.

Key Issues for FY 2018-19


♦ Implementation of a new Laboratory Information System (LIMS).
♦ Improvement to network and system security to address increasing security
threats.

Orange County Water District 3-27 FY 2018-19 Work Plan


INFORMATION SERVICES

♦ Improvements to disaster recovery capabilities to decrease recovery time


objectives.
♦ Replacement of obsolete hardware.
♦ Optimization of IS Operations.
♦ Development of and the ongoing updating of system and operational
documentation.
♦ Information Services staffing and training.

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actual Budget Proposed Budget
Salaries and Benefits 1,433,307 1,576,342 1,680,650
Services and Supplies 849,039 908,100 916,000
Total $2,282,346 $2,484,442 $2,596,650

I FY 2018-19 Major New Initiatives/Programs


♦ Support the Laboratory in the implementation of a new Laboratory Information
Management System (LIMS).
♦ Implementation of Microsoft Office 365 and OneDrive for all users.
♦ Implementation of Network and Systems monitoring.
♦ Build new web-based Water Billing System to replace aging Microsoft
Access-based application.
♦ Improve server room / data communications space at Anaheim Field
Headquarters.

II Core Activities
IS is a staff support organization that manages and supports District information
systems, services and communication assets used by District staff and third-
parties in support of basin management goals and objectives.
Core activities include:
♦ Network support: Managing and supporting the various components of the
enterprise-wide network infrastructure spanning the Fountain Valley, Anaheim
and Prado facilities, and composed of Ethernet hubs, routers and switches,
wi-fi access points, and the Ethernet and fiber-optic cabling and data
communication services connecting them.
♦ Server management: Managing and supporting Microsoft Windows Servers
based network computer systems that support email, databases, and core
enterprise software applications, Intranet, Internet and other information
services.

Orange County Water District 3-28 FY 2018-19 Work Plan


INFORMATION SERVICES

♦ Core system support: Managing, supporting and programming for the


District’s core enterprise software applications such as the JDE Financial
Information System used by the Finance and other departments for tracking
and reporting the financial and purchasing transactions of the District, the
Water Resource Management System (WRMS) used for tracking, analyzing
and mapping data collected from the District basin, the Computerized
Maintenance Management System (Maximo) used by Water Production to
manage the maintenance requirements of the AWPF and the Lab Information
System (LIMS) used by the Laboratory to track water samples from the
District basin and for complying with regulatory reporting.
♦ Operations: Performing routine and non-routine systems operations
including network and server system administration, managing user accounts,
managing server disk space and load balancing, performing daily, weekly and
monthly computer system backups and restores, and telephone system
administration.
♦ System maintenance: Performing system maintenance, repairs and
upgrades for network and servers, desktop and laptop computers as well as
managing maintenance and license agreements for District hardware,
software and information services.
♦ Programming and Technical IS Projects: Managing, supporting and limited
programming for interdepartmental projects including special, short-term
computer system projects for various departments. IS also provides
analytical, programming, technical and training support to those who use
District information systems.
♦ Staff support: Providing support to District staff for network and server
issues, core enterprise software applications, email systems, Microsoft Office
software, desktop and laptop computers and a variety of other digital mobile
equipment including iPads, iPhones and digital cameras.
♦ Telecommunications: Managing and supporting voice and data
communication services including the Cisco Voice over Internet Protocol
(VoIP) telephone and voicemail system, all communication equipment and
lines connecting the District to various telephone system carriers, voice and
data service contracts and District-issued cell phones and smartphones. IS
also manages and supports the enterprise-wide data lines connecting the
Anaheim and Prado facilities with the Fountain Valley campus, various
SCADA locations throughout the basin and internet connectivity to District
staff and third parties.
♦ System security: Ongoing management of system security including
administration of an appropriate level of firewall protection to prevent
unauthorized intrusion to the District network from the Internet, the
administration and monitoring of centralized, District-wide anti-malware
software and services to prevent the spread of destructive and non-
destructive computer viruses and “spam” email. As new forms of security
threats emerge on the Internet, IS analyzes the risk and determines the
appropriate steps and actions necessary to respond.

Orange County Water District 3-29 FY 2018-19 Work Plan


INFORMATION SERVICES

♦ Audio/Visual: Managing and supporting the District’s sophisticated network


controlled multi-component audio-visual equipment composed of LED
screens, amplifiers, switchers, transmitters, receivers and control devices.
♦ Websites: Ongoing technical support for District-related websites including
resolving technical issues with websites, hosting services, Internet registration
services and reputation management services.

III Non-Core Activities


♦ Supporting District staff with graphic design, photography and video services.

IV Group Goals for FY 2018-19


♦ Optimize File Server Infrastructure: Continued implementation of file server
infrastructure leveraging the use of virtualized files servers, network shared
data storage and optimized disk-to-disk and tape backup methods in support
of server optimization best practices, file server consolidation, and reduced
complexity.
♦ Improve Disaster Recovery Capability: Implement regular testing of
Disaster Recovery Capabilities; Assess disaster recovery capabilities for the
Forebay Operations Supervisory Control and Data Acquisition (SCADA)
system and the AWPF Delta V process control system.
♦ Improvements to Systems Security: Audit Information Services system
security and implement improvements. Deployment of security and other
regular updates to server operating systems and network communication
hardware.
♦ Improvements to WRMS: Upgrade of the WRMS portal used to access
WRMS functions and applications; Automate/integrate and reciprocate data
such as Well Status, Well Notes, and Well Contact Information, and Well
Production Data between WRMS and Water Billing systems; conversion of
WRMS applications using Oracle Forms to Windows/Web Forms; upgrade
WRMS AutoCAD to the newer version of AutoCAD; enhance WRMS Library
adding well permits and the permit expiration notification feature. Working
with Hydrogeology in developing a roadmap for future WRMS and GIS
improvements including refining the import of 3rd party data to WRMS and
automation of data entry and remotely using GIS tools by staff in the field.
♦ Upgrade District Enterprise Systems: Upgrade minor versions in major
District systems such as JD Edwards and Maximo as appropriate.
♦ Network Improvements: Network improvements at Anaheim Field
Headquarters.
♦ Develop System and Security Policies: Develop written system and
security policies.
♦ Security Training: Continuously train staff on detecting security threats that
may enter through email, and by other means.

Orange County Water District 3-30 FY 2018-19 Work Plan


INFORMATION SERVICES

♦ Develop System Documentation: Revise system operations procedures


and documentation to address more current hardware and software in use by
District.
♦ Provide Litigation Support: Provide reports and databases as requested for
District litigation using both the District production business network and the
legacy litigation support network that replicates the District’s production
business network for migration of obsolete hardware and software versions to
support litigation requests for data from prior years. The legacy litigation
support network is necessary as keeping the obsolete versions on the
production business network limits the ability to upgrade it and provide more
current user and security functionality.
♦ Technical Training: Continued focus on training for Information Services
staff.
♦ Project Management: Continued focus on using Project Management
software for managing Information Services projects.

V Pending Activities
Major activities that are not being implemented include:
♦ Performing analytics to determine usage of District website.
♦ Ongoing monitoring and configuring websites for Search Engine Optimization
(SEO).
♦ Information Services provides little to no support of the Forebay SCADA
system and the AWPF Delta V process control system.

VI Staff Addition Needed for FY 2018-19


None

VII Future Issues


In the next two to three years, issues the District will need to consider include:
♦ Increased Internet security threats: Measures to provide security against
emerging Internet threats continue to increase resulting in dedicating
additional hardware, software and staff resources to address the emerging
security issues.
♦ Increased disk storage, backup and disaster recovery requirements:
With new systems and technology, the IS staff will continue to be challenged
with evaluating new methods and systems of data storage, backups and
disaster recovery methods.
♦ Audiovisual replacement: The audiovisual equipment was installed in the
Boardroom and the Conference rooms in 2012 and will require reviewing for
possible replacement.

Orange County Water District 3-31 FY 2018-19 Work Plan


INFORMATION SERVICES

♦ Obsolescence of Microsoft Windows 7: MS Windows 7, the District


standard computer operating system, will no longer be supported with
updates by Microsoft in 2020. The majority of District computers run MS
Windows 7 and will need to be replaced by that date to optimize for
applications and to minimize security threats.
♦ Records Management System Replacement: District should conduct a
needs assessment for the Records Management system to determine if
needs are being met or require additional functionality as existing system has
been in place for over 5 years.
♦ Staff Training: Staff training to implement and support newer systems and
keeping up with fast-moving Information Systems trends.
♦ Printer Sharing: To reduce both hardware and support costs, research
locations where printers could be shared and remove from the desktop.

Orange County Water District 3-32 FY 2018-19 Work Plan


PROPERTY M ANAGEMENT

PROPERTY MANAGEMENT

Summary Information

Existing Staff - 1 FTE


1 – Property Manager

Mission
To manage the District’s real estate assets in a manner that provides revenue to the
District and preserves or adds value to the assets while supporting basin management
objectives.

Key issues for FY 2018-19


♦ Determine disposition and final use of Ball Road Basin whether or not the General
Plan Amendment and Zone Change is approved by the City of Anaheim.
♦ Increased requests from other agencies for use of District land

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actual Budget Proposed Budget
Salaries and Benefits 126,912 108,109 117,820
Services and Supplies 137,673 136,666 131,046
Total $264,585 $244,775 $248,866

I FY 2018-19 Major New Initiatives/Programs


♦ Negotiations with Caltrans to secure additional land at Burris Basin

Orange County Water District 3-33 FY 2018-19 Work Plan


PROPERTY M ANAGEMENT

II Core Activities
The Property Management Department is primarily responsible for managing
over 3,700 acres of the District’s real estate assets, negotiating and managing
licenses, leases, easements and deeds for use of the District’s real estate assets
by other parties including local and state agencies, protecting the District’s
property rights, processing land use entitlements to add value to the assets,
acquiring real estate, property rights and rights-of-ways for use as recharge
basins, well-sites, pipelines or other uses in support of basin management goals
and objectives.
Core activities include:
♦ Property Management: includes administrative management of District real
estate including inspections, fire department vegetation control and neighbor
interaction.
♦ Developing Property Use Agreements: includes negotiating and managing
licenses, leases, easements, rights-of-ways and exclusive negotiating
agreements with other parties; monitoring collected rents and fees and
agreement compliance auditing.
♦ Maintaining Property Rights: coordination with staff, local, state and federal
agencies and law enforcement to keep District land free of hazards and
trespassers and by securing property with fencing, locks, and gates; posting
“No Trespassing” signs and other signage as appropriate; verifying District
property boundary lines to determine if trespassing or encroachment is
occurring on District property. Monitoring Land Use and zoning modifications
by municipalities and assessing impacts on District real estate.
♦ Managing Real Estate Acquisitions and Sales: includes managing the
acquisition or sale process for real estate or property rights; negotiating
purchase agreements, real estate broker agreements and other related
documents and agreement for new well sites and new construction projects;
acquiring and evaluating appraisals and title reports; involves determining
legal descriptions, property owners and rights to be acquired.
♦ Managing Land Use Entitlements: includes managing the Land Use
Entitlement process such as Zoning and General Plan changes with
appropriate cities.
♦ Coordinating Property Management Committee: development of agendas
for the monthly Property Management Committee meetings of the Board of
Directors including writing all staff reports.

III Non-Core Activities


Non-core activities (secondary priority compared to core activities) conducted by
the Property Management group include:
♦ Providing data and information to outside agencies and organizations.

Orange County Water District 3-34 FY 2018-19 Work Plan


PROPERTY M ANAGEMENT

IV Group Goals for FY 2018-19


♦ Negotiate terms for expiring leases: Major leases expiring in FY 2017-18
include, Sandwood, Inc., and Gentry Golf. Negotiate new agreement with
Caltrans on Burris Basin property.
♦ Assistance on property issues for new wells and new construction
sites: Assist Hydrogeology and Engineering groups with acquiring easements
for wells and facilities for the North Basin Groundwater Protection Project,
Mid-Basin Injection Project, and other projects with site access needs.
♦ Development of properties: Continued work on developing properties for
long-term revenue generation including the Ball Road Basin Property
(continue work with the City of Anaheim in advancing the General Plan
Amendment and Zone Change process with the City).
♦ Anaheim Coves Extension: Work with the City of Anaheim in development
of the City’s planned park in the District’s Five Coves property.
♦ Prado Properties: Explore potential acquisition of property adjacent to
District Prado properties in Riverside and San Bernardino counties.
♦ Santa Ana River Trail: Coordinate activities with the County of Riverside,
City of Corona and other participating agencies in the development of the
Santa Ana River Trail (SART) project as it relates to the District’s Prado
properties.
♦ I-405 Project Plan / Deep Well #4 & 5 Easement: Work with Orange
County Transportation Authority (OCTA) and the City of Fountain Valley in the
determination of Easements of specific pipelines for the Improvement Project
between State Route 73 and Interstate 605.
♦ Homeless Issues: Work with OC Public Works on an on-going basis on
Homeless Issues regarding security of basins, Santa Ana River and well
properties.
♦ Gate names/numbering: The assignment of names/gate numbers of access
gates to basins, & installation of signs on access gates.

V Pending Activities
Major activities that are reduced, not being implemented or conducted include:
♦ Research and pursuit of creative lease opportunities to generate revenue for
the District.
♦ Proactive monitoring of zoning and sphere of influence issues on District
property.

VI Staff Addition Needed for FY 2018-19


None

Orange County Water District 3-35 FY 2018-19 Work Plan


PROPERTY M ANAGEMENT

VII Future Issues


In the next one to two years, issues the District may need to consider:
♦ Consideration of other long-term opportunities to lease District land at higher
lease rates.

Orange County Water District 3-36 FY 2018-19 Work Plan


PLANNING AND W ATERSHED M ANAGEMENT

PLANNING AND WATERSHED MANAGEMENT

Summary Information

Existing Staff - 4 FTEs


1 – Executive Director of Planning and Natural Resources
1 – Principal Planner
1 – Senior Watershed Planner
1 – Recharge Planning Manager

Mission
Conduct long-term planning of District’s facilities and programs, prepare planning
documents and environmental analyses for new projects, secure permits from
resources agencies, and implement the District’s watershed management programs.

Key Issues for FY 2018-19


♦ Working with Army Corps to enhance water conservation at Prado Dam.
♦ Working with Army Corps and other stakeholders to assess long-term
sediment management solutions in the Santa Ana River.
♦ Developing new approaches to Integrated Regional Water Management
(IRWM), including a new Orange County IRWM Group.
♦ Managing the demonstration project to test pre-treatment of river water prior
to recharge as a means to improve recharge basin performance.
♦ Watershed Management – Interface with watershed stakeholders. Participate
in Upper Santa Ana Watershed Habitat Conservation Plan, Basin Monitoring
Program Task Force, Imported Water Recharge.

Orange County Water District 3-37 FY 2018-19 Work Plan


PLANNING AND W ATERSHED M ANAGEMENT

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actual Budget Proposed Budget
Salaries and Benefits 820,697 819,708 879,189
Services and Supplies 1,949,032 589,098 859,100
Total $2,769,729 $1,408,806 $1,738,289

I FY 2018-19 Major New Initiatives/Programs


♦ None

II Core Activities
The Planning and Watershed Management Department is primarily responsible for the
District’s long-term planning, interfacing with agencies above Prado Dam, watershed
management, and preparation of environmental documents.
Core activities include:
♦ Conducting long-range planning of future activities and facilities at the District.
♦ Planning new projects to increase the yield of the basin and protect water
quality (shared with Engineering and Hydrogeology).
♦ Protecting the quality of SAR flows.
♦ Preparing environmental documents (e.g., Environmental Impacts Reports).
♦ Securing environmental permits for District projects, such as Army Corps
Clean Water Act Section 404 permits and California Department of Fish and
Game 1600 permits.
♦ Maintaining compliance with the Sustainable Groundwater Management Act
(SGMA).
♦ Evaluating new methods to improve the performance of the District’s surface
recharge facilities in Anaheim and Orange.
♦ Interacting, representing, and processing agreements with outside upstream
agencies such as SAWPA, upstream agencies, regulatory agencies, etc.
♦ Interface with watershed stakeholders. Lead Integrated Regional Water
Management activities. Participate in Upper SA Watershed Habitat
Conservation Plan development. Participate in SAWPA task forces on
basinwide water quality. Monitor implementation of stormwater NPDES
(“MS4”) permits in Orange, Riverside, and San Bernardino Counties. Monitor
cleanup of the Stringfellow hazardous waste plume in Riverside County and
other contamination sites in the upper watershed that may pose a threat to
the Santa Ana River.
♦ Interfacing with the regulatory agencies and upstream water agencies on
issues affecting the SAR.

Orange County Water District 3-38 FY 2018-19 Work Plan


PLANNING AND W ATERSHED M ANAGEMENT

♦ Reviewing environmental documents prepared by agencies in the watershed


with respect to potential impacts on the District’s operations and the
watershed.

III Non-Core Activities


None

IV Group Goals for FY 2018-19


Prado Basin Feasibility Study – This is a joint activity with the Army Corps to
evaluate ecosystem restoration and increase the storage level at Prado Dam so
that additional water can be stored and subsequently recharged in the District’s
facilities. This is a multi-year effort with the Army Corps to prepare a Corps’
Feasibility Study for ecosystem restoration and water conservation (stormwater
capture). The Feasibility Study includes evaluation of increasing the winter-time
water conservation from elevation 498 feet to 505 feet. The Study also evaluates
sediment management in Prado Basin.
Integrated Regional Water Management (IRWM) – The Board directed staff to
explore development of a new IRWM Group in Orange County, and also explore
options to revise the existing SAWPA IRWM program referred to as the One
Water One Watershed (OWOW) program. Staff is working with the County of
Orange and other stakeholders to prepare an updated North and Central OC
IRWM Plan and will continue these efforts in 2018-19.
Forecast Informed Reservoir Operations (FIRO) Scoping Study - Storm water
captured at Prado Dam is a key source of water used to recharge the
groundwater basin. Enhanced weather forecasting has the potential to increase
the efficiency of storm water capture and reduce potential losses to the ocean. In
June 2017, the Board approved a FIRO Scoping Study at Prado Dam with the
Scripps Institute of Oceanography. Work in FY 2018-19 will focus on completing
Phase 1 of the Scoping Study with Scripps and the Army Corps of Engineers.
Sediment Management in SAR – The transport and deposition of sand in the
SAR is important to maintaining recharge through the SAR river bottom. A sandy
river bottom provides high recharge rates and allows the District to construct
levees to maximize percolation. Prado Dam traps the majority of sand flowing
down the river, reducing the dam’s storage capacity and causing negative
impacts on the recharge capacity of the riverbed and the District’s ability to
construct sand levees. The sand deficit below Prado Dam, unless remediated,
will cause long-term reductions in the recharge rate of the channel. Work in FY
2018-19 will focus on evaluating regional options to address the issue and
working with the Army Corps on the Corps’ Prado Basin Feasibility Study.
Additionally, staff will assist with implementation of the Prado Basin Sediment
Management Pilot project.
Santa Ana River Conservation and Conjunctive Use Program (SARCCUP) – This
program includes development of a water bank to store water conveyed into the
watershed from surplus supplies available from the San Bernardino Valley

Orange County Water District 3-39 FY 2018-19 Work Plan


PLANNING AND W ATERSHED M ANAGEMENT

Municipal Water District (Valley District) and other supplies that may be
conveyed through the State Water Project by Valley District. Additionally,
SARCCUP includes funding to remove 640 acres of Arundo donax. SARCCUP
is partially funded through a Proposition 84 grant. Work in FY 2018-19 will focus
on completing environmental documentation and preliminary design.
SAR Water Rights - The District currently holds rights to divert and recharge
362,000 afy of Santa Ana River water. In its water rights decision that
appropriated 362,000 afy of river water to the District, the State Water Resources
Control Board determined that it would hold in abeyance an additional 143,000
afy associated with potential long-term projects that the District could construct.
The State Board determined that it would hold the additional 143,000 afy in
abeyance until 2023. However, the State Board has requested that the District
provide annual reports on the District’s plans to utilize the 143,000 afy held in
abeyance.
Recharge Facility Planning – The District has several activities focused on
maximizing the performance of our existing surface recharge basins in Anaheim
and Orange. This effort includes managing the Riverbed Filtration
Demonstration project, which pretreats river water prior to recharge in Olive
Basin as a means to improve recharge performance. Performance testing will
continue to collect water quality and recharge rate data over a range of
hydrologic conditions. Staff is also evaluating options to increase the
performance of various recharge facilities. This effort also includes managing the
Recharge Enhancement Working Group (REWG), which is a meeting of staff
from multiple District departments to brainstorm methods to enhance
groundwater recharge.
Santa Ana River Flow Estimates – Potential projects and activities in the upper
SAR Watershed can affect the amount of SAR flow that reaches Orange County.
Due to water supply changes in California and the southwest United States,
agencies throughout the area are proposing new projects that could impact flows
in the SAR. Staff will continue to monitor and review proposed projects in the
upper watershed with respect to their impact on flow rates in the SAR. Staff will
also work with agencies in the upper watershed to evaluate these issues.
Environmental Analyses and Permitting – Environmental analyses are
anticipated for new projects, including the North Basin Groundwater Protection
Project and the South Basin Groundwater Protection Project.
Watershed Management – Participate in task forces administered by SAWPA,
including:
♦ Basin Monitoring Program Task Force
♦ Salinity Management and Imported Water Recharge Workgroup
♦ Middle Santa Ana River Bacterial Indicators TMDL
Participate in implementation of watershed plans for Central Orange County and
North Orange County Watershed Management Areas. Monitor activities in the

Orange County Water District 3-40 FY 2018-19 Work Plan


PLANNING AND W ATERSHED M ANAGEMENT

Chino Groundwater Basin and implementation of ‘hydraulic control’ in the Chino


Basin.

V Pending Activities
None

VI Staff Addition Needed for FY 2018-19


None

Orange County Water District 3-41 FY 2018-19 Work Plan


NATURAL RESOURCES

NATURAL RESOURCES

Summary Information

Existing Staff – 3.5 FTEs


1 ─ Director of Natural Resources
1 ─ Habitat Restoration Manager (Principal Environmental Specialist)
1 ─ Senior Environmental Specialist
0.5 – Environmental Specialist (* Cost Shared 50% with SAWA)

Mission
Manage natural resources in the Santa Ana River Watershed, focusing upon District
property to maintain or improve water quality, water supply, habitat, and wildlife
populations in fulfillment of OCWD mitigation responsibilities; help maintain Arundo-free
a minimum of 5,000 acres of former Arundo on the Santa Ana River generating a
minimum of 18,750 acre-feet of water valued at $8,437,500 annually.

Key issues for FY 2018-19


♦ Continue partnerships for additional Arundo control on the SAR while raising
public awareness of the issues and benefits.
♦ Assist in the preparation of permit applications and negotiate conditions
cooperatively with other Departments and Regulators for various District

Orange County Water District 3-42 FY 2018-19 Work Plan


NATURAL RESOURCES

projects including Sediment Management in Prado Basin, water conservation,


the Corps Feasibility Study, and District operational activities including RGP
implementation and monitoring.
♦ Coordinate with Army Corps and resource agencies regarding Enhanced
Water Conservation in Prado Basin including deviation requests while
environmental documentation and permits are pending.
♦ Represent the District on the Santa Ana Watershed Association Board and on
various other task forces and planning groups such as the Santa Ana Sucker
Conservation Team.
♦ Oversee endangered bird monitoring and Natural Resources management
efforts in the Prado Basin and other District properties; organize watershed-
wide monitoring of select endangered populations, documenting the annual
population status of the largest least Bell’s vireo population in existence.
♦ Refine data gathering and reporting on OCWD maintenance activities in the
recharge area of the river and at Prado under permits with the U.S. Army
Corps of Engineers, and agreements with CA Department of Fish and
Wildlife, and California Regional Water Quality Control Board.
♦ Continue Sucker restoration on Sunnyslope Creek and other activities as per
OCWD - CA Department of Fish and Wildlife Agreement.
♦ Maintain, monitor, and report upon dozens of mitigation and other habitat
restoration sites that were set aside to offset potential effects of District
projects and activities.
♦ Monitor and attempt control of Quagga Mussels and other potentially harmful
invasive species.
♦ Maintain permits for endangered species work.

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actual Budget Proposed Budget
Salaries and Benefits 653,906 645,757 680,924
Services and Supplies 671,328 603,250 778,653
Total $1,325,234 $1,249,007 $1,459,577

I FY 2018-19 Major New Initiatives/Programs


♦ Participate in the San Bernardino Valley MSHCP resulting in permits for three
District covered activities.
♦ Collaborate with experts in monitoring and controlling shot hole borer beetle
damage to riparian trees in Prado and throughout the watershed.
♦ Organize fish population studies and enhanced monitoring and management
of nesting seabirds in Burris Basin toward greater reproductive success.
♦ Facilitate transfer to OCWD of 2,000 acres of Corps lands leased to the
County of Riverside in the Prado Basin.

Orange County Water District 3-43 FY 2018-19 Work Plan


NATURAL RESOURCES

♦ Adaptively create and manage habitat for threatened Santa Ana Suckers in
the river above Prado.

II Core Activities
♦ Managing wildlife habitat and populations as per mitigation requirements and
regulatory permit compliance.
♦ Implement and report sucker conservation, restoration, and native fish
establishment efforts.
♦ Interacting with outside agencies such as the U.S. Fish and Wildlife Service,
Army Corps of Engineers (ACOE), SAWPA, the local governmental agencies,
etc., in representing OCWD interests in environmental planning.
♦ Interacting with other departments and regulatory agencies to ensure
environmental compliance of District projects and activities.
♦ Administering and overseeing natural resources management efforts and
removal of Arundo and other invasives from the SAR Watershed.
♦ Seeking outside funding and administering expenditure of those funds.
♦ Interfacing with non-governmental organizations in the SAR Watershed.
♦ Monitor endangered birds on District lands per permit requirements including
management of seasonal contractors.
♦ Santa Ana sucker monitoring and conservation.
♦ Permit maintenance.
♦ Oversight and cooperation with contractors, interns, and partners to maximize
efficiency in attainment of mission and goals.
♦ Reporting of the annual achievements of the District’s Natural Resources
Program to the Regulatory Agencies and public.

III Non-Core Activities


♦ Care of and finding suitable housing for a major wildlife specimen collection.
♦ Production and dissemination of educational materials.

IV Group Goals for FY 2018-19


Monitor Endangered Bird Populations in the Prado Basin and Watershed – The
Department leads the monitoring of endangered birds in the Prado Basin and the
SAR Watershed. This activity also keeps the District in compliance with
Regulatory Permits for Water Conservation and other District projects.
Endangered bird populations will be monitored and managed in the Prado Basin
and throughout most of the SAR Watershed.
Santa Ana River Watershed Program – Staff will participate as a member of the
governing Board the SAWA, which is the organization removing Arundo
throughout the SAR Watershed. The Natural Resources Director or his designee
will attend regular meetings, prepare, review, and edit various documents

Orange County Water District 3-44 FY 2018-19 Work Plan


NATURAL RESOURCES

including amendments to bylaws, operational procedures, budgets, annual work


plan, and reports in directing management activities in the upper watershed.
Mitigation/Habitat Restoration in Prado Basin and OC – Staff will prepare,
implement, monitor, and report upon habitat restoration and wildlife populations
in compliance with permit conditions for Prado Water Conservation and other
District projects and activities.
Ongoing Removal of 5,000 acres of Arundo – Staff will help manage and monitor
the efforts to keep Arundo out of the 2,500 acres initially treated with Proposition
13 funding, and that removed before and since including the OCWD Board
approved 350 ac 2015 Highway Fire burn site in the Prado Basin.
Negotiate Funding for Arundo Removal – Natural Resources staff will participate
in watershed efforts that are controlling Arundo and seek opportunities to bring
funding and Arundo control onto OCWD lands in the Prado Basin. Staff will
solicit, track, and report funding received and resulting activities.
Monitor and Control Problematic Invasive Species – Quagga Mussels,
Polyphagous Shot Hole Borers, and other non-native species that have the
potential to cause great harm in the watershed will be monitored and
cooperatively controlled when possible.
Prepare Permits for District Projects and Activities – Natural Resources Staff will
prepare permit applications and negotiate conditions cooperatively with
Engineering, Planning, and staffs of other Departments for various District
projects including Prado Sediment Management Study, Enhanced Water
Conservation at Prado, Burris Basin, and other facilities and operations as
needed.
Participate in Project Planning and Operations – Natural Resources staff will
continue to participate cooperatively with other departments in preparation of
environmental documentation and other planning efforts on Santiago Creek, and
on all facilities in cooperation with Engineering and Operations.
Educational Material – Natural Resources staff will continue to compile
interpretive materials including live-mounted specimens, reports, tours, and
presentations.

V Pending Activities (Not Being Addressed Due to Insufficient Resources)


Major activities that are not being implemented include:
Clean up of Chino Creek into the Prado Basin – Eucalyptus and several other
problematic non-native plants have invaded Chino Creek and are interfering with
flood control, water flow, habitat restoration, endangered bird management, etc.
The creek is isolated and could be cleaned as a separate unit.
Clean up of the Riverside County portion of the Santa Ana Canyon – Orange
County is implementing Arundo-control in the canyon, which will help keep the
OCWD recharge area more free of debris. However, they are not including the

Orange County Water District 3-45 FY 2018-19 Work Plan


NATURAL RESOURCES

part of the canyon just upstream in Riverside County. Giant reed from this
upstream section will re-infest their work areas unless it is removed.

VI Staff Addition Needed for FY 2018-19


None

VII Future Issues


Planning and Implementation Assistance for Prado Feasibility Study – Staff will
continue to support study development and implementation.

Full implementation of the SAR Watershed Program – There are still 2,000 or so
acres of Arundo, or more to be removed from the watershed. This scale of
removal would generate more than 12,000 af of water annually for the District.
Assist in Development of a Plan for Wildlife Specimens – In preparation for a
possible interpretive center associated with a future District Wetland, Natural
Resources staffs have assembled an impressive collection of wildlife specimens
in life-like poses that will need a home when the hallway visitor’s center is built.
Staffs will assist in preparing documents and scoping available options.
Integrate Rigorous Statistical Analysis into Habitat Monitoring – The US Fish and
Wildlife Service wants statistics integrated into the monitoring of habitat recovery
following inundation due to water conservation in the Prado Basin. We must
determine how to satisfy that requirement.

Orange County Water District 3-46 FY 2018-19 Work Plan


FINANCE

FINANCE

Summary Information

Existing Staff - 13 FTEs


1 –CFO/Treasurer
1 – Accounting Manager
1 – Finance Manager
4 – Staff Accountants
1 – Senior Accountant (Payroll)
3 − Principal Project Accountants

Orange County Water District 3-47 FY 2018-19 Work Plan


FINANCE

1 – Accounting Clerk
1 – Field Representative/Meter Reader

Mission
To perform the District’s accounting, finance and treasury functions to maintain the
District’s strong financial position, high credit ratings, reliable reporting of budgets,
revenues, expenditures and investments and to ensure that adequate financial controls
are in place to accurately record financial transactions, communicate financial results,
and protect the District’s assets. In addition, to ensure the financial records are
maintained in accordance with generally accepted accounting procedures and
guidelines as established by state and federal agencies.

Key Issues for FY 2018-19


♦ Adapt District finances to drought related economic issues.
♦ Issue debt to efficiently fund OCWD’s CIP at the lowest possible cost and
optimize debt program by refinancing debt to reduce debt service costs.
♦ Manage OCWD’s Investment Portfolio per the Board approved investment
policy.
♦ WIFIA loan application final approval.
♦ Continue to ensure that internal controls are in place to provide assurance
that assets are safeguarded and financial information is fairly stated. Review
and update existing procedures and establish new procedures that will help
expand the group’s analysis and reporting capabilities.
♦ Continue the timely draw down of SWRCB loan funds.
♦ Submit Comprehensive Annual Financial Report to Government Finance
Officers Association for their award program.

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actuals Budget Proposed Budget
Salaries and Benefits 1,742,880 1,869,355 1,924,923
Services and Supplies 16,784 124,900 129,800
Total $1,759,664 $1,994,255 $2,054,723

I FY 2018-19 Major New Initiatives/Programs


♦ Financial planning for material increases in the purchase of imported water
should the region continue to experience dry weather conditions.
♦ Continue to increase rebate earnings from wider use of the District’s
purchasing card/single - use account program.
♦ Secure the lowest cost of financing and grant funding for the GWRS final
expansion project.

Orange County Water District 3-48 FY 2018-19 Work Plan


FINANCE

 Begin to explore accounts payable automation, including imaging, work flow


management and electronic storage and incorporate the application of
paperless digital record keeping for the department’s large quantity of hard
copy transaction records.
 Support of the District’s review of the operating costs of the Green Acres
Program.
 Fixed Asset tagging and inventory.
 Implement new water assessment billing and work towards online RA filling
by the producers.

II Core Activities
The Finance Department is primarily responsible for the District’s accounting and
treasury functions, including debt and investment management, financial
planning and analysis including rate setting, budgeting, accounting and control
including financial reporting, payroll, accounts payable and accounts receivable,
as well as working with various internal and external groups and agencies.
The core activities of the department are:
 Process the District’s accounts payable ensuring all payments and
reimbursements are done timely, accurately and in compliance with policies
and procedures along with state and federal regulations.
 Process accounts receivable invoices and incoming payments timely,
accurately and in compliance with financial policies and procedures.
 Maintaining the general ledger.
 Administer and process the District’s payroll function, including accurate and
timely payroll tax filings, year-end reporting, employee retirement and benefits
payments, and any other employee related costs administered through the
payroll function.
 Monitor, track, execute and complete all grant billings for the District’s general
fund and capital projects.
 Prepare annual budget and provide quarterly budget versus actual variance
analysis and reporting.
 Present to the board ratio analysis semi-annually.
 Continue to review and update the R&R model.
 Account for and audit various BEA exemption programs.
 Provide monthly water production cost analysis to the water production
department.
 Maintain and update monthly rolling cash forecast model.
 Prepare monthly cash and investment holdings report.

Orange County Water District 3-49 FY 2018-19 Work Plan


FINANCE

 Prepare and update water quality legal cost report on a quarterly basis.
 Process and calculate the District’s Replenishment Assessment (RA) and
Basin Equity Assessment (BEA) billings including any special water program
billings. This includes ongoing monitoring and reading of all of the meters.
 Complete the financial information necessary for the District’s annual
Engineer’s Report.
 Prepare and submit quarterly sales and use tax returns, and any other
financial reporting or compliance reporting as needed as it relates to the
District’s finances.
 Working with external independent auditors to complete the District’s annual
fiscal year end audit, pension plan audits, single audits (as necessary), and
work with other outside agency auditors to fulfill any additional audit
requirements.
 Complete and submit a CAFR for possible award.
 To monitor, track and report the District’s Reserve Funds.
 Prepare and complete all annual reporting for District travel and expense
expenditures in a timely manner.
 Manage and invest the District’s cash in-house on a daily basis in order to
meet District’s cash needs. This includes an annual review of the District’s
investment policy with the Admin/Finance Committee.
 Continue to manage the treasury functions of the District which includes
ensuring all debt related payments are made timely for all debt issuances,
state loans, and commercial paper. In addition, maintain compliance with all
continuing disclosure requirements, review and renew all necessary debt
administrative services including bank letters of credit, rating agency
monitoring, trustee administration, and any other debt related maintenance
services.
 Debt issuances – to initiate, support, analyze and complete the execution of
all necessary debt financings needed for the District’s capital projects.
 Continue to review and work with various financial scenarios in order to make
recommendations to seek and obtain the most economical financings to
support the District’s capital projects.

III Non-Core Activities


 Children’s Water Festival Accounting.
 Contract administration and building maintenance billing operations for
MWDOC occupancy expenses.

Orange County Water District 3-50 FY 2018-19 Work Plan


FINANCE

IV Group Goals for FY 2018-19


 Review and update documentation of procedures for all accounting functions.
 Review Producer meter calibration reporting program and procedures.
 Complete monthly closing of the general ledger, all account reconciliations,
and accruals in a timely manner.
 Complete the annual independent audit and all necessary audit schedules
more efficiently in order to complete the year-end audit on a timely basis.
 Review the general ledger and all ledger accounts to ensure that revenues
and expenses have been posted properly. This includes analyzing and
researching any discrepancies and unusual variances.
 Effectively and efficiently streamline the accounts payable workflow process
including matching, approving, and payment processing by working with
internal departments to ultimately process vendor payments timely,
accurately, and in compliance with adequate internal control processes.
 Discover ways to streamline all processes and to continue to strengthen
internal controls throughout the District, in accordance with “Best Practices”.
 Financial modeling to analyze and support the District’s annual RA/BEA rates
established and approved by the Board on an annual basis. Ongoing
forecasting and projections of revenue and expenses.
 Provide project accounting analysis for all of the District’s capital projects and
work with all project managers to ensure that all project costs are properly
accounted for and are within the project budget. This also reduces the burden
currently placed with each project manager to provide financial analysis
support for their own projects.
 Record, monitor, and ensure proper accounting for the District’s fixed assets
and inventories on a monthly basis, including the proper accounting for
depreciation and transferring assets from work in progress as projects are
completed.
 Look for refinancing opportunities for an economic benefit to the District.
 Complete annual filings and certification of compliance with circular OMB-133
for all grant funding sources when required.
 Manage and audit litigation settlement accounting.
 Review and update all the assets in the R&R model.
 Cross-training of staff in all accounting positions to provide better coverage,
and to strengthen accounting internal controls with the ability to “rotate” staff
in certain functions.

V Pending Activities
None

Orange County Water District 3-51 FY 2018-19 Work Plan


FINANCE

VI Staff Addition Needed for FY 2018-19


None

VII Future Issues


None

Orange County Water District 3-52 FY 2018-19 Work Plan


Purchasing

PURCHASING

Summary Information

Existing Staff - 6 FTEs


1 – Purchasing Manager
1 – Senior Buyer
1 – Buyer
2 – Warehouse Technicians
1 – Senior Administrative Support Specialist/ Contracts

Orange County Water District 3-53 FY 2018-19 Work Plan


Purchasing

Mission
The Mission of the Purchasing Department is to procure reliable quality services
and products, at a good cost and in a timely manner, using ethical procurement
standards, to achieve a high level of assistance for the District.

Key Issues for FY 2018-19


None
FY 2016-17 FY 2017-18 FY 2018-19
Account Information
Actual Budget Proposed Budget
Salaries and Benefits $662,158 $700,489 721,661
Services and Supplies $36,690 $35,350 36,650
Total $698,848 $735,839 $758,311

I FY 2018-19 Major New Initiatives/Programs


♦ Set up insurance program to cover requirements, renewals and
maintain a filing system for the certificates.
♦ Implement procedure for fully electronic purchase orders from
requisition through payment, thereby reducing paperwork.

II Core Activities
The Purchasing Department is responsible for:
♦ Purchasing goods and services.
♦ Assisting all work groups with the issuance of request for proposals
(RFP) for goods and services.
♦ Maintaining the warehouse.
♦ Managing inventory.
♦ Preparing, processing, and administering District’s public works
contracts and agreements.
♦ Maintaining filing system for purchase orders, contracts and
agreements.
♦ Identifying, obtaining Board approval, and disposing of surplus.
♦ Maintaining records for District vehicles and equipment; assigning
District identification numbers.
♦ Locate new sources for procurement of materials, supplies and
services.
♦ Prepare and issue Requests for Proposals (RFP’s) and Requests for
Quotations (RFQ’s) for services and products to obtain the best pricing
and good quality.
♦ Meet with each Department quarterly to discuss requests and
problems to ensure quality service is being provided.

Orange County Water District 3-54 FY 2018-19 Work Plan


Purchasing

♦ Meet with the project managers to discuss contracts and agreements


so that (1) we can process the documents expeditiously and address
the agreement language issues that arise; and (2) provide an update
on status of the agreements/contracts, as needed.
♦ Review and update warehouse, purchase order and agreement
services procedures and improve on receiving activities.
♦ Administrator for purchasing card program, addressing issues which
may arise and monitoring cards.
♦ Check safety procedures for warehouse receiving and storing goods,
including chemicals.
♦ Assist Departments for procurement of Department special
needs/events.
♦ Complete a formal procedures manual to be submitted for approval.

III Non-Core Activities


Non-core activities conducted by the Purchasing Department include:
♦ Meet with purchasing personnel from other water agencies to share
information on new vendors, pricing, procedures, etc.
♦ Attend seminars on procurement and warehousing for updated
information to save money while still obtaining quality products.

IV Group Goals for FY 2018-19


♦ Improve on warehouse procedures and material handling; improve on
warehouse storage at FHQ.
♦ Assessment of all District vehicles – prepare a detailed report and
analysis for the General Manager.
♦ Surplus – research and implement procedure for cost effective
disposal of obsolete items.
♦ Implement procedure for fully electronic purchase orders from
requisition through payment.
♦ Set up insurance program.

V Pending Activities
♦ Preparation of a formal Procedures Manual for Purchasing.

VI Staff Addition Needed for FY 2018-19


None

VII Future Issues


♦ Additional warehouse space/warehouse cleanup.

Orange County Water District 3-55 FY 2018-19 Work Plan


WATER QUALITY

WATER QUALITY

Summary Information

Existing Staff - 12 FTEs

1 – Director of Water Quality


1 – Environmental Specialist Supervisor
1 – Principal Environmental Specialist
1 – Senior Environmental Specialist/Analyst
3 – Senior Environmental Specialists
1 – Senior Environmental Technician
2 – Environmental Specialists
2 – Environmental Technicians

Orange County Water District 3-56 FY 2018-19 Work Plan


WATER QUALITY

Mission
Implement water quality monitoring programs to (1) protect and evaluate basin
conditions and (2) comply with regulatory requirements for drinking water wells and the
District’s NPDES and Water Reclamation permits.

Key Issues for FY 2018-19

♦ GWR System (GWRS) Monitoring: Continue to implement water quality


monitoring requirements for the final product water and groundwater
monitoring wells in compliance with the GWRS permit, as well as recently
reduced voluntary testing at monitoring wells. This is a high priority for the
department, including assisting with preparation of (1) regulatory quarterly
reports, (2) the annual report, and (3) the annual independent advisory panel
meeting and supplemental tech memos. Use of the GWRS product water for
injection at the Talbert Barrier for seawater intrusion and for surface
spreading at the Forebay requires quarterly monitoring of 36 permit specified
groundwater monitoring wells. Based on a review by staff and concurrence
from the NWRI GWRS Independent Advisory Panel, some supplemental
voluntary monitoring/testing performed at the monitoring wells will be reduced
this year. Meeting monitoring schedules at both the Talbert Barrier and
recharge basins take precedence and require close coordination and
scheduling with the Laboratory and other WQ programs to ensure maximum
efficiency with sample loads and resources.
♦ U.S. EPA Unregulated Contaminant Monitoring Rule Phase 4 (UCMR4): On
behalf of basin Producers, OCWD has successfully met the monitoring and
reporting requirements for the past UCMR1, UCMR2, and UCMR3 programs.
The UCMR4 monitoring program is scheduled over 3 years with monitoring to
begin in 2018 and must be completed in year 2020. To accomplish this
additional drinking water monitoring for Groundwater Producer’s (GWP’s),
many hours of preparation and coordination are required. The additional
UCMR4 monitoring challenges for the WQ Department require close
coordination with GWP’s and the Laboratory to ensure (1) monitoring
schedules are developed and met, (2) all required sample collection
procedures and quality assurance are followed as required by the specific
analytical methods, and (3) all reported sample results are properly entered,
reviewed, and reported into the EPS SDWARS4 database with necessary
sample results, QA/QC information, and all additional water system
information per the EPA UCMR4 reporting requirements.
♦ North Basin Groundwater Protection Project (NBGPP): Continue to implement
monitoring activities at monitoring wells to track the volatile organics
contaminant (VOC) plume and to provide information for the VOC remediation
plan in the North Basin area of the District.
♦ South Basin Groundwater Protection Project (SBGPP): Continue to
implement water quality monitoring activities at monitoring wells in

Orange County Water District 3-57 FY 2018-19 Work Plan


WATER QUALITY

southeastern Santa Ana to further investigate the extent of VOCs and


perchlorate contamination.
♦ GWRS Metals Mobilization Study: Continue to implement water quality
monitoring activities to assess potential metals mobilization in groundwater
near GWRS recharge facilities. A monitoring program was initiated as
recommended by the NWRI GWRS Independent Advisory Panel to analyze
for trace metals (arsenic is one metal of key concern) from selected wells in
the vicinity and downgradient of the GWRS recharge basins. Monitoring data
has confirmed some metals are mobilized along the groundwater recharge
flow path due to the geochemical differences between GWRS water and the
receiving groundwater aquifer. Monitoring will continue to provide data to
assess metals mobilization over a long-term and distance from the recharge
basins as well as support monitoring activities for the Stanford metals
mobilization research studies.
♦ Mid-Basin Injection Project: Continue to implement water quality monitoring
activities for the Mid-Basin Injection (MBI) Project which is monitoring the
injection of GWRS water directly into the Principal aquifer. Currently, water
quality is monitored at two downgradient monitoring well sites (7 separate well
casings) as well as at several nearby production wells downgradient of the
Demonstration MBI Project. Eight additional well casings will be installed as a
part of the ongoing MBI Centennial Project.
♦ OCWD Storm Water Permit: Provide field and technical support for the
District’s GWRS Industrial Storm Water permit to comply with EPA’s National
Pollutant Discharge Elimination System (NPDES) permit covering storm water
management, discharges, water quality monitoring, and reporting
requirements. Perform monitoring, site inspection tasks, and annual refresher
training as approved in the District’s Storm Water Pollution Prevention Plan
(SWPPP) and WQ monitoring plan. Under the newly adopted SWQCB storm
water permit, two storm water sampling events must be conducted between
July and December, and January and June. The permit requires preparation
of an annual report and electronic reporting.
♦ Santa Ana River Monitoring Program (SARMON): Continue to implement the
comprehensive surface and groundwater monitoring program recommended
by the SARWQH study. Monitoring activities include sites on the Santa Ana
River (SAR), Santiago Basin, and selected downgradient monitoring wells to
provide data on travel time and to assess water quality changes that may
occur after recharge of water from the Santa Ana River. Monitoring activities
are regularly updated and revised based on ongoing review of reported
sample results and recommendations from the regular meetings of the
SARMON Independent Advisory Panel (IAP). One specific focus of the
monitoring program is to continue to monitor and evaluate occurrence of
Contaminants of Emerging Concern (CEC, including recently addition of
monitoring for perfluoralkyl acids (PFAAs) such as Perfluorooctanoic acid
(PFOA) and Perfluorooctanesulfonic (PFOS) . Also, Santa Ana River water
flowing into and out of the District’s Prado basin wetlands are monitored to

Orange County Water District 3-58 FY 2018-19 Work Plan


WATER QUALITY

evaluate changes in water quality and to evaluate the effectiveness of the


wetlands for water quality treatment. Technical tasks for the SARMON
program include but are not limited to assisting with preparation of (1) the
biennial report summarizing SAR monitoring results, (2) presentations or
technical reports for the NWRI’s SARMON IAP annual meeting, and (3)
completing the annual SARMON water quality program summary.
♦ Seawater Intrusion Program: Continue to implement water quality monitoring
activities to helps assess possible seawater intrusion in areas such as the
Talbert Gap, Bolsa Gap, and Sunset Gap. Recent monitoring results have
shown possible seawater migration landward in the Sunset Gap and
impacting a nearby Huntington Beach drinking water well. Hydrogeology has
drilled new monitoring wells to assess seawater intrusion in Bolsa and Sunset
Gaps to provide information for assessing seawater intrusion. In recent
years, over 30 wells have been constructed and added to the seawater
intrusion semi-annual monitoring program for the Bolsa and Sunset Gap
areas alone. Additional wells, 11 monitoring wells, have also been
constructed in the East Newport Mesa Area to provide water quality data in
areas of the groundwater basin that do not have any wells. These wells will
help to delineate aquifer correlations and construct the annual Shallow aquifer
water level (WL) contour maps. Water quality and water level data will aid in
delineating seawater intrusion that could potentially impact Mesa WD and
IRWD wells, assist with geologic correlations in east Newport Mesa and SW
Irvine area, and help fill in data gaps to construct the annual Shallow aquifer
WL contour map.
♦ GWRS Applied Research and Operational Support: Continuing from last year
and building on current knowledge are planned focused water quality studies
to evaluate treatment removal efficiencies and membrane integrity
assessment (new and older membranes). Specific studies will focus on
specific water quality assessments and may include use of external contract
lab support for specific analyses such as bacteriophage monitoring and other
microbial testing at specific process points. The department will assist with
monitoring tasks and coordination with external lab support, as needed.
♦ Planning and Coordinating Water Quality/Laboratory Workload: Additional
challenges facing the department to manage, track, schedule and coordinate
the compliance and non-compliance monitoring activities are dependent on
(1) Laboratory resources and analytical capacity, (2) GWRS and MBI
monitoring activities, (3) Producer drinking water well state/federal monitoring
schedules, and (4) other on-going District projects, research or focused
studies, etc. These programs and available resources must be considered in
weekly planning and assigning workload. The efficiency of the Water Quality
field activities will be dependent on these factors, and resources to initiate
monitoring schedules for newly constructed wells or locations for various
projects (if approved; see below). Scheduling and coordinating workloads
that maximize the Laboratory and Water Quality department’s efficiencies are
challenging (i.e., maximum samples per extraction methods, etc.) to meet the

Orange County Water District 3-59 FY 2018-19 Work Plan


WATER QUALITY

water quality data information needs for the various compliance and non-
compliance monitoring programs and research investigations.
♦ Monitoring Activities for Other Projects or Investigative Studies: Pending
Board approval, commitment or agency agreements (see below) several
District projects, investigations or research endeavors will commence that will
require field and technical assistance from the Water Quality Department (see
below).

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actual Budget Proposed Budget
Salaries and Benefits 1,592,529 1,679,442 1,606,680
Services and Supplies 280,194 518,547 341,100
Total $1,872,723 $2,197,989 $1,947,780

I FY 2018-19 Major New Initiatives/Programs


Field support and resources may be needed to monitor water quality from
existing locations or new monitoring wells to be constructed for the projects listed
below, pending Board approval. These are listed as potential programs/projects
for planning projections only.
♦ Tracer Study – Burris Basin, Santiago Basin and Santiago Creek Area –
Tracer studies may commence downgradient of Burris Basin, Santiago Basin
and Santiago Creek to provide groundwater travel time and flow paths in
support of future GWRS recharge at these locations. An extensive tracer
study was performed in the Forebay area recharge facilities and SAR
providing technical data to document groundwater flow paths and travel time
and a similar study is planned for this area of the basin to provide real-time
tracer data. Three nested monitoring wells consisting of 14 wells are planned
at strategic downgradient areas for the tracer study. Other wells within the
study area will be incorporated in an extensive monitoring program and
timeline to ensure capture of arrival of the tracer for age dating, confirmation
of groundwater flow paths, and arrival times.
♦ Mid-Basin Injection (MBI) Centennial Project – Future injection wells in
Centennial Park located in Santa Ana are planned similar to MBI-1 which was
completed in April 2015. As part of the MBI expansion at Centennial Park,
several new nested monitoring wells (SAR-12 and SAR-13) are have been
constructed and will be monitored to provide background water quality for
future areas of GWRS injection. Monitoring activities will include
comprehensive baseline monitoring of the underlying aquifers before start-up
of the new Centennial Park injection wells. Quarterly monitoring will continue
to assess changes in water quality over time as injected water migrates
downgradient to the nested wells. As with MBI-1 and SAR-10/SAR-11

Orange County Water District 3-60 FY 2018-19 Work Plan


WATER QUALITY

monitoring wells, monitoring will likely include monitoring for metals


mobilization as well.
♦ South Basin Groundwater Protection Project (SBGPP) - Phase I investigation
included construction of 6 nested wells consisting of 18 wells drilled to various
depths. Water quality monitoring has been continuing for over two years at a
semi-annual frequency. The Phase II investigation has commenced and
included construction of 7 nested wells within the study area to fill in data
gaps at various depths and locations. Twenty-nine monitoring wells have
been drilled and are initially being sampled by an outside contractor.
Following initial monitoring, OCWD will take over monitoring water quality
conditions to identify constituents of concern and levels of occurrence.
♦ Water Quality Evaluation of Stormwater Runoff - Glassell site – The County of
Orange has retrofitting an existing 10 acre office space site located in the City
of Orange on Glassell St. to infiltrate stormwater on-site. The retrofit will
include multiple EPA low impact development (LID) features to reduce
stormwater run-off/pollutants and improve water quality. Possible LID features
include bioswales, modular wetlands, permeable paving, and a subsurface
cistern to treat stormwater and to retain the majority of stormwater on-site.
The County will be collaborating with OCWD and the City of Orange with
specific aspects of the project, which may include water quality analysis and
addressing groundwater quality before and after infiltration.
♦ Prado Basin Sediment Management Demonstration Project - The Planning
and Watershed Management Department is working with the Army Corps to
address the build-up of sediment behind Prado Dam. Monitoring of water
quality during this project is expected once activities begin in August 2018.

II Core Activities
The Water Quality Group is primarily responsible for (1) implementing water
quality monitoring programs to protect and evaluate basin conditions, including
emerging contaminants; (2) providing technical and field support for compliance
programs, District projects, and research investigations; (3) disseminating water
quality information and assisting with expansion and update of the WRMS
database (historic and new water quality data); (4) reviewing and commenting on
relevant water regulatory and compliance issues (e.g., drinking water,
stormwater, de minimis permits, etc.); and (5) providing support to ensure that
the District complies with regulations pertaining to the Safe Drinking Water Act
and Clean Water Act amendments.
Core activities include:
♦ Implementing surface and groundwater quality monitoring programs for
(1) compliance with permits, mandated environmental and drinking water
regulations, (2) District projects and research investigations, and (3)
evaluating the ambient quality of the groundwater basin.
♦ Scheduling and sampling groundwater producer wells for compliance with
state/federal drinking water regulations for regulated and unregulated

Orange County Water District 3-61 FY 2018-19 Work Plan


WATER QUALITY

chemicals; reviewing, approving and reporting chemical data electronically to


the state on behalf of the groundwater Producers; assisting with data
compilation for the groundwater Producers’ Annual Consumer Confidence
Report, Public Health Goals Report, Annual District Engineer’s Report,
GWRS Annual report, and SARMON biennial report.
♦ Implementing basinwide monitoring for constituents proposed for regulation
and emerging chemicals of concern (CEC) to assess occurrence and
distribution within the Orange County Groundwater Basin and potential impact
to the groundwater Producers and OCWD.
♦ Overseeing and performing the compliance monitoring activities at
groundwater monitoring wells specified in the GWR System permit and permit
Amendments, including water used for blending, final product water,
coordinating with contract labs for selected analyses not performed by
OCWD’s Main Laboratory (e.g., asbestos, dioxin, radioactivity, etc.). GWRS
monitoring activities include both Forebay and Talbert Barrier locations, Mid-
Basin Injection, and relevant research investigations associated with tracer
and intrinsic studies to (1) establish groundwater flow paths and travel time to
the nearest wells (potable and monitoring), (2) assess metals mobilization
issues, joint research projects, and (3) assess treatment processes and
changes in water quality after time underground, etc. through joint research
endeavors.
♦ Implementing a surface and groundwater quality monitoring program to
assure the continued safety of the Santa Ana River as source water for
groundwater replenishment (SARMON monitoring activities).
♦ Ensuring compliance with the District’s NPDES general de minimus
dewatering permit including weekly notification, sampling, treatment of purged
groundwater (as needed), data analysis, and preparing monthly compliance
reports.
♦ Reviewing and approving new water quality data for the District’s WRMS
database; compiling and analyzing data for reports and internal staff, the
Board, and groundwater Producers.
♦ Coordinating with the Regional and State Water Quality Control Boards to
provide appropriate water quality data to assess compliance with Basin Plan
objectives for the SAR, TMDL issues, and other water quality river issues
relevant to protection of the OCWD groundwater basin.
♦ Performing semi-annual water quality monitoring of coastal wells to assess
the extent of seawater intrusion; coordinating with Hydrogeology on reviewing
and revising program as new data become available.
♦ Assisting with field data collection for the semi-annual basinwide water level
monitoring program to identify threats to the basin (i.e., groundwater
overdraft, seawater intrusion, etc.) and provide groundwater elevations of
basin aquifers measured six times annually.

Orange County Water District 3-62 FY 2018-19 Work Plan


WATER QUALITY

♦ Fulfilling water quality and water resources information requests from the
public, groundwater Producers, and regulatory agencies; responding to
special data requests for external site investigations and litigations.
♦ Tracking, reviewing and addressing new emerging contaminants of concern;
evaluating basin water quality conditions for emerging contaminants,
assessing management and response strategies, coordinating with Public
Affairs and groundwater Producers with water quality information.
♦ Preparing reference materials and presentations on water quality issues;
participating on advisory committees specific to water quality issues of
concern to OCWD and groundwater Producers.
♦ Reviewing and commenting on proposed regulations such as federal and
state maximum contaminant levels (MCLs), state notification levels and public
health goals, unregulated chemicals, NPDES permits, emergency regulations,
etc. relevant to the District and groundwater drinking water source monitoring.
♦ Responding to and coordinating with regulatory agencies on emergencies
and hazardous materials spills, fire fighting run-off, etc. that may affect
groundwater quality. Perform WQ monitoring as needed to assess potential
discharge impacts to recharge facilities or groundwater.
♦ Assisting with preparation of regulatory compliance reports and other water
quality reports.

III Non-Core Activities


Non-core activities (secondary priority compared to core activities) conducted by
the Water Quality Group include:
♦ Serving on water quality and project advisory committees for ACWA,
WEROC, etc. on emerging water quality issues relevant and beneficial to
OCWD as managers of the groundwater basin, preparing for water resources
emergencies (i.e., earthquakes), etc.
♦ Assisting other water agencies and Public Affairs in addressing water quality
issues, emerging contaminants, and tracking and assist in preparing
comments on proposed relevant drinking water-related regulations.

IV Group Goals for FY 2018-19


♦ Administer Water Quality Monitoring Programs: Ensure water quality sample
collection is performed with high quality and analyzed for (1) compliance with
mandated drinking water quality regulations and regulatory permits, (2)
District projects and investigations, and (3) evaluating the quality of the basin
(e.g., seawater intrusion in coastal areas). Evaluate new emerging chemicals
of concern and coordinate with the Laboratory to implement 2018-19
compliance monitoring requirements for drinking water sources, UCMR4
monitoring requirements, GWRS compliance monitoring locations, focused
studies, and to ensure maximum use of resources for both departments.
Work with Laboratory to effectively and efficiently schedule analysis for new

Orange County Water District 3-63 FY 2018-19 Work Plan


WATER QUALITY

changes to testing frequency within GWRS groundwater and SARMON


programs.
♦ Data Management Activities: Ensure new data are reviewed with high quality
assurance and approved into the WRMS database for end users; submit
Producer compliance data electronically to the SWRCB Division of Drinking
Water (DDW) database; prepare annual water quality schedules for DDW and
groundwater Producers; prepare annual data summaries for groundwater
producers for the Annual Consumer Confidence and triennial Public Health
Goals reports; prepare annual water quality data summary for OCWD’s
Engineer’s Report, GWRS quarterly/annual reports, and SARMON biennial
report; prepare and submit Annual Industrial Stormwater report and
compliance stormwater monitoring results electronically.
♦ Water Quality Regulatory Activities: Review and comment on newly proposed
state or federal drinking water standards (MCL), state notification levels and
evaluate potential impacts to groundwater basin and coordinate with
groundwater Producers; continue to track and comment on proposed non-
drinking water regulations relevant to OCWD’s activities (e.g., state NPDES
general permits, stormwater permit, etc.); monitoring federal and state
regulatory schedules for upcoming proposed drinking water regulations –
review and comment during public comment period.
♦ Implement the Santa Ana River Monitoring Program: Continue to implement
the long-term Santa Ana River Monitoring (SARMON) Program in joint effort
with Regulatory Affairs. Manage and provide oversight to ensure monitoring
activities are completed based on recommendations of the NWRI convened
SARMON Independent Advisory Panel.
♦ Talbert/Bolsa/Sunset Gaps Seawater Intrusion Monitoring: Implement the
seawater intrusion program in the Talbert/Bolsa/Sunset Gaps as
recommended by the Hydrogeology Group to provide real-time water quality
information to aid in assessing the extent and areal distribution of seawater
within these gaps. Water level (some locations measured six times per year)
and semi-annual water quality monitoring activities are conducted to provide
information for Hydrogeology’s assessment to evaluate the landward
migration of seawater and adjust monitoring activities based on findings.
♦ Water Quality Protection: Activities include tracking, reviewing and addressing
new chemicals of concern, evaluating basin conditions or source waters
potentially used for groundwater replenishment (e.g., perchlorate/chlorate in
the Santa Ana River); monitor and review media and research reports;
coordinate with regulatory agencies on upcoming new water quality issues;
provide field water quality monitoring support for Board approved projects that
authorize construction of new monitoring wells for District projects and
investigations.
♦ New Water Sources: Implement groundwater monitoring activities for short-
term focused studies related to recharge enhancement (stormwater infiltration
projects; river water sediment removal and percolation studies); provide
compliance testing for newly constructed groundwater Producers’ drinking

Orange County Water District 3-64 FY 2018-19 Work Plan


WATER QUALITY

water wells and new monitoring wells approved by the Board for specific
water quality studies; evaluate new source waters for GWRS (e.g., possibly
monitor flood control channel waters for diversion to OCSD for GWRS, SARI
Line water quality studies, etc.).
♦ Aquatic Weed and Pesticide Control: Continue to coordinate with Forebay
Operations to use non-chemical methods to address pests (e.g., midges at
recharge basins) and vegetative growth at the wetlands in lieu of chemical
application. Non-chemical strategies avoid (1) coverage under the SWRCB
aquatic weed and pesticide NPDES permits, (2) pre- and post-water quality
monitoring and analysis of the applied aquatic pesticides, (3) preparation of
regulatory reports, and (4) issues of the District applying chemicals to water
bodies potentially tributary to the river and/or underlying groundwater.
♦ Standard Operating Procedures (SOPs): Review and update department
SOPs and conduct periodic refresher training.
♦ Improved Water Quality Monitoring Efficiency
• Assess new methods and strategies to increase field productivity without
compromising quality of sample collection or integrity of sampled water.
• Improve sample collection equipment and sampling procedures; review,
revise and finalize standard operating procedures and implement
processes to increase efficiency and productivity. Continue with evolving
department-wide cross-training programs.
• Evaluate options to streamline specific monitoring programs for broader
coverage, increase efficiency, and reduce sample load to the laboratory.
• Continue to research and improve mobile carbon treatment system and
equipment decontamination procedures. These systems help to address
high concentrations of volatile organic compounds (VOCs) and chemicals
that exceed regulatory limits or notification levels (e.g., perchlorate and
1,4-dioxane), which require treatment of purged water prior to discharge.
• Continue to evaluate methods to forecast optimum schedules to change-
out spent carbon in mobile treatment units to avoid breakthrough and to
address new contaminants requiring removal prior to discharge.
• Research new technologies for automating field data collection and
documentation tasks.

V Pending Activities
Major activities that are reduced, not being implemented or conducted include:
♦ Stormwater monitoring of the Santa Ana River and tributaries to OCWD’s
recharge facilities.
♦ Non-point source water quality monitoring on the river and tributaries near
OCWD’s recharge facilities.
♦ Implement more enhanced quality assurance data review protocols for data
analysis and tracking of water quality concerns to identify developing water
quality issues (e.g., increase in color, seawater intrusion, volatile organics,

Orange County Water District 3-65 FY 2018-19 Work Plan


WATER QUALITY

SAR monitoring, upper watershed, etc.); provide notification to OCWD


managers and stakeholders; prepare semi-annual reports, as needed.
♦ Implement continued monitoring of the Riverbed Sediment Removal Studies
such as the Riverbed Filtration Demonstration project to assess the overall
water quality changes pre-, post-treatment, and after percolation as measured
by water quality in the nearest monitoring wells (AM-51/1 and AM-51A/1).
♦ Quarterly or monthly water quality monitoring of upper SAR watershed
wastewater discharges; investigate water quality issues originating from the
upper watershed that may potentially affect the Orange County groundwater
basin (e.g., chlorate, NDMA, and other emerging constituents).
♦ Develop and prepare an annual Water Quality report of the basin (deferred for
several years) – strive to prepare initial report with multi-department input in
near future.
♦ Provide enhanced staff development (internal and external) and mentoring to
take on higher-level duties and responsibilities; enhance and broaden cross-
training to increase flexibility and ability to respond to changing conditions.
♦ Active attendance and involvement with water associations and agencies on
water quality issues relevant to OCWD and groundwater Producers.

VI Staff Addition Needed for FY 2018-19


None

VII Future Issues


In the next several years, the District will need to consider the following issues
and the associated resources and costs.
♦ Evaluate and purchase more efficient sampling equipment to improve
productivity with field monitoring activities, treatment of purged groundwater,
and replace aging vehicles, as needed.
♦ Complete the process to move the mobile carbon change-out process from
the Hazmat locker to a location (e.g., building with mezzanine or modular
building) with a higher profile to (1) install a gravity-fed silo system, (2)
provide a working environment at ground surface (level, flat), and (3) address
and improve ergonomic and potential safety issues with the current process.
♦ Evaluate and assess resources and options to meet the increasing new water
quality monitoring workload generated by expanding projects, new projects,
focused studies, and research partnerships (i.e., UCMR, GWRS injection or
spreading, metals mobilization, tracer studies, SBGPP, NBGPP, seawater
intrusion, etc.) with existing staff.
♦ Adapt to (1) increasing new regulations requiring new monitoring activities, (2)
implementing new and relevant research investigations, (3) researching
enhanced protocols for equipment decontamination, and (4) assuring high
quality assurance with all field tasks and activities.

Orange County Water District 3-66 FY 2018-19 Work Plan


WATER QUALITY

♦ Provide field support to monitor North Basin Groundwater Protection project


(NBGWPP) monitoring wells and associated monitoring activities for the
treatment facility in compliance with future treatment permit requirements.
♦ Provide field support for the South Basin Groundwater Protection Project
(SBGPP) investigations. Future monitoring wells will be needed to provide
WQ data to delineate the extent of contamination and to evaluate feasibility of
an interim groundwater remediation/containment system.
♦ Continue to provide field support for the GWRS project that includes
enhanced monitoring activities at select downgradient wells for new areas in
the basin receiving GWRS water to (1) establish baseline conditions, (2)
monitor metals mobilization, and (3) evaluate/assess changes in water
quality.

Orange County Water District 3-67 FY 2018-19 Work Plan


ADVANCED WATER QUALITY ASSURANCE LABORATORY

Existing Staff – 30 FTEs


1– Laboratory Director
1 – LIMS - QA/QC Administrator
4 – Supervising Chemists
6 – Senior Chemists
10 – Chemists
1 – LIMS-Data Analyst
4 – Senior Laboratory Technicians
3 – Laboratory Technicians

Orange County Water District 3-68 FY 2018-19 Work Plan


ADVANCED WATER QUALITY ASSURANCE LABORATORY

Mission
Provide high quality, timely, and efficient analytical services to support the Groundwater
Producers’ groundwater source water quality monitoring and unregulated contaminant
monitoring requirements, as well as the District’s water quality testing needs for operational
support monitoring, permit-required water quality monitoring, applied research, and overall
groundwater quality assessment in support of Basin management activities.

Key Issues for FY 2018-19


♦ New Laboratory Information Management System (LIMS) – The Laboratory must
complete development and work with its software vendor, Autoscribe, and proceed with
the testing and full-scale implementation of the new Matrix Gemini LIMS to replace the
15+ year old Aspen LIMS that is no longer supported.
♦ Federal Unregulated Contaminant Monitoring Rule Phase 4 – UCMR4 – The District
continues to support the federally mandated Unregulated Contaminant Monitoring Rule
No.4 (UCMR4) program from 2018 to 2020 for the Groundwater Producers. It is likely
that initial testing will begin in 2018, with regular UCMR4 sampling will begin in earnest
in July 2018. The AWQAL has been certified for 7 EPA methods to support analytical
requirements under this program and continue the process of List 1 and 2 assessment
monitoring for the total of 28 constituents using new EPA methods: 525.3, 552.3, 530,
541 and the existing methods: 200.8, 300.1 & SM5310C. As within past UCMR
programs, the required method performance and QA/QC management is critical to the
success of this support. The AWQAL and Water Quality Department successfully
managed the three UCMR monitoring samples of UCMR 1, 2, 3 programs with less than
5% resampling and reanalysis requests. In addition to the sample analysis for UCMR
programs, EPA requires an acceptable quality control management plan for every batch
of the samples. Laboratory resources within this budget cycle will be dedicated to
develop technical expertise to generate fully acceptable QA/QC data packages for the
drinking water samples to maintain the USEPA approved laboratory status for the
UCMR 4 program.
♦ GWRS Permit & Operational Support – The Advanced Water Quality Assurance
Laboratory (AWQAL) continues to generate operational and permit compliance data in
support of the GWRS project. Regular operational plant monitoring
(weekly/monthly/quarterly) has been reduced after a review of the last 10 years of water
quality data. Furthermore the sample load from quarterly comprehensive testing at 40+
GWRS groundwater monitoring locations will be reduced significantly with most organic
constituents only needing to be tested annually. Conversely, additional support will be
required for new groundwater monitoring wells installed as a part of the Mid Basin
Injection (MBI) Centennial project. Laboratory staff members continue to coordinate
sample loads and investigations with the Water Production Group as well as other
departments and OCSD.
♦ GWRS Optimization Research & Development – The AWQAL continues to support
GWRS–related applied research led by the Research & Development (R&D)
Department. Ongoing support includes water quality testing of potential replacement RO

Orange County Water District 3-69 FY 2018-19 Work Plan


ADVANCED WATER QUALITY ASSURANCE LABORATORY

membrane during their 6-12 month trial periods and testing in support of periodic UV-
AOP pilot reactor experiments investigating process optimization and disinfection
byproduct (DBP) formation. Ongoing grant-funded research projects requiring lab
support include two supported by the Water Environment & Reuse Foundation
(WE&RF) on a rapid nitrosamine analytical method and post-treatment optimization.
New (R&D) research projects for FY18-19 requiring lab support include the US Bureau
of Reclamation grant-supported research projects assessing Closed Circuit Desalination
(CCD) and Forward Osmosis (FO) technologies for water recovery from RO concentrate
recovery and a separate investigation into NDMA precursor removal by advanced
treatment processes.
♦ North & South Basin Groundwater Protection Projects – Both the North Basin
Groundawter Protection Project (NBGPP) and the South Basin Groundwater Protection
Projects (SBGPP) continue to require laboratory support and have been expanded with
monitoring additional wells required as a part of their ongoing Remedial Investigations
(RI).
♦ Santa Ana River Monitoring (SARMON) Program – The SARMON program requires
monthly, quarterly, and annual testing at surface water and groundwater monitoring
sites. The SARMON sample load has been significantly reduced after a review of the
last 10 years of water quality data, with many organic constituents only needing to be
tested annually now.
♦ Replacement of ICP-MS, autosamplers and autodilutors to improve analytical
performance – The Lab needs to replace a 9 year old ICP-MS with a new generation of
ICP-MS to improve analytical sensitivity and reliability of trace element analysis. The
workload of ICP-MS analysis is increasing and low level detection capability is required
for GWRS plant, groundwater basin, drinking water samples and UCMR 4 program to
support the minimum reporting level of 0.3 ppb Germanium and 0.4 ppb Manganese.
♦ Improved Laboratory Productivity and Cost Containment – The AWQAL team takes
great pride in the development of cost efficient high quality processes. We continue to
work closely with the Purchasing staff to further expand the automated reorder process
for those products and reagents we continuously utilize within our analyses. Lab staff
members work closely with our vendors to secure the best possible pricing on
instruments, support, and supplies. We continue to develop our staff support around a
flexible “team” structure through a cross training schedule and team working
environment, which has kept District labor demands at the lowest possible level. Staff
members are rotated and cross trained through all methods of analysis, to ensure
flexibility within analytical capabilities. Laboratory staff members continue to advance
technological improvements with globally recognized instrument vendors to further
address cost effectiveness and exceptional laboratory services. Potential adjustments
to monitoring frequencies will need to be properly coordinated through the lab to keep
efficiencies at a high level. Sample load scheduling must be properly planned so that
additional benefits to our monitoring programs can be achieved. We have also used the
vendors to provide in-house training and user group workshops on preventive
maintenance (PM) and data system applications on the more sophisticated analytical
instrumentation. This has helped reduce our training expenses, and has promoted the
District’s image as a leader in water quality technology.

Orange County Water District 3-70 FY 2018-19 Work Plan


ADVANCED WATER QUALITY ASSURANCE LABORATORY

FY 2016-17 FY 2017-18 FY 2018-19


Account Information Actual Budget Proposed Budget
Salaries and Benefits 3,734,520 4,051,878 4,248,410
Services and Supplies 1,437,950 1,373,403 1,460,800
Total $5,172,470 $5,425,281 $5,709,210

I FY 2018-19 Major New Initiatives/Programs


The laboratory is a service oriented department, and we continue to provide analytical support
to a wide range of District programs. New initiatives and support will be based on specific
project requirements within several departments and investigations.
♦ GWRS Research and Optimization – Two new USBR grant-supported projects
♦ GWRS Groundwater monitoring – new monitoring wells for the MBI Centennial Project
♦ Provide analytical support and maintain approved status for the UCMR4 program
♦ North and South Basin Protection Projects and associated litigation data support
♦ Bi-annual State ELAP Audit and adopting TNI quality system by January 2021
♦ Complete the implementation of New Matrix-LIMS replacing 15+ year old Aspen LIMS
♦ Investigation of local occurrence, fate, and transport of perfluorinated compounds

II Core Activities
The Advanced Water Quality Assurance Laboratory utilizes cost-effective analytical services in
support of all monitoring programs and projects required by the District. Water quality data
generated by the laboratory provides critical analytical information, needed to make timely
accurate decisions, for regulatory requirements as well as the direction and support of District
policies. Our facility is designed as a compliance-monitoring laboratory certified with the State
of California and US EPA.
Basic core laboratory activities include:
♦ Support Groundwater Producer’s required drinking water quality compliance testing and
source assessments.
♦ Support basin wide groundwater monitoring programs, and provide both compliance
and informational analytical data. Ensure proper method compliance for state and
federal drinking water requirements. Protection of the Basin and the SAR through
analytical monitoring.
♦ Support and direction of emerging contaminants and water quality issues, to address
both GWRS plant, mid injection well development and basin wide concerns.
♦ Procurement of needed analytical State Certifications with the SWRCB, as well as
development of any needed EPA methodology. Support federal monitoring programs
as requested by the Groundwater Producers approved by District management –
UCMR
♦ Support for the Green Acres Project (GAP) facility for both permit requirements and
operational feedback.

Orange County Water District 3-71 FY 2018-19 Work Plan


ADVANCED WATER QUALITY ASSURANCE LABORATORY

♦ Support investigations in both treatment research and in-house analytical


methodologies. Provide solutions to improve cost effectiveness - both within plant
processes as well as with laboratory procedures.

III Non-Core Activities


The AWQA-Laboratory’s support has always been a strictly core activity department without
many non-required duties. This has been based on years of natural growth in workload, which
has caused all non-essential tasks to be dropped. Non-core activities (secondary priority
compared to core activities) conducted by the AWQA-Laboratory group include:
♦ Support of research and monitoring programs not directly benefiting District or
laboratory processes.
♦ Support of public relations tours and NWRI investigations and studies.
♦ Support of Department of Homeland Security and CAMALnet investigations for
emergency response.

IV Group Goals for FY 2018-19


New Instrumentation - The new generation of ICP-MS will be installed to provide an
enhanced performance and the following benefits not available with the 9-year old
system, which is at the end of its useful life expectancy:

• Software performs dilutions automatically to reduce analytical time and labor


• Smart gas dilution for measuring high and low-level elements simultaneously
• 3 Distinct Modes of Operation, 3 cone design, and 3 correction gas channels
• Maintenance free coil, lens and semi maintenance free single pump
• Modem which allows remote trouble shooting and remote operation of system
• Bench top design enabling it to be placed directly against the wall.

GWRS Operational, Research, and Compliance Support – Laboratory support of the


GWRS is critical in maintaining compliance and permit goals. We will continue to
support all process investigations that require analytical data. Continued focus on
emerging targets and future investigations into AOP/UV disinfection by-products will be
required. Total support of the GWRS represents nearly a third of the workload received
by our department. GWRS research through all treatment steps and the proposed RO
concentrate recovery pilot studies will be required within this budget cycle.

Emerging Contaminant Method Development and Improvement – The laboratory seeks


the following improvements and enhancements to its current emerging contaminant
methods:
• Lowering the detection limit for sucralose from 100 ppt to 10 ppt or lower, in
support of RO removal efficiency demonstration
• Assessing the possibility of using direct injection for the CEC method in order to
enhance throughput by avoiding sample extraction prior to analysis. Typically,

Orange County Water District 3-72 FY 2018-19 Work Plan


ADVANCED WATER QUALITY ASSURANCE LABORATORY

direct injection does not permit the same level of accuracy and sensitivity at very
low concentrations, yet may be suitable for many District samples
• Adding additional perfluorinated targets to EPA Method 537
• Moving the AWQAL’s method for N-nitrosodimethylamine (NDMA) from liquid-
liquid extraction to solid phase extraction for all non-wastewater matrices, while
also investigating increasing the sensitivity of NMOR detection

New LIMS Implementation – The new LIMS will provide an established upgrade path
that will keep the new LIMS up to date with rapidly changing technology. LIMS has
consistently been one of the most cost-effective software applications utilized at the
District. LIMS is an outstanding tool for the reporting of water quality data from our
facility. Managing AWQA-Lab’s data is a very complex task. In FY 2016-2017, 29
Laboratory staff processed 19,545 samples, reported 408,114 test results to WRMS,
and produced over 500,000 Quality Control test results. In 2017, over 10 million data
points were added to LIMS.

During FY 2016 – 2017, the District contracted with a software vendor, Autoscribe, to
develop and configure a new LIMS, called Matrix. It is anticipated that this Matrix LIMS
will be in working production for the lab by September 2018. Staff must work with the
LIMS vendor to plan, organize, direct and control the transition to the new Matrix-LIMS.
As the AWQAL moves to the new Matrix-LIMS, staff will be trained to play a larger role
in maintaining and configuring new Matrix-LIMS. Four current AWQA-Lab staff will be
trained to change quality control acceptance ranges, changes currently done by the
LIMS Administrator or Information Services. Trained AWQA-Lab staff will not only
manage their data but also configure LIMS without writing computer code. Trained
AWQAL staff will understand its work processes and can rapidly configure LIMS based
on that expert knowledge. This training is cost-effective because LIMS configuration
requests to Information Services will be reduced.

Optimization of Laboratory Efficiencies – Staff & Processes – The laboratory staff


continues to work as a cohesive team, and support flexibility continues to be a required
goal of our department. Two new staff will start in January 2018 and staff training is a
critical support issue and we continue to increase operational knowledge of our
analytical systems. This has helped to expand coverage during our heaviest workloads.
The District’s laboratory also stresses process efficiencies and cost effectiveness. Staff
members continue to investigate improvements to the supply ordering process and
streamlining overall data analysis and reporting. Furthermore, due to the significant
reduction in sample loads from the GWRS Groundwater Monitoring and SARMON
programs, resources have been freed up for UCRM4 testing, R&D project support, and
additional method development and optimization. Laboratory staff will need to be agile
and flexible to take on a more diverse and dynamic sample load.

Orange County Water District 3-73 FY 2018-19 Work Plan


ADVANCED WATER QUALITY ASSURANCE LABORATORY

V Pending Activities
Major activities not being fully supported include:
♦ Outsourced monitoring – EPA 548.1 (endothall), EPA 556 (formaldehyde),
bacteriophage, radioactivity, asbestos, and dioxin monitoring needs are all farmed out to
specific contract labs. This is currently a cost-efficient approach by reducing chemical
cost and staff overtime as these water quality concerns does not require significant
monitoring frequencies. Based on current inputs, phenoxy acid herbicides, endothall,
formaldehyde phage testing do not appear to have an increased focus within District
monitoring programs, which would require in-house monitoring. The Lab has to balance
the workloads from the plant expansion and additional research project samples with
the limited analytical systems and staff resources.
♦ Method Development – As we continue to increase analytical capabilities within overall
monitoring support, it has been difficult to address future support requirements such as
bringing on-line 8 Nitrosamines using GC/MS/MS using Solid Phase Extraction (SPE)
and Perfluoroalkyl Acids, NDELA and 10 ppt RDL for Sucralose using LC/MS/MS. A
specific area of concern is based on CEC monitoring and the use of the LC/MS/MS
system for both drinking water and wastewater samples. Increased support loads on
this system can generate workload backlogs, and thus will influence any additional
method development support using this system. Proper sample load projections must
be utilized to determine these future analytical support requirements. It is difficult to
support continued expansion of capabilities without adjustment to monitoring frequency
or support resources; proper scheduling is the key to these method development
issues.
♦ Research Activities and Agency Meetings – The Laboratory continues to support District
research activities. However, it is critical that these support requirements be properly
coordinated with laboratory resources. This budget cycle may provide some additional
support windows for investigations, especially if compliance requirements can be
reduced to annual samplings. Research demands focused on AOP, MF, RO, UV,
peroxide, and OCSD Plant No. 2: UF/MF pilot studies to support final GWRS expansion
design can benefit from an early notification of these analytical needs. Issues
concerning CEC monitoring and analysis of new targets move quickly, thus it is critical
for laboratory staff members to attend meetings with other agencies and researchers
that are providing similar support. Information gained from such meetings has helped
shape our support and target lists. Attending these informative meetings is based on
workload requirements and compliance duties.
♦ CAMALnet (California Mutual Aid Laboratory network) & Department of Homeland
Security Support – There are still efforts at the State and Federal levels to address
water security issues, and the overall coordination of analytical support. Based on
workloads and duties, we have not been an active player in supporting these groups.
The development of specific methods to address potential targeting of water resources
is currently not within our scope. The District’s laboratory will continue to monitor the
progress of these programs, through adjunct participation of CAMALnet (California
Mutual Aid Laboratory network) and Department of Homeland Security. This state level
program includes active participation by SWRCB and MWD addressing these water
security/analysis related concerns.

Orange County Water District 3-74 FY 2018-19 Work Plan


ADVANCED WATER QUALITY ASSURANCE LABORATORY

VI Staff Additions Needed for FY 2018-19


N/A

VII Future Issues


In the next two to three years, issues the District will need to consider include:
♦ Continue laboratory support of the unregulated contaminant monitoring rule (UCMR),
which is approved and directed by the District’s Board. UCMR4 monitoring will run from
March 018 until 2020; an annual program audit by EPA and the method compliance will
be required within the next several budget cycles.
♦ Conditions may arise where we need to develop a more sensitive analytical method for
Nitrosodiethanolamine (NDELA), NMOR, sucralose and other synthetic chemical
compounds. LC/MS/MS or GC/MS/MS systems could be utilized to achieve these lower
reporting levels.
♦ The District lab operates 5 GC/MS-ion trap systems manufactured by Varian Instrument
Inc. After Agilent Technologies took over Varian Instrument Inc. in 2011, Agilent
Technologies discounted the MS-ion trap technology and will end the MS-ion trap
system support in 2-3 years. The lab is planning to replace 5 GC/MS-ion trap systems
aged 7-10 years by next 2-3 years to support UCMR program and Title 22 analysis.
♦ As cited above, the geology department has expressed interest in monitoring specific
targets at lower than current reportable levels. Methyl tertiary butyl ether (MtBE) and
Bromate are two such examples, where lower reportable levels would benefit monitoring
programs by identifying the leading edge of contamination plumes, or an earlier
notification of water quality concerns before exceeding an MCL. Other analytical
methods are currently available that would provide enhanced sensitivity to address
these needs, depending on target. Again, LC/MS/MS or GC/MS/MS could be utilized to
achieve these lower levels of reporting. This would require the acquisition of these
instruments to provide this enhanced monitoring support.
♦ We continue to get feedback from State officials and other laboratories that speciation
of arsenic may be required as a future water quality monitoring criteria. As with the
examples above, this would require other hyphenated techniques – liquid
chromatography followed by HG-ICP/MS analysis to generate this level of data. We will
continue to monitor this future requirement, which may require adjustment to our
analytical capabilities.
♦ UV/AOP treatment within the GWRS continues to warrant further investigation and
research. Disinfection By-Products (DBPs) specific to this treatment technology have
not been fully studied or investigated. This is an area that should be developed as an
“investigative” monitoring program.
♦ We continue to develop the analytical techniques to detect extremely low levels (parts
per trillion: ppt) of 1,2,3-Trichloropropane (TCP), Methadone, Nitrosodiethanolamine
(NDELA), p-Chlorobenzene Sulfonic Acid (p-CBSA), Methyl Isothiocyanate (MITC), and
Sucralose within the GWRS system and the monitoring wells close to the recharge
basin. These target compounds are moderately removed within the treatment process
and could be linked to source control issues. The District has detected significant levels
(parts per billion: ppb) of Sucralose coming through the GWR System. The laboratory

Orange County Water District 3-75 FY 2018-19 Work Plan


ADVANCED WATER QUALITY ASSURANCE LABORATORY

continues to monitor persistent emerging contaminants using the automated solid phase
extraction (SPE) techniques and tandem mass spectrometry systems.
♦ The District continues to strengthen our interactions and communications with Orange
County Sanitation District’s laboratory and source control programs. This relationship
has benefited many of the water quality monitoring and characterization projects that
have impacted our processes: NDMA formation study, 1,4-dioxane and 1,3-dioxolane
source control, chemicals of emerging concern (CECs), etc. We continue to see
potential benefits in collaboration and regulatory alignment with OCSD divisions, as we
further investigate new targets, GWRS performance and phase II final expansion
project.
♦ Constituents of Emerging Concern (CECs) continue to receive political attention as a
significant water quality issue. As our laboratory supports the monitoring of this issue, it
is important to develop a proper priority setting process by which targets are brought on-
line within our analytical monitoring programs. CEC monitoring requires significant
analytical support, and technical expertise using highly sensitive analytical systems
such as LC/MS/MS, IC/MS and GC/MS/MS, and an enhanced target selection process
is needed to effectively keep analytical resources properly addressed. Currently, the
lab is applying EPA Method 537 Rev. 1.1 to include the branched PFOA isomer for total
PFOA determination to verify the 70 ppt heath advisory limit set by USEPA. This is
especially true as additional research in this field will continue to identify new targets of
concern, before SWRCB and EPA can fully address them within any monitoring criteria.

Orange County Water District 3-76 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

RESEARCH AND DEVELOPMENT

Existing Staff – 7 FTEs


1 – Research Director
2 – Principal Scientists
2 – Senior Scientists
1 – Scientist/Process Specialist
1 – Scientist

In addition to the above FTEs, the R&D Department in FY2018-19 is expected to have
three Postdoctoral Research Associates (full time, limited-term contract).

Mission
Conduct applied research that supports the District’s operational, regulatory, and water
quality objectives through innovation, technology evaluation, development of new or
improved processes and methods, and collaboration with universities and topic experts.

Orange County Water District 3-77 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

Key Issues for FY 2018-19


♦ In cooperation with Water Production staff, continue research into
microfiltration (MF), reverse osmosis (RO), and ultraviolet (UV)/advanced
oxidation process (AOP) issues at the Advanced Water Purification Facility
(AWPF) that affect the Groundwater Replenishment System’s (GWRS)
efficiency in order to help decrease GWRS operation and maintenance
(O&M) costs and enhance water quality.
♦ Work with the Planning and Forebay Operations departments to improve
percolation efficiency and reduce O&M costs, including field sampling and
laboratory support.
♦ Continue to address focus areas presented to, and supported by, the GWRS
Independent Advisory Panel (IAP) regarding minimization of N-
nitrosodimethylamine (NDMA) reformation post-UV/AOP and incorporation of
Next Generation Sequencing into the microbial water quality R&D program.
♦ Continue to seek collaborative partnerships with other research groups
(academic and industrial) and funding agencies capable of expanding the
scope of groundwater recharge and advanced water treatment research at
OCWD.

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actual Budget Proposed Budget
Salaries and Benefits 1,138,089 1,173,227 1,335,133
Services and Supplies 254,721 219,464 246,770
Total $1,392,810 $1,392,691 $1,581,903

I FY 2018-19 Major New Initiatives/Programs


♦ Expansion of the R&D postdoctoral research program via hiring of two new
Postdoctoral Research Associates (for a total of three positions).
♦ Identification of new research avenues based on the expertise of a
Postdoctoral Research Associate hired to support groundwater recharge
research at R&D’s Field Research Laboratory (FRL).
♦ New collaborative research partnerships to be pursued with UCLA and UCI.
♦ Support GWRS Final Expansion as needed, including treatment technology
or other evaluations.
♦ Modifications and improvements to the satellite vessel RO product testing
program in collaboration with Water Production and consultant (SPI).
♦ Increase outreach and publication of R&D work including for the public, as
suggested by Board of Directors, in collaboration with Public Affairs.

Orange County Water District 3-78 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

II Core Activities
♦ Solve problems and research promising technologies to improve water quality
and to increase the efficiency of District water treatment and recharge
operations.
♦ Provide scientific and technical support to GWRS treatment processes,
recharge, and injection.
♦ Provide support and implementation of strategies to increase capture and
recharge of Santa Ana River (SAR) flows via more efficient recharge
practices, as well as evaluate the watershed sources of pathogens and
contaminants that affect SAR water quality.
♦ Report research progress internally via inter-departmental communications
and reports, and via participation in the Recharge Enhancement Working
Group (REWG).
♦ Develop and evaluate new analytical methods for detecting contaminants and
pathogens.
♦ Seek external funding.
♦ Publish and present research findings.
♦ Continue Postdoctoral Research Program, which began with first hire of
Postdoctoral Research Associate in FY 2016-17, to conduct research that
supports the District’s core objectives.

III Non-Core Activities


♦ Participate in scientific advisory panels/research advisory boards/research
project advisory committees (PACs).
♦ Provide consulting information to other water agencies, utilities and regulatory
agencies.

IV Group Goals for FY 2018-19

GRANT FUNDED RESEARCH:


These projects are funded wholly or partially through external grants, including funding
for OCWD labor and/or equipment/supplies.
♦ Middle Santa Ana River Pathogen Total Maximum Daily Load Study,
funded by SAWPA (9955) [2008 to present] – This is a long-term study
managed by the Santa Ana Watershed Project Authority (SAWPA), with
OCWD and the Regional Water Quality Control Board (RWQCB) as Technical
Leads, and funding and sampling support from San Bernardino County Flood
Control District, Riverside County Flood Control and Water Conservation
District, other counties, and RWQCB. The objective is to evaluate pathogen
sources in the Santa Ana River (SAR) Watershed. OCWD will continue in a
support role for Bacteroides analysis and limited meeting participation. As

Orange County Water District 3-79 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

with previous years, R&D will analyze for presence/absence (P/A) of


Bacteroides and additional qPCR-based markers; if required, concentrations
will be determined. In past years, though not expected for this year, R&D
also analyzed for fecal indicator bacteria (FIB) in the Upper SAR to correlate
with the qPCR-based markers. OCWD is compensated on a per-sample
basis, which includes analysis costs plus staff time for laboratory work,
meeting participation, and report writing.

♦ Improving Membrane Treatment Energy Efficiency through Monitoring


and Removal of Colloidal Particle Foulants, funded by California Energy
Commission (CEC) (9952) [2015 to 2018] – OCWD is a demonstration site
for this $1.2 million study funded by CEC and led by Kennedy/Jenks
Consultants to improve the energy efficiency of low pressure membrane
treatment (e.g., MF) of recycled water through online monitoring (Malvern
Instruments Nanosight NS500) and removal (via pre-treatment) of colloidal
particles that cause fouling. R&D is providing project support via R&D’s
Engineering Research Center (ERC) pilot equipment and R&D staff time for
piloting operational support, project experimental design, membrane
autopsies, and other analysis. OCWD received $40,000 funding from CEC to
cover equipment costs (non-labor). Data analysis and reporting will continue
in FY 2018-19.

♦ Evaluating Post-Treatment Challenges for Potable Reuse Applications,


funded by WE&RF (9998) [2016 to 2018] – This study is investigating post-
treatment optimization at AWPF, to balance competing goals of maintaining
pipeline integrity while minimizing NDMA reformation and aquifer recharge
metals mobilization. OCWD, including R&D, has conducted research and
data collection on each topic independently; this WE&RF project is an
opportunity to interpret these findings together and collect additional data to
address knowledge gaps. The project team consists of OCWD, Trussell
Technologies, and Stanford University, together with several participating
utilities that contributed cash funding. Research tasks will be completed for
this project by mid-2018, with the study final report as well as journal
publications and conference presentations completed later in FY 2018-19.

♦ Utility Validation of Alternative Method for NDMA Analysis Requiring


Less Time, Cost, and Sample Volume, funded by WE&RF (9994) [2017 to
2018] – This project was funded beginning January 2017 through the WE&RF
Unsolicited Research Program. R&D is investigating and validating a novel
NDMA benchtop analysis method that has potential for online (real-time) use.
The method was developed by Professor Hitoshi Kodamatani (Kagoshima
University, Japan) and has been adapted to recycled waters (Professor
Takahiro Fujioka, Nagasaki University, Japan). Professors Kodamatani and
Fujioka are advisors on the WE&RF study and have loaned OCWD the
prototype detector. R&D staff obtained and repurposed a high performance
liquid chromatography (HPLC) instrument that was no longer needed by the
OCWD AWQAL. The method couples the HPLC with automated

Orange County Water District 3-80 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

photochemical reaction (PR) and chemiluminescence (CL) detection of


NDMA and other nitrosamines. The HPLC-PR-CL method is able to
quantitate NDMA to approximately 1.5 ng/L. Through this study, the method
is being tested for reproducibility, detection limit, matrix interference, and is
being compared to the AWQAL method via split sample results. Research
tasks will be completed for this project by June 2018, with the final report as
well as journal publications and conference presentations completed later in
FY 2018-19.

♦ Characterization of the Microbiome of a State-of-the-Art Water Reuse


System to Enhance Treatment Performance, funded by USBR and
WE&RF (9992) [Sep 2016 to Aug 2018] – Funding for this study began in
September 2016 from US Bureau of Reclamation (USBR), with some
supplementary funding from Water Environment and Reuse Foundation
(WE&RF). The goal of the study is to apply Next Generation Sequencing
(NGS) combined with CosmosID’s highly curated sequence databases to
identify microbial community signatures and their transformations through the
GWRS treatment processes. The study is a collaboration with Colorado
School of Mines and seeks to address uncertainties associated with microbial
water quality by using NGS methods to improve understanding and
monitoring of the advanced treatment process. In addition to identifying the
microbial communities that are comprised of bacteria, protozoa, fungi,
viruses, pathogens, and antibiotic resistance genes present at each stage of
advanced treatment and in biofilms, the study assesses correlations and
possible relationships between the microbial communities and the standard
bulk water quality monitoring and operating parameters used for GWRS (e.g.
chlorine, turbidity, total organic carbon (TOC), electric conductivity (EC),
transmembrane pressure). A draft of the final report is expected to be
completed by January 2018; additional analyses, reports and manuscripts are
expected to be submitted in FY 2018-19 after the USBR report has been
accepted.

♦ Metagenomic Analysis to Ensure Water Quality and Safety, funded by


NSF (EAGER:Collaborative) and a water utility (1790 & 9992) [Aug 2017
to Aug 2018] – Funding for this study (Award Abstract #1742870) began
August 2017 from NSF with a some additional funding from a drinking water
utility. The goal of the study is to analyze various water and biofilm samples
to identify communities of microorganisms that include bacteria, protozoa,
fungi, viruses, pathogens, indicator organisms, antibiotic and virulence genes
by Next Generation Sequencing (NGS) and bioinformatics, employing the
highly curated DNA sequence database from CosmosID. This study seeks to
identify the temporal, seasonal, and operational shifts in the microbial
communities associated with GWRS treatment and with conventional
treatment processes. In addition to DNA sequence analysis, RNA (i.e.,
cDNA) will also be analyzed to identify communities RNA viruses and
functional genes and related organisms in the communities. During FY 2017-
18, the data collection and overall tasks for the study will be completed.

Orange County Water District 3-81 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

During FY 2018-19, a report to NSF will be developed and submitted, as well


as subsequent journal publication(s).

♦ Understanding Formation of a Critical Disinfection Byproduct: NDMA


and Previously Unidentified NDMA Precursors in Advanced Potable
Reuse Treatment Plants, funded by USBR (1782) [2018 to 2019] – This
project was funded by the United States Bureau of Reclamation (USBR) for a
1.5-year study beginning January 1, 2018. R&D is investigating the
occurrence and removal of NDMA precursors at AWPF as well as conducting
high-frequency monitoring of NDMA to determine diurnal, temporal and
seasonal trends in NDMA occurrence. Additionally, R&D is partnering with
San Diego State University, University of Nevada-Reno and University of
Colorado-Boulder to complete non-targeted analysis of AWPF waters, which
will identify previously unknown compounds and determine their removal or
reduction during the UV/AOP process. Identification of NDMA precursors and
assessment of their removal via different treatment processes will aid in the
understanding of NDMA appearance post-treatment.

♦ Increasing Potable Water Recovery to >95%: Pilot Evaluation of Closed


Circuit Desalination (CCD) and Forward Osmosis (FO) Alternatives for
Concentrate Treatment, funded by U.S. Bureau of Reclamation (USBR)
(1781) [2017 to 2018] – This project was funded by USBR for a fifteen-month
study (1.25 year) beginning January 1, 2018. The objective of this study is to
evaluate two alternative treatment technologies at pilot scale to recover water
from reverse osmosis (RO) concentrate generated from an advanced potable
reuse treatment facility. Concentrate treatment will be evaluated in the
proposed study using closed circuit desalination (CCD) and forward osmosis
(FO) as alternative technologies. Successful treatment and recovery of RO
concentrate at advanced potable reuse facilities will minimize the volume of
the waste stream while generating more water, increasing overall facility
water recovery (plant efficiency) from 85% to greater than 90 or 95%. Pilot
operational feasibility and optimization will be completed prior to the proposed
work. This study will focus on pilot performance with respect to water quality,
treatability, and acceptance for potable reuse. The pilot-scale study of CCD
and FO will include comprehensive water quality testing of the product water
for chemical constituents and microorganisms, determination of virus log
removal via seeding studies, confirmation of suitability for subsequent
UV/AOP treatment, and cost analysis.

OTHER RESEARCH:
These projects are funded by OCWD. For some projects consisting of collaboration
between OCWD R&D and a university or technology partner, the project partner have
grant funding, or OCWD may be providing funding to the partner to support the
research. This is indicated in the summaries below where applicable.

Orange County Water District 3-82 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

AWPF PROCESS OPTIMIZATION (9952):


♦ Task 1: AWPF Support – R&D will continue to engage in short-term
research activities on an ad-hoc basis to assist the Water Production and
Engineering Departments in solving problems arising during operation of the
AWPF. Examples of applied research under this activity have included:
o Assisting Engineering and Water Production staff to determine
mechanisms and solutions for GWRS Pipeline and Barrier Pipeline
lining erosion.
o Autopsy (microbial and chemical analysis) of fouled MF and RO
membranes from the AWPF and ERC.
o Providing controls and sampling apparatus for ongoing AWPF RO
phage monitoring.
o Molecular biological and assimilable organic carbon (AOC) analysis of
monitoring well samples.
o Annual reports and presentations to the NWRI Independent Advisory
Panel (IAP) regarding GWRS performance.

o Providing microbial analysis and support (IDEXX) for Water Production


and AWQAL.

♦ Task 2: MF Performance/Fouling Research – R&D is completing MF/UF


product testing via piloting at the ERC (see next section) which may continue
in FY 2018-19. With respect to research projects, R&D will evaluate:
o Influence of Combined Chlorine Exposure on MF Efficiency – It is
generally thought that exposure to combined chlorine improves MF
efficiency by reducing biological fouling. There appears to be a paucity
of direct quantitative evidence supporting this hypothesis. Moreover,
recent studies indicate that nanoparticulate pore plugging and not
biological fouling is the primary mechanism leading to reduction in MF
performance in the AWPF. A short-term study is proposed to quantify
the impact that combined chlorine species have on MF fouling by
utilizing two pilot MF units in parallel to compare the rate of flux decay
and time to CIP in the presence and absence of combined chlorine
under nominal AWPF operating conditions.

o Pilot Scale Comparison of Hydrogen Peroxide to Combined


Chlorine as an MF and RO Biocide – Pending availability of pilot
units and ongoing discussions with Professor Martin Reinhard
(Stanford University), this study would utilize MF and RO pilot units to
evaluate the effectiveness of hydrogen peroxide as an alternative to
monochloramine as an MF and RO biocide. Special attention would be
paid to hydrogen peroxide demand over time and the required dosing
strategies necessary to maintain an effective hydrogen peroxide
residual throughout MF and RO. Previous research (laboratory scale)

Orange County Water District 3-83 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

has indicated that hydrogen peroxide at relatively low dosages (4-5


mg/L) can act as a suitable biocide, reducing accumulation of
microorganisms and improving RO performance, as observed for
combined chlorine. Hydrogen peroxide would be desirable for use in
this role because of its reduced disinfection byproduct formation and
the potential cost-savings for the AWPF. OCWD would fund the
university partner for technical support and data analysis.

♦ Task 3: RO Performance/Fouling Research – In addition to ERC pilot


studies related to RO (see next section), R&D will conduct investigations of
RO fouling aimed at:
o Cartridge Filter Performance Evaluation using the Rapid ATP
Assay [2015 to present] – Begun in 2015 with support of Water
Production, R&D will continue monitoring cartridge filters (CF) for
immediate and long-term performance. Adenosine triphosphate (ATP)
levels in the CF effluent (RO feed water) serve as a good indicator of
RO biofouling potential (Rapid LuminUltra kit method) and will be used
to monitor CF performance.
o Antiscalant evaluation and dose optimization using a real-time
membrane scale monitor (MeMo) [2018 to 2019] – In the proposed
study, a real-time scale monitor (MeMo) system provided by Noria
Water (based on patented University of California, Los Angeles
(UCLA) technology) will be evaluated, installed on the concentrate line
of an RO pilot system treating GWRS RO feed water. OCWD would
purchase the MeMo system from Noria Water. The MeMo system will
provide direct membrane surface imaging and allow quantification of
the onset of mineral scaling/fouling and crystal growth kinetics.
Following this approach, MeMo application for future testing could
including comparing different antiscalants, including determining
optimal dose, to evaluate antiscalant effectiveness in scaling
mitigation.
o Assessment of Selected Methodologies for Monitoring the
Integrity of Reverse Osmosis (RO) Membranes [2017-2019] – RO
provides a barrier to salts, dissolved chemicals, particles, and
microorganisms. There are no integrity monitoring online methods for
RO systems that directly demonstrate microbial removal. The true
barrier power of the RO is not recognized by the regulatory agencies,
often only ≤ 2 log removal credits are granted, based on currently
available methods for integrity monitoring. This study will assess a
range of online monitoring methods including for RO integrity including
emission excitation matrices (fluorophores /dissolved organic matter
rejection) compared to conventionally monitored electrical conductivity
(EC) and total organic carbon (TOC), using an RO pilot at ERC.
Improved RO membrane integrity monitoring techniques will allow
greater credit for virus removal for IPR/DPR applications. The goal of

Orange County Water District 3-84 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

this study will be to demonstrate a greater than 2-log removal of an


indicator and ideally greater than 3 or 4 logs.

♦ Task 4: Advanced Oxidation Process (AOP) Studies – R&D will continue


research aimed at characterizing the chemical dynamics of the GWRS
UV/H 2 O 2 process and optimizing the performance of the Trojan Technologies
UVPhox reactor train through analysis of water quality, system operational
parameters and UV pilot reactor studies. Planned studies include:
o H 2 O 2 /Chloramine Matrix Pilot Studies [~2008 to present] – During
UV/AOP treatment, UV irradiation and HO• radicals derived from
hydrogen peroxide (H 2 O 2 ) are not solely responsible for bringing about
oxidation; combined chlorine species (mono- and di-chloramine)
present in the UV/AOP feed water may also play a significant role.
R&D will continue to investigate removal of 1,4-dioxane and
additionally acetone and tert-butyl alcohol (TBA) at varying H 2 O 2 and
combined chlorine levels utilizing the onsite UV/AOP pilot reactor. For
FY 2018-19, studies will focus on identifying the conditions for which
optimal 1,4-dioxane removal occurs, based on past data suggesting
synergistic effects of chloramine and H 2 O 2 . This work has been
conducted in collaboration with Professor Haizhou Liu in the Chemical
and Environmental Engineering Department at University of California,
Riverside (UCR) through a Water Research Foundation (WaterRF)
grant to UCR funded beginning 2017, WRF-4699 Kinetics Modeling
and Experimental Investigation of Chloramine Photolysis in Ultraviolet-
Driven Advanced Water Treatment. OCWD’s FY2016-17 matching
contribution was $25,000.
o Optimization of UV/AOP with Chloramine and H 2 O 2 via
Computational Modeling Followed by Pilot-Scale Validation [2015
to present] – R&D will continue ongoing collaborative information
exchange with Professor Liu (UCR). Dr. Liu models radical chemical
reactions in the UV/AOP to predict destruction of target compounds
(e.g., NDMA, 1,4-dioxane) given the oxidant concentrations of
chloramine and H 2 O 2 . These oxidants can produce unique reactive
species under UV photolysis, and the solution chemical conditions
(e.g., pH; dose of oxidant) can be optimized through computational
modeling to maximize contaminant degradation, minimize the chemical
dosage cost and minimize the energy cost of UV/AOP of the AWPF.
The multivariate computational kinetic model uses reaction rate
constants determined from literature and those provided by Dr.
Stephen Mezyk of RadKEM from complimentary ongoing R&D
collaborations (see below). OCWD funding is not necessary for
FY2018-19 as Dr. Liu has been awarded WaterRF (see previous,
above) and NSF funding to build on model development work from
previous OCWD funded studies to continue to develop the model. Dr.
Liu will validate the model predictions using the R&D UV/AOP pilot
reactor.

Orange County Water District 3-85 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

o Experimental Investigation of Chloramine and Persulfate Aqueous


Photochemistry and Development of Efficient UV-Based Water
Reuse Treatment [2016 to 2019] – This is a NSF-GOALI project in
collaboration with Professor Liu at UCR, with NSF funding to UCR.
This work will elucidate the UV-driven AOP of trace organic
contaminants in RO permeate on the basis of two oxidants: chloramine
and persulfate. Persulfate could be used as a novel oxidant due to its
high yield of sulfate radicals and conversion to hydroxyl radicals. The
hypothesis of this research is that chloramine and persulfate can
produce unique reactive species under UV photolysis, and the solution
chemical conditions can be optimized to maximize contaminant
degradation and minimize the energy footprint of AOP water treatment.
OCWD funding is not required for this project. Dr. Liu was awarded a
3-year $330,000 grant from NSF, and OCWD is an industrial partner.
The project started in 2016; however, work with OCWD’s pilot UVAOP
reactor in collaboration with UCR will not begin until July 2018.
o Non-Targeted GCxGC TOF-MS [2013 to present] – This is a
collaborative project with Professor Eunha Hoh of San Diego State
University Graduate School of Public Health to continue non-targeted
analysis (NTA) of trace organic compounds present in RO permeate
and the UV/AOP product water via dual gas chromatography (GC) time
of flight mass spectrometry (GCxGC-TOF-MS). In the first two years,
the method of extraction and analysis was established with the focus
on GC peaks that were (automatically) identifiable by the NIST
software database that represented approximately 50% of the sample
peaks. In FY 2017-18, SDSU evaluated existing data with the aim of
characterizing removal as a function of chemical properties of
compounds, for example alkanes, aldehydes, aromatic compounds,
etc., and collected samples for additional NTA from UV/AOP pilot trials
that are already planned as part of another study (WE&RF-funded 16-
01 Post Treatment study) to compare different oxidants used in the
UV/AOP pilot. For FY 2018-19, NTA work will continue under a USBR
grant (see previous section on grant funded research, USBR NDMA
study) that was awarded to R&D for work associated with the
identification of NDMA precursors.

♦ Task 5: Water Quality Characterization at AWPF


o Characterization of NDMA Precursors Using the Polarity Rapid
Assessment Method (PRAM) and Ultrafiltration [2018 to 2019] –
R&D will collaborate with and fund UCLA to complete a comprehensive
evaluation of the nature of NDMA precursors in AWPF waters. Water
will be collected before and after various chemical additions and
treatment processes to determine how they influence the chemical
structure (polarity and molecular weight) of NDMA precursors and how
well different types of NDMA precursors are removed by various
processes.

Orange County Water District 3-86 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

o Investigation of Water Quality and Advanced Treatment via


Fluorescence Decay by EEM Spectroscopy [Planned 2016 to 2018]
– R&D will continue use of excitation emission matrix spectroscopy
(EEMS) (Horiba Aqualog purchased in 2015) to investigate removal of
fluorophores by advanced treatment at GWRS including MF, RO, and
UV/AOP. Water quality monitoring by EEMS related to seasonal MF
membrane fouling and across GWRS will be reported in a scientific
publication in collaboration with University of Nevada-Las Vegas. Other
R&D work related to EEMS planned for FY 2018-19 includes
assessment as a potential surrogate for constituents such as organics
and microorganisms for regulatory virus log removal credit across RO
and investigation of correlation with trace organics constituents such
as NDMA precursors in MF feed and other monitoring points.

♦ Task 6: Treatment and Recovery of Water from RO Concentrate


o Photobiological Water Treatment Process to Enable More
Efficient Water Recovery in Advanced Water Reclamation – Dr.
Keisuke Ikehata (PACE, Fountain Valley, CA) will locate a small
bench-scale flow-through photobiological reactor at the AWPF to
utilizes diatoms to remove silica, inorganic salts and trace organic
contaminants from RO concentrate. This project is a continuation of Dr.
Ikehata’s studies that were initially funded by NSF and the USBR (no
funding from OCWD).

o Water Recovery from RO Concentrate via CCD and FO – See


Task 4 in next section (ERC) for Phase I testing and see earlier section
on grant funded projects for Phase II testing.

ENGINEERING RESEARCH CENTER (9952):


Projects conducted at the ERC are summarized below. These projects are all pilot-scale
evaluations that tend to be very applied and/or focused on demonstration of an
available technology or product.

A list of equipment and systems supporting these activities is also presented in Table 1.

♦ Task 1: Low-Pressure Membrane Technology Evaluation [2015 to


present] – This program consists of an ongoing effort to evaluate alternative
low-pressure membrane technologies (i.e., MF and ultrafiltration [UF])
specifically for the GWRS. The District is currently operating MF membranes
which have reached their end-of-life; further, the 30-mgd GWRS Final
Expansion has been approved and formal engineering design has begun in
2017. Long-term piloting evaluations for both MF and UF products are
currently underway at the ERC and at OCSD Plant No. 2 with a number of
leading manufacturers, including Evoqua Water Technologies, Toray
Industries, Inc. and Scinor North America. Identifying suitable technologies

Orange County Water District 3-87 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

will provide staff with options for replacing existing AWPF membranes and for
the GWRS Final Expansion. These evaluations were mostly completed in FY
2017-18 due to the design schedule for Final Expansion. Long-term
confirmation testing of selected products will likely continue in FY 2018-19.

♦ Task 2: Antiscalant Testing Program [2008 to present] – The GWRS RO


system requires specialty chemicals, including antiscalant and acid, to
prevent the precipitation of sparingly soluble minerals which foul the
membranes. Identifying the appropriate antiscalant product, dosage and feed
water pH is an important challenge. R&D will continue pilot-scale testing at
the ERC using RO pilots to evaluate antiscalant products, as well as
monitoring performance using three systems (B01, B02 and A03 3rd Stage
Monitoring Vessels) currently operating within the GWRS AWPF RO facility.
Antiscalant products found to be effective through these efforts will be short-
listed for bidding through the District’s procurement process. To date, this
program has resulted in cost-savings totaling in excess of $1,000,000
annually due to reduced acid usage.

♦ Task 3: RO Membrane Procurement Program [2009 to present] –


Commercial RO membrane products continue to be developed which pose
the potential for significant benefits in enhanced permeability and rejection.
Products are evaluated by R&D through conducting long-term testing using a
series of eight test vessels located in the GWRS RO facility. Products
deemed successful are short-listed for future membrane procurements. The
goal is to expand the list of pre-qualified products to create a competitive
environment within the District’s procurement process. R&D will continue to
consider prototype membranes, such as currently being tested from Dow
Water & Process Solutions, for near-commercial products to streamline the
development and evaluation of the very latest membrane chemistries and
technologies. These RO products are evaluated in satellite vessels at the
GWRS RO facility.

Task 4: Water Recovery from RO Concentrate via CCD and FO [2014 to


present] – R&D is collaborating with technology providers to pilot systems for
enhanced RO recovery, including ongoing evaluation of closed circuit
desalination (CCD) using a pilot system that has been purchased by OCWD
and delivered in Fall 2017, with funding to Desalitech (the technology
provider) from OCWD; and an ongoing study with Porifera, Inc. on forward
osmosis (FO) treatment of RO concentrate (funded by the California Energy
Commission [CEC]). This operational-focused phase of testing for both CCD
and FO is considered Phase I; a second phase of testing will be completed in
FY2018-19 funded by USBR (see earlier section on grant funded projects).

Orange County Water District 3-88 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

Table 1. Summary of Pilot Testing at ERC / AWPF

Pilot Equipment FY 2017-18 FY 2018-19


Performance Test (AWPF and Additional Performance
Toray, submerged PVDF UF pilot unit
Plant No. 2) Test (AWPF)*

Performance Test (AWPF and Additional Performance


Scinor, submerged PVDF UF pilot
Plant No. 2) Test (AWPF)*

Performance Test (AWPF and Performance Test (Plant


Evoqua submerged, PVDF CSII pilot unit
Plant No. 2) No. 2)*

Performance Test (AWPF and Performance Test (Plant


Evoqua submerged, PP long module pilot
Plant No. 2) No. 2)*

CEC Study (Colloid


Evoqua #1 submerged, PP MF pilot unit TBD
Pretreatment)

CEC Study (Colloid CEC Study (Colloid


Evoqua #2 submerged, PP MF pilot unit
Pretreatment) Pretreatment)

RO pilot unit #1 Antiscalant evaluations Antiscalant evaluations

RO pilot unit #2 Antiscalant evaluations Antiscalant evaluations

CEC Study (Colloid


CEC Study (Colloid Pretreatment), Integrity
RO pilot unit #3
Pretreatment) Monitory Study, OCSD
Plant No. 2 testing

GWRS 3rd-stage monitoring vessels


Ongoing Monitoring Ongoing Monitoring
(A01, B01, B02, and D01)

GWRS RO satellite vessels (A01, A02, Performance Test (various RO Performance Test (various
B01, B02, C01, C02, D01, D02) membrane products) RO membrane products)

Closed circuit desalination pilot


Performance Test Performance Test
(Desalitech)

Forward osmosis pilot (Porifera) Performance Test Performance Test

*Testing of candidate MF/UF products for GWRS Final Expansion in FY18-19 is pending the
selection of a preferred product in Spring 2018 and the need for further data for the selected
product.

Orange County Water District 3-89 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

TALBERT BARRIER O&M (9908):


♦ Injection Well Fouling and Pipeline Integrity Issues – R&D staff will
continue to provide ad hoc support for Barrier Operations, including
microscopic, biological and biochemical analysis, as well as numerical
analysis of field data as necessary. This includes assisting Water
Production/Barrier staff in evaluating and monitoring particle sloughing in the
GWRS Pipeline and Barrier Pipeline, and assisting Water Production/Barrier
staff in evaluating the effect of Mid Basin Injection Well (MBI) fouling as the
function of particle sloughing from the GWRS Pipeline.

FOREBAY O&M (9920):


♦ Task 1: Desilting Demonstration Project Phase III Support [2013 to
present] – Led by the Planning Department, this project assesses the field-
scale performance of a subsurface passive collection unit (riverbed filtration
system) placed below the off-river facilities to desilt Santa Ana River (SAR)
water and provide this as recharge water to Olive Basin. R&D staff at the
Field Research Laboratory (FRL) in Anaheim provides support to this project
in the form of water sample collection and analyses (total suspended solids
[TSS], organics content, turbidity and particle profile/distribution). FRL staff
also conducts hydraulic testing to compare performance by changing
experiment configurations (opening and closing of lateral valves to watch
performance comparison).

♦ Task 2: Recharge Enhancement Working Group (REWG) Support – In


addition to supporting the specific projects listed above, R&D staff at the Field
Research Laboratory (FRL) and Fountain Valley facility will continue to
provide scientific assistance and analytical support for recharge enhancement
projects that are identified as an outcome of REWG during the fiscal year.
This may include:
o Sediment and water sampling using grab and autosampler methods for
parameters including TSS, organic content, protein, carbohydrate, and
chlorophyll content, dissolved oxygen (DO), pH redox potential, AOC,
microbial community analysis, and FIB concentration
o Basin sediment compositional analysis (particle size distribution by wet
sieving methods)
o Soil permeametry
o Field percolation measurements with piezometers
o Characterization of suspended solids contributing to basin fouling
(including particle size distribution and microscopic identification)
o Soil column studies

Orange County Water District 3-90 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

GWR SYSTEM O&M (9922):


♦ Task 1: Miraloma Basin Percolation Decline Support and Related Soil
Column Study [2014 to present] – Under this project, R&D is evaluating
potential causes of observed percolation rate decline at Miraloma Basin. The
observed clogging has resulted in decreased cleaning intervals from every 12
months to every 3-6 months since the basin was initiated in 2012. A new
basin (La Palma Basin) online since November 2016 is also dedicated to
GWRS FPW, and there was concern that this basin may exhibit similar
behavior (decline in percolation). In FY 2017-18, R&D completed a column
study using Miraloma Basin sand that compares clogging rates between
finished product water (FPW) water, water collected at the end of the GWRS
pipeline at Miraloma, and water collected from Miraloma Basin, which
demonstrated that the pipeline transit, as well as residence time in the pond,
contribute to clogging / slowing of percolation. In FY2018-19, flow and water
quality data will continue to be compiled and analyzed, an internal report
completed, and scientific journal publication developed.

♦ Task 2: Soil Column Test of GWRS FPW Clogging Associated with


Epoxy-coated Pipeline [2018] – Under this project, R&D will evaluate the
benefit of epoxy-coating GWRS pipelines (or alternative lining, pending
Engineering decision) with respect to reducing clogging potential for water
delivery to percolation ponds and injection wells. A soil column study will be
performed to compare percolation rates before and after pipeline epoxy-
coating. The epoxy-coating could enhance GWRS water recharge rates and
also benefit injection wells. The Unit 1 pipeline between AWPF and MBI-1
site will be epoxy coated (targeting September 2018). This stretch of pipeline
delivers GWRS water to the MBI-1 injection well.
♦ Task 3: La Palma Basin Percolation Rate Monitoring Using Fiber Optic
Distributed Temperature Sensing (FODTS) [2016 to 2018] – Under this
project, R&D is collaborating with California State University, Long Beach
(CSULB) to install a FODTS system to monitor percolation rates at La Palma
Basin (newly constructed and dedicated to recharge of advanced treated
recycled water). This technology utilizes heat as a tracer of infiltration
andprovides improved resolution of percolation rates throughout the study site
compared to traditional water balance methods. By tracking spatial and
temporal variations of infiltration across the basin, FODTS can reveal specific
areas where clogging occurs and help to optimize operations by improving
cleaning strategies which enhance long-term basin performance. In FY 2017-
18, CSULB will complete training of R&D staff to process and interpret data
using Matlab software. The team will generate a final report summarizing
findings for the second year of the study and evaluating this technology as a
tool for basin management. In FY 2018-19, R&D will continue collecting,
processing and interpreting data in order to periodically generate heat maps
to display areas of low/ high percolation. Additionally, charts/ tabular data
figures will be generated to show change in percolation over time and in
different locations across the basin to support optimizing cleaning strategies.

Orange County Water District 3-91 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

PRADO WETLANDS SUPPORT (9983):


♦ Task 1: Prado Wetland Research on Biobarriers [2017 to 2020] – In this
study, funded by the United State Geological Survey (USGS), OCWD is
collaborating with Colorado School of Mines (CSM) to investigate the
enhancement of nitrate attenuation in seven parallel shallow open water
treatment wetlands. The objectives are to reduce the design footprint and
increase the reliability and resiliency of the engineered wetland by enhancing
biological contaminant transformation capacity via passive hydrologic
manipulation utilizing microbially active treatment barriers. Project tasks
include: laboratory and pilot-scale simulations (completed), construction of
field scale systems (completed), assessing nitrogen fate and transport and
quantifying microbial drivers of biogeochemical processes (ongoing). OCWD
has provided in-kind support for construction costs, operation and
maintenance, and limited data coordination and analyses. R&D will continue
providing support for planning and field monitoring as needed in FY 2018-19.

COLLABORATIVE STUDIES AS PARTICIPATING UTILITY:


OCWD regularly participates in collaborative research with universities and other
partners, often facilitated by R&D staff, in which OCWD provides water samples, data,
operating history, and other support as an in-kind contribution to a partner-led study.
Planned projects of this nature in FY2018-19 include:

Water Research Foundation (WaterRF)

♦ Assessment of Techniques to Evaluate and Demonstrate the Safety of Water


from Direct Potable Reuse Treatment Facilities, WRF 4508

♦ Blending Requirements for Water from DPR Treatment Facilities, WRF 4536

Water Environment and Reuse Foundation (WE&RF)*

*formerly WateReuse Research Foundation (WRRF). Recently merged with WaterRF to


become The Water Research Foundation (WRF). Projects herein are listed separately
regardless as many pre-dated the merger(s).

♦ Integrating Management of Sensor Data for a Real Time Decision


Making/Response System, WRRF 14-01

♦ Performance/Cost Review of Existing Desalination Plants which use


Conventional/Membrane Pretreatment Prior to Reverse Osmosis, WRRF
14-07

♦ From Collection System to Tap: Resiliency of Treatment Processes for Direct


Potable Reuse, WRRF 14-13

Orange County Water District 3-92 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

♦ Optimization of Ozone-BAC Treatment Processes for Potable Reuse


Applications, WRRF 15-10

♦ Developing Curriculum and Content for DPR Operator Training, WRRF 15-05

National Institutes for Water Resources / United States Geological Survey (NIWR/
USGS)

♦ ‘The Role of Environmental Buffers in Potable Water Reuse’, University of


North Carolina at Chapel Hill, Prof. Olya Keen

♦ ‘Hydrodynamic-enhancement of nitrate attenuation by integrating reactive


biobarriers into shallow, open water treatment wetlands’, Colorado School of
Mines, Prof. Josh Sharp

National Science Foundation (NSF)


♦ A Novel Photobiological Water Treatment Process to Enable More Efficient
Water Recovery in Advanced Water Reclamation and Brackish Groundwater
Desalination Facilities, NSF Award ID: 1648495. Dr. Keisuke Ikahata, Pacific
Advanced Engineering (PACE), Fountain Valley, CA.

♦ University of Illinois at Urbana-Champaign, Prof. Roland Cusick, to establish


a dynamic RO model to estimate the demand GWRS could take to grid
ancillary market run by the California Independent System Operator (CAISO)
based on past GWRS RO unit membrane performance data.

Collaborative Antiscalant Research with University of California, Riverside (UCR)

 RO scale formation and antiscalant research with Dr. Haizhou Liu of UC


riverside

IDENTIFY FUNDING OPPORTUNITIES:


R&D continually seeks collaborative research funding opportunities from WE&RF, NSF,
CEC, USBR, etc. Typically, external funding for R&D activities requires partnering with
groups such as universities, NWRI, ReNUWIt ERC, or academic and industrial
laboratories to develop proposals for solicited or unsolicited research.

PARTICIPATION IN PACS AND ADVISORY COMMITTEES:


For FY 2018-19, planned activities include:

♦ WRF TC-16-007 “Building-Scale Treatment for Direct Potable Water Reuse &
Intelligent Control for Real Time Performance Monitoring” (Megan Plumlee)
♦ WE&RF Project “Use of in vitro Bioassays to Assess the Safety of Drinking
Water” (Menu Leddy)

Orange County Water District 3-93 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

♦ WRRF Project U3R15 “Fate of Coliphage in WRRFs” (Menu Leddy)


♦ WRRF Project 14-06 “Methodology for Assigning Pathogen Removal Credits
for Sub-Surface Desalination Intakes” (Menu Leddy)
♦ WRRF Project 14-02 “Establishing additional log reduction credits for
WWTPs” (Menu Leddy)
♦ WRF Project 4508 “Assessment of Techniques to Evaluate and Demonstrate
the Safety of Water from Direct Potable Reuse Treatment Facilities” (Menu
Leddy)
♦ WRRF Project 14-17 “White Paper on the Application of Molecular Methods
for Pathogens for Potable Reuse” (Menu Leddy)
♦ MSAR TMDL Task Force; sponsored by SAWPA and Regional Board (Menu
Leddy)
♦ WE&RF Project U4R16 “Estimating the Comammox Contribution to Ammonia
Oxidation in Nitrogen Removal Systems (Menu Leddy)

V Pending Activities
♦ RO Pilot Testing at OCSD Plant No. 2 to Support GWRS Final Expansion
– In cooperation with Water Production staff, R&D may conduct a pilot
evaluation of RO performance at OCSD Plant No. 2. The 30-mgd GWRS
Final Expansion formal engineering design began in 2017. Plant No. 2
effluent will be a source water for the GWRS Final Expansion (blended with
Plant No. 1 effluent). Pilot evaluations for MF and UF products have been
ongoing at the ERC and at OCSD Plant No. 2. Extending this testing to RO
would provide an indication of performance with respect to energy
requirements and scaling/fouling potential of this more challenging feed water
quality.

♦ Development and Optimization of a Bacteroides Human-Specific Fecal


Contamination Assay Using Quantitative PCR (qPCR) – Bacteroides
thetaiotaomicron is a human-specific fecal indicator organism that has been
used as an additional fecal standard since legacy fecal standards are not
human-specific. The OCWD R&D Department is one of a number of
laboratories involved in research to develop qPCR methods capable of
specifically detecting Bacteroides thetaiotaomicron (Bt). Methanobrevibacter,
a methanogen found in the human intestine and a putative sewage marker,
has been proposed as a potential indicator of human fecal
contamination. Depending on availability of R&D staff time, R&D will continue
work to develop and optimize qPCR assays and apply Next Generation
Sequencing analyses to identify these markers in microbial communities and
their removal during GWRS treatment, conventional wastewater and drinking
water treatment. In previous years progress was made in further developing
the qPCR assay for Bt and bird-specific marker that are being used for the
TMDL Source Evaluation study. The project was diverted from developing

Orange County Water District 3-94 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

Methanobrevibacter qPCR primers to developing Helicobacter qPCR assays


for identifying non-human fecal contamination in the MSAR. Both Bt and the
Helicobacter qPCR assay are successfully being used for the MSAR
Pathogen TMDL Source Evaluation study. These assays will be highly useful
for source tracking human fecal and sewage contamination and to confirm
human and non-human markers identified by the NGS studies. R&D will
continue to develop qPCR assays for Bt, Methanobrevibacter and Pepper
mild motile virus (PMMoV), recently identified as a wastewater indicator
organims for use in the MSAR and NGS studies.

♦ Continuation of Second Phase of RO Membrane Fouling Study/Data


Analysis – The purpose of this project would be to define which water quality
parameters serve as predictors of membrane lifetime (via data analysis by
multivariate methods), including loading of total chlorine and chemical species
that contribute to membrane fouling by precipitation. The first phase of this
project (begun in 2012) has been completed and was reported in WRRF
Report 08-11 (2015); R&D will consider whether an additional internal report,
and/or external publication, is necessary to more completely document this
work. The second phase of this RO fouling study using R&D’s flat-sheet RO
test unit array connected to RO Unit E01 could be completed after new
membranes have been installed in RO Unit E01 (estimated 2017 or 2018)
facility and replicated in the test cells. Membrane behavior will be
characterized by data obtained at four key points in the RO train (the
beginning of the 1st stage, 2nd stage and 3rd stage, and end of the 3rd stage),
including monitoring of RO feed water quality through the RO trains. Data will
be assessed to correlate the accumulation of material on the membranes in
the AWPF, as well as plant operational parameters, with loss of membrane
performance (the decay rate of the normalized specific membrane flux). Data
analysis will be performed in order to compare the observations made in the
first phase of the study (different membranes) with respect to correlating
deposition of materials on the RO membrane and spacer with decay of
normalized specific product flux during RO membrane fouling.

♦ Evaluation of UV/HOCl AOP Utilizing Trojan’s (4-Lamp) Pilot UV Reactor


– Trojan Technologies relocated a 4-lamp UV pilot unit to a Southern
California warehouse and has expressed a desire to operate the unit at the
AWPF to investigate UV/HOCl AOP. The water reuse industry has begun
shifting from UV/H 2 O 2 to UV/HOCl at new treatment facilities. However, the
understanding of the chemical dynamics of UV/HOCl is severely lacking.
Trojan would like to partner with OCWD to conduct pilot experiments to
investigate UV/chloramine/HOCl AOP on source water from the AWPF.

VI Staff Addition Needed for FY 2018-19


None

Orange County Water District 3-95 FY 2018-19 Work Plan


RESEARCH AND DEVELOPMENT

VII Future Issues


The purpose of this section is to list future issues, developments, and opportunities
related to the District’s objectives that may affect R&D or where R&D may contribute.

♦ Applied research opportunities at the Engineering Research Center – In


December 2015, the Engineering Research Center was reorganized under
R&D (formerly under Water Production). Opportunities for future pilot testing
(whether physically located at the Engineering Research Center or elsewhere
on-site) to identify new technologies and operational strategies capable of
improving water reclamation at AWPF include:
o Next generation MF and RO membranes for the AWPF.
o New chemical treatment techniques capable of enhancing MF and RO
effectiveness and reducing operating costs.
o Sensing methodologies capable of real-time or near-real time
assessment of the RO and AOP barriers to contaminants of public
health concern.
o Technologies for enhancing water recovery.
o New or improved AOP methodologies (e.g., chlorine AOP, catalytic
AOPs).
o Treatment of RO concentrate for destruction of trace organics.
♦ Evaluation of new methodologies capable of enhancing recharge efficiency,
or studies of recharge impacts, such as:
o Use of FODTS to provide a basin management benefit, based on
outcome of current FODTS study.
o Additional column studies, building on previous findings, to understand
and minimize clogging in recharge systems that are fed AWPF FPW or
other water supplies.
o Long-term effects of AWPF FPW recharge on the groundwater basin.

♦ Evaluation of new and novel methods of measuring water quality, including:


o Molecular biological methodologies for virus and bacterial pathogen
detection, such as Droplet Digital PCR for organisms of interest related
to AWPF or of public health concern.
o New real-time detection methodologies for biological and chemical
species of public health concern.
o Bioassays to assess toxicity and other specific biological responses.

Orange County Water District 3-96 FY 2018-19 Work Plan


HYDROGEOLOGY

HYDROGEOLOGY

Summary Information

Existing Staff - 13.5 FTE


1 – Chief Hydrogeologist
1 – Principal Engineer
2 – Principal Hydrogeologists
1 – Senior Hydrogeologist
2 – Hydrogeologists
1 – Assistant Hydrogeologist
1 – GIS/Database Supervisor
2 – Senior GIS Analysts
1 – Environmental Specialist/Data Analyst
1 – Maintenance Technician
0.5 – Administrative Support Specialist (shared with Regulatory Affairs)

Orange County Water District 3-97 FY 2018-19 Work Plan


HYDROGEOLOGY

Mission
Define the physical characteristics of basin aquifers, determine groundwater flow
pathways, and provide analyses and recommendations necessary to manage
groundwater production, recharge, groundwater quality protection and remediation,
seawater intrusion, and water levels within the basin.

Key issues for FY 2018-19


♦ Under USEPA oversight, conduct the remedial investigation and feasibility
study of remedial alternatives to address groundwater contamination in the
North Basin area.
♦ Evaluate the hydraulic effects and performance of 17 new injection wells
recently constructed to increase capacity of the Alamitos Seawater Barrier.
♦ Conduct remedial investigation and feasibility study of remedial alternatives to
address groundwater contamination in the South Basin area.
♦ Construct remaining monitoring wells and analyze data to characterize
sources and extent of seawater intrusion in Sunset Gap; use expanded
groundwater model to evaluate potential intrusion prevention/containment
projects.

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actual Budget Proposed Budget
Salaries and Benefits 1,864,148 1,762,131 2,103,291
Services and Supplies 2,131,974 1,460,300 2,726,900
Total $3,996,122 $3,222,431 $4,830,191

I FY 2018-19 Major New Initiatives/Programs


♦ Construction of four new mid-basin injection wells and two regulatory permit
compliance monitoring wells began in FY17-18 in Santa Ana’s Centennial
Park and will continue into FY18-19.

II Core Activities
The objectives of the Hydrogeology group are to define the physical and
chemical characteristics of basin aquifers, determine groundwater flow pathways,
and provide analyses and recommendations necessary to manage groundwater
production, recharge, quality, and water levels within the basin. Core functions
include:
♦ Basin-wide water level monitoring program of over 200 wells and trend
analysis. These data are used for numerous applications including the
annual calculation of basin storage in support for the Annual Engineer’s
Report and the compliance with state SGMA and CASGEM programs.

Orange County Water District 3-98 FY 2018-19 Work Plan


HYDROGEOLOGY

♦ Refinement and operation of the basin groundwater flow model used to


evaluate the effects of basin management alternatives, proposed well fields,
recharge projects, and pumping variations.
♦ Evaluation of the Talbert and Alamitos seawater barrier performance.
♦ Evaluation of seawater intrusion in the Bolsa and Sunset gaps.
♦ GIS map production and database support for projects, planning, reports, and
presentations.
♦ Enhancement and maintenance of the Water Resources Management
System (WRMS) database and geographic information system (GIS).
♦ Technical support and assistance for the groundwater producers.
♦ Preparation of the monthly Water Resources and annual Santa Ana River
Watermaster reports. Funds for contracting with the U.S. Geological Survey
to collect SAR flow measurements are budgeted annually. These
measurements are essential for preparation of the Watermaster reports,
storage operations at Prado Dam, and calculation of recharge volumes.
♦ Participate in Santa Ana River Watermaster meetings, including
determination of annual Santa Ana River base flow and storm flow.
♦ Review and evaluation of site-specific groundwater contamination
investigations and cleanups overseen by regulatory agencies.
♦ Hydrogeologic analysis of recharge project feasibility studies.
♦ Evaluation of RA/BEA exemption requests.

III Non-Core Activities


None

IV Group Goals for FY 2018-19


The following programs are highlighted as major activities encompassed within or
in addition to the core group activities listed above:
North Basin Groundwater Protection Project – Complete the remedial
investigation and initiate the feasibility study of remedial alternatives to address
VOC contamination under USEPA oversight. Monitor the performance of
extraction well EW-1 activated in 2017 to reduce the spread of VOCs.
South Basin Groundwater Protection Project – Complete the remedial
investigation and initiate the feasibility study of remedial alternatives to address
VOC and perchlorate contamination.
Mid-Basin Injection Wells - Construct four mid-basin injection wells and two
regulatory permit compliance monitoring wells in Santa Ana’s Centennial Park.
Talbert Extraction Well Decommissioning – Demolish, backfill, and seal seven
inactive extraction wells, vault boxes, and pipelines.

Orange County Water District 3-99 FY 2018-19 Work Plan


HYDROGEOLOGY

Water Resources Management System (WRMS) – Review water level, water


quality, and groundwater production data compilation and processing and QA/QC
protocols with the goal of eliminating, streamlining, and/or automating as many
processes as possible. Redesign the WRMS web portal that provides user
access to graphs, reports, and applications. Develop additional tools for data
display and retrieval, e.g., data and graphs from the Water Resources and
Watermaster reports. Training of new staff is also planned.
Alamitos Gap Seawater Intrusion – Evaluate initial effects and performance of 17
new Alamitos Barrier injection wells expected to become operational in mid-2018.
Sunset Gap Seawater Intrusion – Complete construction of two monitoring wells
to investigate the sources and extent of seawater in the Sunset Gap area;
analyze data from the new monitoring wells and use expanded groundwater
model to develop potential intrusion containment alternatives.
Santa Ana Riverbed Recharge Evaluation – Assist Planning and Recharge
departments in subsurface characterization of riverbed above Imperial Highway
as a potential infiltration system location; one shallow monitoring well is planned
initially for construction.
Litigation Support – Provide support as needed for the North Basin, and South
Basin, and MTBE cost recovery actions.
Basin Hydrogeologic Characterization – Refine/update basin-wide geologic cross
sections based on substantial amounts of new data collected since 2000. Cross
sections are routinely used in a variety of basin analyses, including water quality
evaluations and designing new production wells.

V Pending Activities
None

VI Staff Addition Needed for FY 2018-19


Staff has budgeted a part-time contract position to assist WRMS data
management staff who are facing a personnel turnover/retraining and large
workload.

VII Future Issues


In the next two to three years, issues involving the Hydrogeology group that the
District will need to consider include:
♦ Implementation of seawater intrusion control alternatives in Sunset Gap.
♦ Replacement of 2-3 Talbert Barrier injection wells that have exceeded their
useful life.
♦ Coordination with USEPA and stakeholders to complete remedial
investigation/feasibility study to develop remedial measures for the North
Basin groundwater contamination.
♦ Coordination with state regulatory agencies and stakeholders on remedial
alternatives for the South Basin groundwater contamination.

Orange County Water District 3-100 FY 2018-19 Work Plan


HYDROGEOLOGY

♦ Continued maintenance and evaluation of aging monitoring well network,


including plans for well refurbishment and replacement as necessary.

Orange County Water District 3-101 FY 2018-19 Work Plan


REGULATORY AFFAIRS

REGULATORY AFFAIRS

Summary Information

Existing Staff – 2.5 FTE


1 – Assistant General Manager – Water Quality & Regulations
1 – Executive Director of Water Quality and Technical Resources
0.5 − Administrative Support Specialist (shared with Hydrogeology)

Mission
Help to assure reasonable regulation of District projects and programs through interface
with regulatory agencies, acquisition of necessary permits, and implementation of water
quality monitoring and research programs to support district goals and compliance with
current and anticipated future water quality regulations. Collectively oversee the
Hydrogeology, Water Quality, Advanced Water Quality Assurance, and Research &
Development Departments.

Key issues for FY 2018-19


♦ Obtain regulatory permitting via both the RWQCB and DDW for Mid-Basin
injection project at Centennial Park and other sites as necessary to recharge
GWRS water, including completion of the required DDW Public Hearing.
♦ Coordinate preparation and submittal of 2017 Groundwater Replenishment
System (GWRS) Annual Report and 2017-18 Santa Ana River (SAR) Water
Quality Report.
♦ Lead preparations for the 2018 annual meetings of the NWRI Independent
Advisory Panels for the GWRS and SAR Monitoring (SARMON).

Orange County Water District 3-102 FY 2018-19 Work Plan


REGULATORY AFFAIRS

♦ Begin regulatory permitting and related studies (i.e., tracer tests) to expand
permitted GWRS recharge areas (e.g., lower SAR, Burris Basin, Santiago
Basin, etc.) to help accommodate GWRS Final Expansion flows.
♦ Complete GWRS water post-recharge/injection water quality dynamics study
with Stanford University.
♦ Continue working with Hydrogeology, Water Quality and Laboratory
departments to characterize the extent of PFOA and PFOS in local
groundwater and the SAR, to determine potential sources, to follow up with
regulators as needed, and assist Groundwater Producers with impacted
wells.

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actual Budget Proposed Budget
Salaries and Benefits 643,160 551,040 618,865
Services and Supplies 142,003 190,798 215,800
Total $785,163 $741,838 $834,665

I FY 2018-19 Major New Initiatives/Programs


♦ Begin required Tittle 22 Engineering Report for GWRS Final Expansion.
♦ Renew NDPES Permit for GWRS SAR Emergency Discharge.
♦ Help review water quality and regulatory issues associated with ongoing
engineering design of GWRS Final Expansion.
♦ Coordinate with regulatory agencies and conduct artificial tracer tests at
Burris Basin, Santiago Basins, Santiago Creek and other relevant locations to
document subsurface retention times such that these facilities could be used
for future GWRS recharge.
♦ In cooperation with Engineering Department, implement recently developed
county-wide standardized procedures for receiving required OCHCA and
DDW approval of new end users and for required regular site inspections for
established use sites.
♦ Work with Water Production to submit new monthly required Title 22 daily Log
Removal Report for GWRS.
♦ Implement pending updated constituents of emerging concern (CEC)
monitoring requirements for GWRS as passed into law by the State Water
Resources Control Board, including careful incorporation of any
bioanalytical/bioassay testing.

Orange County Water District 3-103 FY 2018-19 Work Plan


REGULATORY AFFAIRS

II Core Activities
The Regulatory Affairs Department is primarily responsible for the District’s
permits with the RWQCB, DDW and the Orange County Health Care Agency
(OCHCA) and assuring compliance with all monitoring and quality requirements.
Core activities include:
♦ Manage Water Quality and Technology Group, which includes the Laboratory,
Water Quality, Regulatory Affairs, Hydrogeology, and Research &
Development.
♦ Obtain permits and negotiate conditions for District projects and facilities from
health and regulatory agencies; RWQCB, DDW, OCHCA.
♦ Assure compliance with permit conditions, including monitoring and reporting
to regulatory agencies.
♦ Facilitate regular coordination between Water Quality and Technology Group
departments and newly reorganized OCSD Division of Environmental
Services, which includes OCSD Laboratory, Ocean Monitoring,
Environmental Compliance, and Regulatory Affairs (Source Control) staff,
with emphasis on identify compounds of concern for regulation by the GWRS
Source Control Program, including testing needs and concentration limits.
♦ Coordinate with OCWD and OCSD Operations staff to improve understanding
of links between secondary treatment and GWRS product water quality.
♦ Help manage and coordinate OCWD participation in external research
projects with funding support, in-kind contributions, the provision of providing
water quality samples and historical data, and the review of draft reports.
♦ Continue to support Planning and Engineering Departments with water quality
and permitting needs for future GWRS recharge and injection facilities.
♦ Coordinate with NWRI on management of Independent Advisory Panels (IAP)
appointed for GWRS and SAR monitoring.
♦ Evaluate recommendations from the NWRI GWRS IAP and prioritize
implementation.
♦ Review sampling and analysis program results for the Santa Ana River and
follow up on recommendations from the SARWQH Study and the SARMON
NWRI IAP.
♦ Serve as primary liaison with the SAWPA Emerging Constituents Workgroup.
♦ Participate in optimization process for GWRS to improve treatment efficiency
and product water quality.
♦ Help oversee and direct the District’s post-doctoral fellow/associate
researcher program.
♦ Coordinate with regulatory agencies and other water agencies regarding
monitoring requirements for CECs.

Orange County Water District 3-104 FY 2018-19 Work Plan


REGULATORY AFFAIRS

♦ Provide consultation to other OCWD groups (e.g., Public Affairs), MWDOC,


and the groundwater producers on water quality, health and regulatory issues
affecting District projects or programs.
♦ Assist in review and development of legislation regarding water quality
requirements and recycled water.
♦ Assist Public Affairs staff with the development and review of technical
information to be included in District brochures and the enhanced hallway
panels, kiosks, and displays.
♦ Assist Public Affairs staff with hosting and educating visitors from water
agencies, regulatory agencies, and other governmental entities.

III Non-Core Activities


Non-core activities (secondary priority compared to core activities) conducted by
the Regulatory Affairs include:
♦ Serve on NWRI Board, Southern California Salinity Coalition (SCSC) Board,
Orange County Water Association (OCWA) Board, Orange County Chapter of
WateReuse CA Board, and as OCWD liaison with Water Environment &
Reuse Foundation (WE&RF) and Water Research Foundation (WaterRF).
♦ Participate in Expert Panels for NWRI regarding water recycling and reuse
projects planned by other agencies.
♦ Serve on Project Advisory Committees (PACs) for Water Research
Foundation (WaterRF) and WE&RF funded projects and coordinate service of
other staff on such PACs.
♦ Provide presentations to Water Education Foundation and other groups
regarding water quality, health and regulatory issues.
♦ Assist other water agencies in addressing water quality issues related to
groundwater recharge with recycled water.

IV Group Goals for FY 2018-19


♦ Mid-Basin Injection Centennial – Submit required reports, schedule & conduct
required DDW public hearing, and obtain permit amendment for Centennial
Park Mid-Basin Injection project.
♦ GWRS Annual Report – Manage preparation of the annual report to
regulatory agencies on the 2017 calendar year performance of GWRS and
results from testing required by the permit.
♦ Supplement to GWRS Annual Report - With the assistance of the Water
Production and Water Quality Departments, prepare report containing
additional detailed analysis of GWRS performance as requested by NWRI
GWRS Independent Advisory Panel.
♦ Santa Ana River Monitoring – Manage the water quality sampling and
analysis for the SAR in follow up to the SARWQH Study and the 2017

Orange County Water District 3-105 FY 2018-19 Work Plan


REGULATORY AFFAIRS

recommendations of NWRI’s SARMON Panel, and prepare the 2017-2018


SAR Water Quality Report.
♦ GWRS Final Expansion Permitting – Begin regulatory permitting process and
develop related reports and submittals for Final GWRS Expansion.
♦ GWRS Water Stabilization Studies – Complete studies with Stanford
University and initiate follow on project to develop optimized post-treatment to
account for metals mobilization, pipeline integrity, DBP formation and other
factors.
♦ Enhanced GWRS Source Control – Continue to coordinate with OCSD on the
development and implementation of a formal Response Plan to prevent
contaminants from adversely affecting GWRS as a part of OCSD’s
commitment to enhanced source control efforts.
♦ North Basin Groundwater Protection Project – Provide technical support for
the North Basin Groundwater Protection Project and guidance relative to
regulatory requirements for recharge of product water or potable use.
♦ South Basin Groundwater Protection Project – Provide technical support for
the South Basin Groundwater Protection Project and guidance regarding
regulatory alternatives for cleanup and reuse of contaminated groundwater.
♦ Laboratory Groups - Since monitoring needs exceed resources in Water
Quality and Laboratory Groups, programs and projects must be continuously
evaluated and prioritized.
♦ R&D for District Critical Needs – Coordinate the Research & Development
Department efforts with the most critical research needs for the District,
including recharge enhancement, MF/RO optimization, UV-AOP optimization
and microbial characterization of SAR recharge waters.
♦ GWRS Regulatory Compliance – Obtain additional log removal credits for
GWRS via studies of OCSD primary/secondary treatment OCSD and
enhanced monitoring at AWPF.

V Pending Activities
Major activities that are not being implemented include:
♦ Develop annual water quality report card on the groundwater basin.
♦ Develop more comprehensive water quality testing program to assure
adequate data for assessment of emerging contaminants, threats to producer
wells and seawater intrusion.
♦ Regulatory validation of treatment alternatives.

VI Staff Addition Needed for FY 2018-19


None

Orange County Water District 3-106 FY 2018-19 Work Plan


REGULATORY AFFAIRS

VII Future Issues


In the next one to three years, issues that the District will need to consider
include:
♦ Additional locations for GWRS water recharge or injection to support GWRS
Final Expansion.
♦ Evaluation of new technologies to enhance treatment in the GWRS and to
improve energy efficiency and reduce chemical costs, specifically targeting
enhanced recovery from the reverse osmosis process and/or concentrate
treatment, accompanied by gaining regulator acceptance.
♦ New and more stringent drinking water standards for contaminants like 1,2,3-
TCP, PFOA & PFOS, total VOCs, nitrosamines, 1,4-dioxane, perchlorate,
hexavalent chromium, arsenic, and disinfection by-products of new concern.
♦ Enhanced monitoring and possible treatment requirements for the discharge
of GWRS RO concentrate to the OCSD outfall.
♦ Expanded source water assessment obligations that could include the entire
SAR watershed and all potential contaminating activities in the watershed.
♦ The application of bioanalytical techniques (e.g., in vitro bioassays) to as a
supplemental screening technique and/or regulatory requirement for potable
reuse and/or drinking water supplies.
♦ In consultation with DDW and RWQCB regulatory staff, rewrite and gain
approval for new GWRS permit to facilitate future implementation of GWRS
Final Expansion and more clearly document updates to operational,
monitoring, and reporting requirements due to changes in regulations and
project features since original permit structure was adopted in 2004.

Orange County Water District 3-107 FY 2018-19 Work Plan


WETLANDS OPERATIONS

WETLANDS OPERATIONS

Summary Information

Existing Staff – 3 FTEs


1 – Director of Field Operations
2 – Senior Heavy Equipment Operator

Mission
♦ Operate and maintain the Prado Wetlands to provide natural water quality
treatment of Santa Ana River flows behind Prado Dam.
♦ Provide operational oversight and maintenance of district property within the
Prado Basin.
♦ Provide logistical and operational support for research activities.
♦ Provide operational support for Natural Resources division.
♦ Coordinate operations with tenant recreational use.

Key Issues for FY 2018-19


♦ Implement operational strategy to maintain optimal wetlands nitrate removal.
♦ Provide logistical support for OCWD collaborative research project with
Engineering Research Center members.
♦ Develop strategy to reduce mosquito populations in wetland ponds.
♦ Continue to implement improvements to ponds, conveyance channels, and
SAR levee infrastructure.

Orange County Water District 3-108 FY 2018-19 Work Plan


WETLANDS OPERATIONS

FY 2016-17 FY 2017-18 FY 2018-19


Account Information Actual Budget Proposed Budget
Salaries and Benefits 422,016 461,503 495,695
Services and Supplies 310,137 265,300 227,000
Total $732,153 $726,803 $722,695

I FY 2018-19 Major New Initiatives/Programs


♦ Adjust operational strategy by de-watering designated ponds to maintain
optimal treatment retention time due to reduced SAR baseflow.
♦ Provide logistical support for OCWD collaborative research project with the
Engineering Research Center and UCR research in Pond E7.
♦ Modify de-watering / vegetation management operations to reduce habitat for
mosquito harborage.

II Core Activities
The Wetland Operations group is primarily responsible for the management and
operation of the wetland facilities that provide natural water quality treatment of
SAR flows behind Prado Dam. The group also supports the Natural Resources
group by providing operational oversight and maintenance of OCWD property
within the Prado Basin.
Core activities include:
♦ Provide natural water treatment of SAR flows through constructed wetlands in
the Prado Basin.
♦ Evaluation of water quality parameters to optimize wetlands operations for
maximum nitrate removal.
♦ Maintenance of the levees, roads and conveyance piping within the wetlands.
♦ Reconstruction of earthen structures and conveyances following storm events
to ensure 50 percent of river flows through wetlands.
♦ Support of district approved research projects.

III Non-Core Activities


Non-core activities conducted by the Wetlands Operations group include:
♦ Oversight and operational support of wetlands research projects.
♦ Collection and analysis of pond water quality data.
♦ Support of the District’s education and outreach program by providing tours of
the wetlands system.
♦ Support of volunteer functions, such as open houses and group tours.

Orange County Water District 3-109 FY 2018-19 Work Plan


WETLANDS OPERATIONS

IV Group Goals for FY 2018-19

Implement Operational Strategy for Optimal Water Treatment Retention Times:


♦ Adjust ponds operations to de-water approximately 100 acres of ponds
to reduce system volume thus maintaining optimal treatment retention
time due to reduced SAR baseflow.

Modify Vegetation Management Techniques:


♦ Use OCWD equipment to mow dry vegetation in de-watered ponds.
♦ Removal of harvested vegetation from operational ponds.

Provide Logistical Support for Collaborative Research Project:


♦ Operate and maintain pond infrastructure per design specifications in
support of research project with the Engineering Research Center.
♦ Provide operational support for Wetlands research projects.
♦ Provide operational support for groundwater monitoring program.

Improvements to Wetlands Infrastructure:


♦ Re-build access road to central basin.
♦ Grade and repair levees in and around pheasant field.
♦ Regrade and install conveyance piping in Pond E5 to connect with outfall of
ERC research cells.

Develop and Implement Operational Strategies to Reduce Mosquito Harborage:


♦ Manage vegetation removal and de-watering cycles to reduce mosquito
breeding habitat.

V Pending Activities (Not Being Addressed Due to Insufficient Resources)


Major activities that are not being conducted include:
♦ Re-establishment of damaged or destroyed monitoring wells to determine the
movement of groundwater under the wetland ponds.
♦ Establish SAR streambed gauging station at River Road Bridge.

Orange County Water District 3-110 FY 2018-19 Work Plan


WETLANDS OPERATIONS

VI Staff Addition Needed for FY 2018-19


None

VII Future Issues


In the next one to two years, issues the District will need to consider include:
♦ Replacement of non-tier 3 compliant heavy equipment.
♦ Replacement of diversion channel control structure.

Orange County Water District 3-111 FY 2018-19 Work Plan


WATER PRODUCTION

WATER PRODUCTION/GROUNDWATER REPLENISHMENT SYSTEM

Orange County Water District 3-112 FY 2018-19 Work Plan


WATER PRODUCTION/GROUNDWATER REPLENISHMENT SYSTEM

Existing Staff − 64 FTEs


1 – Executive Director of Operations
1 – Director of Water Production
1 – Senior Administrative Support Specialist
4 – Supervisors (Operations Manager, Process Control & System Manager and
Maintenance Manager, Maintenance Supervisor)
21 – Operators (includes Operator III GWRS/Applied Research)
14 – Maintenance Technicians
1 – Vehicle and Equipment Technician
2 – Utility Maintenance Technicians
2 – Maintenance Scheduler/Planners
1 – Material and Chemical Management Technician
8 – Instrumentation & Electrical Technicians
2 – Process Control System Programmers
1 – Chemist
1 – Principal Hydrogeologist
3 – Senior Distribution Technicians
1 – Lead Distribution Technician

Mission
Operations and maintenance (O&M) of the GWRS Advanced Water Purification Facility
(AWPF), Mid Basin Injection,Talbert Barrier and Green Acres (GAP).

Key Issues for FY 2018-19


♦ Maximize operation of GWRS processes:
 Continue to work with the Orange County Sanitation District to make
as much water as possible for GWRS production.
 Goal for 2018-19 production 103,000 acre feet.
 Send all non-barrier production to Mid Basin Injection Well, Canyon
Power, Arctic, La Palma, Miraloma and Kraemer/Miller basins.
 Continue to control or reduce the water treatment unit cost by getting
the best possible price on electricity, chemicals and spreading the
system’s fixed costs over the maximum possible production.

♦ Reduce GWRS processing costs:


 Continue optimization of MF backwash and cleaning regimes.
 Optimization of RO cleaning regimes by optimizing clearing chemical
concentrations and cleaning intervals.

Orange County Water District 3-113 FY 2017-18 Work Plan


WATER PRODUCTION/GROUNDWATER REPLENISHMENT SYSTEM

 Optimization of RO pretreatment chemical program, which includes the


use of acid and antiscalant to reduce cost and prevent mineral scaling
of membranes in the 3rd stage of RO units.
 Optimize use of new RO energy recovery devices in six new RO units
to reduce energy cost and/or balance flux performance.
 Continue to optimize usage of new antiscalant product to help control
mineral scaling at pH 6.9 with the goal to achieve lowest possible
chemical cost. At the same time, continue to engage manufacturers
to develop and evaluate antiscalant formulations that would be
successful with future poorer water quality associated with the GWRS
Final Expansion.
 Work with purchasing to find and procure the best chemical pricing.
 Energy use reduction, load shifting to less expensive nighttime hours
where possible, and participation in demand response programs that
offset the cost of electricity.
 In the third year of 5 year energy contract that is helping maintain costs
of energy.
 Lifespan extension of both MF and RO membranes.
 Continue to replace older MF membranes in phases and planned
approach to maintain production and water quality with purchase of 5
cells of MF membranes (684 membranes per cell).
 Continue efforts to maximize UV lamp life to 12,000 hours.
 Continue to replace remaining older RO membranes in RO Train A to
maintain water quality with the purchase of 3 sets of 1,050 RO
membrane elements.

♦ Provide technical support and assistance to the GWRS Program Manager in


the design of the GWRS Final Expansion.
♦ Manage GWRS assets by:
 Continued implementation of a robust preventative maintenance
program using the Maximo computerized maintenance management
system (CMMS).
 Staff continues to update GWRS the work plans in the CMMS to reflect
knowledge gain with 10 years of experience operating the treatment
plant.
 Continued development of staff capabilities to make both minor and
major mechanical and electrical repairs on equipment and facilities.
These internal capabilities assure fast response, quality repairs and
lower cost.

Orange County Water District 3-114 FY 2017-18 Work Plan


WATER PRODUCTION/GROUNDWATER REPLENISHMENT SYSTEM

 Install RO membranes in the three units of RO Train A to result in all


older membranes being replaced in the RO system.
 The new Tekken lime system is being optimized for delivery of non-
corrosive water into distribution system by effective lime post treatment
with confirmatory testing.
 Protection of injection wells by delivery of low particle water.

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actual Budget Proposed Budget
Salaries and Benefits 9,359,301 9,302,981 10,022,452
Services and Supplies 20,217,278 21,780,802 21,416,687
Total $29,576,579 $31,083,783 $31,439,139

I FY 2018-19 Major New Initiatives/Programs


♦ Continue to monitor changes in the MF membrane backwash and cleaning
intervals to increase process efficiency and production.
♦ Make final evaluation of alternative microfiltration or ultrafiltration products
capable of successfully operating on future AWPF source water associated
with the GWRS Final Expansion. This evaluation includes products that could
be retrofitted into existing infrastructure.
♦ Support Engineering Department in a possible full scale demonstration of
PVDF MF technology by retrofit of one cell in the AWPF MF system.
♦ As the RO membranes age, investigate methods to effectively clean them
extend their life to 5 years without reducing salt rejection effectiveness and to
control energy use.
♦ Develop key performance factors that help identify and predict MF and RO
membrane end of life conditions.
♦ Support GWRS Program Manager in the design of the GWRS Final
Expansion.

II Core Activities
♦ O&M of the 100 mgd GWRS AWPF.
♦ O&M of the 102 well Talbert Injection Barrier.
♦ O&M of Mid Basin Injection Demonstration well.
♦ O&M of EW-1 well.
♦ O&M of the GAP treatment plant.

Orange County Water District 3-115 FY 2017-18 Work Plan


WATER PRODUCTION/GROUNDWATER REPLENISHMENT SYSTEM

♦ Work with Research and Development on engineering and research aimed at


maintaining and optimizing treatment plant performance, production and the
Talbert Barrier.
♦ Continue to support R&D in MF and UF pilot testing at OCSD Plant No. 2
facility in Huntington Beach in support of the GWRS Final Expansion design.
♦ Administering the joint OCWD & OCSD GWRS Steering Committee
meetings.
♦ Facilitate monthly OCWD and OCSD Joint Operation Committee meetings.

III Non-Core Activities


♦ Participate in technology transfer on advanced treatment with other water
districts, consultants, public agencies, and industry organizations.
♦ Provide in-kind support as specified by OCWD for participating Water Reuse
Research Foundation and Water Research Foundation research projects.
♦ Provide technical support on various wellhead treatment systems throughout
Santa Ana Watershed.
♦ Provide technical support as needed to the Water Quality, Engineering,
Hydrogeology, Public Relations and Health & Regulatory Departments.
♦ Provide facility maintenance support for OCWD’s Fountain Valley facilities.
♦ Provide support to set up meetings and events.
♦ Provide instrumentation and electrical support to OCWD’s recharge and
Prado operations.
♦ Provide data collection and monitoring support for the Research &
Development Department.
♦ Provide technical updates and participate in meetings with the GWRS
Independent Advisory Panel.
♦ Provide assistance with GWRS tours for the Publics Affairs Department as
necessary.
♦ Provide any required GWRS technical and operational information for outside
data requests.

IV Group Goals for FY 2018-19


GWRS:
1. Produce up to 103,000 acre feet of water for recharge and injection.
2. Continue efforts to control net production cost to less than $500 per acre
foot.

Orange County Water District 3-116 FY 2017-18 Work Plan


WATER PRODUCTION/GROUNDWATER REPLENISHMENT SYSTEM

3. Continued development of the CMMS for the GWRS and update


maintenance requirements for existing and new equipment associated
with the GWRS Initial Expansion.
4. Continued development of databases to help staff monitor the individual
process performance of the MF, RO and UV treatment systems.

OCSD:
1. Continue with joint operations meetings with OCSD plant operations and
source control and OCWD staff to ensure both agencies are
knowledgeable of issues with each other’s operations.
2. Coordinated day to day operation and optimization of the new 15 million
gallon volume flow equalization storage tanks.
DDW and the RWQCB:
1. Prepare an Annual Report on the GWRS operation with District staff and
outside consultant.
Talbert Barrier:
1. In conjunction with the barrier staff continue evaluating the corrosivity and
injection well fouling propensity of the GWRS finished product water.

V Pending Activities

Continue to develop staff to effectively operate and maintain the GWRS and
determine infrastructure needs for the GWRS Final Expansion facilities.

VI Staff Addition Needed for FY 2018-19


None planned for FY 2018-19, but additional staffing needs associated with the
GWRS Final Expansion will be evaluated.
VII Future Issues
In the next two years, issues the District will need to consider include:
1. Optimization of the GWRS AWPF treatment process to lower operational
costs, including operation of new flow equalization facilities.
2. Continue to optimize MF and RO membrane replacement strategies.
3. Process optimization and adjustment of preventative maintenance
requirements as necessary.
4. Continue forward-looking review of water treatment technologies and
opportunities to optimize current GWRS membrane and advanced
oxidation treatment processes.
5. Continue to monitor energy issues to ensure the lowest possible power
expenditures for the GWRS.

Orange County Water District 3-117 FY 2017-18 Work Plan


WATER PRODUCTION/GROUNDWATER REPLENISHMENT SYSTEM

6. Support the planning, construction, start-up, operation, maintenance and


optimization of the District’s future Centennial park mid-basin injection
wells.
7. Support planning and design of the GWRS Final Expansion.

Orange County Water District 3-118 FY 2017-18 Work Plan


Recharge Operations

RECHARGE OPERATIONS

Summary Information

Existing Staff – 20 FTEs


1- Recharge Operations Supervisor
1- Field Headquarters Maintenance Supervisor
1- Field Headquarters Heavy Equipment Operator Supervisor
1- Grounds Maintenance Supervisor
1- Recharge System Operator - (Position Open)
1- Maximo Scheduler/Planner
1- Senior Administrative Support Specialist
2- Assistant Recharge System Operators
3- Field Maintenance Technicians
1- Senior Heavy Equipment Mechanic
3- Senior Heavy Equipment Operators
3- Heavy Equipment Operators
1- Diesel Mechanic

Orange County Water District 3-119 FY 2018-19 Work Plan


Recharge Operations

Mission
Replenishment of the groundwater basin by operating and maintaining recharge basins
and associated infrastructure, surface water conveyance system, storage and recharge
facilities, and managing the conservation pool behind Prado Dam.

Key issues for FY 2018-19


♦ Continued implementation of replacing aging infrastructure and
instrumentation.
♦ Continue heavy equipment replacement program to maintain compliance with
CARB regulatory schedule.
♦ Support the City of Anaheim / OCWD joint efforts to build public access trails
at 5-Coves (extension of Anaheim Cove).
♦ Update landscaping at Anaheim Lake by selective tree removal, installation of
native and drought tolerant plantings, and demolition of abandoned buildings.
♦ Upgrade security infrastructure at Field Headquarters and the Santiago Basin
complex.
♦ Coordinate with engineering staff to establish district standards for installation
and replacement of directly buried vales and actuators.
♦ Replace directly buried 48” valves and actuators at Anaheim Lake / Atwood
Channel.
♦ Coordinate with the County of Orange to add video surveillance at the OC
Corporation Yard for the SAR at Ball Road to Orangewood Avenue reach.
♦ Manage vegetation in a manner that accommodates both the seasonal
habitat needs of nesting birds and the use of the land for groundwater
recharge.
♦ Installation of transfer piping between Warner and Conrock Basins.
♦ Installation of conveyance piping, control structures, and instrumentation at
Huckleberry / Conrock Basin.
♦ Installation of weir and replacement of catwalks / gates at Five Coves.
♦ Continue to upgrade PLC / SCADA hardware.
♦ Continue upgrades to infrastructure, instrumentation, and equipment.

FY 2016-17 FY 2017-18 FY 2018-19


Account Information
Actual Budget Proposed Budget
Salaries and Benefits 2,305,275 2,460,913 2,638,913
Services and Supplies 1,897,403 1,529,840 1,552,890
Total $4,202,678 $3,990,753 $4,191,803

Orange County Water District 3-120 FY 2018-19 Work Plan


Recharge Operations

I FY 2018-19 Major New Initiatives/Programs


♦ Adapt operations to allow for the purchase and recharge of 65,000 AFY of
imported water to help offset the decline is SAR base Flow.
♦ Improve data acquisition and retrieval at diversion points and other critical
facility infrastructure to comply with provisions of SB 88.
♦ Develop district standards for installation and replacement of directly
buried vales and actuators.
♦ Replace and relocate directly buried valves and actuators to protective
vaults.
♦ Collaborate with Field Research Staff to utilize data collected from La
Palma infiltration instrumentation to optimize basin operation.
♦ Collaborate with Hydrogeology Department to utilize WRMS data to inform
recharge operations.
♦ Re-landscape Anaheim Lake frontage area along Miraloma Avenue.

II Core Activities
The Recharge Operations group is responsible for replenishing the groundwater basin
by operating and maintaining the surface water conveyance system, storage and
recharge facilities and managing the conservation pool behind Prado Dam.

III Non-Core Activities


♦ Support District’s education and outreach program by providing tours of
the recharge system.
♦ Providing data and information to outside agencies and organizations.
♦ Support selected research and development efforts aimed at improving
recharge efficiency and capacity.

IV Group Goals for FY 2018-19


♦ Develop strategies for the capture of local inflow with Prado storage levels at
498 ftand 505 ft.
♦ Continued implementation of replacing aging infrastructure and
instrumentation.
♦ Continue heavy equipment replacement program to maintain compliance with
CARB regulatory schedule.
♦ Support the City of Anaheim / OCWD joint efforts to build public access trails
at 5-Coves (extension of Anaheim CoveUpgrade security infrastructure at
Field Headquarters and the Santiago Basin complex.
♦ Coordinate with engineering staff to establish district standards for installation
and replacement of directly buried vales and actuators.
♦ Replace directly buried 48” valves and actuators at Anaheim Lake / Atwood
Channel.

Orange County Water District 3-121 FY 2018-19 Work Plan


Recharge Operations

♦ Coordinate with the County of Orange to add video surveillance at the County
corporation Yard for the SAR at Ball Road to Orangewood Avenue reach.
♦ Upgrade communications at Anaheim Lake to fiber optic network.
♦ Manage vegetation in a manner that accommodates both the seasonal
habitat needs of nesting birds and the use of the land for groundwater
recharge.
♦ Installation of transfer piping between Warner and Conrock Basins.
♦ Installation of conveyance piping, control structures, and instrumentation at
Huckleberry / Conrock Basin.
♦ Installation of weir and replacement of catwalks / gates at Five Coves.
♦ Landscape Anaheim Lake frontage along Miraloma Avenue.

V Pending Activities
♦ Implementation of infrastructure repair and replacement projects.

VI Staff Addition Needed for FY 2018-19


None

VII Future Issues


♦ Continued replacement of heavy equipment to maintain compliance with
CARB diesel emissions regulations. The cost of equipment upgrade and
replacements is substantial. R&R fund reserves have therefore been
identified and set aside to accommodate this long term compliance
program. All Tier 0 and Tier 1 engines to be replaced by 2023.
♦ Re-locate direct buried valves to underground vaults. Existing buried
valves and actuators are 20+ years old and are beginning to fail.
♦ Install inflatable dam in Raymond Basin which will allow remote operation
and use of basin during rain events.
♦ Designate Warner Basin as a primary SAR storage basin to gain an
additional 2,500 af storage capacity.
♦ Continue upgrades of flow and water level instrumentation.
♦ Remove islands and peninsulas in Anaheim Lake to increase storage
capacity. Add sand and re-grade basin bottom for improved recharge.
♦ Relocate 48” magnetic flowmeter at Kraemer Basin. Current installation is
30 feet above basin low point.
♦ Installation of transfer pipe with valve between golf concession and Burris
Basin to prevent golf lagoon de-watering at low water levels in Burris.

Orange County Water District 3-122 FY 2018-19 Work Plan


Section 4
Debt Service Fund
SECTION 4
DEBT SERVICE

DEBT SERVICE
The District often uses debt to fund capital projects approved by the Board. The
purpose of the Debt Service is to budget and set aside monies necessary to
make principal and interest payments on the District’s debt.

Total gross debt service payments and administration costs are budgeted at
$36,901,837 for FY 2018-19 as shown on Table 1. This amount also reflects
estimated revenues and payments related to the District’s swap transactions.
The components of the budgeted debt service payments are as follows:
 $8.14 million for fixed rate debt.
 $8.50 million for variable rate debt & commercial paper.
 $1.27 million net swap payment.
 $18.03 million for low interest State Loans.
 $0.96 million for debt administration.
In November 2002, the Board approved a comprehensive long-term debt
program with a number of goals including:
 To provide funding for the GWR System and other capital projects.
 To provide the lowest cost of funds.
 Take advantage of low interest rates and the District’s variable rate
debt capacity.
 Provide the lowest predictable RA.
In FY 2007-08 the Board adopted an updated Plan of Finance, which provided
for repaying some of the District’s highest cost fixed rate debt using low interest
state loan reimbursement monies and for execution of two interest rate swap
transactions. The overall impact on the District’s debt structure was to lower the
District’s overall cost of debt outstanding; reduce the District’s variable rate
exposure using an interest rate swap; and reduce the duration of the existing
debt outstanding by approximately two years.

Orange County Water District 4-1 FY 2018-19 Budget Report


SECTION 4
DEBT SERVICE

The District’s policy of using long-term debt to fund capital projects was
established in October 2000 and calls for the following:
 Preliminary project expenses related to direct research are to be paid
from the General Fund and cannot be financed with long-term debt.
 Project expenses for such items as feasibility reports, pilot studies,
engineers reports, compliance with CEQA and project design and
construction may be capitalized and funded with long-term debt.
 Project expenses that are capitalized and funded with long-term debt
and which do not lead to construction of a project will require an
adjustment by the Accounting Department to pay off the long-term debt
incurred using cash reserves.

Orange County Water District 4-2 FY 2018-19 Budget Report


Section 4
Debt Service

TABLE 1
DEBT SERVICE BUDGET
FY 2018-19

Debt Outstanding
Principal Interest Administration Debt Balance as
Payments Payments Cost Total of June 30, 2019

Certificates of Participation/Refunding Revenue Bonds


2017A &B Refunding Revenue Bond Fixed Rate $ 600,000 $ 4,906,915 $ - $ 5,506,915 $ 113,780,000
2013A Refunding Revenue Bond Fixed Rate - 2,635,000 - 2,635,000 53,000,000
2003A COP Variable Rate - 3,569,913 (1) - 3,569,913 129,815,000
Subtotal $ 600,000 $ 11,111,828 $ - $ 11,711,828 $ 296,595,000

SWAPS - $82.55 Million


OCWD Payments - fixed at 3.314% $ 2,735,707 $ - $ 2,735,707
OCWD Revenues - .56 LIBOR plus .23% - Estimates (1,461,135) (2) - (1,461,135)

State Loans
GWR System C-06-4462-110 $ 427,006 $ 54,076 $ - $ 481,082 $ 2,267,086
GWR System C-06-4462-120 176,008 29,753 - 205,761 1,333,143
GWR System C-06-4462-130 156,137 25,576 - 181,713 1,179,931
GWR System C-06-4462-140 240,360 39,161 - 279,521 1,815,703
GWR System C-06-4462-150 5,720,777 1,119,296 - 6,840,073 56,358,910
GWR System C-06-4462-160 189,057 30,723 - 219,780 1,427,895
GWR System C-06-4463-110 5,947,445 3,492,792 - 9,440,237 128,390,727
Fletcher Basin C-06-7867-110 125,185 50,481 - 175,666 2,531,716
La Palma Basin C-06-8101-110 151,945 50,826 - 202,771 5,046,238
Alamitos Barrier Improvement C-06-7868-110 - - 10,623,910
Subtotal $ 13,133,920 $ 4,892,684 $ - $ 18,026,604 $ 210,975,259

Commercial Paper $ 4,000,000 $ 926,833 (3) $ - $ 4,926,833 $ 52,813,000

Debt Administration $ 962,000 $ 962,000

TOTAL EXPENDITURES $ 17,733,920 $ 18,205,917 $ 962,000 $ 36,901,837 $ 560,383,259

(1) Assumes 2.75% interest rate.


(2) Assumes LIBOR equal to variable rate of 2.75%.
(3) Assumes 2.0% interest rate for taxable and 1.5% for tax-exempt.

Orange County Water District 4-3 FY 2018-19 Budget Report


Section 4
Debt Service

Debt Administration Fees


FY 2018-19
Fee Annual Amount

1 Letter of Credit Commercial Paper Fee


with Sumitomo Mitsui Banking Corp. $76.300 M x 0.29% $221,300

Citigroup Quarterly 2003A Remarketing


2
Fee $129.8 M x 0.075% $97,400

3 2003A CitiBank N.A. Letter of Credit $131.9 M x 0.33% $435,300

4 Annual Rating Agency Fees: Fitch,


Moody's and Standard & Poor's $57,000

Bond Counsel/Financial
5
Advisor/Arbitrage Service $39,000

US Bank Trust Commercial Paper Draw


Fees and Quarterly Certificate
6
Fees/Citigroup Commercial Paper
Remarketing Fees $60,000

Union Bank of California Quarterly COP


7
Trust Fees $52,000

Total $962,000

Orange County Water District 4-4 FY 2018-19 Budget Report


Section 5
Other Post Employment
Benefits
SECTION 5
OTHER POST EMPLOYMENT BENEFITS

OTHER POST EMPLOYMENT BENEFITS


The Government Accounting Standards Board Statement No. 74, Financial
Reporting for Postemployment Benefit Plans Other Than Pension Plans, and
GASB 75 - Accounting and Financial Reporting for Postemployment Benefits
Other Than Pensions, establishes new accounting and financial reporting
requirements for OPEB plans costs and obligations related to retiree healthcare
benefits (Other Post Employment Benefits – OPEB). The statements generally
require employers to account for and report the annual cost and outstanding
obligations and commitments for these benefits. The GASB standards require
that the long-term cost of retiree health care be determined and accrued on an
actuarial basis. The results of the valuations must be disclosed on the District’s
financial statements.
A new actuarial study will be c ommissioned to replace the existing liability
determination, however the budget estimate below is based on t he biennial
actuarial study conducted for the District in 2015 to determine the annual
required contribution to provide the retiree medical benefit. The Board has
directed funding this liability to our PARS trust per the actuarial study.

Annual OPEB Cost for the budget year 2018-19 $1,303,931

The District’s actual cost to pay medical premiums for retired employees will be
paid out of the PARS trust. This annual cost is estimated at $600,000.

Orange County Water District 5-1 FY 2018-19 Budget Report


Section 6
Water Purchase
SECTION 6
WATER PURCHASE

WATER PURCHASE
The proposed FY 2018-19 water budget is $61.6 million and it calls for the purchase of
65,000 acre-feet of Metropolitan Water District (MWD) untreated full service water to
help support the recommended 75% Basin Production Percentage (BPP). The
volumetric unit cost of MWD untreated water is $695/acre-foot in 2018 and $731/acre-
foot in 2019. Additionally, the District would pay for 13,000 acre-feet of in-lieu water that
was received in FY 2017-18 under the MWD Cyclic Program.

This budget will result in a planned 6,000 to 30,000 acre-feet reduction in the
accumulated overdraft depending upon the assumptions for basin recharge.

By purchasing untreated MWD water, recharging it into the groundwater basin, and
increasing the BPP, the Groundwater Producers avoid paying for treated MWD full
service water which currently cost $1,015/acre-foot. The MWD treatment surcharge is
currently $320/acre-foot. The Producers do incur about a $97/acre-foot variable energy
and O&M cost to pump this water out of the ground. However, there is an overall
$223/acre-foot savings ($1,015 - $695 - $97) to the service territory.

The groundwater basin accumulated overdraft is projected to be in the area of


approximately 287,000 acre-feet on June 30, 2018. The overdraft is 162,000 acre-feet
from the District’s target accumulated overdraft of 125,000 acre-feet. The general
maximum desired balance in the water reserve fund is to have sufficient funding
available to be able to purchase 50% of the water needed from MWD to refill the
groundwater basin to the 125,000 acre-foot target. This amounts to 81,000 acre-feet
(162,000 acre-feet x 50%) which is estimated to cost $64.2 million using the MWD
untreated full service rate.

Estimated June 30, 2018 Accumulated Overdraft 287,000 af

OCWD Target Accumulated Overdraft Range (100,000 to 150,000 af) 125,000 af

Difference 162,000 af

50% of Difference 81,000 af

2018-19 Average MWD untreated full service rate including $80/af for $793/af
RTS and Capacity Charge (713+80)

Necessary water fund balance to purchase 81,000 af of water $64.2 million


($793/af x 81,000 af)

Estimated June 30, 2018 Water Reserve Fund Balance $0 Million

Orange County Water District 6-1 FY 2018-19 Budget Report


SECTION 6
WATER PURCHASE

The accompanying table provides a detailed summary of the Water Purchase Budget
for FY 2018-19. MWD’s rates will generally increase on January 1, 2019 by 3%. For
budgeting purposes the cost per acre-foot for MWD water is an average of the existing
and expected 2019 rates. The specific water purchase items in the table include:
1. The District anticipates purchasing approximately 2,000 acre-feet of water
from the City of Long Beach for injection into the Alamitos Barrier. The cost
of this water is $5/acre-foot above the cost of MWD Tier I water plus the
Readiness-To-Serve and Capacity Charge paid by the City of Long Beach to
MWD. The total cost for this water is $1,148/af.
2. In FY 2017-18 the District plans on receiving approximately 73,000 acre-feet
of MWD in-lieu water as part of the Cyclic Storage Agreement approved in
July 2017. The District funded 60,000 acre-feet ($40 million) of this purchase
using the Commercial Paper Program. The District is currently paying $4
million annually towards its Commercial Paper program to pay for the cost of
purchasing the land for the recently constructed La Palma recharge basin.
The remaining Commercial Paper balance was $13 million in FY 2017-18
but will be increased by an additional $40 million.
The remaining 13,000 acre-feet of in-lieu water received in FY 2017-18 will
be paid for in FY2018-19 at the current MWD rate.
3. The District has budgeted to purchase 65,000 acre-feet of untreated full
service non-interruptible MWD water for recharge at the District’s field
headquarters in the City of Anaheim. Purchasing this water helps support
the Basin Production Percentage.
4. MWDOC Groundwater Charge – MWDOC charges the District a fee to fund
their staff time and other expenses incurred to support OCWD’s programs
and purchases of imported water. The expected fee is $499,002.
5. The District incurs a Capacity Charge fee on any purchase of MWD non-
interruptible water supplies (i.e., OC-44 connection supplies or untreated
non-interruptible water). The Capacity Charge is administered by MWDOC
and is now billed monthly to the District as a flat fee. The Capacity Charge
for FY 2018-19 will be approximately $900,000.
6. The District also incurs a Readiness-To-Serve charge on any purchase of
MWD treated non-interruptible water supplies (i.e., OC-44 connection
supplies or untreated non-interruptible water). The fee is expected to be
approximately $2,500,000 in FY 2018-19.
The total Water Purchase budget expense for FY 2018-19 is $61.6 million. Any water
budget money not spent will remain in the water fund for future water purchases.

Orange County Water District 6-2 FY 2018-19 Budget Report


Section 6
Water Purchase
Fiscal Year 2018-19 Budget for Water Purchase
(July 1, 2018 to June 30, 2019)

2018-19 MWDOC
Volume Unit Cost Surcharge Total Cost
Item # (AF) $/af (1) $/af Amount

1 Alamitos Barrier Injection water from Long Beach Water Dept (2) 2,000 1,147.50 n/a $2,295,000

2 Payment for FY2017-18 - 13,000 af of In-Lieu Water Deliveries 13,000 695.00 n/a $9,035,000

3 (3)
Untreated Non-interruptible MWD water 65,000 713.00 n/a $46,345,000
Sub-total 80,000 $57,675,000

4 MWDOC Groundwater Charge $499,002


5
MWD/MWDOC Capacity Charge (4) $900,000

6 Readiness-to-serve charge is based upon an 4-year average of previous OC-44


connection supplies (5) $2,500,000
Total 80,000 $61,574,002

NOTES
(1) Average of 2018 and 2019 rates
(2) Treated Non-interruptible rate to increase from $1,015/af to $1,050/af: Average is $1,032.5/af
Unit cost includes $5/af City of Long Beach fee plus $110/af RTS and Capacity Charge paid by Long Beach to MWD
(3) Untreated non-interruptible rate to increase from $695/af to $731/af: Average is $713/af
(4) MWD/MWDOC Capacity Charge is billed monthly by MWDOC as a flat fee
(5) Readiness-to-serve (RTS) charge is calculated and provided by MWDOC

Orange County Water District 6-3 FY 2018-19 Budget Report


Section 6
Water Purchase
Fiscal Year 2018-19 Budget for Water Purchase
(July 1, 2018 to June 30, 2019)

2018-19 MWDOC
Volume Unit Cost Surcharge Total Cost
Item # (AF) $/af (1) $/af Amount

1 Alamitos Barrier Injection water from Long Beach Water Dept (2) 2,000 1,147.50 n/a $2,295,000

2 Payment for FY2017-18 - 13,000 af of In-Lieu Water Deliveries 13,000 695.00 n/a $9,035,000

3 (3)
Untreated Non-interruptible MWD water 65,000 713.00 n/a $46,345,000
Sub-total 80,000 $57,675,000

4 MWDOC Groundwater Charge $499,002


5
MWD/MWDOC Capacity Charge (4) $900,000

6 Readiness-to-serve charge is based upon an 4-year average of previous OC-44


connection supplies (5) $2,500,000
Total 80,000 $61,574,002

NOTES
(1) Average of 2018 and 2019 rates
(2) Treated Non-interruptible rate to increase from $1,015/af to $1,050/af: Average is $1,032.5/af
Unit cost includes $5/af City of Long Beach fee plus $110/af RTS and Capacity Charge paid by Long Beach to MWD
(3) Untreated non-interruptible rate to increase from $695/af to $731/af: Average is $713/af
(4) MWD/MWDOC Capacity Charge is billed monthly by MWDOC as a flat fee
(5) Readiness-to-serve (RTS) charge is calculated and provided by MWDOC

Orange County Water District 6-3 FY 2018-19 Budget Report


Section 7
Basin Equity Assessment
SECTION 7
BASIN EQUITY ASSESSMENT

BASIN EQUITY ASSESSMENT (BEA) BUDGET


The objective of the BEA program, as authorized by Section 31.5 of the Orange
County Water District Act, is to make possible more effective management of the
groundwater basin and to equalize water costs within the District.

BEA collections for FY 2018-19 are estimated at $1,750,000, which applies to


pumping in excess of the basin production percentage (BPP). The District sets
the BEA based upon the price of Metropolitan Water District’s water.

BEA revenue is used to offset the cost of MWD water purchases. Predicting BEA
revenue is difficult as it is determined by: (1) groundwater producers who decide
to pump above the BPP; (2) groundwater producers participating in water quality
projects that receive partial BEA exemptions for pumping above the BPP; and (3)
smaller private party pumping.

BEA revenues expected for pumping above the BPP $1,750,000

Orange County Water District 7-1 FY 2017-18 Budget Report


Section 8
Capital Improvement Program
Debt and PAYGO Funded Projects
Section 8
Capital Improvement Program

CAPITAL IMPROVEMENT PROGRAM

The fiscal year (FY) 2018-19 Capital Improvement Program (CIP) is provided on the
following pages. The CIP projects are funded by debt proceeds, grants, litigation
settlements, state loans and $4 million from operating revenues. The assets created by
the CIP projects typically have a useful life of between three to seventy years.

The total proposed CIP cost for the FY 2018-19 budget is $47.1 million and it includes
11 projects. The life span of various CIP projects varies from project to project and it
can be three years or longer. The District will fund $4 million of the $47.1 million dollar
CIP budget from the operating revenues. This District practice is very useful in keeping
the debt service cost to the minimum and maintaining debt service coverage targets.

The CIP is primarily driven by the following objectives: (1) increasing the District’s
recharge capacity to allow for increased sustainable production out of the groundwater
basin; (2) protecting water quality by removing contaminated groundwater from the
basin and providing additional wetlands treatment for Santa Ana River flows; and
(3) protecting the coastal portion of the groundwater basin.

Budgeting of project expenditures does not authorize staff to proceed with a project.
Each budgeted project must be individually reviewed and formally approved by the
Board via the preparation of an Engineer’s Report. In addition, the Board would need to
approve the design and the construction contracts as/if the project progresses forward.

The expenditures for each project are shown in the fiscal year they are anticipated to
occur in. The District has many multi-year projects that require several years to process
and construct. Table 8-1 provides a broad summary of the projects in the CIP. A brief
description and status of each project are provided on the attached Capital Projects
Information sheet.

TABLE 8-1
SUMMARY OF PROJECTS IN CAPITAL IMPROVEMENT PROGRAM
PROJECT TYPE OBJECTIVE
PROVIDE FOR INCREASED GROUNDWATER PRODUCTION AND CREATE
WATER SUPPLY
SUPPLIES WHERE ECONOMICAL AS COMPARED WITH MWD RATES.
Construct facilities to increase recharge capacity and
percolation rates to allow for increased groundwater pumping
Improve existing facilities to increase percolation rates
Create new water supply
WATER QUALITY PROTECT THE QUALITY OF THE GROUNDWATER BASIN SUPPLIES.
Protect groundwater in north basin by extracting and treating
wells threatened by VOC contamination in Anaheim and
Fullerton
Protect groundwater in south basin by extracting and treating
wells threatened by VOC contamination in Santa Ana

Orange County Water District 8-1 FY 2018-19 Budget Report


Section 8
Capital Improvement Program

PROJECT TYPE OBJECTIVE


COASTAL MITIGATE FOR EXISTING AND PROJECTED FUTURE PROBLEMS ALONG
IMPROVEMENTS THE COAST.
Construct barrier facilities to prevent seawater intrusion

The cost information for multi-year debt and operating revenue funded projects is
summarized in Table 8-2.

The OCWD staff works closely with the Board of Directors in processing capital
projects. Formal Board approval is required at various stages of a project’s life as
shown below:
1. Inclusion in OCWD annual budget.
2. Issuance of Request for Proposals for hiring of consultants for fees greater
than $20,000 to assist in processing project documents.
3. Awarding consultant contracts greater than $20,000.
4. Approval of Feasibility Study Report, if so directed by General Manager.
5. Approval of necessary CEQA documents.
6. Approval of project Engineer’s Report.
7. Approval of any agreements (i.e. grant funding, interagency).
8. Approval of advertising construction contracts.
9. Award of construction contracts.
10. Approval of change orders greater than 5% of construction budget.
11. Approval of Notice of Completion.
The District primarily uses long-term debt to fund capital projects. The District policy for
using long-term debt was established in October 2000. The policy calls for the following:
 Preliminary project expenses related to direct research are to be paid from
the General Fund.
 Project expenses for such items as feasibility reports, pilot studies, engineer’s
reports, compliance with CEQA, and project design and construction may be
capitalized and funded with long-term debt.
 Project expenses that are capitalized and funded with long-term debt and to
which do not lead to construction of a project will require an adjustment by the
Accounting Department to pay off the long-term debt incurred using cash
reserves.

Orange County Water District 8-2 FY 2018-19 Budget Report


Section 8
TABLE 8-2 Capital Improvement Program Summary
FISCAL YEAR 2018-19
CAPITAL IMPROVEMENT PROGRAM SUMMARY
JDE
Salaries &
PROJECT Fiscal Year Salaries Benefits Pre-design Design Construction Total
Benefits
ID NO.
ACCOUNT NO: COST CODE 02000 03000 40010
2018-19 300,883 100,180 401,063 460,750 12,484,721 33,742,468 47,089,002
2019-20 0 0 0 250,000 0 70,900,000 71,150,000
Grand Total 2020-21 0 0 0 0 300,000 91,800,000 92,100,000
2021-22 0 0 0 0 0 74,000,000 74,000,000
2022-23 0 0 0 0 0 0 0
JDE
PROJECT Project Name Project Description Project Details Dept.
ID NO.

2018-19 167,171 54,346 221,517 12,000,000 9,000,000 21,221,517


Construction includes the addition of
2019-20 - 68,000,000 68,000,000 infrastructure, equipment, pumps, and
Expansion of the GWRS Facility from 100
GWRS Final Expansion pipelines to expand the GWRS facility and
MGD to the production of 130 MGD
GWRSFE 2020-21 - 91,800,000 91,800,000 the infrastructure required on OCSD Plant 1050
GWRS recycled water including OCSD
No. 2 property to convey and segregate the
Plant No. 2 Conveyance Facilities
2021-22 - 72,000,000 72,000,000 additional secondary effluent required for
GWRS Final Expansion.
2022-23 - -
Estimated Total Capital Cost: $253M 5-Year Project Total 253,021,517

2018-19 - 110,750 344,721 1,072,468 1,527,939

Consolidate bullet lead contaminated soil 2019-20 - - Hire consultants to oversee the work and
Prado Shooting Range Bullet Lead from inactive areas into the sporting clay prepare the needed environmental
Interim Remediation Actions shooting range areas for remediation at a
C18001 2020-21 - - documentation. Construction will bid out as 1069
later date following the closure of the
public works construction and-or self
active shooting range. Restore disturbed
2021-22 - - performed by operations staff.
areas and hydroseed with native plants.

2022-23 - -
Estimated Total Capital Cost: $1.5M 5-Year Project Total 1,527,939

2018-19 65,742 20,776 86,518 100,000 21,000,000 21,186,518


Construction of four injection wells in Santa
Ana's Centennial Park with supply and
Drilling and equipping four injection wells 2019-20 - 1,000,000 1,000,000 backflush pipelines. The wells will have
at Santa Ana's Centennial Park. Supply
Mid Basin Injection: Centennial Park and backflush pipelines are required. The dedicated pumps for backflush. The project
C14004 2020-21 - - includes construction of two shared 1070
Park is located across the Santa Ana
structures and paving for joint use by the
River from the Mid-Basin Injection
Demonstration Project. 2021-22 - - District and City. Two monitoring wells will
be constructed down gradient within SAUSD
property.
2022-23 - -
Estimated Total Capital Cost: $33M 5-Year Project Total 22,186,518

2018-19 39,761 15,077 54,838 500,000 554,838

2019-20 - -
Alamitos Barrier Improvement
Project Installation of wellhead equipment for 17 Construct 17 injection wells and 4 monitoring
C12003 2020-21 - - 1070
injection wells in the Alamitos Barrier wells; 8% to be paid by LACDPW.

2021-22 - -

2022-23 - -
Estimated Total Capital Cost: $3.8M 5-Year Project Total 554,838

Orange County Water District 8-3 FY 2018-19 Budget Report


Section 8
TABLE 8-2 Capital Improvement Program Summary
FISCAL YEAR 2018-19
CAPITAL IMPROVEMENT PROGRAM SUMMARY
JDE
Salaries &
PROJECT Fiscal Year Salaries Benefits Pre-design Design Construction Total
Benefits
ID NO.
ACCOUNT NO: COST CODE 02000 03000 40010

2018-19 - 200,000 200,000

2019-20 - - Construction of extraction wells to reduce


Construction of extraction wells to stop aquifer outflow to Los Angeles County. The
West Orange County Wellfield groundwater outflow to LA County and a wells would connect to a pipeline and
C18002 2020-21 - - 1070
pipeline to convey groundwater to local connect to the West Orange County Water
Producers Board feeder OC-35 in the western portion of
2021-22 - - the basin for Producer use.

2022-23 - -
Estimated Total Capital Cost: $60M 5-Year Project Total 200,000

2018-19 - 150,000 150,000

2019-20 - 250,000 250,000 Construction will include a cut-out to Burris


Basin to allow GWRS water to flow into
Burris Basin Outlet and Tracer Study Construction of a large diameter outlet on Burris and subsequently flow to the
C18003 2020-21 - 300,000 300,000 1070
the GWRS pipeline into Burris Basin Riverview, Fletcher, and Santiago Basins as
well as Santiago Creek. A tracer study will be
2021-22 - 2,000,000 2,000,000 performed to verify GWRS water travel time.

2022-23 - -
Estimated Total Capital Cost: $2.7M 5-Year Project Total 2,700,000

2018-19 - 100,000 100,000

2019-20 - -
Irrigation Pipeline Connection to Construction of an irrigation pipeline
Construction of an irrigation pipeline to connecting to YLWD Well 21 for irrigation
C18004 Yorba Linda Water District Well 21 2020-21 - - 1070
serve Warner Basin landscape around Warner Basin and installation of a
water truck J-stand.
2021-22 - -

2022-23 - -
Estimated Total Capital Cost: $0.1M 5-Year Project Total 100,000

2018-19 - 40,000 40,000


Construction of a large diameter transfer
2019-20 - 1,000,000 1,000,000 tube with a flow meter will allow Conrock and

Conrock-Warner Transfer Tube Warner Basins to fill and drain quickly and
Construction of large diameter transfer
C15003 2020-21 - - evenly. Additionally, headwalls and outlet 1070
tube between Conrock and Warner Basin
structures for the small diameter lower drain
2021-22 - - tubes will be constructed with new valves
and electric actuators.
2022-23 - -
Estimated Total Capital Cost: $1.1M 5-Year Project Total 1,040,000

2018-19 28,209 9,981 38,190 1,000,000 1,038,190

2019-20 - -
North Basin RI Monitoring Wells Conduct remedial investigation/feasibility Construct 8 additional monitoring wells at 5
C16007 (Prop 1 Funding 50%) study to evaluate remedial options for 2020-21 - - locations in support of the remedial 1075
VOC plume; approved by Board in 2016. investigation.
2021-22 - -

2022-23 - -
Estimated Total Capital Cost: $2M 5-Year Project Total 1,038,190

Orange County Water District 8-4 FY 2018-19 Budget Report


Section 8
TABLE 8-2 Capital Improvement Program Summary
FISCAL YEAR 2018-19
CAPITAL IMPROVEMENT PROGRAM SUMMARY
JDE
Salaries &
PROJECT Fiscal Year Salaries Benefits Pre-design Design Construction Total
Benefits
ID NO.
ACCOUNT NO: COST CODE 02000 03000 40010

2018-19 - 1,000,000 1,000,000

2019-20 - 900,000 900,000


Sunset Gap Seawater Intrusion Construct 11 monitoring wells at 5 locations
Investigate potential source and
Monitoring Wells to evaluate intrusion proximity to
C18005 downgradient extent of seawater intrusion 2020-21 - - 1075
downgradient production wells; work
in the city of Huntington Beach.
expected to continue into FY19-20.
2021-22 - -

2022-23 - -
Estimated Total Capital Cost: $1.9M 5-Year Project Total 1,900,000

2018-19 - 70,000 70,000

2019-20 - -
Santa Ana River Infiltration System Investigate soils and groundwater depth to
Shallow Piezometers evaluate feasibility of potential infiltration Drill 8 exploratory boreholes and install
C18006 2020-21 - - 1075
gallery beneath Santa Ana River above shallow piezometers.
Imperial Highway.
2021-22 - -

2022-23 - -
Estimated Total Capital Cost: $70,000 5-Year Project Total 70,000

Orange County Water District 8-5 FY 2018-19 Budget Report


Section 9
New Equipment
(Fixed Assets) Summary
New Equipment Budget Funded by Operating Revenues
Section 9
New Equipment Summary

EQUIPMENT (FIXED ASSETS) SUMMARY

This section describes the equipment items proposed for FY 2018-19.


There are 13 equipment items listed in Table 9-1. These items will be funded
using operating revenues.
There is one road vehicle included in the equipment list (Table 9-1). It is a
replacement vehicle. This vehicle complies with the Vehicle Replacement Policy
established by the District in May 2006.

Orange County Water District 9-1 FY 2018-19 Budget Report


Section 9
New Equipment Summary

TABLE 9-1
FY 2018-19 PROPOSED EQUIPMENT BUDGET
FUNDED BY OPERATING REVENUES
Budget
Item Name Item Description Department Amount
Public Affairs (1012)
1 Tour Cart Need a new tour cart to replace the old one and to accommodate more people. Public Affairs (1012) 20,000
2 Outdoor Monitor for RO Tour Route Outdoor monitor for RO tour route Public Affairs (1012) 6,000
E18.17110.1012 Total Public Affairs (1012) 26,000

Laboratory (1038)
3 AS-AP Autosampler for ICS 3000 Autosampler with auto diluter for Ion Chromatography 3000 for inorganic DBP Laboratory (1038) 30,000
4 Autosamplers for TOC (2) 2 autosamplers for GE-Sievers Total Organic Analyzer Laboratory (1038) 22,000
5 Turbo Vap Concentrators (2) 2 new Turbo Vap Concentrators to replace 10+ year old concentrators Laboratory (1038) 22,000
6 Scientific Refrigerator Need to replace a 20+ year old unit Laboratory (1038) 9,000
E18.17110.1038 Total Laboratory (1038) 83,000

Research & Development (1040)


Turner Designs "Cyclops" C3 submersible fluorometer, for real-time online measurement of
organic fluorescence. To be used for R&D study on RO pilot to evaluate Peak C fluorescence
region to establish log removal credits for regulatory compliance purposes. Two units are needed,
7 C3 Submersible Fluorometers (2) one for RO feed and one for permeate. Research & Development (1040) 13,000
Heavier-duty style golf cart to allow transport of several sample coolers and other equipment
8 Electric Maintenance Cart around the AWPF site to support R&D projects. Research & Development (1040) 10,000
E18.17110.1040 Total Research & Development (1040) 23,000

Water Production (1050)


Replacement truck for existing T-112 Ford Ranger truck for I&E travel to FHQ from Fountain Valley
9 T-112 Truck for I&E (2001) Water Production (1050) 40,000
10 Portable Tank Area Lightings (2) Two 300 watt 30k lumens intrinsically safe LED work area lights mounted on carts Water Production (1050) 12,000
11 Power Breezer Fans (2) Two high volume cooling fans and ducting kits Water Production (1050) 10,000
E18.17110.1050 Total Water Production (1050) 62,000

Recharge Operations (1060)


12 Flow Tracker Portable flow measuring instrument for making streamflow measurements in the field Recharge Operations (1060) 13,500
E18.17110.1060 Total Recharge Operations (1060) 13,500

Wetland Operations (1062)


13 20 ft.- Two Row Disk Harrow Ploughing disc for managing vegetation at Prado Wetland Operations (1062) 65,000
E18.17110.1062 Total Wetland Operations (1062) 65,000

Grand Total for Equipment Funded by Operating Revenues $ 272,500

Orange County Water District 9-2 FY 2018-19 Budget Report


Section 10
Replacement and
Refurbishment Fund
Section 10
Replacement and Refurbishment Fund

REPLACEMENT AND REFURBISHMENT BUDGET

The District has over $1.1 billion in assets, excluding construction in progress, that will
need to be replaced or refurbished at some point in the future. To prevent additional
pressure on the Replenishment Assessment, a replacement and refurbishment model
was developed in 1998, which included all District assets and used engineer’s estimates
for the useful life of each asset. This model is capable of forecasting future costs and
required revenue streams and is updated annually.

The Replacement and Refurbishment (R&R) fund was originally funded in FY 1998-99
with $15 million from the District Replacement Reserves and $20 million from the
Orange County bankruptcy proceeds.

In 2004 the R&R program was downsized to only include infrastructure type assets.
The amount of money annually transferred into the R&R program was reduced from
$4.5 million annually to $2.8 million. The annual transfer amount has been growing by
7% to provide sufficient funds to meet future expected R&R expenses. The fiscal year
2018-19 contribution is planned to be $16.7 million.

An update to the R&R Model was made in 2007 and the changes included:

1. All infrastructure replacement cost have been updated.


2. The R&R Fund balance was set at the current amount of $56.6 million with an
expected interest earnings rate of 5% over the next 30 years.
3. The inflation rate was increased from 3% to 3.5% to reflect recent increases in
construction material.
4. The cost of repairing and refurbishing the Talbert barrier injection wells has been
moved out of the R&R program and into the District’s general fund.
5. The cost of major lab equipment costing greater than $100,000 has been moved
into the R&R program.
Another update to the Model was conducted in 2011 and the changes include the
following:

1. Eliminated the replacement of the Green Acres Project’s conventional filtration


technology as it will be replaced by an expansion of the microfiltration treatment
of GWRS.
2. The Basin Cleaning Vehicles (BCV) was removed from the R&R Model as the
BCV Program was discontinued.
3. Pump stations electrical and pumps were separated from buildings as they were
previously treated as a single unit in the R&R Model.
4. Transferred $10 million in reserves from the R&R Fund to the Operating Fund.
Actual expenditures from the fund vary significantly each year depending upon which
District assets have reached the end of their useful life and need to be replaced or

Orange County Water District 10-1 FY 2018-19 Budget Report


Section 10
Replacement and Refurbishment Fund

which assets can have their lives extended by refurbishing them. In FY 2018-19, the
proposed R&R expenses include these five major items.
 GWRS Pipeline Lining ($8,000,000)
 Upper and Lower Five Coves Rehabilitation Project ($3,021,759).
 Talbert Barrier Pipeline Improvements ($2,525,602).
 Santiago Intertie ($2,500,000)
 Sunset Gap Monitoring Well Replacement (BS13) ($912,427)
The actual proposed expenditures for FY 2018-19 are $22.6 million.

Orange County Water District 10-2 FY 2018-19 Budget Report


Section 10
Replace and Refurbishment Fund

Table 10-1
FISCAL YEAR 2018-19
PROPOSED REPLACEMENT & REFURBISHMENT FUND REQUESTS
Asset
Project Salaries Total Project Refurbishment Age
# ID Item Description Department & Benefits Project Cost Cost Asset Class or Replacement (yr)
Laboratory (1038)
Inductively Coupled Plasma / Mass Spectroscopy (ICP-MS); will Lab Equipment >
1 R18001 ICP-MS receive trade-in-credit of $30,000. Laboratory (1038) 180,000 180,000 $100,000 Replacement 9
Total Laboratory (1038) $ - $ 180,000 $ 180,000

Research & Development (1040)


Replace door of main FRL trailer (Custom Modular Services Corp
(CMSC)), including: Remove existing doors and install hollow core
steel doors with jamb, paint new doors, provide and install new
locking (solenoid) mechanism, install 4’X8’ aluminum awning
above double door. Also, in main FRL trailer restroom: replace 12’
Replace Doors of Main FRL Trailer and Make of white VWL (laminate sheets) and paint, re-secure sink.counter, Refurbishment or
2 R18002 Necessary Repairs in Trailer Restroom. install corner cap and paint. Research & Development (1040) 9,065 9,065 Buildings Replacement 18
Total Research & Develop. (1040) $ - $ 9,065 $ 9,065

Water Production (1050)


These funds are to refurbish or replace GWRS, GAP, and Pipe/Pipeline, Pumps,
Refurbish or Replace Mechanical, Electrical Fountain Valley building mechanical, electrical, and structural Wells, Buildings, RO, Refurbishment or
3 R18003 and Structural Items. items that unexpectedly fail. Water Production (1050) 400,000 400,000 MF units Replacement Varying
The RO CIP system requires a replacement of key PVC schedule
80 piping at the skid pump system. The piping has experienced
several stress crack failures due to thermal expansion and water
hammer. Replacement with steel piping is complex and a majority
RO Clean In Place System Piping of the assembly fabrication requires use of an offsite piping repair
4 R17011 Replacement shop. Water Production (1050) 300,000 300,000 Pipe/Pipeline Replacement 11
Painting of various equipment piping and structures from original
5 R18004 Painting GWRS Process Areas GWRS Process installation to maintain appearance Water Production (1050) 200,000 200,000 Buildings Refurbishment 11
6 R18005 Administration Building Carpet Replacement Replace 28 year old carpet in the administration building. Water Production (1050) 200,000 200,000 Buildings Replacement 28
Green Acres and GWRS Distribution These funds allow for the refurbishment of Green Acres or GWRS
7 R18006 Emergency Pipeline Repairs distribution pipeline assets that unexpectedly fail. Water Production (1050) 150,000 150,000 Pipe/Pipeline Refurbishment Varying
MF structures and awnings are showing signs of corrosion and
8 R18007 Paint Structures and Awnings need to be prepared and painted. Water Production (1050) 85,000 85,000 Buildings Refurbishment 11
Coating on the outside of the product and barrier water surge
9 R18008 Surge Tank External Painting tanks is rusting. Water Production (1050) 75,000 75,000 Other Refurbishment 11
Replacement for Cell E01 pump original IMF pump moved to
10 R18009 MF Filtrate Pump and Motor GWRS Water Production (1050) 60,000 60,000 Pumps Replacement 14

11 R18010 RO Feed Pump and Motor Rebuild to be determined RO high pressure feed pump and motor. Water Production (1050) 55,000 55,000 Pumps Refurbishment 11
12 R18011 Paint the Exterior of the GAP Building Patch and paint the external of GAP Process Building. Water Production (1050) 35,000 35,000 Buildings Refurbishment 27
125VDC Charger and Battery Backup System Refurbish or replace 12kV switchgear batteries as needed based
13 R18012 for Area 240 East Switchgear upon evaluation. Water Production (1050) 30,000 30,000 Other Refurbishment 11
T-72 is a 1991 F700 Ford truck with 14 ton telescoping boom
needs to be painted and updated with new operating and safety Heavy Equipment >
14 R18013 Paint T-72 RO Stinger Crane Truck & Boom stickers. Water Production (1050) 25,000 25,000 $50,000 Refurbishment 27
Manufacture a new stainless steel shaft and machine sprockets to
15 R18014 Influent Screen Shaft and Sprocket fit. Water Production (1050) 20,000 20,000 Other Refurbishment 11
Replace 3000 gallon water tank for use with T-110 hook lift
16 R18015 New Water Tank for T-110 system. Water Production (1050) 15,000 15,000 Other Replacement 16
Repaint the large blue piping atop the break tank at the RO
17 R18016 Paint Break Tank Piping transfer pump station. Water Production (1050) 10,000 10,000 Pipe/Pipeline Refurbishment 11
Total Water Production (1050) $ - $ 1,660,000 $ 1,660,000

Recharge Operations (1060)


Heavy Equipment >
18 R18017 Caterpillar 950 Front End Loader Replacement for RT-17, a 1989, Tier 0 loader with > 10,000 hrs. Recharge Operations (1060) 438,000 438,000 $50,000 Replacement 29
19 R18018 Five Coves Trash Rack Refurbishment Repair & replace damaged/worn trash rack parts. Recharge Operations (1060) 150,000 150,000 Other Refurbishment 35+

Orange County Water District 10-3 FY 2018-19 Budget Report


Section 10
Replace and Refurbishment Fund

Table 10-1
FISCAL YEAR 2018-19
PROPOSED REPLACEMENT & REFURBISHMENT FUND REQUESTS
Asset
Project Salaries Total Project Refurbishment Age
# ID Item Description Department & Benefits Project Cost Cost Asset Class or Replacement (yr)
Five Coves Generator And Control Building Repair damaged roof on Five Coves control and generator
20 R18019 Roof Repair buildings. Recharge Operations (1060) 60,000 60,000 Buildings Refurbishment 48
Replace bulldozer undercarriage composed of track links, upper Heavy Equipment >
21 R18020 TL-36 Undercarriage and lower idlers, segments and all hardware, front idler update. Recharge Operations (1060) 42,000 42,000 $50,000 Refurbishment 6
Caterpillar 299 skid steer needs replacement bucket, a new set of
tracks, new drive sprockets, and front and rear idlers and bottom Heavy Equipment >
22 R18021 TL-35 Undercarriage rollers. Recharge Operations (1060) 15,900 15,900 $50,000 Refurbishment 7
Field Head Quarters Admin. Building Stucco
23 R18022 Repair Repair damaged stucco on eves of FHQ administration building. Recharge Operations (1060) 9,500 9,500 Buildings Refurbishment 35+
Total Recharge Operations (1060) $ - $ 715,400 $ 715,400

Wetland Operations (1062)


24 R18023 Prado Office Carpet Replacement Replace Prado office carpet, 10 years old. Wetland Operations (1062) 7,500 7,500 Buildings Replacement 10
Total Wetland Operations (1062) $ - $ 7,500 $ 7,500

Engineering (1070)
This project will apply a protective coating onto the existing
cement mortar lining of the first 3.7 miles of 78-inch GWRS Unit I
Pipeline (up to Edinger Ave). This project will prevent the lining
particles from entering into the Mid Basin Injection well and
25 R17025 GWRS Pipeline Lining GWRS recharge basins. Engineering (1070) 8,000,000 8,000,000 Pipe/Pipeline Refurbishment 11

The Upper and Lower Five Coves Rehabilitation Project includes


the rehabilitation of the Lower Five Coves (LFC) drain tube, the
construction of a new inlet structure and flow control gate for the
LFC drain tube, the replacement of the Upper Five Coves (UFC)
drain tube with a new inlet structure, flow control gate and outlet
structure, replacement of transfer structure between UFC and
LFC, the rehabilitation of the SAR/UFC intertie flow control gates,
Off River flow control gates and a new Off River flow
measurement structure. This project also includes replacing two
Upper and Lower Five Coves Rehabilitation flow meters at the 5 Coves rubber dam transfer and bypass Replacement or
26 R13022 Project structures and two flow meters at Huckleberry Basin. Engineering (1070) 21,759 3,000,000 3,021,759 Pipe/Pipeline Refurbishment 25

The Talbert Barrier supply pipeline has segments of high velocity


and materials that are deteriorating as they have reached the end
of their useful life expectancy. High velocity causes additional
wear and tear to the pipeline and cause electrical pumps to
consume more energy. The Talbert Channel portion to be
replaced is approximately 150 feet, 24-inch, asbestos cement
pipe. The portion at the intersection of Ellis and Ward is
27 R17027 Talbert Barrier Pipeline Improvements approximately 800 feet, 30-inch, concrete cylinder pipe. Engineering (1070) 25,602 2,500,000 2,525,602 Pipe/Pipeline Replacement 46+
Replacement of failed transfer pipeline between Blue Diamond
and Bond Basins caused by very high releases from Villa Park
28 R11015 Santiago Intertie Dam in December 2010. Engineering (1070) 2,500,000 2,500,000 Recharge Basins Refurbishment 25+
The soil-structure interaction of portions of the existing GAP
pipeline network have tested corrosive. This project is to
implement the design for cathodic protection to protect the
pipeline integrity and lengthen its usable lifespan for the Newport
29 R15018 GAP Cathodic Protection Beach and Southeast loop pipelines. Engineering (1070) 12,801 600,000 612,801 Pipe/Pipeline Refurbishment 28
30 R18024 GAP Vault Repairs Replace low traffic rated vaults. Engineering (1070) 500,000 500,000 Pipe/Pipeline Replacement 27
Santiago Creek is shifting to the south and causing the slopes of
Smith Basin to erode closer to Villa Park Rd above the south
slope of the basin. This project will restore the creek to its
31 R17026 Smith Basin Improvements previous path and repair the erosion to the slopes in the basin. Engineering (1070) 300,000 300,000 Recharge Basins Refurbishment 30
The locker room, shower, and restroom areas require
refurbishment due to the facilities being in poor shape. This
project includes the upgrade and reconfiguration of these
32 R16010 Refurbish Annex Locker Room facilities. Engineering (1070) 250,000 250,000 Buildings Refurbishment 36
Replacement of two 48-inch butterfly valves and actuators and
33 R17029 48-inch Valve & Actuators at Anaheim Lake enclose in subterranean vault at Anaheim Lake. Engineering (1070) 200,000 200,000 Pipe/Pipeline Replacement 30

Orange County Water District 10-4 FY 2018-19 Budget Report


Section 10
Replace and Refurbishment Fund

Table 10-1
FISCAL YEAR 2018-19
PROPOSED REPLACEMENT & REFURBISHMENT FUND REQUESTS
Asset
Project Salaries Total Project Refurbishment Age
# ID Item Description Department & Benefits Project Cost Cost Asset Class or Replacement (yr)
Replace low traffic rated vaults, leaky and broken valves, buried Replacement or
34 R17029 GAP Distribution System Repairs valve cans, and broken cathodic protection test stations. Engineering (1070) 100,000 100,000 Pipe/Pipeline Refurbishment 27
Total Engineering (1070) $ 60,162 $ 17,950,000 $ 18,010,162

Hydrogeology (1075)
Complete replacement of 56-year old seawater intrusion
Sunset Gap Monitoring Well Replacement monitoring wells BSO6A and BSO8; project delayed due to
35 R12030 (BS13) borehole collapse and Navy permitting; includes repair of levee. Hydrogeology (1075) 32,427 880,000 912,427 Wells (all types) Replacement 56
Complete replacement of 55-year old seawater intrusion
Sunset Gap Monitoring Well Replacement monitoring well BSO9A; project was divided into separate
36 R14026 (Well BS24) boreholes due to unstable geologic condition. Hydrogeology (1075) 650,000 650,000 Wells (all types) Replacement 55
Destroy 7 unnecessary and unused extractions wells including 2
large vaults; install one monitoring well to replace well P10;
remainder of vaults and pipeline decommissioning to occur in 3
37 R18025 Talbert Extraction Well Decommissioning years after city of HB road construction moratorium ends. Hydrogeology (1075) 460,000 460,000 Wells (all types) Decommission 49+
Total Hydrogeology (1075) $ 32,427 $ 1,990,000 $ 2,022,427

R&R Grand Total $ 92,589 $ 22,511,965 $ 22,604,554

Orange County Water District 10-5 FY 2018-19 Budget Report


Section 11
Cost Center Details
Detail Cost Center General Fund Budget
Acronyms and Abbreviations
GENERAL FUND BUDGET
COST CENTER DETAIL

Cost Center Page No.


1010 General Manager’s Office 11-1
1012 Public Affairs 11-4
1016 Information Services 11-6
1018 Board Administration 11-8
1022 Purchasing 11-10
1024 Finance 11-12
1030 Human Resources 11-15
1034 Safety & Risk Management 11-17
1036 Water Quality 11-20
1038 Laboratory 11-22
1040 Research & Development 11-24
1044 Planning and Watershed Management 11-26
1045 Local Resources 11-28
1046 Regulatory Affairs 11-29
1050 Water Production/GWR System 11-31
1060 Recharge Operations 11-39
1062 Wetland Operations 11-44
1069 Property Management 11-47
1070 Engineering 11-49
1075 Hydrogeology 11-51
1080 Natural Resources 11-54
GENERAL FUND OPERATING BUDGET FY 18-19
GENERAL MANAGER'S OFFICE (1010)
JDE Account Description General GWRS 9936 9941 9954
Total
Number
ACTIVITY CODE 9900 9922 North Basin South Basin MTBE
SALARIES & BENEFITS
1010.50104 REGULAR SALARIES 245,995 118,799 117,871 117,871 19,594 620,130
1010.50210 PAYROLL TAXES 4,479 2,634 1,937 1,937 284 11,271
1010.50202 RETIREMENT 40,958 19,780 19,626 19,626 3,262 103,252
1010.50204 HEALTH INSURANCE 21,784 8,610 11,329 11,329 2,039 55,092
1010.50206 WORKERS' COMPENSATION 1,648 796 790 790 131 4,155
SALARIES & BENEFITS TOTAL 314,864 150,619 151,553 151,553 25,311 793,900

1010.51102 DISTRICT MEMBERSHIPS


AMERICAN GROUNDWATER TRUST 500 500
AMERICAN MEMBRANE TECHNOLOGY ASSOCIATION 825 825
AMERICAN WATER WORKS ASSOCIATION (AWWA) 1,700 1,700
ASSOCIATION OF CALIFORNIA CITIES - ORANGE COUNTY (ACC-OC) 5,000 5,000
ASSOCIATION OF CALIFORNIA WATER AGENCIES (ACWA) 33,000 33,000
ASSOCIATION OF METROPOLITON WATER AGENCIES (AMWA) 18,600 18,600
BUILDING INDUSTRY ASSOCIATION OF SOUTHERN CALIFORNIA 650 650
CAL DESAL 5,000 5,000
CAL STATE FULLERTON DEMOGRAPHICS 4 x $11,761 47,044 47,044
CALIFORNIA SPECIAL DISTRICTS ASSOCIATION (CSDA) 6,900 6,900
CALIFORNIA GROUNDWATER COALITION 9,500 9,500
CHAMBERS OF COMMERCE 5,000 5,000
GROUNDWATER GUARDIAN 2,500 2,500
GROUNDWATER FOUNDATION 100 100
GROUNDWATER RESOURCES ASSOCIATION (GRA) 200 200
INDEPENDENT SPECIAL DISTRICTS ASSOCIATION (ISDOC) 250 250
INTERNATIONAL UV ASSOCIATION 250 250
PROFESSIONAL MEMBERSHIPS (ASCE & WEF) 650 650
REGIONAL STORMWATER TASK FORCE 1,000 1,000
SANTA ANA RIVER FLOOD PROTECTION AGENCY (SARFPA) 1,300 1,300
SOUTHERN CALIFORNIA ALLIANCE OF PUBLICLY OWNED TREATMENT WORKS 3,000 3,000
SOUTHERN CALIFORNIA SALINITY COALITION (NWRI) 10,000 10,000
SOUTHERN CALIFORNIA WATER COMMITTEE 5,000 5,000
SOUTHWEST MEMBRANE OPERATORS ASSOCIATION 300 300
UTILITY BRANDING NETWORK 5,000 5,000
WATER ADVISORY COMMITTEE OF ORANGE COUNTY (WACO) 100 100
WATER EDUCATION FOUNDATION 5,500 5,500
WATER RESEARCH FOUNDATION 100,000 100,000
WATEREUSE ASSOCIATION 10,200 10,200
WATER ENVIRONMENT & REUSE FOUNDATION 35,000 35,000
DISTRICT MEMBERSHIPS TOTAL 314,069 - - - - 314,069

Orange County Water District 11-1 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
GENERAL MANAGER'S OFFICE (1010)
JDE Account Description General GWRS 9936 9941 9954
Total
Number
ACTIVITY CODE 9900 9922 North Basin South Basin MTBE
1010.51104 SUBSCRIPTIONS
ADMINISTRATIVE PROFESSIONAL, NEWSPAPERS 1,000 1,000
SUBSCRIPTIONS TOTAL 1,000 - - - - 1,000

1010.51112 SPECIAL DISTRICT EXPENSES (SPONSORSHIPS)


SAWPA OWOW CONFERENCE 5,000 5,000
CALIFORNIA FOUNDATION ON THE ENVIROMENT AND THE ECONOMY 3,000 3,000
ORANGE COUNTY SCIENCE FAIR 3,000 3,000
CALIFORNIA WATEREUSE CONFERENCE 5,500 5,500
MISC. SPONSORSHIPS 5,000 5,000
SPECIAL DISTRICT EXPENSES (SPONSORSHIPS) TOTAL 21,500 - - - - 21,500

1010.51192 TECHNICAL TRAINING


STAFF TRAINING 250 250
TECHNICAL TRAINING TOTAL 250 - - - - 250

1010.51301 TRAVEL/CONFERENCE/MILEAGE
ACWA SPRING CONFERENCE, MONTEREY 1,500 1,500
ACWA FALL CONFERENCE, SAN DIEGO 1,200 1,200
AMWA CONFERENCE, SAN FRANCISCO 1,500 1,500
SACRAMENTO LEGISLATIVE TRIPS (6) 3,600 3,600
WASHINGTON DC LEGISLATIVE TRIPS (4) 6,000 6,000
33ND ANNUAL WATEREUSE SYMPOSIUM, AUSTIN 1,500 1,500
WATEREUSE CALIFORNIA ANNUAL CONFERENCE, PALM SPRINGS 1,200 1,200
WEFTEC CONFERENCE, NEW ORLEANS 1,500 1,500
TRAVEL/CONFERENCE/MILEAGE TOTAL 18,000 - - - - 18,000

1010.51501 OFFICE EXPENSE - GENERAL


BULK OFFICE AND CONSUMABLE SUPPLIES 53,500 53,500
FED EX 500 500
MINUTE MAN 1,000 1,000
MAIL DISPATCH 4,500 4,500
POSTAGE 25,000 25,000
OFFICE EXPENSE - GENERAL TOTAL 84,500 - - - - 84,500

1010.51531 SHIRTS - LOGO


SHIRTS - LOGO 300 300
SHIRTS - LOGO TOTAL 300 - - - - 300

Orange County Water District 11-2 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
GENERAL MANAGER'S OFFICE (1010)
JDE Account Description 9900 9922 9936 9941 9954
Total
Number
ACTIVITY CODE General GWRS North Basin South Basin MTBE
1010.51565 RENT EQUIPMENT - GENERAL
XEROX E-1105 & E-5540CT COPY MACHINES LEASE (MAIN COPY ROOM) 20,000 20,000
COPY CENTER C35 (MAIN COPY ROOM) 500 500
COPY CENTER C35 (SM COPY ROOM) 500 500
DC420AC COPIER (FHQ) 500 500
DC420AC COPIER (LAB/MAINT) 500 500
DC420AC COPIER (OPERATIONS) 500 500
DC535H COPIER (LARGE COPY ROOM) 500 500
DC535H COPIER (ANNEX) 500 500
DC535H COPIER (WATER PRODUCTION) 500 500
MAKEREADY SOFTWARE 6,000 6,000
SCANNER 2,500 2,500
DC535H COPIER (LAB) 500 500
NEOPOST POSTAGE MACHINE 8,000 8,000
RENT EQUIPMENT - GENERAL TOTAL 41,000 - - - - 41,000

1010.53001 PROFESSIONAL SERVICES - GENERAL


MANAGEMENT CONSULTING 39,500 39,500
PROFESSIONAL SERVICES - GENERAL TOTAL 39,500 - - - - 39,500

1010.53005 PROFESSIONAL SERVICES - LEGAL


RUTAN & TUCKER, LLP 600,000 600,000
PROFESSIONAL SERVICES - LEGAL TOTAL 600,000 - - - - 600,000

1010.56012 INTERAGENCY AGREEMENTS


ACOE WATER CONSERVATION MAINTENANCE FEE 103,000 103,000
LOCAL AGENCY FORMATON COMMISSION (LAFCO) 28,000 28,000
NATIONAL WATER RESOURCE INSTITUTE (NWRI) 50,000 50,000
OCFCD WATER CONSERVATION MAINTENANCE FEE 33,000 33,000
SAWPA 288,500 288,500
WATER EMERGENCY RESPONSE ORGANIZATION OF ORANGE COUNTY (WEROC) 95,400 95,400
INTERAGENCY AGREEMENTS TOTAL 597,900 - - - - 597,900

1010.57004 MAINTENANCE EQUIPMENT - GENERAL


EQUIPMENT REPAIRS 100 100
MAINTENANCE EQUIPMENT - GENERAL TOTAL 100 - - - - 100

GENERAL MANAGER'S OFFICE GRAND TOTAL 2,032,983 150,619 151,553 151,553 25,311 2,512,019

Orange County Water District 11-3 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
PUBLIC AFFAIRS (1012)

Youth Water Hero Water


JDE Account Description General GWRS Water 101 Tours
Number
Education Program Summit Total
ACTIVITY CODE 9900 9922 1206 9926 9959 9962 9963
SALARIES & BENEFITS
1012.50104 REGULAR SALARIES 578,495 24,997 38,362 4,149 19,396 108,990 68,085 842,474
1012.50106 OVERTIME SALARIES 125 250 250 250 1,625 2,500
1012.50210 PAYROLL TAXES 9,599 366 560 60 281 1,584 1,011 13,461
1012.50202 RETIREMENT 93,093 4,204 6,429 691 3,229 18,188 11,607 137,441
1012.50204 HEALTH INSURANCE 84,679 3,782 6,741 634 2,713 16,985 11,336 126,869
1012.50206 WORKERS' COMPENSATION 3,882 179 268 28 130 742 530 5,758
SALARIES & BENEFITS TOTAL 769,872 33,778 52,610 5,561 25,749 146,739 94,194 1,128,503

1012.51301 TRAVEL/CONFERENCE/MILEAGE
WASHINGTON D.C. - 2-3 TRIPS 4,250 4,250
ACWA CONF (SPRING AND FALL; 1 STAFF) 2,000 2,000
LOCAL ONE-DAY CONFERENCES (10) 2,250 2,250
SACRAMENTO (14) (ACWA/WRA LEG COMMITTEE & COMMUNICATIONS COMMITTEE) 6,500 6,500
MISCELLANEOUS TRAVEL EXPENSES (MILEAGE) 4,000 4,000
WATEREUSE & ACWA CONFERENCES (2 STAFF) 3,000 3,000
PRSA CONFERENCE (LOCATION VARIES) (FULL REG. IS $1,000) 2,500 2,500
TRAVEL/CONFERENCE/MILEAGE TOTAL 24,500 - - - - - - 24,500

1012.51305 PUBLIC INFORMATION TOURS


PUBLIC TOURS & GROUNDWATER ADVENTURE TOUR 7,000 10,000 17,000
INSIDE THE OUTDOORS 5,400 5,400
SURVEY LICENSING RENEWAL & REPLACEMENTS FOR LISTENING DEVICES 2,700 2,700
SPEAKERS BUREAU 2,000 2,000
PUBLIC INFORMATION TOURS TOTAL - - 12,400 - - 2,000 12,700 27,100

1012.51204 MISCELLANEOUS EXPENSE


LEGISLATIVE & PRODUCER ACTIVITIES 2,500 2,500
MISCELLANEOUS EXPENSE TOTAL 2,500 - - - - - - 2,500

1012.53001 PROFESSIONAL SERVICES - GENERAL


ENS RESOURCES (FEDERAL ADVOCACY) 92,000 92,000
JAMES F. MCCONNELL (FEDERAL ADVOCACY) 92,000 92,000
HOLLAND & KNIGHT (FEDERAL ADVOCACY) 92,000 92,000
EDELSTEIN, GILBERT, SMITH & ROBSON (STATE ADVOCACY) 92,000 92,000
GONSALVES & SON (STATE ADVOCACY) 92,000 92,000
TRAVEL & EXPENSES REIMBURSEMENTS FOR LEGISLATIVE ADVOCACY 7,500 7,500
LIBRIS ONLINE PHOTO AND VIDEO LIBRARY 5,500 5,500
UC VIEW (LICENSING & TECH SUPPORT FOR H2O LEARNING CENTER HALLWAY SYSTEMS) 7,500 7,500
PROFESSIONAL SERVICES - GENERAL TOTAL 473,000 - - - - - 7,500 480,500

1012.51501 OFFICE EXPENSE - GENERAL


AWARDS (SUBMITTALS) 2,000 2,000
PHOTOGRAPHY SERVICES/VIDEO TAPE TRANSFER TO DIGITAL 1,500 1,500
MEDIA ACTIVITIES (MELTWATER; CLIP SERVICE W/MEDIA CONTACT DB; WEEKLY WATER LINES FEED) 25,000 25,000
LICENSING TO POST/REPRINT ARTICLES 1,000 1,000
OFFICE EXPENSES SUPPLIES, PRINTING ETC. 15,000 15,000
FLYER DISTRIBUTION & MAILINGS (WALKING MAN CONTRACT) - NORTH & SOUTH BASIN COMMUNICATIONS 3,000 3,000
OFFICE EXPENSE - GENERAL TOTAL 47,500 - - - - - - 47,500

Orange County Water District 11-4 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
PUBLIC AFFAIRS (1012)

Youth Water Hero Water


JDE Account Description General GWRS Water 101 Tours
Education Program Summit Total
Number
ACTIVITY CODE 9900 9922 1206 9926 9959 9962 9963
1012.51104 SUBSCRIPTIONS
LEGISLATIVE AND OTHER PUBLICATIONS (STATE NET BILL TRACKING) 500 500
SUBSCRIPTIONS TOTAL 500 - - - - - - 500

1012.51102 MEMBERSHIP
PROFESSIONAL MEMBERSHIPS (PRSA - NATIONAL AND ORANGE COUNTY CHAPTERS) 900 900
MEMBERSHIP TOTAL 900 - - - - - - 900

1012.51192 TECHNICAL TRAINING


PROFESSIONAL DEVELOPMENT 2,000 2,000
TECHNICAL TRAINING TOTAL 2,000 - - - - - - 2,000

1012.56012 GWRS
GWRS GROUP TOURS (INCLUDING BUS FUNDED FIELD TRIPS MIN 2/DIVISION) 12,000 12,000
GWRS TOUR ROUTE SIGNAGE 2,000 2,000
GWRS BOTTLED WATER 15,000 15,000
MARKETING/OUTREACH GWRS BOTTLED WATER & TOURS 10,000 5,000 15,000
GWRS COLLATERAL (BAGS, PENS, 24-PAGE TECH BROCHURE OTHER HANDOUTS) 10,000 20,000 30,000
GWRS TOTAL - - - - - 35,000 39,000 74,000

1012.51112 SPECIAL DEPARTMENT EXPENSE


OCWD BROCHURES, FOLDERS & COLLATERAL 7,500 7,500
EMPLOYEE EVENTS 10,000 10,000
MARKETING - OCWD'S ROLE IN OC ( SOCIAL MEDIA, NEWSPAPER, PROGRAM & RADIO ADS); 85TH ANNIVERSARY 10,000 10,000
OC WATER HERO PROGRAM 5,000 5,000
GROUNDBREAKINGS, DEDICATIONS, COMMUNITY CONSTRUCTION MEETINGS 8,000 8,000
(UPDATE SIGNAGE AS NEEDED, MISSION STATEMENT, FRAMED MAPS AND PHOTOS THROUGHOUT BUILDINGS 1,000 1,000
SPECIAL DEPARTMENT EXPENSE TOTAL 36,500 - - 5,000 - - - 41,500

1012.51119 SPECIAL DEPARTMENT EXPENSE - OC WATER SUMMIT


OC WATER SUMMIT - OPERATING COSTS 76,000 76,000
WATER ADVISORY COMMITTEE OF ORANGE COUNTY 6,000 6,000
SPECIAL DEPARTMENT EXPENSE - OC WATER SUMMIT TOTAL 6,000 - - - 76,000 - - 82,000

MISCELLANEOUS REIMBURSEMENT - OC WATER SUMMIT


1012.51119.170 MWDOC REIMBURSEMENT (SUMMIT AND WACO) (6,000) (6,000)
1012.51119.250 OC WATER SUMMIT - SPONSOR REIMBURSEMENT (70,000) (70,000)
MISCELLANEOUS REIMBURSEMENT - OC WATER SUMMIT TOTAL - - - - (76,000) - - (76,000)

1012.51116 SPECIAL DEPARTMENT EXPENSE - CWF


CHILDREN'S FESTIVAL 225,000 225,000
SPECIAL DEPARTMENT EXPENSE - CWF TOTAL 225,000 - - - - - - 225,000

1012.51116.250 MISCELLANEOUS REIMBURSEMENT - CWF


CHILDREN'S FESTIVAL ( $70,000 SPONSORS) (80,000) (80,000)
MISCELLANEOUS REIMBURSEMENT - CWF TOTAL (80,000) - - - - - - (80,000)

PUBLIC AFFAIRS GRAND TOTAL 1,508,272 33,778 65,010 10,561 25,749 183,739 153,394 1,980,503

Orange County Water District 11-5 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
INFORMATION SERVICES (1016)
JDE Account Description General GWRS
Total
Number ACTIVITY CODE 9900 9922
SALARIES & BENEFITS
1016.50104 REGULAR SALARIES 889,836 381,358 1,271,194
1016.50210 PAYROLL TAXES 13,749 5,892 19,641
1016.50202 RETIREMENT 145,885 62,522 208,407
1016.50204 HEALTH INSURANCE 121,024 51,867 172,891
1016.50206 WORKERS' COMPENSATION 5,962 2,555 8,517
SALARIES & BENEFITS TOTAL 1,176,455 504,195 1,680,650

1016.52501 COMMUNICATION
CELLULAR TELEPHONE & WIRELESS SERVICES 45,000 45,000
PHONE SERVICE (PHYSICAL CIRCUITS, DID LINES, LONG DISTANCE, ETC.) 60,000 60,000
REPLACEMENT PHONES 20,000 20,000
INTERNET SERVICE - FOUNTAIN VALLEY, ANAHEIM, ORANGE, PRADO 45,000 45,000
MISCELLANEOUS COMMUNICATIONS 5,000 5,000
COMMUNICATION TOTAL 175,000 - 175,000

1016.51301 TRAVEL/CONFERENCE/MILEAGE
CONFERENCE/TRAINING TRAVEL (INTEROP TECHNICAL CONFERENCE) 5,000 5,000
MILEAGE (FIELD HQ, PRADO) 500 500
TRAVEL/CONFERENCE/MILEAGE TOTAL 5,500 - 5,500

1016.51501 OFFICE EXPENSE - GENERAL


GENERAL OFFICE EXPENSE (SHIPPING, FEDEX) 2,000 2,000
OFFICE EXPENSE - GENERAL TOTAL 2,000 - 2,000

1016.51510 HARDWARE/SOFTWARE
HARDWARE & SOFTWARE PURCHASES FOR DEPTS, PROGRAMMER TOOLS FOR IS 35,000 35,000
COMPUTER REPLACEMENTS - QTY 40 COMPUTERS 48,000 48,000
OFFICE 365 GOVERNMENT E3 LICENSING FOR EMPLOYEES (285 LICENSES) 55,000 55,000
MS OFFICE 2016 FOR 50 COMPUTERS (SHARED AND CONFERENCE ROOM) 15,000 15,000
SECURITY APPLIANCE AND SERVICE (NORSE) 65,000 65,000
NETWORK SWITCH AND WIRELESS REPLACEMENTS
( FOUNTAIN VALLEY & ANAHEIM 25,000 25,000
SERVICES) 6,000 6,000
TAPES, STORAGE MEDIA, OFFSITE & OTHER DATA SERVICES 15,000 15,000
REPLACEMENT MODULES AND BATTERIES FOR UPS (COMING OUT OF WARRANTY) 22,000 22,000
PRINTERS (REPLACEMENT AND NETWORK PRINTERS) 3,000 3,000
HARDWARE/SOFTWARE TOTAL 289,000 - 289,000

Orange County Water District 11-6 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
INFORMATION SERVICES (1016)
JDE Account Description General GWRS
Total
Number ACTIVITY CODE 9900 9922
1016.57004 MAINTENANCE EQUIPMENT - GENERAL
MAINTENANCE AGREEMENTS FOR EXISTING HW & SW 350,000 350,000
MAINTENANCE AGREEMENTS FOR NEW HW & SW 5,000 5,000
EXTENDED WARRANTY FOR BOARDROOM/CONF ROOM AUDIOVISUAL EQUIP (1 YEAR) 25,000 25,000
ON-CALL SERVICE AGREEMENT FOR HALLWAY LEARNING CENTER EQUIPMENT 8,000 8,000
REPAIR EXISTING CABLING (NETWORK, TELEPHONE, COPPER, ETC.) 5,000 5,000
REPAIR EXISTING EQUIPMENT (WORKSTATIONS, PRINTERS, ETC.) 10,000 10,000
REPAIR EXISTING AUDIOVISUAL EQUIPMENT 5,000 5,000
MAINTENANCE EQUIPMENT - GENERAL TOTAL 408,000 - 408,000

1016.53001 PROFESSIONAL SERVICE - GENERAL


ON-CALL CONSULTING (JD EDWARDS, MAXIMO, WRMS, SECURITY, NETWORK,
DOCUMENTATION) 20,000 20,000
PROFESSIONAL SERVICE - GENERAL TOTAL 20,000 - 20,000

1016.51102 MEMBERSHIP
USER GROUP MEMBERSHIP 500 500
MEMBERSHIP TOTAL 500 - 500

1016.51192 TECHNICAL TRAINING


ONGOING TECHNICAL TRAINING FOR IS DEPARTMENT 10,000 10,000
PC SOFTWARE TRAINING FOR ALL DEPARTMENTS 1,000 1,000
ORACLE JD EDWARDS TRAINING/IBM MAXIMO TRAINING 5,000 5,000
TECHNICAL TRAINING TOTAL 16,000 - 16,000

INFORMATION SERVICES GRAND TOTAL 2,092,455 504,195 2,596,650

Orange County Water District 11-7 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
BOARD ADMINISTRATION (1018)
JDE Account Description General GWRS
Total
Number
ACTIVITY CODE 9900 9922
SALARIES & BENEFITS
1018.50104 REGULAR SALARIES 244,748 61,187 305,935
1018.50118 DIRECTORS' FEES 262,656 65,664 328,320
1018.50210 PAYROLL TAXES 7,357 1,839 9,197
1018.50202 RETIREMENT 84,483 21,121 105,603
1018.50204 HEALTH INSURANCE 180,373 45,093 225,466
1018.50206 WORKERS' COMPENSATION 3,400 850 4,250
SALARIES & BENEFITS TOTAL 783,016 195,754 978,770

1018.51301 BOARD TRAVEL/CONFERENCE/MILEAGE


ACWA, AWWA, ADA, NWRA, ASCE, CRWUA, OCCOG, WATEREUSE, AND MISC.
CONFERENCES 26,300 26,300
BOARD TRAVEL/CONFERENCE/MILEAGE TOTAL 26,300 - 26,300

1018.51012 LEGAL ADVERTISING


LEGALLY REQUIRED NOTICES AND REPORTS, I.E. PUBLIC HEARINGS, ETC. 3,000 3,000
LEGAL ADVERTISING TOTAL 3,000 - 3,000

1018.51501 OFFICE EXPENSE - GENERAL


BOARDROOM SUPPLIES, REFRESHMENTS FOR BOARD AND COMMITTEES 16,000 16,000
FILING FEES 100 100
NOTARY SUPPLIES 200 200
OFFICE SUPPLIES 1,000 1,000
OFFICE EXPENSE - GENERAL TOTAL 17,300 - 17,300

1018.51192 EDUCATIONAL TRAINING


ARMA TRAINING AND SEMINARS 300 300
EDUCATIONAL TRAINING TOTAL 300 - 300

1018.51102 MEMBERSHIP
ASSOCIATION OF RECORDS MANAGERS & ADMINISTRATORS (1) 215 215
NATIONAL NOTARY ASSOCIATION (2) 225 225
MEMBERSHIP TOTAL 440 - 440

Orange County Water District 11-8 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
BOARD ADMINISTRATION (1018)
JDE Account Description General GWRS
Total
Number
ACTIVITY CODE 9900 9922
1018.51112 SPECIAL DEPARTMENT EXPENSE
DOCUMENT ARCHIVAL AND SCANNING 5,000 5,000
OFFSITE STORAGE 30,000 30,000
SPECIAL DEPARTMENT EXPENSE TOTAL 35,000 - 35,000

1018.51042 ELECTION COSTS


ACCRUED ELECTION COSTS 133,000 133,000
ELECTION COSTS TOTAL 133,000 - 133,000

BOARD ADMINISTRATION GRAND TOTAL 998,356 195,754 1,194,110

Orange County Water District 11-9 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
PURCHASING (1022)
JDE Account Description General GWRS
Total
Number
ACTIVITY CODE 9900 9922
SALARIES & BENEFITS
1022.50104 REGULAR SALARIES 491,582 25,873 517,455
1022.50210 PAYROLL TAXES 7,128 375 7,503
1022.50202 RETIREMENT 81,848 4,308 86,156
1022.50204 HEALTH INSURANCE 98,994 5,210 104,205
1022.50206 WORKERS' COMPENSATION 6,025 317 6,342
SALARIES & BENEFITS TOTAL 685,578 36,083 721,661

1022.51501 OFFICE EXPENSE - GENERAL


SAFETY SIGNS/HARDWARE FOR WAREHOUSE 400 400
MISCELLANEOUS SUPPLIES (TONERS, DRUMS, FILING SUPPLIES) 6,000 6,000
SHIPPING SUPPLIES (SHRINK WRAP/TAPE, BINDING, ETC.) 1,500 1,500
UPS SHIPPING FEES 2,500 2,500
TRUCK WASH FOR DISTRICT VEHICLES - PRADO AND FV 2,000 2,000
OFFICE EXPENSE - GENERAL TOTAL 12,400 - 12,400

1022.51520 GAS & DIESEL


VEHICLE FUEL 1,000 1,000
GAS & DIESEL TOTAL 1,000 - 1,000

1022.51531 SHIRTS - LOGO


SHIRTS - LOGO/SHIRTS/JACKETS 150 150
SHIRTS - LOGO TOTAL 150 - 150

1022.51545 SMALL TOOLS


MISCELLANEOUS HAND TOOLS 100 100
SMALL TOOLS TOTAL 100 - 100

Orange County Water District 11-10 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
PURCHASING (1022)
JDE Account Description General GWRS
Total
Number
ACTIVITY CODE 9900 9922
1022.51102 MEMBERSHIP
PURCHASING (CALIFORNIA ASSOCIATION OF PUBLIC
PURCHASING OFFICERS, INC. AND NATIONAL ASSOCIATION
OF PURCHASING MANAGEMENT) 1 MEMBERSHIP AND FEE FOR AWARD APP. 500 500
MEMBERSHIP TOTAL 500 - 500

1022.51192 TECHNICAL TRAINING


PURCHASING SEMINARS (INSURANCE EDUCATION FOR NEW PROGRAM) 500 500
TECHNICAL TRAINING TOTAL 500 - 500

1022.51630 INVENTORY FREIGHT


DELIVERY FEES AND FREIGHT CHARGES 20,000 20,000
INVENTORY FREIGHT TOTAL 20,000 - 20,000

1022.57016 MAINTENANCE STRUCTURE AND IMPROVEMENT - GENERAL


WAREHOUSE MAINTENANCE - ADDITIONAL SHELVING/RACKING & FLOOR REFURB. 2,000 2,000
MAINTENANCE STRUCTURE AND IMPROVEMENT - GENERAL TOTAL 2,000 - 2,000

PURCHASING GRAND TOTAL 722,228 36,083 758,311

Orange County Water District 11-11 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
FINANCE (1024)
JDE Account Description General GWRS
Total
Number
ACTIVITY CODE 9900 9922
SALARIES & BENEFITS
1024.50104 REGULAR SALARIES 1,077,604 359,201 1,436,806
1024.50106 OVERTIME 1,041 347 1,388
1024.50210 PAYROLL TAXES 16,970 5,657 22,627
1024.50202 RETIREMENT 176,023 58,674 234,697
1024.50204 HEALTH INSURANCE 164,778 54,926 219,704
1024.50206 WORKERS' COMPENSATION 7,276 2,425 9,701
SALARIES & BENEFITS TOTAL 1,443,692 481,231 1,924,923

1024.51301 TRAVEL/CONFERENCE/MILEAGE
SPECIAL DISTRICT FINANCIAL MANAGEMENT CONFERENCE - SO CALIFORNIA 1,000 1,000
TRAVEL/CONFERENCE/MILEAGE TOTAL 1,000 - 1,000

1024.53001 PROFESSIONAL SERVICES - GENERAL


EXTERNAL AUDIT (SINGLE AUDIT/MPP INCLUDED) 65,000 65,000
PAYROLL OUTSOURCING 58,000 58,000
SPECIALIZED ACCOUNTING/FINANCIAL SERVICES 40,000 40,000
PROFESSIONAL SERVICES - GENERAL TOTAL 163,000 - 163,000

1024.51501 OFFICE EXPENSE - GENERAL


CHECK STOCK FOR A/P - SAFECHECKS 1,000 1,000
COLOR COPY ALLOCATION 1,000 1,000
COLOR PRINTING CHARGE FOR CAFR AND BUDGET BOOK 2,500 2,500
FEDEX 1,000 1,000
MICR TONER - A/P, P/R 1,000 1,000
COMPREHENSIVE ANNUAL FINANCIAL REPORT APPLICATION 1,000 1,000
MISCELLANEOUS SUPPLIES (COMPUTER PAPER, SMART & FINAL, SUPPLIES) 8,500 8,500
OFFICE EXPENSE - GENERAL TOTAL 16,000 - 16,000

Orange County Water District 11-12 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
FINANCE (1024)
JDE Account Description General GWRS
Total
Number
ACTIVITY CODE 9900 9922
1024.51104 SUBSCRIPTIONS
GASB/GAAP-ACCOUNTING JOURNAL 500 500
SUBSCRIPTIONS TOTAL 500 - 500

1024.51520 GAS & DIESEL FUEL


SC FUEL @ $400/MO 4,800 4,800
GAS & DIESEL FUEL TOTAL 4,800 - 4,800

1024.51530 UNIFORMS & SAFETY


OVERALL - UNIFORMS 200 200
UNIFORMS & SAFETY TOTAL 200 - 200

1024.57004 MAINTENANCE EQUIPMENT - GENERAL


METER READ EQUIPMENT MAINTENANCE 500 500
MAINTENANCE EQUIPMENT - GENERAL TOTAL 500 - 500

1024.51102 MEMBERSHIP
AMERICAN INSTITUTE OF CERTIFIED PUBLIC ACCOUNTANTS 1,000 1,000
INSTITUTE OF MANAGEMENT ACCOUNTANTS 300 300
CALIFORNIA MUNICIPAL TREASURERS ASSOCIATION 300 300
CPA LICENSE/AICPA (VS, DS, WX, MO) 1,200 1,200
CALIFORNIA SOCIETY OF MUNICIPAL FINANCE OFFICERS 300 300
GOVERNMENT FINANCE OFFICERS ASSOCIATION 300 300
MEMBERSHIP TOTAL 3,400 - 3,400

Orange County Water District 11-13 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
FINANCE (1024)
JDE Account Description General GWRS
Total
Number
ACTIVITY CODE 9900 9922
1024.51192 TECHNICAL TRAINING
DIEHL EVANS TAX LAW CHANGES SEMINAR (2 STAFF) 1,000 1,000
CSCPA TECHNICAL TRAINING (VS, DS, WX, JY, MO) 3,000 3,000
TECHNICAL TRAINING TOTAL 4,000 - 4,000

1024.56023 PURCHASE DISCOUNTS


PURCHASE DISCOUNTS (70,000) (70,000)
PURCHASE DISCOUNTS TOTAL (70,000) - (70,000)

1024.56024 REBATES - PURCHASING CARD


REBATES - PURCHASING CARD (32,000) (32,000)
REBATES - PURCHASING CARD TOTAL (32,000) - (32,000)

1024.56028 BANK CHARGES


BANK CHARGES ($3,200 AVERAGE/MO) 38,400 38,400
BANK CHARGES TOTAL 38,400 - 38,400

FINANCE GRAND TOTAL 1,573,492 481,231 2,054,723

Orange County Water District 11-14 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
HUMAN RESOURCES (1030)
JDE Account Description General GWRS
Total
Number ACTIVITY CODE 9900 9922
SALARIES & BENEFITS
1030.50104 REGULAR SALARIES 500,499 125,125 625,623
1030.50106 REGULAR OVERTIME SALARIES 400 100 500
1030.50210 PAYROLL TAXES 8,255 2,064 10,319
1030.50202 RETIREMENT 80,736 20,184 100,920
1030.50204 HEALTH INSURANCE 100,315 25,079 125,394
1030.50205 HEALTH INSURANCE - RETIREE PREMIUMS 12,400 3,100 15,500
1030.50206 WORKERS' COMPENSATION 3,355 839 4,194
SALARIES & BENEFITS TOTAL 705,959 176,490 882,449

1030.51301 TRAVEL/CONFERENCE/MILEAGE
ACWA/JPIA COMMITTEE/ACWA/JPIA PERSONNEL COMMITTEE
MEETINGS (6 TRIPS) 1,000 1,000
CALPELRA CONFERENCE (MONTEREY, CA) & SEMINARS 2,500 2,500
MILEAGE 150 150
TRAVEL/CONFERENCE/MILEAGE TOTAL 3,650 - 3,650

1030.53001 PROFESSIONAL SERVICES - GENERAL


LIFEWORKS EMPLOYEE ASSISTANCE PROGRAM 6,500 6,500
HEALTH AND WELLNESS 1,000 1,000
UNIVERSAL BACKGROUND INVESTIGATION 5,000 5,000
ALLIANT BROKER SERVICES FEE 25,000 25,000
PERSONNEL ISSUES - LEGAL FEES 10,000 10,000
RETIREE MEDICAL ACTUARIAL FEES 5,000 5,000
RETIREMENT PLAN FEES (PARTICIPANT INITIATED TRANSACTIONS) 1,800 1,800
RETIREMENT PLAN LEGAL CONSULTING AND PLAN FILINGS 10,000 10,000
PRE-EMPLOYMENT PHYSICALS 6,000 6,000
SHEAKLEY FEES 150 150
PROFESSIONAL SERVICES - GENERAL TOTAL 70,450 - 70,450

1030.53015 TEMPORARY LABOR - GENERAL


TEMPORARY LABOR - MISC DEPARTMENTS 75,000 75,000
TEMPORARY LABOR - GENERAL TOTAL 75,000 - 75,000

Orange County Water District 11-15 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
HUMAN RESOURCES (1030)
JDE Account Description General GWRS
Total
Number ACTIVITY CODE 9900 9922
1030.51501 OFFICE EXPENSE - GENERAL
AROMA MACHINE SUPPLIES AND MAINTENANCE 600 600
EMPLOYMENT ADVERTISING 10,000 10,000
NEOGOV 6,000 6,000
FEDERAL EXPRESS 200 200
EMPLOYEE OF THE MONTH/YEAR AWARD EXPENSES 200 200
ERP AWARD CERTIFICATES 500 500
LENGTH OF SERVICE AWARDS 6,500 6,500
OFFICE SUPPLIES 6,000 6,000
OFFICE EXPENSE - GENERAL TOTAL 30,000 - 30,000

1030.51104 SUBSCRIPTIONS
LEGAL BULLETINS 200 200
SUBSCRIPTIONS TOTAL 200 - 200

1030.51102 MEMBERSHIP
NATIONAL NOTARY ASSOCIATION 200 200
ORANGE COUNTY HR CONSORTIUM (FORMERLY LEAGUE OF CITIES HR
GROUP) 250 250
MEMBERSHIP TOTAL 450 - 450

1030.51192 TECHNICAL TRAINING


HR DEVELOPMENT TRAINING AND ANNUAL LEGAL UPDATES 2,000 2,000
EMPLOYEE TRAINING 4,000 4,000
TECHNICAL TRAINING TOTAL 6,000 - 6,000

1030.50208 EDUCATION TUITION REIMBURSEMENT


EDUCATION TUITION REIMBURSEMENT 33,550 33,550
EDUCATION TUITION REIMBURSEMENT TOTAL 33,550 - 33,550

1030.51112 SPECIAL DEPARTMENT EXPENSE


DOT DRUG & ALCOHOL PROGRAM 5,000 5,000
EMPLOYEE FITNESS FACILITIES 10,000 10,000
UNEMPLOYMENT INSURANCE 10,000 10,000
SPECIAL DEPARTMENT EXPENSE TOTAL 25,000 - 25,000

HUMAN RESOURCES GRAND TOTAL 950,259 176,490 1,126,749

Orange County Water District 11-16 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
SAFETY & RISK MANAGEMENT (1034)
JDE Account Description Administration GWRS
Total
Number
ACTIVITY CODE 9900 9922
SALARIES & BENEFITS
1034.50104 REGULAR SALARIES 216,390 49,223 265,613
1034.50210 PAYROLL TAXES 4,347 714 5,060
1034.50202 RETIREMENT 32,782 8,196 40,978
1034.50204 HEALTH INSURANCE 40,286 10,072 50,358
1034.50206 WORKERS' COMPENSATION 1,725 399 2,124
SALARIES & BENEFITS TOTAL 295,531 68,602 364,133

1034.52001 INSURANCE
CRIME/EXCESS 8,000 8,000
FIDUCIARY 6,500 6,500
GENERAL LIABILITY 331,000 331,000
PROPERTY 290,000 290,000
TOUR GROUP AND BUSINESS TRAVEL 4,000 4,000
INSURANCE TOTAL 639,500 - 639,500

1034.52005 CLAIMS
SMALL NON-TRIAL CLAIMS, WORK COMP FIRST AID 5,000 5,000
CLAIMS TOTAL 5,000 - 5,000

1034.51301 TRAVEL/CONFERENCE/MILEAGE
AMERICAN SOCIETY OF SAFETY ENGINEERS CONFERENCE 2,000 2,000
ANNUAL AMERICAN RED CROSS DISASTER/SAFETY CONFERENCE 300 300
PASMA CONFERENCE/BUSINESS MEETINGS 400 400
MILEAGE 500 500
TRAVEL/CONFERENCE/MILEAGE TOTAL 3,200 - 3,200

1034.53001 PROFESSIONAL SERVICE - GENERAL


HEPATITIS A AND B SHOTS 1,000 1,000
RESPIRATOR FIT TESTS 2,000 2,000
RESPIRATOR MEDICAL EVALUATIONS 2,000 2,000
INDUSTRIAL HYGIENE MONITORING 3,000 3,000
PROFESSIONAL SERVICE - GENERAL TOTAL 8,000 - 8,000

Orange County Water District 11-17 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
SAFETY & RISK MANAGEMENT (1034)
JDE Account Description Administration GWRS
Total
Number
ACTIVITY CODE 9900 9922
1034.51501 OFFICE EXPENSE - GENERAL
FEDERAL EXPRESS/COURIER 200 200
MISCELLANEOUS SUPPLIES 500 500
TRAINING MATERIALS AND MEETING EXPENSES 2,000 2,000
OFFICE EXPENSE - GENERAL TOTAL 2,700 - 2,700

1034.51104 SUBSCRIPTIONS
CAL OSHA REPORTER 400 400
BUSINESS AND LEGAL REPORT (BLR) 1,300 1,300
MSDS ONLINE ANNUAL FEE (YEAR 3 OF 3 YEAR CONTRACT) 3,000 3,000
ANNUAL SUBSCRIPTION AGREEMENT - SMART HAZARD MANAGER SYSTEM 1,000 1,000
SUBSCRIPTIONS TOTAL 5,700 - 5,700

1034.51530 UNIFORMS & SAFETY


ERGONOMIC EQUIPMENT 6,000 6,000
PERSONAL PROTECTIVE EQUIPMENT - NON OPERATIONS DEPARTMENTS 1,000 1,000
OCWD SHIRTS 500 500
SAFETY GLASSES - RX 2,000 2,000
SHOES 20,000 20,000
UNIFORMS & SAFETY TOTAL 29,500 - 29,500

1034.57004 MAINTENANCE EQUIPMENT - GENERAL


MEDICAL EQUIPMENT AED UNITS & SUPPLIES 4,500 4,500
MAINTENANCE EQUIPMENT - GENERAL TOTAL 4,500 - 4,500

1034.51550 SAFETY SUPPLIES


CONFINED SPACE EQUIPMENT 1,500 1,500
DISASTER/HAZMAT EQUIPMENT/SUPPLIES 3,000 3,000
SAFETY INCENTIVES/SUPPLIES 1,200 1,200
FIRST AID SUPPLIES 1,000 1,000
SIGNS, TRAFFIC CONES 2,500 2,500
SAFETY SUPPLIES TOTAL 9,200 - 9,200

Orange County Water District 11-18 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
SAFETY & RISK MANAGEMENT (1034)
JDE Account Description Administration GWRS
Total
Number
ACTIVITY CODE 9900 9922
1034.51102 MEMBERSHIP
AMERICAN SOCIETY OF SAFETY ENGINEERS 350 350
PUBLIC SAFETY MANAGEMENT ASSOCIATION 150 150
MEMBERSHIP TOTAL 500 - 500

1034.51192 STAFF TRAINING


CONFINED SPACE - TRAINING AND ANNUAL REQUIRED DRILLS 15,000 15,000
RESPIRATOR TRAINING 1,500 1,500
CPR/FIRST AID/AED 3,000 3,000
CRANE SAFETY/RIGGING 1,000 1,000
DOT HAZARDOUS MATERIALS TRAINING 3,200 3,200
ELECTRICAL TRAINING 10,000 10,000
FALL PROTECTION 2,500 2,500
FIRE EXTINGUISHER 500 500
FLAGGER TRAINING 1,200 1,200
HAZMAT 24/40 HOUR 2,000 2,000
HAZMAT ANNUAL 6,000 6,000
SAFETY STAFF REQUIRED PROFESSIONAL TRAINING 2,000 2,000
STAFF TRAINING TOTAL 47,900 - 47,900

1034.51202 SECURITY PROGRAM


ALARM SYSTEM MONITORING - TRI-TEK (FHQ AND PRADO) 3,800 3,800
BAY ALARM FV 600 600
FV SECURITY GUARD SERVICES 170,000 170,000
FIELD SECURITY SERVICES 255,000 255,000
SECURITY PROGRAM TOTAL 429,400 - 429,400

1034.51112 SPECIAL DEPARTMENT EXPENSE


CITY/COUNTY ALARM PERMITS 1,800 1,800
COUNTY HAZMAT WASTE PROGRAM - CUPA FEES 1,000 1,000
DTSC AND EPA FEES 1,000 1,000
STATE GENERATOR FEE 1,200 1,200
SPECIAL DEPARTMENT EXPENSE TOTAL 5,000 - 5,000

SAFETY AND RISK MANAGEMENT GRAND TOTAL 1,485,631 68,602 1,554,233

Orange County Water District 11-19 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
WATER QUALITY (1036)
GWP GWR System SAR Forebay VOC MTBE
JDE Account Description General SBGPP
Number
Assistance O&M Monitoring Litigation Litigation Total
ACTIVITY CODE 9900 4406 9922 4602 9936 9941 9954
SALARIES & BENEFITS
1036.50104 REGULAR SALARIES 498,697 223,116 288,406 133,962 1,049 17,772 1,049 1,164,050
1036.50106 OVERTIME 5,296 1,789 3,381 1,473 16 190 16 12,159
1036.50210 PAYROLL TAXES 7,308 3,261 4,231 1,964 15 260 15 17,055
1036.50202 RETIREMENT 83,915 37,447 48,583 22,550 177 2,991 177 195,839
1036.50204 HEALTH INSURANCE 77,066 31,990 49,224 22,678 96 2,879 96 184,030
1036.50206 WORKERS' COMPENSATION 14,941 4,605 9,261 4,156 38 508 38 33,546
SALARIES & BENEFITS TOTAL 687,222 302,208 403,085 186,783 1,391 24,600 1,391 1,606,680

1036.51301 TRAVEL/CONFERENCES
WATER QUALITY, WATER RESOURCES, SAFETY CONFERENCES 2,000 2,000
ACWA WATER QUALITY COMMITTEE MEETINGS (SACRAMENTO) 500 500
TRAVEL/CONFERENCES TOTAL 2,500 - - - - - - 2,500

1036.51501 OFFICE EXPENSE - GENERAL


OFFICE/WQ SAMPLING CONSUMABLE PRODUCTS (SAMPLE LABELS, PAPER,
PRINTER CARTRIDGES, TAPE, ETC.); COMPUTER-RELATED EQUIPMENT 4,000 2,000 3,200 1,000 300 10,500
FEDEX SHIPPING: WQ SAMPLES TO RESEARCHERS - COOPERATIVE,
JOINT EFFORT; JPIA SAFETY AND TRAINING VIDEOS, ETC. 3,000 3,000
OFFICE EXPENSE - GENERAL TOTAL 7,000 2,000 3,200 1,000 - 300 - 13,500

1036.51520 GAS & DIESEL FUEL


GASOLINE/DIESEL FUEL 5,000 5,000 3,000 2,000 500 15,500
GAS & DIESEL FUEL TOTAL 5,000 5,000 3,000 2,000 - 500 - 15,500

1036.51530 UNIFORMS & SAFETY


OCWD UNIFORMS; RAIN BOOTS; RAIN JACKET/OVERALLS 1,500 1,500
UNIFORMS & SAFETY TOTAL 1,500 - - - - - - 1,500

1036.57004 MAINTENANCE & EQUIPMENT - GENERAL


ROUTINE MAINT & PARTS FOR FIELD MONITORING EQUIPMENT,
PUMPS, GENERATORS, CONSTRUCTING ANCILLARY SYSTEMS,
TREATMENT ISSUES, ETC.; REPLACEMENT EQUIPMENT, FIELD METERS,
INSTRUMENTATION, PIPES, WIRE, CONNECTORS, FITTINGS, PARTS
FOR MECHANICAL AND SUBMERSIBLE PUMPS; SAFETY ITEMS, TRAFFIC
CONTROL DEVICES; REPLACEMENT VEHICLE/OTHER SPECIALTY PARTS 8,000 1,000 2,500 1,000 12,500
REPLACEMENT OF FAILED SUBMERSIBLE PUMPS - MP1 &
SQE PUMPS AT EXISTING SITES OR PUMPS ON TRUCKS 15,000 15,000
HYDRAULIC SYSTEM MAINTENANCE (T-98) 800 800 1,600
MANUFACTURER FIELD EQUIPMENT REPAIRS 4,000 300 3,000 1,000 100 8,400
MAINTENANCE & EQUIPMENT - GENERAL TOTAL 27,800 1,300 6,300 2,000 - 100 - 37,500

1036.51545 SMALL TOOLS/FIELD SUPPLIES


FIELD SUPPLIES & MATERIALS FOR SAMPLE COLLECTION TASKS;
BATTERIES,BUCKETS, ICE CHESTS, MAN-HOLE
PULLERS, CARBON TREATMENT VESSELS AND ANCILLARY
PARTS, LOCKS, 250-GAL DECON WATER TANK(S) OR OTHER TANKS/VESSELS,
SAFETY EQUIPMENT (LIGHT BAR, CONES, SIGNS), CARBON SUPPLIES,
SPECIALIZED FITTINGS FOR CARBON TREATMENT SYSTEM, DRUMS FOR
SPENT CARBON; SPECIALTY ITEMS/EQUIPMENT 7,000 800 4,000 3,000 200 15,000
WQ CONSUMABLE ITEMS (TUBING, HOSES, FITTINGS, SMALL
TOOLS, BLUE ICE, SHIPPING SUPPLIES & PACKING MATERIALS
REPLACEMENT OF AGED, FAILED FIELD METERS, PROBES,
WATER LEVEL TAPES, CONTROLLERS, ETC.) 8,000 8,000
FILTRASORB F600 CARBON AND OVC CARBON FOR
MOBILE CARBON TREATMENT UNITS (MONITORING WELL DISCHARGES) 26,000 26,000
SMALL TOOLS/FIELD SUPPLIES TOTAL 41,000 800 4,000 3,000 - 200 - 49,000

Orange County Water District 11-20 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
WATER QUALITY (1036)
GWP GWR System SAR Forebay VOC MTBE
JDE Account Description General SBGPP
Number
Assistance O&M Monitoring Litigation Litigation Total
ACTIVITY CODE 9900 4406 9922 4602 9936 9941 9954
1036.51555 LAB SUPPLIES/EQUIPMENT
CALIBRATION SOLUTIONS AND FIELD PRESERVATIVES
GLASSWARE, STORAGE CONTAINERS, CARBOYS, GLOVES,
DISPENSERS, SAFETY GLASSES, SPILL CONTROL
MATERIALS, MISC. LAB SUPPLIES AND UTENSILS,
RADIOACTIVITY BOTTLES AND OTHER SPECIALTY SAMPLE
CONTAINERS OR SUPPLIES (ORP SOLUTION, ETC.) 2,000 1,000 1,000 700 100 4,800
LAB SUPPLIES/EUIPMENT TOTAL 2,000 1,000 1,000 700 - 100 - 4,800

1036.51560 LAB SAMPLES ANALYSIS


GWRS PERMIT: FPW, TALBERT BARRIER AND FOREBAY BASIN MW SITES:
RADIOLOGICAL, PRIORITY POLLUTANTS, ASBESTOS, DIOXIN;
MICROBIAL AND MONTHLY ROP COLIPHAGE MONITORING. 20,000 20,000
GWRS SPECIAL STUDIES (OCWD/OCSD PATHOGEN LRV STUDY, CEC's, ETC.) 25,000 25,000
GROUNDWATER PRODUCER DRINKING WATER WELL TESTING: NEW WELLS,
RADIOLOGICAL TESTING, CONFIRMATION TESTING, ETC. 12,000 12,000
GREEN ACRES MONITORING 800 800
SARMON WATER QUALITY: MICROBIAL (E.G., PHAGE, BACTERIAL, ETC.)
TOTAL ORGANIC HALIDES (TOX) AND RADIOLOGICAL TESTING 48,000 48,000
SARMON SPECIAL STUIDES (EMERGING CONTAMINANTS) 10,000 10,000
RIVER DESILTING STUDIES (RIVERBED FILTRATION) 3,000 3,000
IRVINE DESALTER/MCAS TCE PLUME: NAVY AGREEMENT, AND
IRWD/DPH MONITORING PROGRAM - SENTINEL WELLS 13,000 13,000
MISC. OUTSIDE LAB TESTING (SPILLS, EMERGENCIES, SPLITS,
CONFIRMATION TESTING, SPECIFIC ANALYTES, ETC.) 12,000 12,000
NPDES TPH MONITORING DE MINIMUS PERMIT, AS NEEDED 3,000 3,000
WESTBAY VOC SAMPLES - CONTRACT LAB ANALYSIS 50,000 50,000
UCMR4 PROGRAM - CONFIRMATIONS (AS NEEDED) 10,000 10,000
LAB SAMPLES ANALYSIS TOTAL 81,800 22,000 45,000 58,000 - - - 206,800

1036.51192 TECHNICAL TRAINING


STAFF SAFETY / WQ SAMPLING / TECHNICAL TRAINING (I.E., STORMWATER
NEW PERMIT & QISP TRAINING, REGULATORY, MONITORING TECHNIQUES,
ETC.) 2,000 2,000
TECHNICAL TRAINING TOTAL 2,000 - - - - - - 2,000

1036.51112 SPECIAL DEPT EXPENSE


NPDES STORMWATER PERMIT - GWRS FACILITY 2,500 2,500
NPDES GENERAL DEWATERING PERMIT - BASINWIDE (EXCLUDES
DISCHARGES TO NEWPORT BAY) 2,000 2,000
SPENT CARBON DISPOSAL COSTS (CARBON TREATMENT OF
PURGED GW AT MONITORING WELL SITES TO MEET NPDES
DISCHARGE PERMIT LIMITS) 3,500 3,500
SPECIAL DEPT EXPENSE TOTAL 5,500 - 2,500 - - - - 8,000

WATER QUALITY GRAND TOTAL 863,322 334,308 468,085 253,483 1,391 25,800 1,391 1,947,780

Orange County Water District 11-21 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
LABORATORY (1038)
Groundwater Forebay
GWR System Talbert Barrier MTBE SAR
JDE Account Description General
O&M O&M
GAP O&M Producers'
Litigation
VOC
Monitoring
Prado O&M
Total
Number Assistance N. Basin
ACTIVITY CODE 9900 9922 9908 9911 4406 9954 9936 4602 9924
SALARIES & BENEFITS
1038.50104 REGULAR SALARIES 360,147 1,112,196 278,048 76,932 1,044,137 6,709 6,709 171,349 62,372 3,118,599
1038.50106 OVERTIME 3,970 23,930 5,748 1,616 22,044 3,647 1,244 62,199
1038.50210 PAYROLL TAXES 5,344 20,404 4,752 1,453 19,264 97 97 3,108 1,113 55,632
1038.50202 RETIREMENT 60,452 178,611 45,542 12,234 167,303 1,117 1,117 27,604 10,081 504,062
1038.50204 HEALTH INSURANCE 50,211 168,704 42,637 11,455 156,822 803 803 26,066 9,337 466,837
1038.50206 WORKERS' COMPENSATION 4,716 14,666 3,664 1,014 13,765 87 87 2,259 822 41,081
SALARIES & BENEFITS TOTAL 484,840 1,518,510 380,391 104,704 1,423,335 8,814 8,814 234,034 84,968 4,248,410

1038.51301 TRAVEL/CONFERENCE/MILEAGE
PITTCON-INSTRUMENT/NEW TECHNOLOGY (ORLANDO, 1-STAFF) 500 500 500 500 500 2,500
NEMC - TNI, EPA - REGULATORY (NEW ORLEANS, 1) 500 500 500 500 500 2,500
WQTC - AWWA CONFERENCE (TORONTO, 2) 2,000 1,000 500 500 1,000 5,000
TRAVEL/CONFERENCE/MILEAGE TOTAL 3,000 2,000 1,500 1,500 2,000 - - - - 10,000

1038.51501 OFFICE EXPENSE - GENERAL


OFFICE SUPPORT MATERIALS 5,500 1,800 1,200 200 2,000 1,000 1,000 1,500 200 14,400
PAPERS, PARTS, DATA CABLES, INSTRUMENT DATA LINKS, ETC. 1,500 400 300 100 300 300 300 300 3,500
OFFICE EXPENSE - GENERAL TOTAL 7,000 2,200 1,500 300 2,300 1,300 1,300 1,800 200 17,900

1038.51104 SUBSCRIPTIONS
JOURNAL: AWWA, ACS, ANALYTICAL CHROMATOGRAPHY 200 200
SUBSCRIPTIONS TOTAL - - - - 200 - - - - 200

1038.51530 UNIFORMS & SAFETY


LAB COATS AND SAFETY EQUIPMENT 800 800 350 800 350 500 3,600
UNIFORMS & SAFETY TOTAL - 800 800 350 800 - - 350 500 3,600

1038.57004 MAINTENANCE EQUIPMENT - GENERAL


DIONEX IC SYSTEM (ANIONS/IDBP) 4,500 3,000 2,500 5,500 2,000 2,000 19,500
DIONEX IC SYSTEM (ANIONS/CR VI) 4,500 3,000 2,500 5,500 2,000 2,000 19,500
THERMO ELECTRON - IC/MS 6,000 5,000 3,000 6,000 3,000 2,000 25,000
PERKIN ELMER ICP/OES 7,000 2,000 500 5,000 4,000 1,500 20,000
ANNUAL LABORATORY BALANCES CERTIFICATION 600 400 300 600 400 400 2,700
LABORATORY SCIENTIFIC REFRIGERATORS (19) 2,500 1,000 500 3,000 500 500 8,000
BRUKER GC/MS SYSTEM (2) 11,000 2,000 1,000 11,000 5,000 1,000 31,000
LIMS AND INSTRUMENT INTERFACE SERVICE SUPPORT 3,000 1,000 1,000 3,000 1,000 1,000 10,000
GE TOC ANALYZERS (3) 9,000 2,000 3,000 9,000 9,000 2,000 34,000
AGILENT GC/MS ANALYTICAL SYSTEMS (ORGANIC) 44,500 10,000 44,500 10,000 1,000 110,000
WATERS HPLC SYSTEMS 10,000 2,000 9,000 5,000 1,000 27,000

Orange County Water District 11-22 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
LABORATORY (1038)
Groundwater Forebay
GWR System Talbert Barrier MTBE SAR
JDE Account Description General
O&M O&M
GAP O&M Producers'
Litigation
VOC
Monitoring
Prado O&M
Total
Number Assistance N. Basin
ACTIVITY CODE 9900 9922 9908 9911 4406 9954 9936 4602 9924
1038.57004 MAINTENANCE EQUIPMENT - GENERAL (CONTINUED)
PARKER NITROGEN GENERATOR 2,500 2,500 5,000
PEAK TRI-GAS GENERATOR 3,500 1,000 3,500 3,000 11,000
THERMO ELECTRON AUTOTRACE 280 (8) 9,000 5,000 9,000 5,000 28,000
AB SCIEX 5500 - LC/MS/MS 26,000 2,000 12,000 3,000 43,000
AB SCIEX 6500 - LC/MS/MS 27,000 3,000 12,000 4,000 46,000
LEAP AUTOSAMPLER 3,500 1,000 2,000 1,000 7,500
METTLER AUTOTITRATOR 1,500 1,500 1,000 4,000
AGILENT LC SUPPORT 4,250 1,000 3,250 8,500
HIGH SPEED PRINTER 1,000 500 1,000 500 3,000
DI SYSTEM - SUPPORT & MAINTENANCE 3,000 2,000 1,000 5,000 2,000 1,000 14,000
STERIS -STERILIZERS, DRYING OVENS & AUTOMATED WASHERS 7,000 2,500 4,500 5,000 3,000 2,000 24,000
CULLIGAN RO SYSTEM 500 500 500 500 500 500 3,000
FUME HOOD CERTIFICATION (36) & SNORKEL(35) SERVICE 1,500 1,500 1,500 4,500
ACID DILUTION TANK PM'S 1,000 1,000 1,000 3,000
VACUUM TRUCK HAUL OFF 2,500 2,000 500 5,000
CHEM PRO - CORROSION INHIBITOR 1,400 1,400
MAINTENANCE EQUIPMENT - GENERAL TOTAL - 197,750 49,900 22,300 161,850 - - 67,900 17,900 517,600

1038.51545 SMALL TOOLS & EQUIPMENT


TOOLS AND EQUIPMENT TO SERVICE ANALYTICAL SYSTEM 1,000 500 500 1,000 500 3,500
SMALL TOOLS & EQUIPMENT TOTAL - 1,000 500 500 1,000 - - 500 - 3,500

1038.51555 LAB SUPPLIES


STANDARDS, PROFICIENCY TEST & QA/QC SAMPLES 5,000 45,000 20,000 20,000 50,000 10,000 150,000
REAGENTS, SOLVENTS & CHEMICALS 10,000 120,000 60,000 50,000 120,000 30,000 390,000
GC-LC-MS COLUMNS, DETECTORS & ANALYTICAL PARTS 10,000 60,000 35,000 25,000 60,000 20,000 210,000
EXTRACTION CARTRIDGES & DISKS 2,000 10,000 5,000 3,000 10,000 10,000 40,000
GAS (HELIUM, NITROGEN, CARBON DIOXIDE, ARGON) SUPPLY 20,000 10,000 8,000 20,000 10,000 68,000
MISCELLANEOUS SUPPLY 500 300 200 500 500 2,000
LAB SUPPLIES TOTAL 27,000 255,500 130,300 106,200 260,500 - - 80,500 - 860,000

1038.51560 LAB SAMPLES ANALYSIS


CONFIRMATION DATA FROM A SECOND LAB 500 200 200 500 400 200 2,000
LAB SAMPLES ANALYSIS TOTAL - 500 200 200 500 - - 400 200 2,000

1038.51565 EQUIPMENT RENTAL - GENERAL


CYLINDER RENTAL 300 200 100 300 100 1,000
EQUIPMENT RENTAL - GENERAL TOTAL - 300 200 100 300 - - 100 - 1,000

1038.51192 EDUCATIONAL TRAINING


ANNUAL LAB TRAINING ON TNI QUALITY SYSTEM/ETHICS 5,000 5,000

EDUCATIONAL TRAINING TOTAL 5,000 - - - - - - - - 5,000

1038.51112 SPECIAL DEPARTMENT EXPENSE


ANNUAL CERTIFICATION FEE - STATE ELAP & TNI AUDIT 2,000 2,500 1,000 1,000 2,500 1,000 10,000
HAZARDOUS WASTE DISPOSAL SERVICE 7,500 5,000 5,000 7,500 5,000 30,000
SPECIAL DEPARTMENT EXPENSE TOTAL 2,000 10,000 6,000 6,000 10,000 - - 6,000 - 40,000

LABORATORY GRAND TOTAL 528,840 1,988,560 571,291 242,154 1,862,785 10,114 10,114 391,584 103,768 5,709,210

Orange County Water District 11-23 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
RESEARCH & DEVELOPMENT (1040)

GWR GWR WE&RF WE&RF


Talbert Forebay ReNUWIt Grants/ Particip- Prado Next Gen. NSF USBR USBR
JDE Account Description General Process System ADVMET NDMA Post SAR TMDL Total
Barrier O&M ERC Proposals ating Utility Wetlands Seq. EAGER NDMA CCD FO
Number Opt. O&M Analyzer Treatment
ACTIVITY CODE 9900 9952 9922 9908 9920 9953 9995 9996 9997 9925 9992 9994 9998 9955 1790 1782 1781
SALARIES & BENEFITS
1040.50104 REGULAR SALARIES 286,101 327,191 113,269 1,399 51,773 6,996 1,484 27,451 30,954 3,787 35,320 4,252 29,474 4,198 29,470 40,883 29,772 1,023,776
1040.50210 PAYROLL TAXES 4,148 6,731 2,690 20 1,799 101 22 398 449 55 875 62 689 61 427 1,169 710 20,406
1040.50202 RETIREMENT 47,636 49,142 16,045 233 5,806 1,165 247 4,571 5,154 631 4,907 708 4,204 699 4,907 5,259 4,210 155,524
1040.50204 HEALTH INSURANCE 35,394 33,493 16,153 207 6,421 1,037 173 3,626 3,752 587 4,321 753 3,941 622 4,321 5,600 3,434 123,836
1040.50206 WORKERS' COMPENSATION 2,845 3,624 1,353 18 590 91 19 357 402 49 459 55 380 55 383 531 377 11,591
SALARIES & BENEFITS TOTAL 376,124 420,181 149,511 1,878 66,390 9,391 1,945 36,402 40,711 5,108 45,882 5,829 38,689 5,635 39,509 53,443 38,504 1,335,133

1040.51301 TRAVEL/CONFERENCE/MILEAGE
ReNUWIt NSF ERC IAB MEETINGS (STANFORD, BERKELEY, CO
SCHOOL OF MINES, NEW MEXICO STATE U) 1,000 1,000

THE WATER RESEARCH FOUNDATION RESEARCH


CONFERENCE (3 STAFF, SPRING 2019) 3,400 3,400

WATEREUSE CALIFORNIA ANNUAL CONFERENCE (3 STAFF,


SPRING 2019) 3,000 3,000
WEFTEC (1 STAFF, NWE ORLEANS, SEPTEMBER 2018) 1,700 1,700
GRA OR BIANNUAL SYMPOSIUM ON MAR (2 STAFF) 2,700 2,700
SPECIALTY CONFERENCE 2,800 2,800
AMERICAN SOCIETY OF MICROBIOLOGY (ASM) MICROBE
CONFERENCE (1 STAFF, SUMMER 2019) 2,100 2,100
CLARKE PRIZE CONFERENCE (5 STAFF, FALL 2019) 700 700
TRAVEL/CONFERENCE/MILEAGE TOTAL 700 10,900 2,700 - - - 1,000 - - - 2,100 - - - - - - 17,400

1040.53001 PROFESSIONAL SERVICES - GENERAL

NON-TARGETED ANALYSIS COMPARISON OF EXTRACTION


SORBENTS (SDSU) 20,000 20,000
LA PALMA BASIN PERCOLATION RATE DETERMINED VIA FIBER
OPTIC DISTRIBUTED TEMPERATURE SENSING (CSULB) 20,000 20,000
RO MEMBRANE SCALE MONITORING (MEMO) FOR
ANTISCALANT TESTING (UCLA/NORIA WATER) 30,000 30,000

INVESTIGATION OF H2O2 AS ALTERNATIVE BIOCIDE FOR MF


AND RO (STANFORD/RENUWIT) 25,000 25,000
RESEARCH COLLABORATION SUPPORT (OPPORTUNISTIC) 30,000 30,000
PROFESSIONAL SERVICES - GENERAL TOTAL 30,000 75,000 20,000 - - - - - - - - - - - - - - 125,000

1040.51501 OFFICE EXPENSE - GENERAL


MISC. OFFICE EXPENSES (NOTEBOOKS, PHOTO, REPORT
PREPARATION, POSTERS, SOFTWARE) 2,500 2,500
PRINTER INK/TONER CARTRIDGES 500 500
SHIPPING (FEDEX/COURIER) 1,000 1,000
OFFICE FURNITURE 1,200 1,200
OFFICE EXPENSE - GENERAL TOTAL 5,200 - - - - - - - - - - - - - - - - 5,200

1040.51520 GAS & DIESEL FUEL


FUEL FOR DEPARTMENT VEHICLE 1,000 1,000
GAS & DIESEL FUEL TOTAL 1,000 - - - - - - - - - - - - - - - - 1,000

Orange County Water District 11-24 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
RESEARCH & DEVELOPMENT (1040)

GWR GWR WE&RF WE&RF


Talbert Forebay ReNUWIt Grants/ Particip- Prado Next Gen. NSF USBR USBR
JDE Account Description General Process System ADVMET NDMA Post SAR TMDL Total
Barrier O&M ERC Proposals ating Utility Wetlands Seq. EAGER NDMA CCD FO
Number Opt. O&M Analyzer Treatment
ACTIVITY CODE 9900 9952 9922 9908 9920 9953 9995 9996 9997 9925 9992 9994 9998 9955 1790 1782 1781
1040.57004 MAINTENANCE EQUIPMENT - GENERAL
ABI 310 GENETIC ANALYZER SERVICE CONTRACT 9,130 9,130
ALL BALANCES (9) 300 300
ALL INCUBATORS (6) 500 500
MICROSCOPE REPAIR/CLEANING 500 500
ATR-FTIR SPECTROMETER REPAIR 3,000 3,000
ABI STEP ONE PLUS REPAIR 3,300 3,300
ALL HOOD SAFETY INSPECTION/CALIBRATION (4) 400 400
FRL EQUIPMENT MAINTENANCE 1,500 1,500
HIGH SPEED CENTRIFUGES (2) 300 300
HPLC (WATERS 2695) SERVICE CONTRACT 4,165 4,165
LARGE REFRIGERATOR 250 250
UV RADIOMETER CALIBRATION/SERVICE 450 450
MEMBRANE FLAT SHEET TEST CELL REPAIRS (20) 1,500 1,500
VERTI FAST THERMOCYCLER REPAIR 2,000 2,000
SMALL REFRIGERATORS (6) 350 350
COULTER MULTISIZER 4 (PARTICLE COUNTER) SERVICE
CONTRACT 5,250 5,250
ULTRA LOW TEMP FREEZER 500 500
MAINTENANCE EQUIPMENT - GENERAL TOTAL 33,395 - - - - - - - - - - - - - - - - 33,395

1040.57016 MAINT STRUCTURE & IMPROVEMENT - GENERAL


GENERAL DEPARTMENTAL REPAIR WORK 1,000 1,000
MAINT STRUCTURE & IMPROVEMENT - GENERAL TOTAL 1,000 - - - - - - - - - - - - - - - - 1,000

1040.51555 LAB SUPPLIES & SMALL EQUIPMENT


EXPENDABLE LAB SUPPLIES - GENERAL 7,750 8,500 3,000 5,200 24,450
HYDRAULIC SUPPLIES (PUMPS, VALVES, FITTINGS) 2,000 1,000 1,500 1,500 6,000
MEMBRANES (MF/RO) 2,000 2,000
MOLECULAR BIOLOGY SUPPLIES 2,000 1,000 1,000 5,000 9,000
LAB SUPPLIES & SMALL EQUIPMENT TOTAL 9,750 13,500 4,500 - 7,700 1,000 - - - - 5,000 - - - - - - 41,450

1040.51560 LAB SAMPLES ANALYSIS


SEM ANALYSIS 6,000 6,000
OTHERS (DNA SEQUENCING, CHEMICAL ANALYSIS, ETC.) 1,000 1,000 2,000
LAB SAMPLES ANALYSIS TOTAL - 7,000 - - - - - - - - 1,000 - - - - - - 8,000

1040.51565 EQUIPMENT RENTAL - GENERAL


BOTTLED WATER SERVICE (SPARKLETTS BPO ANNEX) 300 300
DI CARTRIDGES (EVOQUA BPO) 2,000 2,000

GAS CYLINDERS/LIQUID N2 (WESTAIR BPO) 400 400


EQUIPMENT RENTAL - GENERAL TOTAL 2,700 - - - - - - - - - - - - - - - - 2,700

1040.51102 MEMBERSHIP
PROFESSIONAL ENGINEER LICENSE RENEWAL FEE 115 115
INTERNATIONAL ULTRAVIOLET ASSOCIATION (IUVA) 250 250
RENUWIT NSF ERC IAB MEMBERSHIP FEE (STANFORD,
BERKELEY, CO SCHOOL OF MINES, NEW MEXICO STATE U)
[YEAR 6 OF 10] 10,000 10,000
GROUNDWATER RESOURCES ASSOCIATION 125 125
NATIONAL GROUNDWATER ASSOCIATION 135 135
MEMBERSHIP TOTAL 10,625 - - - - - - - - - - - - - - - - 10,625

1040.51112 SPECIAL DEPARTMENT EXPENSE


JOURNAL PAGE CHARGES & REPRINTS 500 500
REFERENCE MATERIAL (BOOKS, MANUALS, CDS) 500 500
SPECIAL DEPARTMENT EXPENSE TOTAL 1,000 - - - - - - - - - - - - - - - - 1,000

RESEARCH AND DEVELOPMENT GRAND TOTAL 471,494 526,581 176,711 1,878 74,090 10,391 2,945 36,402 40,711 5,108 53,982 5,829 38,689 5,635 39,509 53,443 38,504 1,581,903

Orange County Water District 11-25 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
PLANNING & WATERSHED MANAGEMENT (1044)

JDE Account Description General SARCCUP Prado FS


Number
Total
ACTIVITY CODE 9900 9993 9978
SALARIES & BENEFITS
1044.50104 REGULAR SALARIES 496,540 159,285 21,131 676,956
1044.50210 PAYROLL TAXES 7,385 3,051 306 10,742
1044.50202 RETIREMENT 82,025 23,923 3,518 109,466
1044.50204 HEALTH INSURANCE 52,967 21,914 2,608 77,489
1044.50206 WORKERS' COMPENSATION 3,327 1,067 142 4,536
SALARIES & BENEFITS TOTAL 642,243 209,240 27,705 879,189

1044.51301 TRAVEL/CONFERENCE/MILEAGE
ACWA CONFERENCES (FALL AND SPRING) 2,500 2,500
ACWA GROUNDWATER COMM MTGS IN SACRAMENTO 600 600
WASHINGTON DC MTGS WITH ARMY CORPS ON PRADO FS 2,200 2,200
GRA BOARD MEETINGS & CONFERENCE 2,000 2,000
INTERNATIONAL SYMPOSIUM ON MANAGED AQUIFER RECHARGE 1,900 1,900
TRAVEL/CONFERENCE/MILEAGE TOTAL 9,200 - - 9,200

1044.53001 PROFESSIONAL SERVICE - GENERAL


PRADO BASIN FEASIBILITY STUDY (TECHNICAL STUDIES AND CONSULTANT SUPPORT) 100,000 100,000
PRADO FORECAST INFORMED RESERVOIR OPERATIONS EVALUATION 250,000 250,000
PRADO DEVIATION TECHNICAL STUDIES 100,000 100,000
SUPPORT FOR CEQA COMPLIANCE (AIR & NOISE ANALYSES) 80,000 80,000
QUAGGA CONTROL STUDY 10,000 10,000
SA RIVER CONSERVATION AND CONJUNCTIVE USE PROJECT 200,000 200,000
PROFESSIONAL SERVICE - GENERAL TOTAL 440,000 200,000 100,000 740,000

1044.51501 OFFICE EXPENSE - GENERAL


OFFICE SUPPLIES 100 100
REWG MEETING EXPENSES 300 300
SPECIAL COPYING AND FEDERAL EXPRESS 1,500 1,500
OFFICE EXPENSE - GENERAL TOTAL 1,900 - - 1,900

1044.51520 GAS & DIESEL FUEL


FUEL FOR DISTRICT VEHICLES 1,000 1,000
GAS & DIESEL FUEL TOTAL 1,000 - - 1,000

Orange County Water District 11-26 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
PLANNING & WATERSHED MANAGEMENT (1044)

JDE Account Description General SARCCUP Prado FS


Number
Total
ACTIVITY CODE 9900 9993 9978
1044.51112 SPECIAL DEPARTMENT EXPENSE
WATER RIGHTS FEE (STATE WATER RESOURCES CONTROL BOARD) 35,000 35,000
REGIONAL GENERAL MAINTENANCE PERMIT (CA DEPT OF FISH & WILDLIFE ANNUAL FEE) 16,000 16,000
O.C. CONSERVATION CORP - ADOPTED CHANNEL 18,400 18,400
REWG STUDIES (CLOGGING STUDIES, SUBSURFACE RECHARGE) 25,000 25,000
PERMIT FEES FOR PROJECTS (CDFG, ARMY CORPS, REG BOARD, CEQA FILINGS) 12,000 12,000
SPECIAL DEPARTMENT EXPENSE TOTAL 106,400 - - 106,400

1044.51530 UNIFORMS & SAFETY


DISTRICT SHIRTS 200 200
UNIFORMS & SAFETY TOTAL 200 - - 200

1044.51102 MEMBERSHIP
PROFESSIONAL CERTIFICATIONS & MEMBERSHIPS 400 400
MEMBERSHIP TOTAL 400 - - 400

PLANNING & WATERSHED MANAGEMENT GRAND TOTAL 1,201,343 409,240 127,705 1,738,289

Orange County Water District 11-27 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
LOCAL RESOURCES (1045)

JDE Account Description General GWRS


Number
Total
ACTIVITY CODE 9900 9922
SALARIES & BENEFITS
1045.50104 REGULAR SALARIES 169,047 42,262 211,308
1045.50210 PAYROLL TAXES 2,451 613 3,064
1045.50202 RETIREMENT 28,146 7,037 35,183
1045.50204 HEALTH INSURANCE 18,062 4,515 22,577
1045.50206 WORKERS' COMPENSATION 1,133 283 1,416
SALARIES & BENEFITS TOTAL 218,839 54,710 273,548

1045.51102 MEMBERSHIPS
MEMBERSHIPS (OCWA, AWWA, CRWA) 200 200
MEMBERSHIPS TOTAL 200 - 200

1045.51301 TRAVEL/CONFERENCE/MILEAGE
ACWA MEETING 1,200 1,200
CAL DESAL 500 500
LOCAL MEETINGS 250 250
TRAVEL/CONFERENCE/MILEAGE TOTAL 1,950 - 1,950

1045.51501 OFFICE EXPENSE - GENERAL


OFFICE/MEETING SUPPLIES 400 400
COLOR COPIES 300 300
FEDERAL EXPRESS TO GRANT & LOAN FUNDING AGENCIES 400 400
OFFICE EXPENSE - GENERAL TOTAL 1,100 - 1,100

1045.53001 PROFESSIONAL SERVICES - GENERAL


POSEIDON STUDIES 50,000 50,000
PROFESSIONAL SERVICES - GENERAL TOTAL 50,000 - 50,000

LOCAL RESOURCES GRAND TOTAL 272,089 54,710 326,798

Orange County Water District 11-28 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
REGULATORY AFFAIRS (1046)
GWR
SAR
JDE Account Description General System GAP O&M
Monitoring Total
Number O&M
ACTIVITY CODE 9900 9922 9911 4602
SALARIES & BENEFITS
1046.50104 REGULAR SALARIES 376,286 94,072 470,358
1046.50210 PAYROLL TAXES 6,341 1,585 7,926
1046.50202 RETIREMENT 62,652 15,663 78,315
1046.50204 HEALTH INSURANCE 47,292 11,823 59,115
1046.50206 WORKERS' COMPENSATION 2,521 630 3,151
SALARIES & BENEFITS TOTAL 495,092 123,773 - - 618,865

1046.51301 TRAVEL/CONFERENCE/MILEAGE
RECYCLED WATER POLICY/LEGISLATION TRIPS (SACRAMETNO, CA) (2) 1,200 1,200
33nd WATEREUSE SYMPOSIUM (SEPTEMBER: AUSTIN, TX) (1 STAFF) 1,250 1,250
2019 WATEREUSE CALIFORNIA ANNUAL CONF (MARCH: TBD) (2 STAFF) 2,000 2,000
2019 THE WRF RESEARCH CONFERENCE (MAY: TBD) (1 STAFF) 2,000 2,000
2018 AWWA WQTC CONFERENCE (NOV: TORONTO, ONT) (1 STAFF) 1,250 1,250
2018 WEFTEC (OCT: NEW ORLEANS) (1 STAFF) 1,300 1,300
RESEARCH FOUNDATION PAC MEETINGS (2) 1,000 1,000
TRAVEL/CONFERENCE/MILEAGE TOTAL 10,000 - - - 10,000

1046.53001 PROFESSIONAL SERVICE - GENERAL


CONSULTING SERVICES TO UPDATE GAP RULES/REGS TO OC GUIDELINES 20,000 20,000
CONSULTING SERVICES FOR 2018 GWRS ANNUAL REPORT 55,000 55,000
NWRI SAR WQ MONITORING (SARMON) INDEPENDENT ADVISORY PANEL 25,000 25,000
NWRI GWRS INDEPENDENT ADVISORY PANEL (PERMIT REQMT) 55,000 55,000
CONSULTING SERVICES TO RENEW GWRS SAR NPDES DISCHARGE PERMIT 10,000 10,000
PROFESSIONAL SERVICE - GENERAL TOTAL - 120,000 20,000 25,000 165,000

Orange County Water District 11-29 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
REGULATORY AFFAIRS (1046)
GWR
SAR
JDE Account Description General System GAP O&M
Monitoring Total
Number O&M
ACTIVITY CODE 9900 9922 9911 4602
1046.51501 OFFICE EXPENSE - GENERAL
SHIPPING COST/FEDEX/ONTRAC 500 500
OFFICE SUPPLIES (TONER, ETC.) 1,000 1,000
COLOR COPIES FOR GWRS ANNUAL REPORT & PANEL BOOKLETS 1,250 750 2,000
OFFICE EXPENSE - GENERAL TOTAL 1,500 1,250 - 750 3,500

1046.51104 SUBSCRIPTION
ENVIRONMENTAL SCIENCE & TECHNOLOGY JOURNAL (ACS) 250 250
GROUNDWATER JOURNAL (NGWA) 250 250
SUBSCRIPTION TOTAL 500 - - - 500

1046.51102 MEMBERSHIPS AND REGISTRATIONS


IWA & AWWA MEMBERSHIPS AND PROFESSIONAL REGISTRATIONS 800 800
MEMBERSHIPS AND REGISTRATIONS TOTAL 800 - - - 800

1046.51112 SPECIAL DEPARTMENT EXPENSE


RWQCB PERMIT FEE FOR GWR SYSTEM RIVER DISCHARGE 6,000 6,000
SWRCB DDW FEES FOR REVIEWING PERMITS AND PROJECTS 30,000 30,000
SPECIAL DEPARTMENT EXPENSE TOTAL 36,000 - - - 36,000

REGULATORY AFFAIRS GRAND TOTAL 543,892 245,023 20,000 25,750 834,665

Orange County Water District 11-30 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
WATER PRODUCTION (1050)
GWR
Process Talbert FV Facility GAP Lab Alamitos Forebay
JDE Account Description General System MWDOC MBI
Number
Optimization Barrier O&M O&M O&M Maintenance Barrier O&M O&M Total
O&M
ACTIVITY CODE 9900 9922 9952 9908 9901 9911 9974 9932 9920 9970 9990
SALARIES & BENEFITS
1050.50104 REGULAR SALARIES 646,095 3,126,999 625,634 425,722 632,123 722,436 229,834 5,570 270,653 117,856 121,300 6,924,224
1050.50106 OVERTIME SALARIES 26,702 209,041 36,968 7,449 24,847 44,336 9,260 60 6,440 5,083 1,450 371,636
1050.50210 PAYROLL TAXES 9,756 48,373 9,608 6,281 9,526 11,118 3,467 82 4,018 1,783 1,780 105,790
1050.50202 RETIREMENT 112,021 555,451 110,323 72,123 109,386 127,667 39,809 937 46,136 20,469 20,438 1,214,761
1050.50204 HEALTH INSURANCE 109,962 535,214 97,020 71,761 120,168 126,207 39,749 871 36,561 21,588 20,459 1,179,560
1050.50206 WORKERS' COMPENSATION 19,533 102,111 20,936 14,114 22,268 25,795 7,779 199 5,561 4,304 3,881 226,483
SALARIES & BENEFITS TOTAL 924,069 4,577,189 900,489 597,451 918,319 1,057,559 329,899 7,719 369,368 171,083 169,309 10,022,452

1050.51301 TRAVEL/CONFERENCE/MILEAGE
PATEL MAY 2019 AMTA WORKSHOP AND BOARD MEETING, OKLAHOMA CITY,
OK (JUST ATTENDING AMTA BOARD MEETING AT EVENT, TRIP COSTS
PARTIALLY REIMBURSED BY AMTA)
300 300
PATEL FEB 28-MARCH 1, 2019 AWWA/AMTA JOINT MEMBRANE TECHNOLOGY
CONF, NEW ORLEANS, LA (CONF ORGANIZER, ABSTRACT WILL BE
SUBMITTED, AMTA BOARD MEETING) 3,000 3,000
PATEL JULY 17-19, 2018 AMTA WORKSHOP, SPOKANE, WA (POSSIBLY
SPEAKING AND ATTENDING AMTA BOARD MEETING AT EVENT, TRIP COSTS
PARTIALLY REIMBURSED BY AMTA) 800 800
PATEL MARCH 2019 WATEREUSE CA ANNUAL CONFERENCE, (TBD,
SOUTHERN CALIFORNIA)
800 800
PATEL OCTOBER 23-25, 2018 AMTA WORKSHOP AND BOARD MEETING, STATE
COLLEGE, PA (JUST ATTENDING AMTA BOARD MEETING, TRIP COSTS
PARTIALLY REIMBURSED BY AMTA) 400 400
PATEL SEPTEMBER 9-12, 2018 WATEREUSE NATIONAL CONFERENCE,
AUSTIN, TX 1,700 1,700
PATEL JUNE 2019 AWWA ANNUAL CONFERNECE AND EXHIBITION (ACE),
DENVER, CO 2,000 2,000
BONSANGUE SEPTEMBER 26-28 TRI-STATE SEMINAR (INVITED TO GIVE A
PRESENTATION) LAS VEGAS, NV 1,000 1,000
DUNIVIN CONFERENCE ATTENDANCE TBD 2,000 2,000
CWEA ANNUAL CONFERENCE (2), MAINTENANCE (SACRAMENTO, CA) 3,000 3,000
KALINOWSKI EMERSON USER CONFERENCE (SAN ANTONIO, TEXAS) 2,500 2,500
PCS PROGRAMMER EMERSON USER CONFERENCE 2,500 2,500
MAINTENANCE CWEA LOCAL SECTION TRISTATE CONFERENCE (3) 4,000 4,000
TRAVEL/CONFERENCE/MILEAGE TOTAL - 24,000 - - - - - - - - - 24,000

1050.53001 PROFESSIONAL SERVICES-GENERAL


CONSULTING SERVICES GWRS 75,000 75,000
PROFESSIONAL SERVICES-GENERAL TOTAL - 75,000 - - - - - - - - - 75,000

1050.51501 OFFICE EXPENSE - GENERAL


BLUE PRINT AND COPIES 2,000 2,000
FILING CABINETS, CHAIRS 3,500 3,500
OFFICE SUPPLIES 9,100 400 9,500
CHAIR/FLOOR MATS FOR AWPF CONTROL ROOM (TYSON) 1,200 1,200
ADOBE PROFESSIONAL 2,000 2,000
ADMIN SOFTWARE TRAINING 1,000 1,000
OFFICE EXPENSE - GENERAL TOTAL - 18,800 400 - - - - - - - - 19,200

1050.51510 HARDWARE/SOFTWARE
PCS SYSTEM SOFTWARE SUPPORT (EMERSON GUARDIAN) 54,500 54,500
PCS SYSTEM HARDWARE 10,000 10,000
LAB BUILDING BMS SYSTEM HARDWARE/SOFTWARE UPGRADE 5,000 5,000
ADOBE PROFESSIONAL 500 500
HARDWARE/SOFTWARE TOTAL - 64,500 - 500 - - 5,000 - - - - 70,000

1050.51520 GAS & DIESEL FUEL


FUEL 12,000 11,000 3,000 26,000
GAS & DIESEL FUEL TOTAL - 12,000 - 11,000 3,000 - - - - - - 26,000

1050.51530 UNIFORMS & SAFETY


BOTTLED WATER AS REQUIRED IN TREATMENT AREA 2,500 2,500
JACKETS, POLO SHIRTS, RAINGEAR 3,500 2,100 5,600
DISTRICT SUPPLIED UNIFORMS 40,000 40,000
UNIFORMS & SAFETY TOTAL - 46,000 - 2,100 - - - - - - - 48,100

Orange County Water District 11-31 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
WATER PRODUCTION (1050)
GWR
Process Talbert FV Facility GAP Lab Alamitos Forebay
JDE Account Description General System MWDOC MBI
Number
Optimization Barrier O&M O&M O&M Maintenance Barrier O&M O&M Total
O&M
ACTIVITY CODE 9900 9922 9952 9908 9901 9911 9974 9932 9920 9970 9990
1050.57001 MAINTENANCE - SUPPLIES & MATERIAL - ELECTRICAL/INSTRUMENTATION
MISC MOTOR, PUMP WAREHOUSE SUPPLIES 5,000 1,000 750 1,250 8,000
PLANT UPS SYSTEM REPAIRS 6,500 1,000 500 8,000
ELECTRICAL WAREHOUSE SUPPLIES 4,500 1,000 500 6,000
INSTRUMENTATION PARTS AND SUPPLIES 8,000 4,500 1,000 13,500
LIGHTING & EMERGENCY, LIGHT SUPPLIES 3,000 1,000 200 500 4,700
OFFICE ELECTRICAL & LIGHTING REPAIRS 2,000 1,000 500 3,500
MAINTENANCE - SUPPLIES & MATERIAL - ELECTRICAL/INSTRUMENTATION TOTAL - 29,000 5,500 2,000 2,750 3,450 1,000 - - - - 43,700

1050.57004 MAINTENANCE - SUPPLIES & MATERIAL


BARRIER FIELD EQUIPMENT REPAIR SUPPLIES 2,000 2,000
BOTTLED GAS NITROGEN ECT FOR BARRIER, OPTIONS & MAINTENANCE 500 3,200 750 4,450
EQUIPMENT AND STRUCTURE REPAIRS SUPPLIES 5,000 2,500 2,500 2,000 12,000
EQUIPMENT LUBRICATION SUPPLIES 14,000 2,000 2,000 3,000 21,000
FENCING AND SECURITY GATE REPAIRS 3,000 1,500 2,000 6,500
GASKETS, BEARINGS, AND GEARS WAREHOUSE SUPPLIES 8,500 500 1,000 2,000 12,000
HARDWARE SUPPLIES FOR BUILDINGS AND PROCESSES 9,000 1,000 1,000 3,000 1,500 15,500
IRRIGATION SUPPLIES 2,000 1,000 4,000 2,000 9,000
JANITORIAL SUPPLIES 9,500 9,500
ADMININSTATION, LABORATORY & ANNEX REPAIRS 6,000 5,000 11,000
LANDSCAPE SUPPLIES 3,000 3,000
LUMBER, PAINT, HARDWARE SUPPLIES 3,500 2,500 6,000
PIPE AND SUPPLIES 8,000 10,000 4,000 3,000 25,000
PVC PIPE REPAIRS AND SUPPLIES 7,500 5,000 1,000 3,000 16,500
SIGNAGE SUPPLIES 5,000 5,000 2,000 1,000 13,000
SITE FACILITY PAINTING/SUPPLIES 7,000 4,500 2,000 13,500
STRUCTURE BLDG REPAIRS MISC 7,000 1,000 5,000 3,000 3,000 19,000
WELDING MATERIAL (SHEET METAL, STAINLESS, ANGLE IRON) 8,000 5,000 2,500 2,500 3,000 2,500 23,500
SUMP PUMP REPLACEMENT ELECTRICAL MANHOLES 5,000 1,000 1,000 1,500 8,500
WELDING SUPPLIES 5,000 500 1,000 2,000 8,500
US FLAGS 3,000 3,000
ENGINEERING RESEARCH CENTER PARTS 6,000 6,000
MAINTENANCE - SUPPLIES & MATERIAL TOTAL - 96,000 31,000 14,200 60,000 33,750 12,500 - - 1,000 - 248,450

1050.57006 MAINTENANCE EQUIPMENT - COMMUNICATION


REPAIR AND REPLACEMENT OF HANDHELD AND CAR RADIOS 1,500 800 700 3,000
MAINTENANCE EQUIPMENT - COMMUNICATION TOTAL - 1,500 - 800 - 700 - - - - - 3,000

1050.57008 MAINTENANCE EQUIPMENT - CARTS


REPAIR OF CARTS 3,000 10,000 13,000
MAINTENANCE EQUIPMENT - CARTS TOTAL 3,000 10,000 - - - - - - - - - 13,000

1050.57010 MAINTENANCE EQUIPMENT - VEHICLES


MAINTENANCE OF ALL VEHICLES IN OCWD FV POOL 40,000 40,000
PAINT AND BODY REPAIR OF POOL VEHICLES 5,000 5,000
SOFTWARE UPGRADE VEHICLE SCANNER 2,000 2,000
MAINTENANCE EQUIPMENT - VEHICLES TOTAL 47,000 - - - - - - - - - - 47,000

1050.57012 MAINTENANCE EQUIPMENT - HEAVY EQUIPMENT


MAINTENANCE OF HEAVY EQUIPMENT FOR WATER PRODUCTION 2,500 2,500
MAINTENANCE OF LARGE AIR COMPRESSOR FOR INJECTION WELLS 2,500 2,500
MAINTENANCE EQUIPMENT - HEAVY EQUIPMENT TOTAL - 2,500 - 2,500 - - - - - - - 5,000

Orange County Water District 11-32 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
WATER PRODUCTION (1050)
GWR
Process Talbert FV Facility GAP Lab Alamitos Forebay
JDE Account Description General System MWDOC MBI
Number
Optimization Barrier O&M O&M O&M Maintenance Barrier O&M O&M Total
O&M
ACTIVITY CODE 9900 9922 9952 9908 9901 9911 9974 9932 9920 9970 9990
1050.57016 MAINTENANCE STRUCTURE AND IMPROVEMENT - OUTSIDE SERVICES
FV SITE BUILDING REPAIRS 5,000 3,000 2,000 10,000
ROOF REPAIRS 2,000 2,000 200 800 5,000
ANNUAL INSPECTION/REPAIR OF RPPD 4,500 2,000 3,000 9,500
PLANT WIDE CRANE SERVICE AND INSPECTION 13,500 2,000 1,000 16,500
CONCRETE REPAIRS & CORE DRILLING 2,000 500 500 3,000
ELEVATOR YEARLY INSPECTION AND CERTIFICATION (MF, RO, ANNEX & LAB) 4,000 7,500 2,500 14,000
FIRE SPRINKLER SERVICE WET AND DRY QUARTERLY AND ANNUAL TEST 12,000 5,000 2,000 19,000
FIRE EXTINQUISHER SERVICE PM 6,000 6,000
LABORATORY FIRE ALARM SERVICE 6,000 6,000
FV SITE FIRE ALARM SERVICE/REPAIR 9,000 4,000 13,000
HVAC & AIR HANDLING PREVENTIVE MAINT GWRS & FV OFFICES 25,000 27,000 2,000 12,000 66,000
HVAC & AIR HANDLING REPAIRS GWRS AND FV SITE OFFICES 13,000 7,000 2,000 22,000
HVAC LAB PM/REPAIR INCLUDES PHOENIX AND ANDOVER CONTROLS &
BOILERS 35,000 35,000
JANITORIAL SERVICE GWRS, FV, LAB BLDS & WINDOWS INCLUDES SHARED
MWDOC 100,000 100,000
GWRS EXTERIOR PANEL MAINTENANCE 5,000 5,000
EMERGENCY JANITORIAL SERVICES & CARPET CLEANING 4,000 4,000
LANDSCAPE SERVICES INCLUDING SHARED MWDOC 49,000 49,000
TREE TRIMMING SERVICE 12,000 12,000
INDOOR PLANT SERVICES 3,300 3,300
EXTERMINATOR PEST CONTROL SERVICES 2,000 6,000 8,000
RAINBOW DISPOSAL TRASH PICKUP INCLUDES SHARED MWDOC 5,000 25,000 30,000
SITE STREET SWEEPING 5,000 5,000
MEDIUM VOLTAGE VFD ANNUAL PM (VFD COUNT INCREASED FROM 27 TO 35) 35,500 35,500
MOTOR CONTROL CENTER PM 2,000 1,000 1,000 4,000
MEDIUM VOLTAGE DISTRIBUTOR & SWITCHGEAR PM & OIL TESTING 20,150 20,150
MEDIUM VOLTAGE DISTRIBUTOR & SWITCHGEAR PM REPAIRS 20% OF PM 4,030 4,030
NFPA SAFETY EQUIPMENT CERTIFICATION/TESTING 1,500 1,500
NIST CERTIFICATION CALIBRATION ELECTRICAL SHOP EQUIPMENT 2,000 2,000
GWRS EMERGENCY GENERATORS QUARTERLY INSPECTION & LOAD TEST 5,500 5,500
MOTOR OIL ANALYSIS 5,000 2,000 7,000
MOTOR VIBRATION ANALYSIS 2,500 500 3,000
PLUMBING SERVICE BUILDINGS 2,000 2,000 1,000 5,000
PUMP MISC INSPECTION AND MODIFICATION 2,000 1,500 3,500
REPAIR STAINLESS STEEL VALVE, FITTINGS AND MISC PIPES 1,500 500 1,000 3,000
REPAIR/INSPECTION OF AIR VAC AND PRESS RELIEF & BF VALVES 1,500 800 1,000 3,300
USA OUTSOURCE UNDERGROUND SERVICE ALERTS 22,120 15,000 35,000 72,120
USA NOTIFICATION REQUEST FEE 5,000 5,000 10,000
STOCKING MAINTENANCE PARTS CAGE 2,500 1,000 1,000 1,000 1,000 6,500
WINDOW AND DOOR REPAIRS AND SUPPLIES 1,500 500 1,000 1,000 4,000
VIBRALIGN CALIBRATION & SERVICE 2,000 2,000
ANNUAL GARAGE DOOR MAINTENANCE 2,000 1,000 3,000
FUME HOOD CERTIFICATION 400 400
UE SYSTEMS ULTRASONIC CALIBRATION SERVICE 1,000 1,000
VACTOR TRUCK SERVICE FOR SCREENINGS SUMP, STORM DRAINS ON SITE 2,000 2,000
SUNBELT CONTROLS -1 YEAR SERVICE CONTRACT FOR NEW ADMIN HVAC
SOFTWARE CONTROL SYSTEM 10,200 10,200
MAINTENANCE STRUCTURE AND IMPROVEMENT - OUTSIDE SERVICES TOTAL - 226,700 1,000 18,300 287,000 56,700 60,300 - - - - 650,000

1050.57044 MAINTENANCE STRUCTURE AND IMPROVEMENT - GWRS SCREENINGS


SCREENINGS PM 20,000 20,000
MAINTENANCE STRUCTURE AND IMPROVEMENT - GWRS SCREENINGS TOTAL - 20,000 - - - - - - - - - 20,000

Orange County Water District 11-33 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
WATER PRODUCTION (1050)
GWR
Process Talbert FV Facility GAP Lab Alamitos Forebay
JDE Account Description General System MWDOC MBI
Number
Optimization Barrier O&M O&M O&M Maintenance Barrier O&M O&M Total
O&M
ACTIVITY CODE 9900 9922 9952 9908 9901 9911 9974 9932 9920 9970 9990
1050.57031 MAINTENANCE STRUCTURE AND IMPROVEMENT - GWRS MICROFILTRATION
MF BACKWASH PUMP PM 5,500 5,500
MF FILTRATE PUMP PM 9,500 2,000 11,500
MF PUMP VFD PM/REPAIRS 14,000 800 14,800
MF PCS EQUIPMENT 5,000 500 5,500
MF CHEMICAL PUMPS 8,500 2,000 10,500
MF INSTRUMENTATION PM 6,500 1,000 7,500
MF CHLORINE ANALYZER PM (INCLUDES $1800 FOR POTASSIUM IODIDE) 7,500 1,000 8,500
MF PIPE REPAIRS 20,000 500 20,500
MF COMPRESSOR PM 8,000 8,000
MF BLOWER PM 12,500 12,500
MF VALVE/ACTUATOR PM 32,000 2,000 34,000
TRANSFER PUMP, BACKWASH PUMP AND VALVE PM 15,500 15,500
MISC MF ELEMENT REPLACEMENT NON WARRANTY/TESTING OF NEW
(MANUFACTURERS) ELEMENT APPROX. 18 ELEMENTS @ $690 EACH 5,000 5,000
MAINTENANCE STRUCTURE AND IMPROVEMENT - GWRS MICROFILTRATION TOTAL - 144,500 14,800 - - - - - - - - 159,300

1050.57032 MAINTENANCE STRUCTURE/IMPROVEMENT - GWRS REVERSE OSMOSIS


RO FEED PUMP PM 20,000 4,000 24,000
REPLACE 4 MECHANICAL SEALS RO FEED PUMPS 13,000 13,000
RO ACID PUMP PM 6,000 1,000 7,000
RO VFD PM 6,000 6,000
RO PCS EQUIPMENT 6,000 6,000
RO INSTRUMENTATION PM 6,000 5,000 11,000
ANNUAL AMMONIA ANALYZER SENSOR REPLACEMENT 2,700 2,700
RO PRESSURE VESSEL END CAP ORING REPLACEMENT 12,000 12,000
RO PIPE REPAIRS 20,000 5,000 25,000
REPLACING RO CLEANING PVC PIPE 20,000 20,000
TOC ANALYZER CHEMICALS/MISC. 12,000 12,000
TOC ANALYZER PM 19,000 19,000
RO VALVE ACTUATOR PM 10,000 10,000
MISC RO MEMBRANES (FULL-SCALE EVALUATIONS) 8,000 5,000 13,000
MAINTENANCE STRUCTURE/IMPROVEMENT - GWRS REVERSE OSMOSIS TOTAL - 160,700 20,000 - - - - - - - - 180,700

1050.57038 MAINTENANCE STRUCTURE/IMPROVEMENT - GWRS UV SYSTEM


UV CHEMICAL PUMP PM 6,000 6,000
UV PCS EQUIPMENT 3,500 3,500
UV INSTRUMENT PM 4,000 4,000
UV LAMP ASSEMBLY PM ORINGS END ADAPTERS 6,000 6,000
UV BALLASTS 10,000 10,000
UV LAMP REPLACEMENT AND SPARES ($170/LAMP, 3460 LAMPS IN 2017+500 600,000 600,000
UV LAMP RECYLCLING FEE 11,000 11,000
UV QUARTZ SLEEVES 8,000 8,000
UV TRANSMITTANCE METER PM 2,000 2,000
UV VALVE ACTUATOR PM 3,000 3,000
MAINTENANCE STRUCTURE/IMPROVEMENT - GWRS UV SYSTEM TOTAL - 653,500 - - - - - - - - - 653,500

1050.57046 MAINTENANCE STRUCTURE/IMPROVEMENT - GWRS LIME SYSTEM


LIME MIXING EQUIPMENT PM 8,500 8,500
POLYMER EQUIPMENT 5,000 5,000
LIME INSTRUMENTATION 3,500 3,500
LIME LOOP PUMP PM / SLAKER PM 9,000 9,000
LIME 4 INCH SLUDGE LINE PLUMBING PM 8,500 8,500
LIME SOLIDS HAULING 2,000 2,000
LIME VALVE PM 4,500 4,500
MAINTENANCE STRUCTURE/IMPROVEMENT - GWRS LIME SYSTEM TOTAL - 41,000 - - - - - - - - - 41,000

Orange County Water District 11-34 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
WATER PRODUCTION (1050)
GWR
Process Talbert FV Facility GAP Lab Alamitos Forebay
JDE Account Description General System MWDOC MBI
Number
Optimization Barrier O&M O&M O&M Maintenance Barrier O&M O&M Total
O&M
ACTIVITY CODE 9900 9922 9952 9908 9901 9911 9974 9932 9920 9970 9990
1050.57048 MAINTENANCE STRUCTURE/IMPROVEMENT - GWRS PRODUCT WATER PUMP
VFD PM 3,500 3,500
MOTOR PM 3,000 3,000
SPLIT SEAL REPLACEMENT (2 SEALS) 8,000 8,000
PUMP PM 8,000 8,000
VALVE PM 6,000 6,000
INSTRUMENTATION PM 3,000 3,000
MAINT STRUCTURE/IMPROVEMENT - GWRS PRODUCT WATER PUMP STATION TOTAL - 31,500 - - - - - - - - - 31,500

1050.57034 MAINTENANCE STRUCTURE/IMPROVEMENT - GREEN ACRES PROJECT


GAP EFFLUENT PUMP VFD PM 3,500 3,500
GAP EFFLUENT MOTOR PM 4,000 4,000
GAP EFFLUENT PUMP PM 3,000 3,000
GAP BACKWASH PUMP PM 1,000 1,000
GAP CHEMICAL PUMP PM 1,500 1,500
GAP FLOCCULATOR PM 2,000 2,000
GAP PCS REPAIRS 2,500 2,500
GAP CL2 ANALYZER PM 2,500 2,500
GAP INSTRUMENT PM 3,000 3,000
GAP PIPING REPAIRS 1,500 1,500
GAP VALVE PM 2,000 2,000
GAP AIR VAC AND PIPELINE EMERGENCY REPAIRS 8,000 8,000
GAP CHLORINE MIXER REPAIRS 2,000 2,000
VACUUM TRUCK TO CLEAN BW SUMP 13,000 13,000
MAINTENANCE STRUCTURE/IMPROVEMENT - GREEN ACRES PROJECT TOTAL - - - - - 49,500 - - - - - 49,500

1050.57036 MAINTENANCE STRUCTURE/IMPROVEMENT - INJECTION WELLS


INJECTION WELL INSTRUMENT PM 4,000 4,000
REHABILITATE UP TO 23 INECTION WELLS 200,000 200,000
INJECTION WELL PCS PM 4,000 4,000
REPAIR & RECALIBRATION OF FLOW METERS/INSTRUMENTS/9 MAG METERS 2,500 2,500
REPAIR ACCESS HATCHES AND VAULTS 25,000 25,000
REPAIR OF DOWN-HOLE VALVES AND BF PUMPS 20,000 20,000
REPAIR/INSPECTION OF SEB 10 INCH BACK FLOW PREVENTION 2,000 2,000
REPLACEMENT PARTS AND SUPPLIES FOR BARRIER 30,000 30,000
REPAIR STAINLESS STEEL VALVE, FITTINGS AND MISC PIPES 5,000 5,000
REPAIR/INSPECTION OF AIR VAC AND PRESS RELIEF & BF VALVES 4,000 4,000
INJECTION WELL SUMP PUMP PM 3,500 3,500
NEW LASER TUBIDITY METER 4,900 4,900
SPINNER LOG MEASUREMENT/TEST FOR MBI 10,000 10,000
BARRIER FIELD EQUIPMENT SUPPLIES REPAIRS 2,000 2,000
MAINTENANCE FOR 3 LASER TURBIDITY METERS 1,500 1,500
PATRICAL COUNTER MAINTENANCE 1,200 1,200
MAINTENANCE STRUCTURE/IMPROVEMENT - INJECTION WELLS TOTAL - - - 309,600 - - - - - - 10,000 319,600

1050.51540 CARTRIDGE FILTERS - REVERSE OSMOSIS


REPLACEMENT OF RO PRETREATMENT FILTERS 3 REPLACEMENTS OF 14
HOUSING WITH 283 FILTERS EACH 35,000 35,000
CARTRIDGE FILTERS - REVERSE OSMOSIS TOTAL - 35,000 - - - - - - - - - 35,000

1050.51545 SMALL TOOLS


TOOLS OPERATIONS 1,500 300 1,000 2,800
TOOLS MAINTENANCE 3,000 1,000 1,000 5,000
TOOLS I&E 3,000 3,000
INSTRUMENT SHOP CALIBRATION EQUIPMENT 3,200 1,500 4,700
SPECIALIZED TOOLS FOR TREATMENT PROCESS AREAS 4,500 4,500
SMALL TOOLS TOTAL - 15,200 1,300 3,500 - - - - - - - 20,000

Orange County Water District 11-35 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
WATER PRODUCTION (1050)
GWR
Process Talbert FV Facility GAP Lab Alamitos Forebay
JDE Account Description General System MWDOC MBI
Number
Optimization Barrier O&M O&M O&M Maintenance Barrier O&M O&M Total
O&M
ACTIVITY CODE 9900 9922 9952 9908 9901 9911 9974 9932 9920 9970 9990
1050.51550 SAFETY SUPPLIES
TRAFFIC SAFETY SUPPLIES 1,000 1,000 2,000
CONFINED SPACE GAS DETECTORS 2,500 1,500 4,000
CONFINED SPACE BLOWERS 1,500 500 2,000
CONFINED SPACE RESCUE EQUIPMENT 3,000 500 1,500 5,000
PPE FOR EMPLOYEES 3,000 200 3,200
FULL FACE RESPIRATORS 1,000 1,000
RESPIRATOR FILTERS 1,500 1,500
SCBA TESTING REPAIR 2,000 2,000
SAFETY EQUIPMENT FOR 12 KV ELECTRICAL SYSTEM PM AND EMERGENCY
TESTING 2,500 2,500
SPILL CONTAINMENT SUPPLIES 4,000 500 4,500
SAFETY AND OPERATION SIGNS 1,000 200 500 1,700
SAFETY SUPPLIES TOTAL - 23,000 900 4,000 - 1,500 - - - - - 29,400

1050.57040 MAINT STRUCTURE/IMPROVEMENT - GREEN ACRES INFLUENT PUMP STATION


INSTRUMENTATION PM 750 750
VFD PM 750 750
MOTOR PM 750 750
PUMP PM 750 750
VALVE ACTUATOR PM 500 500
VALVE PM 500 500
MAINT STRUCTURE/IMPROVEMENT - GREEN ACRES INFLUENT PUMP STATION TOTAL - - - - - 4,000 - - - - - 4,000

1050.57042 MAINTENANCE - SANTA ANA RESERVOIR


CHEMICAL PUMP PM 500 500
INSTRUMENTATION PM 750 750
MOTOR PM 750 750
PUMP PM 750 750
VALVE MOTOR ACTUATOR PM 1,500 1,500
VALVE PM 750 750
MAINTENANCE - SANTA ANA RESERVOIR TOTAL - - - - - 5,000 - - - - - 5,000

1050.54001 CHEMICALS - CHLORINE (NO TAX)


GWRS SODIUM HYPOCHLORITE (11,500 TONS) 1,730,000 2,000 1,732,000
GAP INFLUENT AND CL CONTACT SODIUM HYPOCHLORITE (1100 TONS) 125,000 125,000
CHEMICALS - CHLORINE TOTAL - 1,730,000 2,000 - - 125,000 - - - - - 1,857,000

1050.54060 CHEMICALS - ANHYDROUS AMMONIA (TAX)


GAP CL CONTACT AMMONIA 5,000 5,000
CHEMICALS - ANHYDROUS AMMONIA TOTAL - - - - - 5,000 - - - - - 5,000

1050.54045 CHEMICALS - POST TREATMENT HYDRATED LIME (NO TAX)


HYDRATED LIME (3,900 TONS) 840,000 840,000
CHEMICALS - POST TREATMENT HYDRATED LIME TOTAL - 840,000 - - - - - - - - - 840,000

1050.54050 CHEMICALS - HYDROGEN PEROXIDE UV (NO TAX)


HYDROGEN PEROXIDE UV (875 TONS) 385,000 385,000
CHEMICALS - HYDROGEN PEROXIDE UV TOTAL - 385,000 - - - - - - - - - 385,000

1050.54055 CHEMICALS - SODIUM BISULFITE (TAX)


SODIUM BISULFITE RO FLUSH AND SAR DISCHARGE (15 TONS) 5,000 5,000
CHEMICALS - SODIUM BISULFITE TOTAL - 5,000 - - - - - - - - - 5,000

1050.54015 CHEMICALS - POLYMER (TAX)


ANIONIC POLYMER LIME SATURATOR (16.5 TONS) 35,000 35,000
CHEMICALS - POLYMER TOTAL - 35,000 - - - - - - - - - 35,000

1050.54020 CHEMICALS - GWRS REVERSE OSMOSIS SULFURIC ACID (NO TAX)


SULFURIC ACID OPERATING WITH SEASONAL ADJUSTMENTS BETWEEN PH
(3,000 TONS) 6.9 TO 7.0 PH 300,000 1,500 301,500
CHEMICALS - GWRS REVERSE OSMOSIS SULFURIC ACID TOTAL - 300,000 1,500 - - - - - - - - 301,500

1050.54025 CHEMICALS - GWRS REVERSE OSMOSIS ANTISCALANT (NO TAX)


RO ANTISCALANT (570 TONS) 700,000 700,000
CHEMICALS - GWRS REVERSE OSMOSIS ANTISCALANT TOTAL - 700,000 - - - - - - - - - 700,000

Orange County Water District 11-36 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
WATER PRODUCTION (1050)
GWR
Process Talbert FV Facility GAP Lab Alamitos Forebay
JDE Account Description General System MWDOC MBI
Number
Optimization Barrier O&M O&M O&M Maintenance Barrier O&M O&M Total
O&M
ACTIVITY CODE 9900 9922 9952 9908 9901 9911 9974 9932 9920 9970 9990
1050.54030 CHEMICALS - GWRS MF CLEANING CHEMICALS (TAX)
MF MEMBRANE CLEANING CHEMICALS CAUSTIC (700 TONS) 340,000 340,000
MF MEMBRANE CLEANING CHEMICALS CITRIC (685 TONS) 464,000 464,000
MF PROPRIETARY CLEANING CHEMICAL STUDY 1,000 1,000
MF MEMCLEAN (35 TONS) 35,000 35,000
CHEMICALS - GWRS MF CLEANING CHEMICALS TOTAL - 839,000 1,000 - - - - - - - - 840,000

1050.54033 CHEMICALS - GWRS RO CLEANING CHEMICALS (TAX)


RO MEMBRANE GENERIC CLEANING CHEMICALS CLEANINGS (51 TONS) 130,000 1,500 131,500
RO MEMBRANE CITRIC (20 TONS) 2,000 2,000
RO MEMBRANE CAUSTIC (15 TONS) 2,000 2,000
RO MEMBRANE DDBS CLEANINGS (12.5 TONS) 25,000 25,000
RO CLEANING CHEMICAL STUDY 500 500
RO MEMBRANE PROPRIETARY CLEANING CHEMICALS 3 STAGE CLEANINGS 50,000 500 50,500
CHEMICALS - GWRS RO CLEANING CHEMICALS TOTAL - 209,000 2,500 - - - - - - - - 211,500

1050.54040 CHEMICALS GAP ALUM


PRETREATMENT COAGULANT (21 TONS) 6,000 6,000
CHEMICALS GAP ALUM TOTAL - - - - - 6,000 - - - - - 6,000

1050.51555 LAB SUPPLIES


CALIBRATION STANDARDS FOR BARRIER FIELD EQUIPMENT 20,000 600 20,600
CHEMICALS AND SUPPLIES 2,500 2,500
LABORATORY DI WATER SYSTEM 1,400 1,400
PEROXIDE AND CHLORINE TEST STRIPS 2,500 2,500
2 NEW HANDHELD EC PH METERS 3,000 3,000
LAB SUPPLIES TOTAL - 29,400 - 600 - - - - - - - 30,000

1050.51560 LAB SAMPLES ANALYSIS


GENERAL LAB ANALYSIS BY OUTSIDE LAB 4,000 3,000 7,000
LAB SAMPLES ANALYSIS TOTAL - 4,000 3,000 - - - - - - - - 7,000

1050.51565 RENT EQUIPMENT- GENERAL


RENTAL OF EQUIPMENT FOR PM PROJECTS 6,000 6,000
RENT EQUIPMENT - GENERAL TOTAL - 6,000 - - - - - - - - - 6,000

1050.54501 UTILITIES - ELECTRICITY (OFFSITE & MISC ELECTRICAL METERS)


GAP CATHODIC PROTECTION 5,000 5,000
GAP DEEP WELL WATER ELECTRICITY 20,000 20,000
GAP INFLUENT PUMPING ELECTRICITY 24,000 24,000
GAP SANTA ANA RESERVOIR PUMP STATION POWER (CNE/SCE) 105,000 105,000
EW-1 WELL POWER 20,000 20,000
MID BASIN INJECTION WELL 62,000 62,000
INJECTION WELLS 15,000 15,000
UTILITIES - ELECTRICITY (OFFSITE & MISC ELECTRICAL METERS) TOTAL - 62,000 - 15,000 - 154,000 - - - - 20,000 251,000

1050.54505 UTILITIES - ELECTRICITY (66KV FV SITE SCE) 103,000 AF


ADMIN BLDG ELECTRICITY 39,000 39,000
MWDOC BLDG ELECTRICITY 26,000 26,000
GAP ELECTRICITY 235,000 235,000
WAREHOUSE, ANNEX & MAINTENANCE SHOPS 184,000 184,000
LABORATORY 190,000 190,000
SCREENINGS 12,400 12,400
MICROFILTRATION 3,100,000 3,100,000
REVERSE OSMOSIS 5,320,337 5,320,337
UV SYSTEM ELECTRICITY 850,000 850,000
DECARB 110,000 110,000
CHEMICAL FEED/LIME SYSTEM 23,000 23,000
PRODUCT WATER PUMP STATION 2,500,000 2,500,000
BARRIER PUMP STATION 550,000 550,000
UTILITIES - ELECTRICITY (66KV FV SITE SCE) 103,000 AF TOTAL - 12,649,737 - - 300,000 - 190,000 - - - - 13,139,737

1050.54505.250 UTILITIES ELECTRICAL CURTAILMENT POWER CREDITS


ESTIMATED PAYMENTS ENERNOC $1,000,000 (1,000,000) (1,000,000)
UTILITIES ELECTRICAL CURTAILMENT POWER CREDITS TOTAL - (1,000,000) - - - - - - - - - (1,000,000)

Orange County Water District 11-37 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
WATER PRODUCTION (1050)
GWR
Process Talbert FV Facility GAP Lab Alamitos Forebay
JDE Account Description General System MWDOC MBI
Number
Optimization Barrier O&M O&M O&M Maintenance Barrier O&M O&M Total
O&M
ACTIVITY CODE 9900 9922 9952 9908 9901 9911 9974 9932 9920 9970 9990
1050.54510 UTILITIES - GAS
NATURAL GAS FOR HVAC OFFICES & ANNEX BUILDING 6,000 6,000
NATURAL GAS FOR LABORATORY 42,000 42,000
UTILITIES - GAS TOTAL - - - - 6,000 - 42,000 - - - - 48,000

1050.54515 UTILITIES - WATER


POTABLE WATER AND INDUSTRIAL WATER 60,000 60,000
UTILITIES - WATER TOTAL - 60,000 - - - - - - - - - 60,000

1050.51102 MEMBERSHIPS/CERTIFICATION FEES


MEHUL - WEF, AWWA, ASCE MEMBERSHIP FEES 800 200 1,000
OPERATOR & MAINTENANCE CERTIFICATION FEES ($1900 MORE FOR OPS) 12,000 12,000
MEMBERSHIPS/CERTIFICATION FEES TOTAL - 12,800 200 - - - - - - - - 13,000

1050.51192 TECHNICAL TRAINING


DELTA V PROCESS CONTROL TRAINING (2 NEW SENIOR TECHS) 3,000 3,000
I&E MEDIUM VOLTAGE SAFETY TRAINING CLASSES 2,000 2,000
MANAGEMENT TRAINING 1,500 1,500
MAINTENANCE TRAINING 2,000 2,000
WPG TRAINING LIBRARY 400 400
OPERATOR CERTIFICATION CLASSES 1,600 1,600
ON SITE O&M TECHNICAL TRAINING 1,500 1,500
CRANE TRAINING/RIGGING AND SIGNALING 2,000 2,000
ULTRASONIC MONITOR TRAINING & CERTIFICATION 2,500 2,500
CSRT TRAINING 3,000 3,000
WATER DISTRIBUTION TRAINING BARRIER STAFF 500 500
TECHNICAL TRAINING TOTAL - 19,100 400 500 - - - - - - - 20,000

1050.51112 SPECIAL DEPARTMENT EXPENSE


CONSULTING SERVICE PERMITS 2,000 2,000
SCAQMD AND CITY PERMIT FEES 14,000 14,000
UNITED PARCEL SERVICE 1,000 1,000
ORANGE COUNTY PUBLIC FACILITIES PERMIT 8,000 8,000
SPECIAL DEPARTMENT EXPENSE TOTAL - 17,000 - 8,000 - - - - - - - 25,000

1050.56026 LADPW CURRENT EXPENSE


LADPW BARRIER 810,000 810,000
LADPW CURRENT EXPENSE TOTAL - - - - - - - 810,000 - - - 810,000

WATER PRODUCTION GRAND TOTAL 974,070 23,210,626 985,989 990,051 1,577,069 1,502,159 640,699 817,719 369,368 172,083 199,309 31,439,139

Orange County Water District 11-38 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
RECHARGE OPERATIONS (1060)
JDE
Forebay
ACCOUNT DESCRIPTION General Prado O&M
O&M Total
NUMBER
ACTIVITY CODE 9900 9920 9924
SALARIES AND BENEFITS
1060.50104 REGULAR SALARIES 175,324 1,372,689 205,223 1,753,237
1060.50106 OVERTIME 14,849 117,889 15,750 148,488
1060.50210 PAYROLL TAX 2,758 21,613 3,204 27,575
1060.50202 RETIREMENT 31,664 248,181 36,792 316,637
1060.50204 HEALTH INSURANCE 32,921 257,596 38,690 329,206
1060.50206 WORKERS' COMPENSATION 6,377 50,131 7,261 63,770
SALARIES AND BENEFITS TOTAL 263,891 2,068,100 306,921 2,638,913

1060.53001 PROFESSIONAL SERVICES


SCADA MAINTENANCE AND TECHNOLOGY 2,500 2,500
PROFESSIONAL SERVICES TOTAL - 2,500 - 2,500

1060.51501 OFFICE EXPENSE - GENERAL


FEDERAL EXPRESS, SHIPPING 250 250
RECHARGE REPORT 500 500
MISCELLANEOUS OFFICE SUPPLIES 5,000 5,000
OFFICE FURNITURE 1,500 1,500
OFFICE EXPENSE - GENERAL TOTAL - 7,250 - 7,250

1060.51520 GASOLINE
GAS 28,000 28,000
GASOLINE TOTAL - 28,000 - 28,000

Orange County Water District 11-39 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
RECHARGE OPERATIONS (1060)
JDE
Forebay
ACCOUNT DESCRIPTION General Prado O&M
O&M Total
NUMBER
ACTIVITY CODE 9900 9920 9924
1060.51521 FUEL - OFF ROAD
DIESEL FUEL (OFF-ROAD) 60,000 60,000
FUEL - OFF ROAD TOTAL - 60,000 - 60,000

1060.51530 UNIFORMS
UNIFORM SERVICES, SHIRTS/JACKETS 10,000 10,000
UNIFORMS TOTAL - 10,000 - 10,000

1060.51531 SHIRTS - LOGO


SHIRTS - LOGO 800 800
SHIRTS - LOGO TOTAL - 800 - 800

1060.57004 MAINTENANCE EQUIPMENT - GENERAL


ANNUAL GAS PUMP TESTING 2,500 2,500
GENERAL MAINT OF SMALLER EQUIP, SUCH AS SMALL GAS AND
DIESEL ENGINES, CRANES, BOATS, AIR COMPRESSORS 2,500 2,500
MAINTENANCE EQUIPMENT - GENERAL TOTAL - 5,000 - 5,000

1060.57006 MAINTENANCE EQUIPMENT COMMUNICATION


CAMERA/RADIO MAINTENANCE 2,000 2,000
MONITOR REPLACEMENTS 1,000 1,000
MAINTENANCE EQUIPMENT COMMUNICATION TOTAL - 3,000 - 3,000

1060.57010 MAINTENANCE EQUIPMENT VEHICLES


SMALL TRUCKS SCHEDULED AND UNSCHEDULED REPAIRS, TIRES,
BELTS, ETC. 30,000 30,000
MAINTENANCE EQUIPMENT VEHICLES TOTAL - 30,000 - 30,000

Orange County Water District 11-40 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
RECHARGE OPERATIONS (1060)
JDE
Forebay
ACCOUNT DESCRIPTION General Prado O&M
O&M Total
NUMBER
ACTIVITY CODE 9900 9920 9924
1060.57012 MAINTENANCE EQUIPMENT - HEAVY EQUIPMENT
GENERAL HEAVY EQUIPMENT PARTS 85,000 85,000
MAINTENANCE EQUIPMENT - HEAVY EQUIPMENT TOTAL - 85,000 - 85,000

1060.57016 MAINTENANCE STRUCTURE AND IMPROVEMENTS - GENERAL


GENERAL MAINTENANCE PARTS & REPAIRS 55,000 55,000
FISH DISPOSAL (2 CLEANINGS) 10,000 10,000
FLOWMETER AND INSTRUMENTATION MAINTENANCE 15,000 15,000
MOTOR ACUATOR/LIMITORQUE SERVICE 35,000 35,000
JANITORIAL 30,000 30,000
FENCE REPAIR 25,000 25,000
LANDSCAPE MAINTENANCE/TREE TRIMMING 60,000 60,000
LANDSCAPE MAINTENANCE/WEED ABATEMENT 105,000 105,000
LANDSCAPE MAINTENANCE/MULCH 26,000 26,000
UST SERVICE 2,000 2,000
GASES (WESTAIR) 3,000 3,000
PAINTING STRUCTURES 5,000 5,000
PLANT SERVICE 1,500 1,500
INSECT/RODENT CONTROL 8,000 8,000
PORTABLE RESTROOM RENTALS 1,500 1,500
TRASH RACK MAINTENANCE 2,000 2,000
MAINTENANCE STRUCTURE AND IMPROVEMENTS - GENERAL TOTAL - 384,000 - 384,000

1060.51545 SMALL TOOLS


MAINTENANCE AND HYDROGRAPHY OPERATIONS 2,000 2,000
MAINTENANCE OPERATIONS 2,500 2,500
FLOWMETER (2) 5,000 5,000
SMALL TOOLS FOR H.E. MECHANIC & MAINTENANCE 3,500 3,500
SMALL TOOLS TOTAL - 13,000 - 13,000

Orange County Water District 11-41 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
RECHARGE OPERATIONS (1060)
JDE
Forebay
ACCOUNT DESCRIPTION General Prado O&M
O&M Total
NUMBER
ACTIVITY CODE 9900 9920 9924

1060.51550 SAFETY SUPPLIES


SAFETY EQUIPMENT, I.E., SAFETY GOGGLES, GLOVES, RESPIRATORS,
EAR PROTECTORS, AIR MONITORING, TRAFFIC, AND CONFINED
SPACE EQUIPMENT 5,000 5,000
SAFETY SUPPLIES TOTAL - 5,000 - 5,000

1060.54010 HERBICIDE/CHEMICALS
HERBICIDE (WEED KILLER) 1,000 1,000
HERBICIDE/CHEMICALS TOTAL - 1,000 - 1,000

1060.51565 RENT EQUIPMENT - GENERAL


TRENCHERS, TAMPERS, DEWATERING EQUIPMENT, ETC. 1,000 1,000
RENT EQUIPMENT - GENERAL TOTAL - 1,000 - 1,000

1060.51570 RENT EQUIPMENT - HEAVY EQUIPMENT


CRANE, MAN LIFT, SCRAPERS, ETC. 6,000 6,000
RENT EQUIPMENT - HEAVY EQUIPMENT TOTAL - 6,000 - 6,000

1060.54501 UTILITIES - ELECTRICITY


ANAHEIM LAKE DEWATER/TRANSFER ($40K - $155K) LAST FY $50K 60,000 60,000
BURRIS BASIN PUMP STATION ($300K - $665K) LAST FY $435K 600,000 600,000
KRAEMER/MILLER PUMPS ($28 - $40K) LAST FY $38K 45,000 45,000
SANTIAGO BASIN PUMP STATION ($30K - $90K) LAST FY $47K 90,000 90,000
WARNER PUMPS ($11K - $50K) LAST FY $18K 25,000 25,000
ALL OTHER (RUBBER DAMS, FHQ, VALVES, METERS, ETC.) 50,000 50,000
UTILITIES - ELECTRICITY TOTAL - 870,000 - 870,000

Orange County Water District 11-42 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
RECHARGE OPERATIONS (1060)
JDE
Forebay
ACCOUNT DESCRIPTION General Prado O&M
O&M Total
NUMBER
ACTIVITY CODE 9900 9920 9924
1060.54515 UTILITIES - WATER
GENERAL (FHQ, SANTIAGO BASIN, BURRIS PS, ETC.) 25,000 25,000
KRAEMER BASIN IRRIGATION 2,500 2,500
UTILITIES - WATER TOTAL - 27,500 - 27,500

1060.51102 MEMBERSHIPS
STATE OF CALIF. PESTICIDE LICENSE (JULIO, OCTAVIO) 240 240
OTHER MEMBERSHIPS (SCOTT NYGREN, CHRIS FRIBERG) 350 350
MEMBERSHIPS TOTAL - 590 - 590

1060.51192 EDUCATIONAL TRAINING


OPERATIONS & MAINTENANCE TRAINING (PAPA WORKSHOPS) 2,500 2,500
PESTICIDE APPLICATORS PROF. ASSOCIATION WORKSHOPS 500 500
TRAINING/CROSS TRAINING FOR FACILITY AND EQUIPMENT 750 750
WONDERWARE TRAINING 5,000 5,000
EDUCATIONAL TRAINING TOTAL - 8,750 - 8,750

1060.51112 SPECIAL DEPARTMENT EXPENSE


TRANSPORTATION FEES 500 500
SOUTH COAST AQMD FEES 1,000 1,000
OTHER PERMITS AND FEES 3,000 3,000
SPECIAL DEPARTMENT EXPENSE TOTAL - 4,500 - 4,500

RECHARGE OPERATIONS GRAND TOTAL 263,891 3,620,990 306,921 4,191,803

Orange County Water District 11-43 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
WETLAND OPERATIONS (1062)
ERC Habitat
JDE Account Description General Prado O&M FHQ O&M
POWUP Restoration Total
Number
ACTIVITY CODE 9900 9924 9920 9983 8008
SALARIES & BENEFITS
1062.50104 REGULAR SALARIES 49,369 154,280 97,840 20,740 23,533 345,762
1062.50106 OVERTIME 1,604 10,860 370 1,172 2,036 16,042
1062.50210 PAYROLL TAXES 739 2,395 1,424 318 371 5,246
1062.50202 RETIREMENT 8,487 27,496 16,352 3,648 4,257 60,240
1062.50204 HEALTH INSURANCE 5,788 31,484 9,747 3,864 5,339 56,223
1062.50206 WORKERS' COMPENSATION 1,317 5,734 3,482 764 884 12,181
SALARIES & BENEFITS TOTAL 67,305 232,248 129,215 30,507 36,420 495,695

1062.53020 SECURITY
SECURITY SERVICES 2,000 2,000
SECURITY TOTAL - 2,000 - - - 2,000

1062.51501 OFFICE EXPENSE - GENERAL


OFFICE SUPPLIES (FED-EX) 2,000 2,000
PRINTER AND COMPUTER EQUIPMENT 1,500 1,500
OFFICE EXPENSE - GENERAL TOTAL - 3,500 - - - 3,500

1062.51520 GAS & DIESEL FUEL


GASOLINE AND DIESEL FUEL FOR ON-ROAD VEHICLES 3,500 3,500
GAS & DIESEL FUEL TOTAL - 3,500 - - - 3,500

1062.51521 FUEL - OFF ROAD


FUEL - OFF ROAD 20,000 20,000
FUEL - OFF ROAD TOTAL - 20,000 - - - 20,000

1062.51530 UNIFORMS & SAFETY


UNIFORMS AND BOTTLED WATER 3,500 3,500
UNIFORMS & SAFETY TOTAL - 3,500 - - - 3,500
1062.51531 SHIRTS - LOGO
SHIRTS - LOGO 250 250
SHIRTS - LOGO TOTAL - 250 - - - 250

1062.57004 MAINTENANCE EQUIPMENT - GENERAL


REPAIR OF SMALL TOOLS, WQ EQUIPMENT, FLOW METERS,
SENSORS, ETC. 1,500 1,500
MAINTENANCE EQUIPMENT - GENERAL TOTAL - 1,500 - - - 1,500

Orange County Water District 11-44 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
WETLAND OPERATIONS (1062)
ERC Habitat
JDE Account Description General Prado O&M FHQ O&M
POWUP Restoration Total
Number
ACTIVITY CODE 9900 9924 9920 9983 8008
1062.57010 MAINTENANCE EQUIPMENT - VEHICLES
TRUCK MAINTENANCE AND ROUTINE REPAIRS 3,500 3,500
MAINTENANCE EQUIPMENT - VEHICLES TOTAL - 3,500 - - - 3,500

1062.57012 MAINTENANCE EQUIPMENT - HEAVY EQUIPMENT


MOWER, TRACTOR, AND OTHER HEAVY EQUIPMENT
MAINTENANCE AND ROUTINE REPAIRS (GREASE, OIL, AIR
FILTERS, HYDRAULICS, BELT ) 25,000 25,000
MAINTENANCE EQUIPMENT - HEAVY EQUIPMENT TOTAL - 25,000 - - - 25,000

1062.57016 MAINT STRUCTURE & IMPROVEMENT - GENERAL


A/C MAINTENANCE, SUPPLIES & REPAIRS 5,000 5,000
ROCK FOR ROAD & LEVEE STABILIZATION 2,500 2,500
GEO-CLOTH & GABIONS 1,500 1,500
ELECTRICAL REPAIRS 1,000 1,000
MISCELLANEOUS AND EMERGENCY REPAIRS 5,000 5,000
MOSQUITO AND VECTOR CONTROL 80,000 80,000
SECURITY MAINTENANCE, FENCES, GATES, CAMERAS, REMOTE
SENSING 1,500 1,500
TRAILER MAINTENANCE & REPAIRS 3,500 3,500
FENCING MODIFICATIONS 500 500
JANITORIAL SERVICE 8,000 8,000
MAINT STRUCTURE & IMPROVEMENT - GENERAL TOTAL - 108,500 - - - 108,500

1062.51545 SMALL TOOLS


MISCELLANEOUS HAND TOOLS (DRILLS, HAMMERS, WRENCHES,
SOCKETS, AND SAWS) 500 500
SMALL POWER EQUIPMENT AND PARTS 500 500
SMALL TOOLS TOTAL - 1,000 - - - 1,000
1062.51550 SAFETY SUPPLIES
WORK SAFETY RELATED SUPPLIES, FIRST AID KITS, GOGGLES,
SPRAY SUITS, GLOVES, AND FIRE EXTINGUISHERS 500 500
SAFETY SUPPLIES TOTAL - 500 - - - 500

Orange County Water District 11-45 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
WETLAND OPERATIONS (1062)
ERC Habitat
JDE Account Description General Prado O&M FHQ O&M
POWUP Restoration Total
Number
ACTIVITY CODE 9900 9924 9920 9983 8008
1062.54035 CHEMICALS
HERBICIDES FOR ARUNDO CONTROL 500 500
LABORATORY REAGENTS AND CHEMICALS 500 500
CHEMICALS TOTAL - 1,000 - - - 1,000

1062.51565 EQUIPMENT RENTAL - GENERAL


RENT SMALL CONSTRUCTION EQUIPMENT 500 500
EQUIPMENT RENTAL - GENERAL TOTAL - 500 - - - 500

1062.51570 EQUIPMENT RENTAL - HEAVY EQUIPMENT


VEGETATION CONTROL 20,000 20,000
RENT EXCAVATOR, AND OTHER EQUIPMENT (DOZERS, WATER
TRUCKS AND MOWERS) 20,000 20,000
EQUIPMENT RENTAL - HEAVY EQUIPMENT TOTAL - 40,000 - - - 40,000

1062.54501 UTILITIES - ELECTRICITY


ELECTRICAL UTILITIES 12,000 12,000
UTILITIES - ELECTRICITY TOTAL - 12,000 - - - 12,000

1062.51192 TECHNICAL TRAINING


REFERENCE BOOKS 250 250
TECHNICAL TRAINING TOTAL - 250 - - - 250

1062.51204 MISCELLANEOUS EXPENSES


MISCELLANEOUS EXPENSES 500 500
MISCELLANEOUS EXPENSES TOTAL - 500 - - - 500

WETLAND OPERATIONS GRAND TOTAL 67,305 459,248 129,215 30,507 36,420 722,695

Orange County Water District 11-46 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
PROPERTY MANAGEMENT (1069)
JDE
Description General GWRS
Account Total
Number
ACTIVITY CODE 9900 9922
SALARIES & BENEFITS
1069.50104 REGULAR SALARIES 61,932 26,542 88,474
1069.50210 PAYROLL TAXES 898 385 1,283
1069.50202 RETIREMENT 10,312 4,419 14,731
1069.50204 HEALTH INSURANCE 8,918 3,822 12,740
1069.50206 WORKERS' COMPENSATION 415 178 593
SALARIES & BENEFITS TOTAL 82,474 35,346 117,820

1069.53001 PROFESSIONAL SERVICES


APPRAISAL SERVICES 500 500
NEWSLETTER, JOURNAL SUBSCRIPTIONS (CORELOGIC SERVICE) 1,200 1,200
TITLE POLICIES 2,000 2,000
PROFESSIONAL SERVICES TOTAL 3,700 - 3,700

1069.51501 OFFICE EXPENSES - GENERAL


OFFICE SUPPLIES INCLUDING SMALL DESK SUPPLIES, REPROGRAPHICS, FILE CABINET 500 500
OFFICES EXPENSES - GENERAL TOTAL 500 - 500

1069.51520 GAS & DIESEL FUEL


FUEL FOR DISTRICT VEHICLES 250 250
GAS & DIESEL FUEL TOTAL 250 - 250

1069.56022 TAXES & ASSESSMENTS


ORANGE COUNTY SEWER & MWD FEES AND ASSESSMENTS 35,000 35,000
RIVERSIDE PROPERTY TAX & ASSESSMENTS 22,000 22,000
SAN BERNARDINO PROPERTY TAX & ASSESSMENTS 500 500
TAXES & ASSESSMENTS TOTAL 57,500 - 57,500

Orange County Water District 11-47 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
PROPERTY MANAGEMENT (1069)
JDE
Description General GWRS
Account Total
Number
ACTIVITY CODE 9900 9922
1069.57016 MAINTENANCE STRUCTURE AND IMPROVEMENTS - GENERAL
PROPERTY FENCES, GATES, LOCKS, MISCELLANEOUS REPAIRS, DISPOSAL SERVICES 500 500
MAINTENANCE STRUCTURE AND IMPROVEMENTS - GENERAL TOTAL 500 - 500

1069.51102 MEMBERSHIP
MEMBERSHIPS FOR IRWA 270 270
MEMBERSHIP TOTAL 270 - 270

1069.51112 SPECIAL DEPARTMENT EXPENSE


PERMIT AND LICENSE FEES, UNITED PARCEL SERVICE 200 200
SPECIAL DEPARTMENT EXPENSE TOTAL 200 - 200

1069.51206 LICENSES AND PERMITS


EDISON PIPELINE LICENSE ACCOUNT 2097 OLD SEAWATER LINE (RESO 72-1-5 / NO RENT INCREASE) 1,165 1,165
GAP EDISON PIPELINE LICENSE ACCOUNT 9.4068 (FORMALLY #2110) (ADAMS, SAR, GARFIELD, HB) 19,826 19,826
GAP EDISON PIPELINE LICENSE ACCOUNT 9.4172 (FORMALLY #3272) (GARFIELD, WARD) 11,957 11,957
LICENSE WITH MWD FOR SANTIAGO CREEK RECHARGE ENHANCEMENT PROJECT (DOCUMENT # R.L. 2832) 1,536 1,536
LEASE AGREEMENT WITH OC FLOOD CONTROL DISTRICT MID-BASIN INJECTION (CPI ADJUSTMENT) 19,296 19,296
EDISON PIPELINE LICENSE ACCOUNT 9.4176 (FORMALLY # 3085) (GARFIELD/ELLIS) INJECTION WELLS I-27 & I-28 14,346 14,346
LICENSES AND PERMITS TOTAL 68,126 - 68,126

PROPERTY MANAGEMENT GRAND TOTAL 213,520 35,346 248,866

Orange County Water District 11-48 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
ENGINEERING (1070)
Talbert Forebay
JDE GWRS OCTA
Description General Barrier GAP O&M Recharge
Account
O&M
OM
O&M
I-405 Total
Number
ACTIVITY CODE 9900 9908 9922 9911 9920 1701
SALARIES & BENEFITS
1070.50104 REGULAR SALARIES 761,612 14,738 86,652 30,310 98,252 23,989 1,015,552
1070.50106 OVERTIME SALARIES 2,400 200 400 3,000
CAPITALIZED SALARIES (271,908) (271,908)
1070.50210 PAYROLL TAXES 12,287 214 1,259 439 1,430 348 15,978
1070.50202 RETIREMENT 123,961 2,454 14,461 5,047 16,425 3,994 166,342
1070.50204 HEALTH INSURANCE 108,556 1,780 12,367 2,981 14,721 3,826 144,231
1070.50206 WORKERS' COMPENSATION 6,035 119 703 246 798 194 8,095
CAPITALIZED BENEFITS (88,307) (88,307)
SALARIES & BENEFITS TOTAL 654,637 19,305 115,643 39,022 132,026 32,351 992,984

1070.51102 MEMBERSHIP
ORGANIZATIONAL MEMBERSHIPS 1,000 1,000
MEMBERSHIP TOTAL 1,000 - - - - - 1,000

1070.51301 TRAVEL/CONFERENCE/MILEAGE
ENGINEERS' CONFERENCE/SEMINARS (10 TOTAL) 5,000 5,000
TRAVEL/CONFERENCE/MILEAGE TOTAL 5,000 - - - - - 5,000

1070.51192 TECHNICAL TRAINING


LOCAL CLASSES AND TRAINING (4 CLASSES) 2,000 2,000
TECHNICAL TRAINING TOTAL 2,000 - - - - - 2,000

1070.53010 PROFESSIONAL SERVICES - ENGINEERING


CONSULTING SERVICES 20,000 20,000
GAP HYDRAULIC MODEL 50,000 50,000
GAP DISINFECTION STUDY 20,000 20,000
PROFESSIONAL SERVICES - ENGINEERING TOTAL 90,000 - - - - - 90,000

Orange County Water District 11-49 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
ENGINEERING (1070)
Talbert Forebay
JDE GWRS OCTA
Description General Barrier GAP O&M Recharge
Account
O&M
OM
O&M
I-405 Total
Number
ACTIVITY CODE 9900 9908 9922 9911 9920 1701
1070.51501 OFFICE EXPENSE - GENERAL
ANNUAL ENGINEER'S REPORT PREPARATION 1,500 1,500
OUTSIDE COPYING SERVICES 1,000 1,000
PRINTER CARTRIDGES 1,500 1,500
CONSTRUCTION MANUALS 200 200
DESIGN BOOKS 500 500
FEDERAL EXPRESS 500 500
MISCELLANEOUS OFFICE SUPPLIES 500 500
SUPPLEMENTS TO MANUALS AND BOOKS 200 200
OUTSIDE SERVICES 1,000 1,000
PUBLIC WORKS INSPECTION MANUALS 1,000 1,000
OFFICE EXPENSE - GENERAL TOTAL 7,900 - - - - - 7,900

1070.51104 SUBSCRIPTIONS
CALVRS TRIMBLE GPS UNIT 1,800 1,800
INFO WATER MODEL 1,200 1,200
AUTOCAD 3D 1,500 1,500
AWWA STANDARDS 500 500
ENR MAGAZINE 100 100
SUBSCRIPTIONS TOTAL 5,100 - - - - - 5,100

1070.51520 GAS & DIESEL


FUEL FOR VEHICLE 3,500 3,500
GAS & DIESEL TOTAL 3,500 - - - - - 3,500

1070.51531 SHIRTS - LOGO


SHIRTS - LOGO 700 700
SHIRTS - LOGO TOTAL 700 - - - - - 700

ENGINEERING GRAND TOTAL 769,837 19,305 115,643 39,022 132,026 32,351 1,108,184

Orange County Water District 11-50 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
HYDROGEOLOGY (1075)
South Basin
JDE So. Basin Alamitos North Basin South Basin MTBE North Basin
Description General Well EW-1 GWRS GW
Account Litigation Barrier O&M NCP NCP Litigation Litigation
Protection Total
Number
ACTIVITY CODE 9900 9976 1711 9932 9985 9986 9975 9977 9922 9941
SALARIES & BENEFITS
1075.50104 REGULAR SALARIES 1,247,193 33,103 11,358 77,895 100,955 131,393 25,408 17,750 7,695 7,695 1,660,445
1075.50106 OVERTIME 10,023 209 1,513 209 209 12,164
CAPITALIZED SALARIES (98,772) (98,772)
1075.50210 PAYROLL TAXES 21,131 480 168 1,151 1,467 1,908 368 257 112 112 27,154
1075.50202 RETIREMENT 201,534 5,512 1,926 13,221 16,844 21,912 4,230 2,955 1,281 1,281 270,697
1075.50204 HEALTH INSURANCE 192,210 2,815 1,627 15,153 12,317 11,040 2,217 2,019 674 598 240,669
1075.50206 WORKERS' COMPENSATION 15,609 887 300 837 2,693 3,984 613 342 62 273 25,600
CAPITALIZED BENEFITS (34,665) (34,665)
SALARIES & BENEFITS TOTAL 1,554,263 42,796 15,587 109,770 134,485 170,446 32,837 23,324 9,824 9,959 2,103,291

1075.51301 TRAVEL/CONFERENCE/MILEAGE
REGULATORY & AGENCY MEETINGS FOR WQ PROJECTS,
SEAWATER BARRIERS; TECHNICAL CONFERENCE ATTENDANCE
(MODELING, DATA/GIS) (CALIFORNIA) 2,000 500 1,000 500 4,000
TRAVEL/CONFERENCE/MILEAGE TOTAL 2,000 - - 500 1,000 500 - - - - 4,000

1075.53005 PROFESSIONAL SERVICES - LEGAL


CONNOR FLETCHER & HEDENKAMP 200,000 100,000 300,000
MILLER & AXLINE 300,000 200,000 200,000 700,000
SCOTT SOMMER 150,000 100,000 250,000
TAKATA ENVIRONMENTAL (FOR SCOTT SOMMER) 10,000 10,000 20,000
LARSON O'BRIEN 20,000 20,000 40,000
PROFESSIONAL SERVICES - LEGAL TOTAL - 500,000 - - 180,000 130,000 200,000 300,000 - - 1,310,000

1075.53010 PROFESSIONAL SERVICES - ENGINEER


HARGIS + ASSOCIATES (SOUTH BASIN RI/FS SERVICES) 300,000 300,000
AQUILOGIC (SOUTH BASIN SITE FILE MANAGEMENT) 40,000 40,000
AECOM (NORTH BASIN RI/FS SERVICES) 460,000 460,000
INTERA (NORTH BASIN MODELING) 60,000 60,000
TRAFFIC CONTROL, WASTE HAULING FOR WELL SAMPLING 1,000 3,000 30,000 34,000
SUNSET GAP SEAWATER INTRUSION GEOPHYS SURVEY 40,000 40,000
FLOWMETER SURVEY FOR TRANSFER WELL 2,500 2,500
PROFESSIONAL SERVICES - ENGINEER TOTAL 43,500 - - - 523,000 370,000 - - - - 936,500

1075.51501 OFFICE EXPENSE - GENERAL


FEDERAL EXPRESS/COURIER 1,500 1,500
OFFICE SUPPLIES INCLUDING SMALL DESK SUPPLIES,
SCANNING SERVICES 6,000 6,000
PLOTTER PAPER & INK CARTRIDGES 4,000 4,000
SUPPLIES FROM WAREHOUSE, PETTY CASH 500 500
OFFICE EXPENSE - GENERAL TOTAL 12,000 - - - - - - - - - 12,000

Orange County Water District 11-51 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
HYDROGEOLOGY (1075)
South Basin
JDE So. Basin Alamitos North Basin South Basin MTBE North Basin
Description General Well EW-1 GWRS GW
Account Litigation Barrier O&M NCP NCP Litigation Litigation
Protection Total
Number
ACTIVITY CODE 9900 9976 1711 9932 9985 9986 9975 9977 9922 9941
1075.51520 GAS & DIESEL FUEL
FUEL FOR DISTRICT FIELD VEHICLES (WELL MONITORING &
MAINTENANCE) 6,000 6,000
GAS & DIESEL FUEL TOTAL 6,000 - - - - - - - - - 6,000

1075.51530 UNIFORMS & SAFETY


BOOTS, RAINGEAR, UNIFORMS FOR FIELD PERSONNEL 200 200
UNIFORMS & SAFETY TOTAL 200 - - - - - - - - - 200

1075.51531 SHIRTS - LOGO


SHIRTS - LOGO 100 100
SHIRTS - LOGO TOTAL 100 - - - - - - - - - 100

1075.57004 MAINTENANCE EQUIPMENT - GENERAL


FIELD EQUIPMENT REPAIR (VIDEO TRAILER, GENERATORS,
PUMPS, WELDER) 3,000 3,000
WATER LEVEL SENSOR REPAIR & CALIBRATION 3,000 3,000
WESTBAY EQUIP. (REELS, SAMPLER, PROBES) SERVICE
AGREEMENT 16,000 16,000
MAINTENANCE EQUIPMENT - GENERAL TOTAL 22,000 - - - - - - - - - 22,000

1075.57016 MAINT STRUCTURES AND IMPROVEMENTS


BASIN-WIDE MONITORING WELL REPAIRS INCLUDING SAM-6
VAULT REPLACEMENT 45,000 45,000
WELLS AMD-12 AND OCWD-M45 REHABILITATION 100,000 100,000
TOOLS FOR WELL AND EQUIPMENT MAINTENANCE 2,000 2,000
MAINT STRUCTURES AND IMPROVEMENTS TOTAL 147,000 - - - - - - - - - 147,000

1075.51545 SMALL TOOLS


DATALOGGERS, VEHICLE EQUIPMENT, WATER LEVEL PROBES,
CABLES, EC & PH METERS 12,000 12,000
TOOLS FOR WELL AND EQUIPMENT MAINTENANCE 2,000 2,000
SMALL TOOLS TOTAL 14,000 - - - - - - - - - 14,000

1075.51555 LAB SUPPLIES


CALIBRATION STANDARDS FOR FIELD EQUIPMENT 100 100
LAB SUPPLIES TOTAL 100 - - - - - - - - - 100

1075.51102 MEMBERSHIP
DISTRICT MEMBERSHIPS FOR GRA, NGWA, URISA AND
PROFESSIONAL CERTIFICATIONS 1,500 1,500
MEMBERSHIP TOTAL 1,500 - - - - - - - - - 1,500

Orange County Water District 11-52 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
HYDROGEOLOGY (1075)
South Basin
JDE So. Basin Alamitos North Basin South Basin MTBE North Basin
Description General Well EW-1 GWRS GW
Account Litigation Barrier O&M NCP NCP Litigation Litigation
Protection Total
Number
ACTIVITY CODE 9900 9976 1711 9932 9985 9986 9975 9977 9922 9941
1075.51192 TECHNICAL TRAINING
WEBINARS, GIS/WRMS PROGRAMMING TRAINING (ARC/GIS,
ORACLE, NET), DRILLING INSPECTION TRAINING 2,500 2,500
TECHNICAL TRAINING TOTAL 2,500 - - - - - - - - - 2,500

1075.51112 SPECIAL DEPARTMENT EXPENSE


WELL SITE & DISCHARGE LICENSE/PERMIT RENEWALS 10,000 17,000 17,000 44,000
REGULATORY AGENCY REVIEW OF NORTH BASIN RI/FS
DOCUMENTS COST REIMBURSEMENT 90,000 90,000
REGULATORY AGENCY REVIEW OF SOUTH BASIN RI/FS
DOCUMENTS COST REIMBURSEMENT 60,000 60,000
SANTA ANA RIVER WATERMASTER EXPENSES 20,000 20,000
USGS STREAMGAGING (WATERMASTER/PRADO GAUGE AND
SANTIAGO CREEK GAUGE) 57,000 57,000
SPECIAL DEPARTMENT EXPENSE TOTAL 87,000 - - 17,000 90,000 77,000 - - - - 271,000

HYDROGEOLOGY GRAND TOTAL 1,892,163 542,796 15,587 127,270 928,485 747,946 232,837 323,324 9,824 9,959 4,830,191

Orange County Water District 11-53 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
NATURAL RESOURCES (1080)
Wildlife Habitat
JDE Account Description General GWRS
Number
Management Restoration Total
ACTIVITY CODE 9900 9922 8010 8008
SALARIES AND BENEFITS
1080.50104 REGULAR SALARIES 159,567 9,842 193,240 129,464 492,112
1080.50210 PAYROLL TAXES 2,481 185 3,745 2,820 9,231
1080.50202 RETIREMENT 26,118 1,526 29,642 19,023 76,309
1080.50204 HEALTH INSURANCE 27,066 1,823 40,042 22,224 91,155
1080.50206 WORKERS' COMPENSATION 3,022 242 5,558 3,294 12,116
SALARIES AND BENEFITS TOTAL 218,254 13,618 272,226 176,825 680,924

1080.51301 TRAVEL/CONFERENCE/MILEAGE
WESTERN WILDLIFE SOCIETY (SANTA ROSA, CA) 1,500 1,500
CAL-IPC (SAN DIEGO, CA) 1,500 1,500
TRAVEL/CONFERENCE/MILEAGE TOTAL 3,000 - - - 3,000

1080.53001 PROFESSIONAL SERVICES - GENERAL


VIREO MONITORING - JIM PIKE CONTRACT 65,000 65,000
BIOLOGIST CONTRACTOR SAWA SPLIT 50,000 50,000
BIRD USE OF OCWD LANDS CA GNATCATCHER 50,000 50,000
FISH/BIRD DIET STUDIES AND PRADO STATISTICS 40,000 40,000
POLYPHAGOUS SHOT HOLE BORER 20,000 20,000
SAWA - MONITOR AND MANAGE SUNNYSLOPE CREEK 35,000 35,000
MONITOR AND REPORT LEAST TERNS 20,000 20,000
CANDIDATE ENDANGERED SPECIES STUDIES 20,000 20,000
PRADO DEVIATION MONITORING 60,000 60,000
PROFESSIONAL SERVICES - GENERAL TOTAL - - 360,000 - 360,000

1080.53001.170 EXPENSE - CONTRA


SAWA REIMBURSEMENT - VIREO MONITORING (65,000) (65,000)
SAWA REIMBURSEMENT - PAYROLL (58,097) (58,097)
EXPENSE - CONTRA TOTAL - - (123,097) - (123,097)

1080.53015 TEMP LABOR


TEMPORARY FIELD LABORERS 75,000 75,000
TEMP LABOR TOTAL 75,000 - - - 75,000

1080.51104 SUBSCRIPTIONS
SUBSCRIPTIONS/PUBLICATIONS 750 750
SUBSCRIPTIONS TOTAL 750 - - - 750

Orange County Water District 11-54 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
NATURAL RESOURCES (1080)
Wildlife Habitat
JDE Account Description General GWRS
Number
Management Restoration Total
ACTIVITY CODE 9900 9922 8010 8008
1080.51501 OFFICE EXPENSE - GENERAL
MISCELLANEOUS OFFICE SUPPLIES 5,000 5,000
OFFICE EXPENSE - GENERAL TOTAL 5,000 - - - 5,000

1080.51520 GAS & DIESEL FUEL


GAS, DIESEL FUEL 11,000 11,000
GAS & DIESEL FUEL TOTAL 11,000 - - - 11,000

1080.51531 SHIRTS - LOGO


SHIRTS - LOGO 500 500
SHIRTS - LOGO TOTAL 500 - - - 500

1080.51530 UNIFORMS
CLOTHING, UNIFORMS, AND BOOTS 500 500
UNIFORMS TOTAL 500 - - - 500

1080.57004 MAINTENANCE EQUIPMENT - GENERAL


FIELD EQUIPMENT - TRAPS 1,000 1,000
MAINTENANCE EQUIPMENT - GENERAL TOTAL 1,000 - - - 1,000

1080.57010 MAINTENANCE EQUIPMENT - VEHICLES


SMALL TRUCK SCHEDULED AND UNSCHEDULED REPAIRS,
TIRES, BELTS, ETC. 5,000 5,000
MAINTENANCE EQUIPMENT - VEHICLES TOTAL 5,000 - - - 5,000

1080.57012 MAINTENANCE EQUIPMENT - HEAVY EQUIPMENT


EQUIPMENT MAINTENANCE, SPRAYER, CHIPPER, SKIDSTER 3,000 3,000
MAINTENANCE EQUIPMENT - HEAVY EQUIPMENT TOTAL 3,000 - - - 3,000

1080.57016 MAINT STRUCTURE AND IMPROVEMENTS - GENERAL


PRADO HABITAT RESTORATION/WETLAND IMPROVEMENTS 75,000 75,000
ARUNDO CONTROL IN THE PRADO BASIN 140,000 140,000
SANTA ANA SUCKER HABITAT RESTORATION 35,000 35,000
RGP RECHARGE AREA HABITAT MAINTENANCE 75,000 75,000
OCWD PROJECT AREA HABITAT RESTORATION 75,000 75,000
MAINT STRUCTURE AND IMPROVEMENTS - GENERAL TOTAL - - - 400,000 400,000

Orange County Water District 11-55 FY 2018-19 Budget Report


GENERAL FUND OPERATING BUDGET FY 18-19
NATURAL RESOURCES (1080)
Wildlife Habitat
JDE Account Description General GWRS
Number
Management Restoration Total
ACTIVITY CODE 9900 9922 8010 8008
1080.51545 SMALL TOOLS
WILDLIFE MANAGEMENT EQUIPMENT 6,500 6,500
FIELD EQUIPMENT (GPS, NETS, BINOCULARS, BIRD BOXES,
ETC.) 6,500 6,500
SMALL TOOLS TOTAL 13,000 - - - 13,000

1080.51565 RENT EQUIPMENT - GENERAL


EQUIPMENT RENTAL 1,500 1,500
RENT EQUIPMENT - GENERAL TOTAL 1,500 - - - 1,500

1080.51550 SAFETY SUPPLIES


SAFETY EQUIPMENT SUCH AS SAFETY GOGGLES, GLOVES 500 500
SAFETY SUPPLIES TOTAL 500 - - - 500

1080.51112 SPECIAL DEPARTMENT EXPENSE


OTHER ENVIRONMENTALLY RELATED FEES 2,000 2,000
SPECIAL DEPARTMENT EXPENSE TOTAL 2,000 - - - 2,000

1080.54035 CHEMICAL
HERBICIDE 5,000 5,000
CHEMICAL TOTAL 5,000 - - - 5,000

1080.56012 INTER AGENCY


SANTA ANA SUCKER CONSERVATION (SAWPA) 15,000 15,000
INTER AGENCY TOTAL 15,000 - - - 15,000

NATURAL RESOURCES GRAND TOTAL 360,004 13,618 509,129 576,825 1,459,577

Orange County Water District 11-56 FY 2018-19 Budget Report


SECTION 11
ACRONYMS & ABBREVIATIONS

ACOE or Corps United States Army Corps of Engineers


ACWA Association of California Water Agencies
af Acre-feet
AGWA Association of Ground Water Agencies
AMX Water billing system
AOP Advanced Oxidation Process
AWPF Advanced Water Purification Facilities
AWWARF American Water Works Association Research Foundation
BCV Basin Cleaning Vehicle
BEA Basin Equity Assessment
BPP Basin Production Percentage
CIP Capital Improvement Program
CMMS Computerized Maintenance Management System
CSDA California Special Districts Association
DPH California Department of Public Health
EDC Endocrine disrupting compounds
EPA Environmental Protection Agency
ERP Emergency Response Plan
FHQ Field Headquarters
FIS Financial Information System
FRL Field Research Laboratory
FTE Full time equivalent
FY Fiscal year
GL General liability insurance
GAP Green Acres Project
GWRS Groundwater Replenishment System
GWRSIE Groundwater Replenishment System Initial Expansion
I&E Instrumentation and electrical
IEUA Inland Empire Utilities Agency
IIS Integrated information systems
IRWD Irvine Ranch Water District
IS Information Services
JDE JD Edwards
JPIA Joint Powers Insurance Authority
LC/MS/MS Liquid chromotograph/double mass spectrometer
LIMS Lab Information System
LTFP Long-Term Facilities Plan
MGD Million gallons per day
MSDS Material Safety Data Sheet
MWD Metropolitan Water District of Southern California
MWDOC Municipal Water District of Orange County
NDMA N-nitrosodimethylamine
NPDES National Pollutant Discharge Elimination System
NWRI National Water Research Institute
O&M Operations and Maintenance
OCCOG Orange County Council of Government
OCEA Orange County Employee Association
OCHCA Orange County Health Care Agency
OCSD Orange County Sanitation District
OMMP Operations, Maintenance and Monitoring Plan
PAC Project advisory committee
SECTION 11
ACRONYMS & ABBREVIATIONS

PAYGO Pay as you go


PBDE Poly-Brominated Diephenyl Ethers
PCS Process Control System
PDAs Personal digital assistants
Producers Orange County groundwater producers
QA/QC Quality assurance/quality control
RA Replenishment assessment
R&D Research and Development
REWG Recharge Enhancement Working Group
RFP Requests for proposals
RMP Risk Management Plan
RO Reverse osmosis
R&R Replacement & Refurbishment
RWQCB Regional Water Quality Control Board
SAR Santa Ana River
SARWQH Santa Ana River Water Quality Health
SAWA Santa Ana Watershed Association
SAWPA Santa Ana Watershed Project Authority
SCADA Supervisory Control and Data Acquisition
SRF State Revolving Fund
TMDL Total maximum daily load
TOC Total organic carbon
UCMR2 Unregulated Contaminant Monitoring Rule Phases
UCI University of California Irvine
UV Ultraviolet light
VOC Volatile organic compounds
WEROC Water Emergency Response of Orange County
WQ Water Quality
W/C Workers’ compensation
WRF WateReuse Research Foundation
WRMS Water Resource Management System
YLWD Yorba Linda Water District

You might also like