3-SIPROTEC - 7VU85 - Session - 3 - Testing - EN
3-SIPROTEC - 7VU85 - Session - 3 - Testing - EN
Session 2: Learn more about our new SIPROTEC 7VU85 HSBT Device
June 28, 2023 10:00 11:00 CEST (Berlin) 60min
• Fast transfer across the whole factory • Making engineering easier: • Safe and reliable modular design based
• No additional VT cabinet for remodeling on Siemens’ most advanced hardware
• Higher success rate achieved by the and software platform SIP5
RTFT mode which employs a unique from ATS;
predictive algorithm • Fault detection; • Fast transfer completely compliant with
ANSI C50.41
• Having a high-speed (<1ms) relay • Protection and supervision;
• Widely used in global chemical /
• 1 device for various system applications, petrochemical industry
without additional adaptive engineering
design
• Making function configuration easier with
the self-adaptive predictive algorithm
Visit our
website
Sequential transfer Y Y Y Y Y
Simultaneous transfer Y Y Y Y Y
Switch types are automatically calculated, Residual voltage mode Long-time mode
detected and decided by device! Backup transfer(ATS)
• Based on the existing world-wide used SIPROTEC 5 platform, the reliability, stability, and
efficiency of 7VU85 are guaranteed
Unified platform • Standardized interfaces and communication protocols
• The 7VU85 provides easy configuration with DIGSI 5 in case of complex application and
scenarios.
7VU68 FG HSBT
7VU68
FN Transfer Direction
7VU68 7VU68
FG LS5
Busbar 1 Busbar 2
Busbar 1 Busbar 2
LS5
L1->L2
B1 B2 B1 B2 B1 B2
L1
L2->L1 L2
L1 B2->L1 L2 L1 L2->B1 L2
B1 B2 B1 B2 B1 B2
FG SSU 1
FN Direction
FN
FN Direction
Direction
FN Direction
FN DirectionDirection
FN Transfer
HW Application Templates
7VU85
• 3* FG Circuit Breaker
• 2* 3ph. Current Inputs
• 2* 3ph. Voltage Inputs
• 2* 1ph. Voltage Inputs
Usyn2
M1 M2 Mn
VBB
ICB1
VInc2
ICB2
Ualt
LS1 LS2
URest
LS3
M1 M2 Mn
Modus
LS1 LS2
URest
LS3
M1 M2 Mn
Introduction RelaySimTest
System-based protection testing
© OMICRON
RelaySimTest in a Nutshell 27
© OMICRON
RelaySimTest within the Protection Testing Context 28
© OMICRON
RelaySimTest Key Features 29
1.
2.
Control or remote-control
multiple test sets from one PC
3.
© OMICRON
Applications
Transmission Substation
Distribution
Industry
Teleprotection
Phase-shifter
Busbar
Transformer
Power-swing
Teleprotection
Insulated
Parallel
Auto-reclosingprotection
Breaker-and-a-half
Distribution and
lines loop and
with line differential
differential
& out-of-step
scheme protection
auto-reclosing
compensated
with mutual networks
coupling
Teleprotection
Traveling
Motor Wave with transformer
Three-terminal
Series-compensated
Testing
Simulate
Modeling
Model
Testing
Test
Inject 1to½
Simultaneous
Simulate
Simulating
the
phase
two-
theof
andprotection
shifting
any
breaker
every
networks
mutual type
tripping lines
of
three-winding
relays
single
coordination
with
coupling
lines
including
transformers
busbar
&recloser
with six
unit
testing
insulated
its
between
communication
according
topology
transformers,
blocking for
and possible.
protection
in the
the loop channels.
to IEC/IEEE
under
scheme
reclosing
compensated
line segments 60076-57-
NoSimultaneous
autotransformers,
ofcurrent-inputs.
the and phase
out-of-step
need
cycles to
of re-wire
star-point
as they occur
Simple
Testing
The testing
distributed
simulation
Simulate the of line
auto-reclosing
protection
automatically
behavior of withsequences
amotors
calculates
asynchronous transformer
the independent
inside
intransient
order signal
to winding
test ofand
motorthebus
its protected
Controlling
1202 with
Controlling
Testing
shifting
injection
and
during all
to
power-swing
test.
simultaneously.
multiple the
types
each
complex
transformers
any test
of
test
zone
number
Check
distributed Tests setup
andset of
condition. from
construction,
from
coordination
simulate
field
coordination
theor
relays. full
Testing one
such
three
tap
units.
Combineof end
as
or
on without
single
more
series
changers,
both
operation
for Fault
ofweakrelays
sequence and coordinating
dual
terminals
internal
simulation
power-swing e.g.
infeed core,
compensated
with
from on one
possible each
end
faultlines
faults
breaker-
scenariosfault on
and
thegrounding.
in your
amount
zone. The of
travelling
transfer
symmetrical schemes Test
real-world
cycles,
transformer
andwave behavior
and topology.
single
model
pulses
motor
asymmetrical.
of the
three
takes
for the
protection
Use
protection
Testing pole
care
TWX1
the
for over-
tripping.
the
systems
dual-core
system
vector
accessory.
. and for
group
simulation
earth
underreach
Simultaneous
and
for
faults
transient
test
and
without over
inrush
including
every node the
how phone.
currents.
having to
they
including Independent
coordinate
are effecting
dead-zone each of
test
time
faultstheon teleprotection
theofcoupling
grading.
in the phone. scheme
breaker
failure
isolation
current
transformer
when
protection
events.
protection.
to
parallel
coordination service
reversal.
and resulting ratio
system
two
lines
testing restoration.
automatically.
phase
studies
are
for infaults.
the operation
reclosing
according to IEEE
orcycles
grounded.
C37.245™-2018multiplefield.
.relays.
being used.
Combined Applications
© OMICRON
transient power system simulation:
RelaySimTest
Vres
Vres
Faults
Main Incomer
• 1 phase
• 2 phase
• 3 phase
Busbar
Alternative Incomer
Fault Resistance
• Based on the existing world-wide used SIPROTEC 5 platform, the reliability, stability, and
efficiency of 7VU85 are guaranteed
Unified platform • Standardized interfaces and communication protocols
• The 7VU85 provides easy configuration with DIGSI 5 in case of complex application and
scenarios.
• Reliable testing only possible with dynamic closed loop simulation (RTDS)
• OMICRON RelaySimTest provides "Iterative Closed Loop Simulation".
Functional testing
• Verification of dynamic behaviour and application parameters
• HSBT blocking and start conditions can be verified with dynamic simulation
Smart Infrastructure
Electrification & Automation
Mozartstraße 31 C
91052 Erlangen
Germany
For the U.S. published by
Siemens Industry Inc.
100 Technology Drive
Alpharetta, GA 30005
United States
© Siemens 2023
Subject to changes and errors. The information given in this
document/video only contains general descriptions and/or
performance features which may not always specifically reflect those
described, or which may undergo modification in the course of
Visit our
further development of the products. The requested performance
features are binding only when they are expressly agreed upon in website
the concluded contract.
All product designations may be trademarks or other rights of
Siemens, its affiliated companies or other companies whose use by
third parties for their own purposes could violate the rights of the
respective owner.