Chapter 8 - Simulation
Chapter 8 - Simulation
1
Concepts of Simulation
A set of assumptions
Real-world
Modeling
process concerning the behavior of a & Analysis
system
Simulation
the imitation of the operation of a real-world process or system over
time
to develop a set of assumptions of mathematical, logical, and
symbolic relationship between the entities of interest, of the system.
to estimate the measures of performance of the system with the
simulation-generated data
7
Why to use simulation? . . .
• Clearly, this is itself not a trivial task
– Simulations are often large, complex and difficult to
develop
– Just developing the correct system model can be a
daunting task
> There are many variables that must be taken into account
– However, if a new plant costs hundreds of millions
or even billions of dollars, spending on the order of
thousands (or even hundreds of thousands) of
dollars on a simulation could be a bargain
– Note that with the Shuttle example, most of the
work for this must be done in advance
> Don't have time to design & implement this during the
duration of a flight
8
Flight Dec Cabin simulator for Main & Copilot
Car driving simulator
When Simulation is the Appropriate Tool (1)
15
Advantages and Disadvantages of Simulation (1)
Advantages
New polices, operating procedures, decision rules, information flows,
organizational procedures, and so on can be explored without disrupting
ongoing operations of the real system.
New hardware designs, physical layouts, transportation systems, and so
on, can be tested without committing resources for their acquisition.
Hypotheses about how or why certain phenomena occur can be tested
for feasibility.
Insight can be obtained about the interaction of variables.
Insight can be obtained about the importance of variables to the
performance of the system.
Bottleneck analysis can be performed indicating where work-in-process,
information, materials, and so on are being excessively delayed.
A simulation study can help in understanding how the system operates
rather than how individuals think the system operates.
“What-if” questions can be answered. This is particularly useful in the
design of new system.
16
Advantages and Disadvantages of Simulation (2)
Disadvantages
Model building requires special training. It is an art that is learned
over time and through experience. Furthermore, if two models are
constructed by two competent individuals, they may have similarities,
but it is highly unlikely that they will be the same.
Simulation results may be difficult to interpret. Since most simulation
outputs are essentially random variables (they are usually based on
random inputs), it may be hard to determine whether an observation is
a result of system interrelationships or randomness.
Simulation modeling and analysis can be time consuming and
expensive. Skimping on resources for modeling and analysis may
result in a simulation model or analysis that is not sufficient for the
task.
Simulation is used in some cases when an analytical solution is
possible, or even preferable. This might be particularly true in the
simulation of some waiting lines where closed-form queueing models
are available. 17
Areas of Application (1)
WSC(Winter Simulation Conference) : http://www.wintersim.org
Manufacturing Applications
Analysis of electronics assembly operations
Design and evaluation of a selective assembly station for high-precision
scroll compressor shells
Comparison of dispatching rules for semiconductor manufacturing using
large-facility models
Evaluation of cluster tool throughput for thin-film head production
Determining optimal lot size for a semiconductor back-end factory
Optimization of cycle time and utilization in semiconductor test
manufacturing
Analysis of storage and retrieval strategies in a warehouse
Investigation of dynamics in a service-oriented supply chain
Model for an Army chemical munitions disposal facility
Semiconductor Manufacturing
Comparison of dispatching rules using large-facility models
The corrupting influence of variability
A new lot-release rule for wafer fabs 18
Areas of Application (2)
Assessment of potential gains in productivity due to proactive reticle
management
Comparison of a 200-mm and 300-mm X-ray lithography cell
Capacity planning with time constraints between operations
300-mm logistic system risk reduction
Construction Engineering
Construction of a dam embankment
Trenchless renewal of underground urban infrastructures
Activity scheduling in a dynamic, multi-project setting
Investigation of the structural steel erection process
Special-purpose template for utility tunnel construction
Military Application
Modeling leadership effects and recruit type in an Army recruiting station
Design and test of an intelligent controller for autonomous underwater
vehicles
Modeling military requirements for nonwarfighting operations
Multi-trajectory performance for varying scenario sizes
Using adaptive agent in U.S Air Force pilot retention 19
Areas of Application (3)
Logistics, Transportation, and Distribution Applications
Evaluating the potential benefits of a rail-traffic planning algorithm
Evaluating strategies to improve railroad performance
Parametric modeling in rail-capacity planning
Analysis of passenger flows in an airport terminal
Proactive flight-schedule evaluation
Logistics issues in autonomous food production systems for
extended-duration space exploration
Sizing industrial rail-car fleets
Product distribution in the newspaper industry
Design of a toll plaza
Choosing between rental-car locations
Quick-response replenishment
20
Areas of Application (4)
21
20/02/2023 Getachew Gobena (Asst. Prof.) 22