CEC003 CEC32S2 Module 2.1 OSH Rule 1060

This document outlines occupational safety and health standards including rules on walkway surfaces, floor and wall openings, stairs, and window openings. It discusses requirements for construction and maintenance. Standard colors are assigned for safety signs including blue for precaution, green for safety, and red for fire protection. Electrical safety standards and rules for elevators, hazardous work processes, and materials handling are also addressed. Groups will report on specific rules covering welding/cutting, inspections, preparation of plans, identification of piping systems, and power piping construction.

Uploaded by

Mark Aquino
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
35 views20 pages

CEC003 CEC32S2 Module 2.1 OSH Rule 1060

This document outlines occupational safety and health standards including rules on walkway surfaces, floor and wall openings, stairs, and window openings. It discusses requirements for construction and maintenance. Standard colors are assigned for safety signs including blue for precaution, green for safety, and red for fire protection. Electrical safety standards and rules for elevators, hazardous work processes, and materials handling are also addressed. Groups will report on specific rules covering welding/cutting, inspections, preparation of plans, identification of piping systems, and power piping construction.

Uploaded by

Mark Aquino
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 20

CEC003 MODULE 2

OSH STANDARDS 1060

Thursday, December 01, 2022 RKAP CEC003 CEC32S2 1


TOPIC OUTLINE

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 2


RULE 1060.1 GENERAL PROVISIONS

Standard Colors
BLUE - PRECAUTION
GREEN – SAFETY
YELLOW – CAUTION
ORANGE – ALERT
RED – FIRE PROTECTION
(PROHIBITION)
PURPLE - RADIATION

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 3


RULE 1060.1 GENERAL PROVISIONS

Standard Colors
BLUE - PRECAUTION
GREEN – SAFETY
YELLOW – CAUTION
ORANGE – ALERT
RED – FIRE PROTECTION
(PROHIBITION)
PURPLE - RADIATION

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 4


RULE 1061 CONSTRUCTION & MAINTENANCE

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 5


RULE 1063 WALKWAY SURFACE

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 6


RULE 1064 FLOOR & WALL OPENINGS

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 7


RULE 1064 FLOOR & WALL OPENINGS

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 8


RULE 1064 FLOOR & WALL OPENINGS

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 9


RULE 1064 FLOOR & WALL OPENINGS

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 10


RULE 1064 FLOOR & WALL OPENINGS

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 11


RULE 1064 FLOOR & WALL OPENINGS

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 12


RULE 1064 FLOOR & WALL OPENINGS

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 13


RULE 1064 FLOOR & WALL OPENINGS

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 14


RULE 1064 FLOOR & WALL OPENINGS

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 15


RULE 1065 STAIRS

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 16


RULE 1065 STAIRS

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 17


RULE 1065 STAIRS

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 18


RULE 1066 WINDOW OPENING

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 19


GROUP REPORTING

GROUP 1 – RULE 1100 GAS & ELECTRIC WELDING AND CUTTING OPERATIONS
GROUP 2 – RULE 1120 HAZARDOUS WORK PROCESSES
GROUP 3 – RULE 1150 MATERIALS HANDLING AND STORAGE
GROUP 4 – RULE 1210 ELECTRICAL SAFETY (UP TO APPLICATIONS AND PLANS)
GROUP 5 – RULE 1210 ELECTRICAL SAFETY (INSPECTIONS TO ADDITIONAL LOADS)
GROUP 6 – RULE 1220 ELEVATORS (DEFINITIONS)
GROUP 7 – RULE 1220 ELEVATORS (APPLICATION TO GENERAL REQUIREMENTS)
GROUP 8 – RULE 1220 ELEVATORS (REQUIREMENTS IN PREPARATION OF PLAN)
GROUP 9 – RULE 1230 IDENTIFICATION OF PIPING SYSTEM
GROUP 10 – RULE 1240 POWER PIPING LINES (UP TO CONSTRUCTION ONLY)

Thursday, December 01, 2022 RKAP CEC002 CEC32S1 20

You might also like