Pages From Chiniot 2-2023 - Part1

This document provides rates in British and metric units for various types of earthwork in District Chiniot for the period of January 7, 2023 to December 31, 2023. It lists 6 grades of excavation with their rates per 1000 cubic feet and cubic meter. It also provides rates for rehandling of earthwork and excavated rock up to certain distances, filling and transportation of earth over 1000 feet, dressing and leveling of earthwork, dowel dressing, and dressing of slopes. Remarks columns specify rate reductions or additions for certain types of work.

Uploaded by

Arslan Javed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views1 page

Pages From Chiniot 2-2023 - Part1

This document provides rates in British and metric units for various types of earthwork in District Chiniot for the period of January 7, 2023 to December 31, 2023. It lists 6 grades of excavation with their rates per 1000 cubic feet and cubic meter. It also provides rates for rehandling of earthwork and excavated rock up to certain distances, filling and transportation of earth over 1000 feet, dressing and leveling of earthwork, dowel dressing, and dressing of slopes. Remarks columns specify rate reductions or additions for certain types of work.

Uploaded by

Arslan Javed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

MRS, 2nd BI-ANNUAL-2023 (01.07.2023 to 31.12.

2023) DISTRICT CHINIOT

Sr. Description Rate (British System) Rate (M etric System) Spec. Remarks
No. Unit of Unit of No.
M /ment Labour Composite M /ment Labour Composite

i) Grade I 1000 Cft. 47,636.15 48,903.35 cu.m 1,682.50 1,727.25 2) Reduce the rate by 8% if the
ii) Grade II 1000 Cft. 51,670.10 53,782.10 cu.m 1,825.00 1,899.60 excavated section is not dressed or
iii) Grade III 1000 Cft. 61,876.30 64,410.70 cu.m 2,185.45 2,275.00 levelled to designed section.
iv) Grade IV 1000 Cft. 68,824.80 71,781.60 cu.m 2,430.90 2,535.35
v) Grade V 1000 Cft. 76,042.55 79,421.75 cu.m 2,685.80 2,805.20
vi) Grade VI 1000 Cft. 81,692.15 85,493.75 cu.m 2,885.35 3,019.65

13 Rehandling of earthwork:

a) Lead upto a single throw of Kassi, phaorah or shovel 1000 Cft. 3,247.20 -- cu.m 114.70 -- ditto
b) Upto a lead of 50 ft. (15 m). 1000 Cft. 4,546.10 -- cu.m 160.55 --

14 Rehandling of gravel work or excavated rock, 1000 Cft. 12,988.80 -- cu.m 458.75 -- 17.1 to 17.5
lead upto 50 ft.( 15 m)

15 Filling, watering and ramming earth under floors:- ditto

i)with surplus earth from foundation, etc. 1000 Cft. 6,526.10 -- cu.m 230.50 --
ii)
with new earth excavated from outside, 1000 Cft. 14,037.85 -- cu.m 495.80 --
lead upto one chain (30 m).
16 Extra for every 50 ft. (15 m) additional lead or part thereof :- This rate shall be applicable upto
1000 ft. total distance, including the
i) for earhtwork soft, ordinary, hard and very hard. 1000 Cft. 130.70 -- cu.m 4.60 -- lead covered in the item of earthwork
ii) for gravel, shingle or rock. 1000 Cft. 155.85 -- cu.m 5.50 --

17 Transportation of earth all types when the total distance, This rate will be paid inaddition to the
including the lead covered in the item of work, is more than rate of earthwork, without deducting
1000 ft. (300 m) the lead covered in the item of
a) upto ¼ mile (400 m). 1000 Cft. 4,932.20 -- cu.m 174.20 -- earthwork
b) for every 330 ft. (100 m) additional lead or part thereof,
beyond ¼ mile (400 m) upto one mile. (1.6 Km.) 1000 Cft. 37.95 -- cu.m 1.35 --
c) for every ¼ mile (400 m) additional lead or part thereof,
beyond one mile (1.6 Km.) upto 5 mile (8 Km). 1000 Cft. 360.50 -- cu.m 12.75 --
d) for every ½ mile (800 m) additional lead
or part thereof, beyond 5 miles (8 Km). 1000 Cft. 342.45 -- cu.m 12.10 --

18 Dressing and levelling of earhtwork to designed section, etc. 17.10 to 17.5


complete:-
a) Ashes, sand, silt or soft soil. 1000 Cft. 419.85 -- cu.m 14.85 --
b) Ordinary or hard soil. 1000 Cft. 815.85 -- cu.m 28.80 --
c) Gravel work or soft rock not requiring 1000 Cft. 1,969.45 -- cu.m 69.55 --
blasting.

19 Dowel dressing. Per 383.25 -- Metre 12.55 -- ditto This rate is in addition to payment for
Chain dressed earhtwork.

20 a) Dressing slopes of banks or ground surface. 100Sft. 170.95 -- sq.m 18.40 -- ditto To be paid only when exclusively
dressing is done and no earthwork is
carried out in embankment or cutting.

Chap-3 (Earthwork) Page 29