Estimate Sample
Estimate Sample
Labor
1. Safety Officer mh P
MATERIAL COST P
LABOR COST P
DIRECT COST FOR ITEM D1 P
OCM (_____%) P
PROFIT (_____%) P
CONTRACTOR'S TAX (2%) P
TOTAL COST FOR ITEM D1 P
D2 SITEWORK
ESTIMATE SHEET
S2A.1 Fencing
Materials
1. Plastic cover (sako), 6ft height m P P
2. 2" x 2" x 12' rough lumber, for post and bracing pc P P
on plastic cover
3. 2" Common wire nail kg P P
4. 3" Common wire nail kg P P
Labor
1. Skilled mh P P
1. Unskilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S2A.1 P
Material Cost P
Labor Cost P
Equipment Cost P
Sub-Total for Item S2C P
MATERIAL COST P
LABOR COST P
EQUIPMENT COST P
DIRECT COST FOR ITEM D2 P
OCM (_____%) P
PROFIT (_____%) P
CONTRACTOR'S TAX (2%) P
TOTAL COST FOR ITEM D2 P
D3 CONCRETE
S3A Cast-In-Place Concrete
S3A.1 Floor slab at Internal Audit Department,
ESTIMATE SHEET
Materials
1. Portland Cement Type I (40 kg./bag) bag P P
2. River Washed Sand cu.m. P P
3. 3/4" Crushed Gravel cu.m. P P
4. 10mm dia. x 6.00 M Reinforcing Steel Bar pc P P
5. # 16 G.I. Tie Wire kg P P
Labor
1. Skilled mh P P
2. Unskilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S3A.1 P
Materials
1. Portland Cement Type I (40 kg./bag) bag P P
2. River Washed Sand cu.m. P P
Labor
1. Skilled mh P P
2. Unskilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S3A.2 P
Materials
1. Portland Cement Type I (40 kg./bag) bag P P
2. River Washed Sand cu.m. P P
3. 3/4" Crushed Gravel cu.m. P P
4. 10mm dia. x 6.00 M Reinforcing Steel Bar pc P P
5. 16mm dia. x 6.00 M Reinforcing Steel Bar pc P P
6. 1/4" thk. x 4' x 8' Marine Plywood pc P P
7. 2" x 2" x 12' Rough Lumber bd.ft. P P
8. 3" Common Wire Nail kg P P
9. 2" Common Wire Nail kg P P
10. 1 1/2" Common Wire Nail kg P P
11. # 16 G.I. Tie Wire kg P P
Labor
1. Skilled mh P P
2. Unskilled mh P P
Equipment Rental
1. One Bagger Mixer day P P
3. Scaffolding (H-Frame and other accessories) set P P
Material Cost P
Labor Cost P
Equipment Rental Cost P
Sub-Total for Item S3A.3 P
MATERIAL COST P
LABOR COST P
EQUIPMENT COST P
DIRECT COST FOR ITEM D3 P
OCM (_____%) P
PROFIT (_____%) P
CONTRACTOR'S TAX (2%) P
TOTAL COST FOR ITEM D3 P
D4 MASONRY
S4A Concrete Masonry Unit Work
S4A.1 Public Toilet,Water Scape area, VP-Finance Toilet,
BOD Toilet, Special Resources Area and
Finance Area
ESTIMATE SHEET
Materials
1. 4" thk. Machine Made Concrete Hollow Block pc P P
2. Portland Cement Type I (40 kg./bag) bag P P
3. River Washed Sand cu.m. P P
4. 10mm dia. x 6.00 M Reinforcing Steel Bar pc P P
5. # 16 G.I. Tie Wire kg P P
Labor
1. Skilled mh P P
2. Unskilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S4A.1 P
MATERIAL COST P
LABOR COST P
EQUIPMENT COST P
DIRECT COST FOR ITEM D4 P
OCM (_____%) P
PROFIT (_____%) P
CONTRACTOR'S TAX (2%) P
TOTAL COST FOR ITEM D4 P
D5 METALS
S5A Miscellaneous Metals
S5A.1 Stair Railing at BOD-Entrance
Materials
1. 1.2mm. Thk. 2 ½ "dia.x6.0m Stainless Steel (10ft.) pc P P
2. 1.2mm. Thk. 1 ½ "dia.x6.0m Stainless Steel (10ft.) pc P P
ESTIMATE SHEET
Labor
1. Skilled mh P P
2. Unskilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S5A.1 P
Materials
1. 3/16" thk. x 2" x 2" x 6.0m Angular Bar pc P P
2. 3/8" dia. x 3" long expansion bolt w/ shield and washer pc P P
3. Welding Rod kg P P
Labor
1. Skilled mh P P
2. Unskilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S5A.2 P
Materials
1. Stainless Steel Logo & Letters w/ mounting accessories 1 set P P
Material Cost P
Sub-Total for Item S5A.3 P
S5B Structural Steel Work
S5B.1 Steel Truss at Internal Audit Dept., Finance Dept.,
COA-Stock/Filing Room, (Roof Extension)
Materials
1. 1/4"x2 ½"x2 ½" Angular Bar (Top chord, Bottom chord) pc P P
2. 1/4" x 2" x 2" Angular Bar (Members) pc P P
3. 1.5mm x 2" x 5" C-Purlins pc P P
ESTIMATE SHEET
Material Cost P
Labor Cost P
Sub-Total for Item S5B.2 P
MATERIAL COST P
LABOR COST P
EQUIPMENT COST P
DIRECT COST FOR ITEM D5 P
OCM (_____%) P
PROFIT (_____%) P
CONTRACTOR'S TAX (2%) P
TOTAL COST FOR ITEM D5 P
D6 WOOD AND PLASTIC
S6A Carpentry and Joinery
S6A.1 Drywall partition w/ Laminated wall finish
VP-Finance, SRD-Manager, COA-Auditor,
Managers for Accounting, SPD, Treasury, Property,
Internal Audit, BOD Area, Treasury Counter,
Main Lobby & Waiting Area and Board Sec. Manager
ESTIMATE SHEET
Labor
1. Skilled mh P P
2. Unskilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S6A.2 P
Labor
1. Skilled mh P P
2. Unskilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S6A.2 P
Material Cost P
Labor Cost P
Sub-Total for Item S6A.3 P
Material Cost P
Labor Cost P
Sub-Total for Item S6A.4 P
Note: Finish and Quality of materials is subject for
Approval of the Designing Architect or Engineer
S6A.5 Ceiling Board, Joist and Hanger
Materials
1. 3/4" thk. 4'x8' Marine Plyboard (for cove lighting) sht P P
2. 4.5mm. thk. x 4'x8' Cement Fiber Board pc P P
3. 7" x 10' PVC Ceiling Panel pc P P
4. 0.40mm x 19mm x 50mm x 5.0m, Double Furring Channel pc P P
5. 1.0mm x 12mm x 38mm x 5.0m, C-channel pc P P
6. 0.40mm x 25mm x 25mm x 3.0m pc P P
7. Perforated Tape rl P P
8. Blind Rivets box P P
ESTIMATE SHEET
Material Cost P
Labor Cost P
Sub-Total for Item S6A.5 P
Material Cost P
Labor Cost P
Sub-Total for Item S6A.6 P
S6A.7 Shelves at Storage/Filing Area
Materials
1. 3/4" thk. 4'x8' Marine Plywood sht P P
2. 2" x 2" x 12' S4S KD Tanguile bdft P P
3. 2" x 2" x 8' S4S KD Tanguile bdft P P
4. Fr.1"x1"x12' K.D.Wooden Tanguile bdft P P
5. Wood Adhesive gal P P
6. 3" Common Wire Nail kg P P
7. 2" Common Wire Nail kg P P
8. 1 1/2" Common Wire Nail kg P P
ESTIMATE SHEET
Material Cost P
Labor Cost P
Sub-Total for Item S6A.7 P
Labor
1. Skilled mh P P
2. Unskilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S6A.8 P
Material Cost P
Labor Cost P
Sub-Total for Item S6A.9 P
Labor
1. Skilled mh P P
2. Unskilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S6A.10 P
MATERIAL COST P
LABOR COST P
EQUIPMENT COST P
DIRECT COST FOR ITEM D6 P
OCM (_____%) P
PROFIT (_____%) P
CONTRACTOR'S TAX (2%) P
TOTAL COST FOR ITEM D6 P
D7 THERMAL AND MOISTURE CONTROL
S7F Skylight Roofing
S7F.1 Roof at Canopy (Entrance BOD)
Materials
1. 3.0mm x 1220mm Polycarbonate Opal White lm P P
Solid Sheet (Main Roof)
2. 1/8"thk. x 1 1/2" x 30' Rubber Tape pc P P
3. 3/16" thick x 1 1/2" x 6.0m Aluminum Flat Bar pc P P
Hardware Accessories:
1. Self-drilling metal screw box P P
2. Silicon Sealant ctdg P P
ESTIMATE SHEET
Labor
1. Skilled mh P P
2. Unskilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S7G P
Hardware Accessories:
1. Blind Rivets box P P
2. Self Drill Metal Screw box P P
3. Silicon Sealant ctdg P P
4. Touch Up Paint ltr P P
Labor
1. Skilled mh P P
2. Unskilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S7G P
MATERIAL COST P
LABOR COST P
EQUIPMENT COST P
DIRECT COST FOR ITEM D7 P
OCM (_____%) P
PROFIT (_____%) P
CONTRACTOR'S TAX (2%) P
ESTIMATE SHEET
Labor
1. Skilled mh P P
2. Unskilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S8A P
S8B Steel Doors and Frames
(Supply and Install)
Materials
1. 38mm x 910mm x 2100mm Flush Hallow Core, 4 set P P
"Flush type door plain", Pre-painted oven baked steel
sheets and honey comb chemical treated paper core
insulation w/ 45mmx100mm single rabbet jamb w/ rubber
silencer and gasket together with panic device.
loc:(Fire Exit Door)MD-1
Door Handling: (Verify on plan)
Material Cost P
Sub-Total for Item S8B P
Material Cost P
Sub-Total for Item S8H.1 P
Material Cost P
Sub-Total for Item S8H.3 P
S8H.4 Glass and Accessories
S8H.4.1 Artificial "Waterscape"and Directory Area
(Supply and Install)
Materials
1. 12mm. x 2400mm(W) x 2300mm(H) Frameless Clear 2 set P P
Tempered Glass (Frameless) w/ Glass Holder 2 sets
Material Cost P
Sub-Total for Item S8H.4 P
Material Cost P
Sub-Total for Item S8J P
MATERIAL COST P
LABOR COST P
EQUIPMENT COST P
DIRECT COST FOR ITEM D8 P
OCM (_____%) P
PROFIT (_____%) P
CONTRACTOR'S TAX (2%) P
TOTAL COST FOR ITEM D8 P
D9 FINISHES
S9A Plastering
S9A.1 (Toilets Door,Windows,Column,Beam and Wall)
Materials
1. Portland Cement Type I (40 kg./bag) bag P P
2. River Washed Sand cu.m. P P
Labor
1. Skilled mh P P
2. Unskilled mh P P
Material Cost P
Labor Cost P
Sub-Total for S9A.1 P
ESTIMATE SHEET
S9B Painting
S9B.1 Shelves and Cabinets
(Wooden Surfaces)
Materials
1. Flatwall Enamel tin P P
2. Semi-Gloss Enamel tin P P
3. Tinting-Color (Set/liter) box P P
4. Lamp Black Tinting-Color ltr P P
5. Paint Brush 2" pc P P
6. Paint Brush 3" pc P P
7. Paint Brush 4" pc P P
8. Roller Brush w/ Handle 7" pc P P
9. Roller Brush Leaf 7" pc P P
10. Patching Compound bag P P
11. # 180 Sand Paper pc P P
12. # 150 Sand Paper pc P P
13. Roller Board 7" pc P P
14. Putty Plate # 4 pc P P
15. Putty Plate # 6 pc P P
16. Paint thinner gal P P
17. Stopa Rug kg P P
Labor
1. Painter mh P P
Materials Cost P
Labor Cost P
Sub-Total for Item S9B.1 P
Labor
1. Painter mh P P
Materials Cost P
Labor Cost P
Sub-Total for Item S9B.2 P
Labor
1. Painter mh P P
Materials Cost P
Labor Cost P
Sub-Total for Item S9B.3 P
Labor
ESTIMATE SHEET
Materials Cost P
Labor Cost P
Sub-Total for Item S9B.4 P
Labor
1. Skilled mh P P
2. Unskilled mh P P
Materials Cost P
Labor Cost P
Sub-Total for Item S9C P
Materials Cost P
Labor Cost P
Sub-Total for Item S9D P
Materials Cost P
Labor Cost P
Sub-Total for Item S9E.1 P
Materials Cost P
Labor Cost P
Sub-Total for Item S9E.2 P
Material Cost P
Sub-Total for Item S9G P
S9H Carpeting
S9H.1 B.O.D.,VPs,Managers,Conference and Staff Areas
Provident Fund, COA Office & BAC Office
Supply and Install
Materials
1. 500mm x 500mm Carpet Tiles 57.0 sq.m. P P
"WC5006 Winter Rose" (For B.O.D. Conference Room-01,
Conference Room-02)
Technical Specifications:
Fibre: 100% BCF Olefin solution dyed
Construction: Tufted, Textured
Stiches/Inch: 1/10" Loop pile
Total Thickness: 7mm
Backing: PVC+Glass fiber spunbonded
Material Cost P
Sub-Total for Item S9H P
Material Cost P
Sub-Total for Item S9M.1 P
Labor
1. Skilled mh P P
2. Unskilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S9M.2 P
Technical Specifications:
American Standard High Quality Fabric Backed
Vinyl Wall covering, Class A Fire Retardant,
Strippable, Scrubbable.
Note: Finish and Quality of materials is subject for
Approval of Designing Architect or Engineer
Material Cost P
Sub-Total for Item S9N.1 P
Material Cost P
Sub-Total for Item S9Q P
MATERIAL COST P
LABOR COST P
EQUIPMENT COST P
DIRECT COST FOR ITEM D9 P
OCM (_____%) P
PROFIT (_____%) P
CONTRACTOR'S TAX (2%) P
TOTAL COST FOR ITEM D9 P
ESTIMATE SHEET
D10 SPECIALTIES
S10A Toilet Accessories
S10A.1 Public Toilet (Gent's/Ladies)
Materials
1. Cadet 11 EL FV 2459, 666mm x 374mm x 380mm, 14 set P P
Elongated flush valve toilet with Complete fitting
and Accessories
Labor
1. Skilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S10A.1 P
Labor
1. Skilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S10A.1 P
Labor
1. Skilled mh P P
Material Cost P
Labor Cost P
Sub-Total for Item S10A.2 P
Material Cost P
Sub-Total for Item S10B P
MATERIAL COST P
LABOR COST P
EQUIPMENT COST P
DIRECT COST FOR ITEM D10 P
OCM (_____%) P
PROFIT (_____%) P
CONTRACTOR'S TAX (2%) P
TOTAL COST FOR ITEM D10 P
D15 MECHANICAL
D15A PLUMBING
S15A.1 Water System
Material
1. 1½" dia. x 6.00m G.I. Pipe Sch. 40 Super 'A' pc P P
2. 1½" dia. Elbow G.I. pc P P
3. 1½" Tee G.I. pc P P
4. 1½" Coupling G.I. pc P P
5. 1½" Union Patente G.I. pc P P
6. 1½" x 1½" x 1¼" Tee G.I. pc P P
7. 1¼" x 1 Coupling Reducer G.I. pc P P
8. 1¼" Gate Valve pc P P
9. 1¼ x 1¼" x 1" Tee G.I. pc P P
10. 1" Elbow G.I. pc P P
11. 1¼" Union Patente G.I. pc P P
ESTIMATE SHEET
Laborer
1. Skilled mh P P
2. Unskilled mh P P
Equipment Rental
Concrete Breaker day P P
Material Cost P
Labor Cost P
Equipment Rental Cost P
Sub-Total for Item S15A.1 P
Laborer Skilled
1. Unskilled mh P P
ESTIMATE SHEET
Material Cost P
Sub-Total for Item S15D.1 P
Material Cost P
Labor Cost P
Sub-Total for Item S15D.2 P
MATERIAL COST P
LABOR COST P
EQUIPMENT COST P
DIRECT COST FOR ITEM D15 P
OCM (_____%) P
PROFIT (_____%) P
CONTRACTOR'S TAX (2%) P
TOTAL COST FOR ITEM D15 P
D16 ELECTRICAL
S16A Electrical Works (New Installation)
Materials:
1. 3.5mm² THHN cu wire 600v roll P P
2. 5.5mm² THHN cu wire 600v roll P P
3. 20mm ø x 3mts uPVC pipe sch. 40 orange color pc P P
4. 20mm ø uPVC pipe adapter endbell orange color pc P P
5. 15mm one hole RSC straps Galv. Ga. 16 pc P P
6. Duplex universal receptacle outlet, white color, 16A 251 set P P
7. 250v w/ metallic dark brown color faceplate wide series
8. Pop-up floor grounding duplex universal outlet, 11 set P P
16A, 250v with cover unit and outlet box aluminum
9. Duplex universal receptacle outlet, white color, 16A 6 set P P
250v w/ metallic dark brown color faceplate wide
series GFCI -rated
Labor Electrician
1. Helper Electrician mh P P
MATERIAL COST P
LABOR COST P
EQUIPMENT COST P
DIRECT COST FOR ITEM D16 P
OCM (_____%) P
PROFIT (_____%) P
CONTRACTOR'S TAX (2%) P
TOTAL COST FOR ITEM D16 P