Work Commencement Turkayamjal
Work Commencement Turkayamjal
Work Commencement Turkayamjal
INSTANT APPROVAL.
****
The TS-bPASS Instant Approval vide Building Permit Order No. 88175/TKJL/2340/2021 dated. 11-10-2021 for
construction of Individual Residential Building consisting of Ground Floor + 1 Upper Floor, has-been verified
through Post Verification Team vide reference 7th cited, in terms of Rules & Regulations in force and found satisfactory.
Hence the Building permission accorded through Instant approval issued vide Application No.
88175/TKJL/2340/2021 is here with confirmed and accordingly the applicant shall commence the construction of work
as per Building Permit Order and conditions laid down.
A APPLICANT DETAILS
8 Village Injapur
9 Mandal Abdullapurmet
10 District Rangareddy
C DETAILS OF APPROVAL
D SETBACKS
2 Mortgage floor
3 Mortgage No N/A
4 SRO N/A
₹ 1663.9
1 Site Approval Charges
₹ 8319.5
2 Betterment Charges
₹ 1000
5 Debris Charges
₹ 500
6 Compound Wall Fee
₹ 597.01
7 Vacant Land Tax
₹ 200
8 Postage/ Advertisement Charges
₹ 831.95
9 Conversion Charges
₹ 2274.2
12 Building Permit Fee
₹ 1000
13 TS-bPASS User Charges
₹ 17135.64
15 Labour cess
₹ 24959
16
TOTAL(INR) ₹ 151300.01
The approval for building construction is issued subject to the following conditions:
a. The approval issued does not confer upon any ownership rights over the property. The applicant is solely
responsible for legal litigations or disputes if any
b. The extent of the plot should not be a part of bigger plot split for this purpose as per the declaration.
c. Applicant should not construct more than Ground Floor + 1 Upper Floor. Any further construction beyond
will be liable for penalty / demolition without notice.
d. If the abutting road width is less than 30 feet (9.00Mts.), 15 feet (4.5Mts.) from the center of the existing road
has to be left for road widening in addition to front setback as per rule 4(a) of G.O. Ms. No. 168 MA dt:07-04-
2012 and its amendments or required area affected under Master Plan road.
e. The proposed construction should be in conformity with the master plan land use and zoning regulations.
f. No building activity shall be carried out in certain area as per rule 3 of G.O. Ms. No. 168 MA dt:07-04-2012
and its amendments.
g. Applicant shall construct 1 rain water harvesting pits, and plant 5 Trees with in the plot at appropriate location
as per G.O.Ms.No.350 MA dt:09-06-2000.
h. The applicant shall commence the construction within 6 months and should complete with in a period of 3
years from date of approval for building constructions. Further, applicant shall upload the photographs of
commencement of construction within 6 months as per 174 (13) of Telangana Municipalities Act 2019.
i. Applicant is liable for penal action as per Telangana Municipalities Act, 2019 in case of misrepresentation or
false declaration and the Certificate of
Registrationwillberevokedandconstructionthereuponwillbedemolishedwithout issuance of any notice under
section 174 (4) of Telangana Municipalities Act 2019.
j. The area mortgaged will be released on submission of building completion certificate and occupancy
certificate.
k. If there are any Court cases pending, the proposal is subject to outcome of Court Orders.
NOTE: This is computer generated letter, doesn’t require any manual signatures