Academic Year: 2018-19
hstrmctious : a) From Q(1) ,Q(3) & Q(4) attempt any two sub questions.
b) From Q(2) , attempt any one sub question
d)OrdinaryorScientificoron-programmable)Calculatorispermitted.
(7.5)
Q1.(a)Explain Total, Free and independent floats.
® Explainbriefly (i)Dummy activity (ii)Critical path (iii) Head and Tail slack (7.5)
(c) Draw the network diagram ,and find the probability of finishing the project with (7.5)
in 35 weeks..
Activity : 1-2 2-3 2-4 2-5 3-5 4-5 5-6 6-7 6-8 7-8
Time(weeks): 3 3 7 9 5 0 6 4 13 10
Given a = 2.9 and area under standard normal curve from Z = 6 to Z = 1.03 is 0.3485
Q2.(a)(i)Explain hteger programming problem and also explain briefly mixed and (9)
pure(all) integer programming problem.
(ii)Explain Branch and Bound method of solving Integer progranming problem (6)
(b)Solve the following integer programming problem usins branch and bound method (15)
(using graphical method)
Ma#8Z=5xpi+6X2
Xi+ X2S5
4 Xi + 7X2 S 28
Xi ,X2 2 0 and X2 integer
Page 1/2
Q3.(a)Explainbrieflythefollowingininventory:
(i)Lead tine (fi) Holding cost (fii)Buffer stock
®DerivetheEOQModelwithinstantaneousreplenishmentandconstantrateof
demand assuming that shortages are not allowed.
(c)Acontractorundertakestosupplydieselenginestoanaireraftmanufacturerata
rateof25perday.Hefrodstha[tthecostOfholdingacompletapengineinstockis
16Samoflthandthereisaclauseinthecontractlaldforthemissingthescheduled
deliverydatethepenaltybeing10S/engine/day.Theprodrctionofengineisinbatches
andeachtimeanewbatchisstarted,thereisasetupcostof10000S
(i)Howfreq.uentlychouldthebatchesbestarted?