Drilling Report

The document summarizes drilling and grouting work conducted between May 9-17, 2023 at bore hole sites along the 0+355.30 to 0+430.30 section of the Baz Ali Dam project in Kurram District, Pakistan. A total of 33 cement bags were used for grouting bore holes and for backfilling. A water pressure test was also conducted at bore hole 8 at RD 0+355.30 on May 10, 2023 to evaluate permeability.

Uploaded by

Bahram Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
51 views10 pages

Drilling Report

The document summarizes drilling and grouting work conducted between May 9-17, 2023 at bore hole sites along the 0+355.30 to 0+430.30 section of the Baz Ali Dam project in Kurram District, Pakistan. A total of 33 cement bags were used for grouting bore holes and for backfilling. A water pressure test was also conducted at bore hole 8 at RD 0+355.30 on May 10, 2023 to evaluate permeability.

Uploaded by

Bahram Khan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

CONSULTANT GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL

DAMS IRRIGATION DEPARTMENT PESHAWAR w CONTRATOR

l�HC_L\<)- BAZ ALI DAM PROJECT DISTRICT KURRAM EDGE ENTERPRISEE


io-1-A
PVT. LTD.

Jv of RHC,
CASCADE & ETA

Drilling and Grouting


S.No. Date RD Bore Depth/Stage Cement Bentonite Total Remarks
Hole Bags/Kgs Bags/Kgs Bags/Kgs
No.

1 9/5/2023 0+355.30 8 15 4 0 4 Complete


2 9/5/2023 0+385.30 9 10.19 1 0 1 Complete
3 9/5/2023 0+390.30 10 10.61 1 0 1 Complete
4 10/5/2023 0+395.30 11 14 0.5 0 0.5 Complete
5 10/5/2023 0+400.30 12 14 1 0 1 Complete
6 10/5/2023 0+405.30 13 15 1 0 1 Complete
7 11/5/2023 0+410.30 14 16 1.5 0 1.5 Complete
8 11/5/2023 0+415.30 15 18.26 1.5 0 1.5 Complete
9 12/5/2023 0+420.30 16 18.42 1.5 0 1.5 Complete
10 13/5/2023 0+435.30 17 20 1 0 1 Complete
11 14/5/2023 0+440.30 18 20 2 0 2 Complete --
12 15/5/2023 0+445.30 19 23 1.5 0 1.5 Complete
'
13 16/5/2023 0+450.30 20 23 5 0 5 Complete
14 16/5/2023 0+425.30 21 11 1 0 1 Complete
15 17/5/2023 0+430.30 22 11 0.5 0 0.5 Complete
Total Cement Bags Used in Grouting of Bore Holes (A) 24 Complete
Total Cement Bags Used in Back Filling of bore Holes (B) 9 Complete
Total Cement Bags Used (A+B) 33 Complete


$.�u
��
Geologist Geologist Resi ent Engineer
M/S Edge M/S Rehman Habib M/5 Rehman Habib
Enterpirses Pvt Ltd. Consultants (Pvt) Ltd (JV) Consultants (Pvt) Ltd (JV)
RHC
Consultant

L\�)1 a-
. ..'-=rr::�.
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR
Bore Hole
NO
---
i uG
Contractor

i
CONSTRUCTION OF BAZ ALI SMALL DAM DISTRICT KURRAM
Jv or RHC, CASCADE & ETA 8 MIS Edge Enterprises (pvr) Ltd
WATER PRESSURE TEST EVALUATION SHEET AT RD~ 0+355.30
Top ofTest
Section (m): I 3
Location: Left Trench Test No: I
Bottom of casing (m)

Bottom of
Test Section (m): I 15
Nothing (m): 3724704.2 Date: I 0/05/2023
Initial GWL (m): 0

Length of Easting (m): 612980.88 Supervised By: Tausif Javed


15 Packer Pressure: 1.0342
Test Section (m):
Center of Elevation (m): 1131.18 Inclination (Degree): 75 Guage Height Above
9 0.6
Test Section(m): Aea(m)·
BOH atTime I Packer Type; Mechanical Rock Type: Limestone & Shale Diameter of Hole inTest
15 72
ofTest (m): Area (mm)·

Stage I Time(min) 0 Liters 5 Liters 10 Liters IS


Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
4.9122 4.9645 4.9877 5.6789
Pressure P Reading (Lit).
Water take
1.0342 0.0523 0.0232 0.7812 0.2859 11.8 0.01
l<Lil)
Stage 2 Tirne (min)
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Reading (Lit).
Water take
(Litl

Stage 3 Time (min)


Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Reading (Lit).
Water take
(Lit)
Stage 4 Time(min)
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Litimin (m)
Pressure P Reading (Lit).
Water take
(Lit)

Stage 5 Time (min)


Average Flow Total Heaci
Lugeon
Guage Flow-meter (q) Lit/min. (m)
Pressure P Rea(ling (Lit).
Water take
(Lit)

Summary of Lu�con
Values
Approximalc Pcrmcabililics, cm/s -�
Max. Lu= I 0.01 Max. k = lxlO:·(-'.?J
�Geologist �
G
ogs
�es�
MIS Edge Enterprises (pvt) Ltd Mis Rehman Habib Consultants (Pvt) Mis Rehman Habib Consultants (Pvt) Ltd
Min. Lu o.nt Min. k= I, 10"1-l) Ltd (N) (N)

A,·c. Lu = II.Ill A,.... k:: lx!0,.·(-2J

Remarks more Jlow and cxccssh·c prcs..�1.rc b�· lhc racker rhc water rrcssurc lest sloped
RHC
Consultant

6/'>"
V
Cj
..t: 1 0..
Jv of RHC, CASCADE & ETA
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR

CONSTRUCTION OF BAZ ALI SMALL DAM DISTRICT KURRAM


Bore Hole
NO.

10
-uG
Contractor

MIS Edae Enterorises <ovtl Ltd


WATER PRESSURE TEST EVALUATION SHEET AT RD- 0+390.30
Top ofTest Location: Left Trench Test No: 2
5 Bottom of casing(m)·
Section(m)·
Bottom of Nothing (m) 3724694.2 Date: I 0/05/2023
10 Initial GWL (m) 0
Test Section (m):
Length of
Test Section(m):
Center of
I 5
Easting(m): 612970.88

Elevation(m): 1134.6 l
Supervised By: Tausif Javed

Inclination(Degree): 90
Packer Pressure:

Guage Height Above


0.8487

7.5 0.6
Test Section(m): Aea(m)
BOH at Time Packer Type; Mechanical Rock Type: Shale
ofTest(m): 13
Diameter of Hole in Test
Area(mm):
72 7�
Stage l Time (min) 0 Liters 5 Liter-s 10 Lite.-s 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
5.4002 5.4233 5.4452 5.6789
Pressure P Reading(Lit).
Water take
0.8487 0.0231 0.0219 0.2337 0.0929 11.2 0.11
(Lil)
Stage 2 Time(min)
Average Flow Total Head
Guage Flo'wmeter Lugeon
(q) Lit/min (m)
Pressure P Reading(Lit).
Water take
(Lit)
Stage 3 Time (min)
Average Flow Total Head
Lugcon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Readine (Lit).
Waler take
(Lit)
Stage 4 Time(min)
Average Flow Total Head
Guage Flowmeter Lugeon
(q) Lit/min (m)
Pressure P Reading (Lit).
Water take
(Lit)
Stage 5 Time(min)
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min (m)
Pressure P Reading(Lit).
Water take
(Lit)

�r�-
I

Max.Lu=

Min.Lu
Summuy orLugeon
Values

I
I
Approximate Permeabilities, emfs

0.11 Max.k =

0.11 Min.k=
1 X 10"{-l)

1 X 10"(-1)
>-efJ Geologist
MIS Edge Enterprises(pvt) Ltd

g
.
Mis Rehman Habib Consultants(Pvt)
Ltd(N)
Mis Rehman Habib Consultants(Pvt) Ltd
(N)

A,·e.Lu= 0.11 A\'�. k = 1 X 10"(-l)

Remarks �ore llon and cxcessiYc pressure hy the 11ackcr the water pressure test stoped
RHC
Consultant

�,)
a-
....1-nA
.
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR

CONSTRUCTION OF BAZ ALI SMALL DAM DISTRICT KURRAM


Bore Hole
NO
----
&)(j""
Contractor

Jv of RHC, CASCADE & ETA 12 M/S Edee Enterorises (ovO Ltd


WATER PRESSURE TEST EVALUATION SHEET AT RD~0+400.30
Top of Test Location: Left Trench Test No: 3 i;,
Section(m):
3 � Bottom ofcasing(m)
Bottom of
Test Section(m)· I 14 Nothing(m): 3724684.2
Date: I 0/05/2023
Initial GWL (m)· 0
Length of Easting (m): 612960.88 Supervised By: Tausif Javed
10 Packer Pressure 1.034
Test Section(m):

H j1 ,19
0,
Center of Elevation(m): 11 37 .29 Inclination(Degree): 90 Guage Height Above
9 0.6
Test Section(m): I .... Aea(m)·
BOH at Time
ofTest (m):
I
14
Packer Type; Mechanical Rock Type: Shale Diameter of Hole in Test
Area (mm):
72 J
Stage 1 Time(min) 0 Liters 5 Liters 10 Liters 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q)Lit/min . (m)
4.9122 4.9645
Pressure P Reading (Lit).
Water take
1.034 0.0523 0.0523 9.034 0.05
(Litl
Stage 2 Time(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q)Lit/min. (m)
Pressure P Reading(Lit).
Water take
/Lit)
Stage 3 Time (min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flo\\meter (q)Lit/min. (m)
Pressure P Reading (Lit).
Water take
l(Lit)
Stage 4 Time(min) 0 5 10 15
Average Flow Total Head
Guage Flow meter Lugeon
(q)Lit/min. (m)
Pressure P Reading(Lit).
Water take I 0.0002
l(Lit)
Stage 5 Time(min) 0 5 10 15
Average Flow Total Bead
Lugeon
Guage Flowmeter (q)Lit/min. (m)
Pressure P Reading (Lit).
Water take
(Lit)

_JJ5)
I

Summary or Lugeon
Values
I Ap11roximate Permeabilities, cm/s

� ��
Max. Lu= I U.051 Max. k:::c 5.1 x 10 (-1) Geologisl Geologisl

Min. Lu I I 0.051 Min. k= 5.1 X 10 (-1)


MIS Edge Enterprises(pvt)Ltd Mis Rehman Habib Consultants(Pvt)
Ltd(JV)
Mis Rehman Habib Consultants(Pvt)Ltd
(JV)

A,·e. Lu= ! 0.051 Avl!. k = 5.1 x 10 (-1)

I
I
Remarks No hiorc flow water 11rcs.�urc sto1lCd at stage-I
RHC
---
Consultant

6./),
CJ-
.. l:: T /\.
Jv of RHC, CASCADE & ETA
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR

CONSTRUCTION OF BAZ ALI SMALL DAM DISTRICT KURRAM


Bore Hole
NO.

14
-.xi"
Contractor

MIS Edee Enternrises (ovt) Ltd


WATER PRESSURE TEST EVALUATION SHEET AT RD~ 0+410.30
Top ofTest Location: Left Trench Test No: 4
10 Bottom of casing(m):
Section (m):
Bottom of Nothing (m): 3724698.2 Date: 11/05/2023
IS Initial GWL(m):
Test Section(m): I 0

Length of I Easting(m) 612960.90 Supervised By: Tausif Javed


5 Packer Pressure 1.5263
Test Section(m):
Center of Elevation (m)- 1139.65 Inclination(Degree)· 90 Guage Height Above
13.S 0.6
Test Section(m): Aea(m):
BOH at Time Packer Type; Mechanical Rock Type: Shale Diameter ofHole in Test
ofTest (m):
I
15 72
Area(mm): L
Stage 1 Time(min) 0 Liters 5 Liters 10 Liters 15
Average Flow Total Bead
Lugeon
Guage Flowmete.- (q) Lit/min. (m)
2.0199 2.061 2.0728 2.0826
Pressure P Reading(Lit).
Water take
1.5263 0.0411 0.0ll8 0.0098 0.0209 10.6 0.01
(Lil)
Stage 2 Time(min)
Average Flow Total Head
Lugeon
Guage F\owmeter (q) Lit/min (m)
Pressure P Reading(Lit).
Water take
l<LiO
Stage 3 Time(min)
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Readine(Lit).
Water take
Irr it)
Stage 4 Time(min)
Average Flow Total Head
Guage Flowmeter Lugeon
(q) Lit/min. (m)
Pressure P Reading (Lit).
Water take
(Lit)

Stage S Time(min)
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Reading (Lit).
Water take
(Lit)

Max. Lu=

Min. Lu
Summary of Lugeon
Values

I
0.01

0.01
A11rrnximace Permeahililics, em/s

Max. k=

Min. k=
1 ,c 10,.,(-2)

1 X 10"(-2)

Geologist
MIS Edge Enterprises(pvt) Ltd
� Geologist
Mis Rehman Habib Consultants(Pvt)
Ltd(JV)
S�,
Mis Rehman Habib Consultants (Pvt) Ltd
(JV)
0.01
A,·c. Lu: A,·�. k = 1 X 10 ,., (-2)

Remarks nore flow and exc\!ssi\"C pressure by the packer the water pressure lest sloped
Consultant

----- Contractor

-RHC
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR

60 I
Cj
. .!:::TA
.. .... .. . 11 ..

CONSTRUCTION OF BAZ ALI SMALL DAM DISTRICT KURRAM


Bore Hole
NO.
uG
Jv of RHC, CASCADE & ETA 16 MIS Edge Enterprises (pvt) Ltd
WATER PRESSURE TEST EVALUATION SHEET AT RD- 0+420.30
Top of Test
Section(m): I I '.3
Location: Left Trench Test No. 5
Bottom of casing (m)

Bottom of
Test Section(m): I I
18
Nothing(m): 3724708.2 Date I I /05/2023
Initial GWL (m) 0

Length of
Test Section(m): I I
10
Easting(m): 612700.90 Supervised By: Tausif Javed
Packer Pressure 1.7538,2.6313

Center of
Test Section(m)· I I
15.5
Elevation(m): 1142.42 Inclination(Degree): 90 Guage Height Above
Aea(m):
0.6

=:i
BOH at Time I Packer Type; Mechanical Rock Type Shale Diameter of Hole in Test
18 72
of Test(m)· Area(mm)

Stage I Time(min) 0 Liters 5 Liters 10 Liters 15


Aver-age Flow Total Head
Lugeon
Guage Flowmcter (q) Lit/min. (m)
2.0955 2.1445 2.1973 2.227
Pressure P Reading(Lit).
Water take
1.7538 0.049 0.0528 0.029 0.0438 0.03
(Lit)

Stage 2 Time(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
2.2392 2.2804 2.3545 2.4044
Pressure P Reading (Lit).
Water take
2.6313 0.0432 0.0741 0.0499 0.1672 12.9 0.06
(Lill

Stage 3 Time(min) I Average Flow Total Head


Lugeon
Guage Flowmeter (q) Lit/min (m)
Pressure P Reading (Lit).
Water take
16.9
(Lit)
Stage 4 Time(min)
Average Flow Total Head
Guage Flowmeter Lugeon
(q) Lit/min. (m)
Pressure P Reading(Lit).
Water take
(Lit)

Stage 5 Time(mm)
I Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min (m)
Pressure P Reading (Lit).

I
Water take
(Lit)

�.�
Summar)· or Lugeon
Approximate Permeabilities, emfs
Values

M.a.L Lu= I I 0.06


Max. k= 6 X 10"(-2) �' �
Min.Lu I 0.03
Min.k= 3 X 10"(-2)
M/S Edge Enterprises(pvt) Ltd M/s Rehman Habib Consultants(Pvt)
Ltd(JV)
Mis Rehman Habib Consultants(Pvt) Ltd
(JV)

A\'c. Lu=
I 0.05
A,l!:• k = S x 10"(-2)

Remarks how and excessive pressure b�· the packer the water pressure lest stof)Cd at sfaJ!
-RHC
Consultant

!>,.◊ . .tT/\.
✓ J-
- .. .. ,.,.
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR

CONSTRUCTION OF BAZ ALI SMALL DAM DISTRICT KURRAM


Bore Hole
NO.
---- Contractor

Jv of RHC, CASCADE & ETA 21 MIS Ede:e Enterorises(ovt) Ltd


WATER PRESSURE TEST EVALUATION SHEET AT RD-0+425.30
Top ofTest
. Section(m): I 3
Location: Left Trench Test No:6 /

Date I 6/05/2023
Bottom of casing(m):

Bottom of I I Nothing(m): 3724684 2 Initial GWL(m) 0


Test Section (m)
Length of Easting(m) 612960.88 Supervised By: Tausif Javed
8 Packer Pressure: 0.4
Test Section (m): I
Center of I Elevation(m): I 140. I 6 [nclination (Degree) 90 Guage Height Above
4 0.6
Test Section(m) Aea(m):
BOH at Time Packer Type; Mechanical Rock Type· Shale Diameter of Hole in Test
II 72
ofTest(m): Area(mm)

Stage 1 Time(min) 0 Liters 5 Liters 10 Liters 15


Average Flow Total Head
Lugeon
Guage Flowmete.- (q) Lit/min. (m)
9.8t53 9.863 9.8993 9.905
Pressure P Reading(Lit �.
Water take
0.4 0.0477 0.0363 0.0057 0.0897 7.4 0.22
(Lit)
Stage 2 Time (min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Rending(Lit).
Water take
(Lit)

Stage 3 Tinie(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Reading {Lit).
Water take
l<Lill
Stage 4 Tirqe(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Reading (Lit).
\-Vater take
0.0002
l(Lit)

Stage 5 Time(min) 0 5 10 15
Average Flow Total Read
Lugeon
Guage Flowmeter (q) Lit/min. (m)
Pressure P Reading (Lit).
Water take
(Lit)

MaL Lu=

Min.Lu

A,·e. Lu=
Summary of Lugeon
Values
I

I
Approximate Permeabilities, emfs

11.22 M:u.k =

n.22 Min.k =

0.22 A\'g.k =
2.2 X 10"(•1)

2.2 X 10.,...(-1)

2.2 X 10 ° (-1)
>J MIS Edge Enterprises(pvt) Ltd

Mis Rehman Habib Consultants(Pvt)
Ltd(JV)
��
Mis Rehman Habib Consultants(Pvt) Ltd
(JV)

Remarks I
Consultant Contractor

6◊
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR

. /�A.0-
Bore Hole

-RHC CONSTRUCTION OF BAZ ALI SMALL DAM DISTRJCT KURRAM


NO.

Jv of RBC, CASCADE & ETA 22 M/S Edoe Enternriscs(ovt) Ltd


WATER PRESSURE TEST EVALUATION SHEET AT RD-0+430.30
Top ofTest
6
Location: Left Trench TesrNo: .7 1 Bottom of casing(m)
Section(m).
Bottom of I I Nothing(m): 3724684.2 Date: I 6/05/2023
Initial GWL(m): 0
Test Section(m)·
Length of Easting(m): 612960.88 Supervised By: Tausif Javed
5 Packer Pressure: 0.2,0.4,0.6,0.4.
Test Section(m):
Center of Elevation(m): 1140.06 Inclination(Degree): 90 Guage Height Above
2_5 0.6
Test Section{m). Aea(m):
BOH at Time Packer Type; Mechanical Rock Type: Shale Diameter of Hole in Test
ofTest(m):
11
Area(mm):
72
J,
Stage I Time(min) Liters Liters 10 Liters 15
Average Flow Total Head
Lugeon
Guage Flowmete.- (q) Lit/min. (m)
9.674 9.7332 9.7585 9.7648
Pressure P Reading(Lil').
Waler- take
0.2 0.592 0.0353 0.0063 0.0673 8.2 0.33
ICLitl
Stage 2 Time(min) 0 5 10 15
Average Flow To1al Head
Lugeon
Guage Flowmeter- (q) Lit/min. (m)
9.7651 9.7717 9.775 9.7771
Pressure P Reading (Lit).
Water- take
0.4 0.0066 0.0033 0.0021 0.0393 8.4 0.09
(Lit)

Stage 3 Time(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter- (q) Lit/min. (m)
9.7776 9.7785 9.8007 9.811
Pressure P Reading (Lit).
Water- take
0.6 0.0009 0.0222 0.0103 0.0334 8.6 0.05
(Lit)
Stage 4 Time(min) 0 5 10 15
Average Flow Total Head
Lugcon
Guage Flowmeter- (q) Lit/min. (m)
9.811 9.8112
Pressure P Reading (Lit).
Wa1er- take
0.4 0.0002 0.0002 8.4 0.00
l(Lit)
Stage 5 Timc(min) 0 5 10 15
Aver-age Flow Total Head
Lugcon
Guage Flo� meter- (q) Lit/min. (m)
Pressure P Reading (Lit).
Water- take
0.2
(Lit)

I
Summar�· or Lu�con
Approximate Permeabilities, emfs
Values

Max:. Lu= 0.33 Max. k = Geoiogist


WS Edge Enterprises(pvt) Ltd Mis Rehman Habib Consultants(Pvt) Mis Rehman Habib Consultants(Pvt) Ltd
Min. Lu I 0 Mio. k= 0 x 10"0. Ltd(N) (N)

A\'c. Lu= 1.1 )( 10 11 (-1).

Remarks
-RHC
Consultant

6.<> a-
·- 1:: . r /\�»
Jv ofRHC, CASCADE & ETA
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR

CONSTRUCTION OF BAZ ALI SMALL DAM DISTRICT KURRAM


Bore Hole
NO.

18
- .:x;-
Contractor

MIS Edee Enterprises (pvt) Ltd


WATER PRESSURE TEST EVALUATION SHEET AT RD- 0+440.30
Top ofTest Location: Left Trench Test No : 8
15 Bottom ofcasing(m):
Section (m):
Bottom of
Test Section (m):
Length of
I 25
Nothing (m): 3724684.2

Easting(m): 61296�88
Date: 15/05/2023

Supervised By: TausifJaved


Initial GWL (m)

Packer Pressure
0

10 0.62,0.932,1.24,0.932,0.62
Test Section (m):
Center of
Test Section(m):
BOH at Time
5.5
Elevation(m): (l 148.87

Packer Type; Mechanical


l I '-1 lb· it Inclination (Degree): 90

Rock Type: Shale


Guage Height Above
Aca (m)
Diameter of Hole in Test
0.6
�-
25 72
ofTest (m): Area (mm):

Stage l Time(min) 0 Liters 5 Lite.-s 10 Liters 15


Average Flow Total Head
Lugeon
Guage Flowmeter (q)Lit/min. (m)
3.2932 3.3238 3.3536 3.3605
Pressure P Reading(Lit�.
Water take
0.62 0.0306 0.0298 0.0069 0.0673 20.62 O.IO
(Lit)
Stage 2 Time(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q)Lit/min. (m)
3.3609 3.3773 3.38 3.3983
Pressure P Reading(Lit).
W:1ter take
0.932 0.0164 0.0027 0.0183 0.0393 20.93 0.04
l(Lil)

Stage 3 Time(min) 0 5 10 15
Average Flow Total Read
Lugeon
Guage Flowmeter (q)Lit/min. (m)
3.3986 3.4011 3.4065 0.4093
Pressure P Refl.dine (Lit).
Water take
1.24 0.0025 0.0054 0.0028 0.0107 21.24 0.01
l(Lit)
Stage 4 Ti�te(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q)Lit/min. (m)
3.4094 3.4122 3.4166 3.4205
Pressure P Reading(Lit).
Water take
0.932 0.0028 0.0044 0.0039 0.0111 20.93 0.01
(Lil)

Stage 5 Time(min) 0 5 IO 15
Average Flow Total Head
Lugeon
Guage Flokmeter (q)Lit/min. (m)
3.4208 3.423 3.4269 3.4292
Pressure P Reading(Lit).
Water take
0.62 0.0022 0.0039 0.0023 0.0084 20.62 0.01
(Li()

_J;J \,�
Summa�· or Lugeon
Approximate Permeabilities, cm.ls
Values
'
Max. Lu= 0.1 Max. k = 1 X 10"{-2). �
g
MIS Edge Enterprises(pvt) Ltd Mis Rehman Habib Consultants (Pvt) Mis Rehman Habib Consultants (Pvt) Ltd
Ltd (JV) (JV)

I
Min. Lu 0.01 Min. k= 1 w. 10"(-1).

An. Lu = O.OH A\'g. k= 3.4 X 10''(-2).

Remarks
RHC
Consultant

�vs,}
I
Cl
.... _....... ,,
....ET/\.
GOVERNMENT OF KHYBER PAKHTUNKHWA SMALL DAMS IRRIGATION DEPARTMENT PESHAWAR

CONSTRUCTION OF BAZ ALI SMALL DAM DISTRICT KURRAM


Bore Hole
NO.
---
uCi
Contractor

Jv of RHC, CASCADE & ETA 20 M/S Edge Enterprises (pvt) Ltd


WATER PRESSURE TEST EVALUATION SHEET AT RD- 0+450.30
Top ofTest
Section (m)·
Bottom of
I 18
Location: Left Trench

Nothing (m): 3724684.2


Test No: 9

Date I 5/05/2023
Bottom of casing (m):

28 Initial GWL (m): 0


Test Section (m)
Length of Easting (m): 612960.88 Supervised By: Tausif Javed
10 Packer Pressure: 0.62,0.932,1.24,0.932,0.62
Test Section (m) I
Center of
Test Section(m):
I 5.5
Elevation (m): 1151.72 Inclination (Degree): 90 Guage Height Above
Aca (m):
0.6

':t
BOH at Time Packer Type; Mechanical Rock Type: Shale Diameter of Hole in Test
28 72
ofTest (m): Area (mm)

Stage I Time (min) 0 Liters 5 Liters 10 Liters 15


Average Flow Total Bead
Lugeon
Guage Fl{>wmeter (q)Lit/min. (ml
2.6334 2.6619 2.722 2.7706
Pressure P Reading (Lit).
Water take
0.62 0.0285 0.0601 0.0486 0, 1372 26.62 0.22
I/Lill
Stage 2 Tirne(min) 0 s 10 15
Average Flow Total Head
Lugeon
Guage FIJwmeter (q) Lit/min. (m)
2.7722 2.8279 2.866 2.9162
Pressure P Reading (Lit) .
Water take
0.932 0.0557 0.0381 0.0502 0.144 26.93 0.16
l(Lit)

Stage 3 Time(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Flowmeter (q)Lit/min. (m)
2.9207 2.9526 2.9992 3.0557
Pressure P Re;\din2 (Lit).
Water take
1.24 0.0319 0.0466 0.0565 0.135 27.24 0.11
(Lil)
Stage 4 Tinte(min) 0 s 10 15
Average Flow Total Bead
Guage Flo�meter Lugeon
3.0565 3.0908 3.1117 3.1549 (q) Lit/min. (m)
Pressure P Reading(Lit).
Water take
0.932 0.0343 0.0209 0.0432 0.0984 26.93 0.11
(Lil)

Stage 5 Time(min) 0 5 10 15
Average Flow Total Head
Lugeon
Guage Floimeter (q)Lit/min. (m)
3.1565 3.1744 3.2027 3.2305
Pressure P Rea<ling(Lit).
Waler take
0.62 0.0179 0.0283 0.0278 0.074 26.62 0.12
(Lit)

Max. Lu=

Min. Lu
Summary or L i.;eon
Values I
I
0.22

0.11
Appr-o:timate Permeabilities, emfs

Max. k=

Min. k =
2.2 x 10"(-2).

1.1 X 10"{•1)
>.#. Geologist
MIS Edge Enterprises (pvt) Ltd
IL
Geologist
Mis Rehman Habib Consultants (Pvt)
Ltd (N)
�-
Mis Rehman Habib Consultants (Pvt) Ltd
(JV)

A,·e. Lu= 0.1-U A,•g. k = 1.44 :x 10"(-2)

Remarks I