MONITORING OR SCHADULE PEMBAHANAN

MATERIAL PREPARATION (PERSIAPAN


% BAHAN)
ORDER REQUES PRIORITY ACC TARGET OR PALNING(RENCANA) ACTUAL(REALISASI) RAW MATERIAL PROCESS (PEMBAHANAN)
REMARK COMPLET
(BUYER) SCALE PRODUCTION PRODUCTION
E ACTUAL SLIPPAGE RAW
PLAN START PLAN END ACTUAL START ACTUAL END PALN DAY PREPARETION PLAN DAY ACTUAL DAY
DAY MATERIALFINISH
URGEN Sesuai Jadwal
AVC 03 T
04/06/2023 12 Stuffing 25 June 2023 18 October 2023 30 September 2023 20 October 2023 100% 21 118 18 20 2
Sesuai Jadwal
TLM 04 MEDIUM 12/09/2023 10 MINGGU Stuffing 3 October 2023 7 November 2023 20 October 2023 2 November 2023 100% 21 38 18 13 -5
Revisi Jadwal
ABD 02 MEDIUM 27/07/2023 12 Stuffing 20 September 2023 20 October 2023 21 September 2023 25 October 2023 100% 55 56 29 34 5
Revisi Jadwal
ABD 03 MEDIUM 09/09/2023 8 MINGGU Stuffing 9 October 2023 21 October 2023 3 October 2023 25 October 2023 100% 30 24 18 22 4
URGEN Sesuai Jadwal
DVT 05 T
29/08/2023 12 MINGGU Stuffing 23 October 2023 30 October 2023 23 October 2023 1 November 2023 100% 55 55 7 9 2
URGEN Revisi Jadwal
GWA 07 T
25/07/2023 14 MINGGU Stuffing 16 August 2023 18 October 2023 16 August 2023 90% 22 22 63 ONPROCES HARI 0
Revisi Jadwal
GWA 09 MEDIUM 22/08/2023 14 MINGGU Stuffing 30 October 2023 18 November 2023 20 October 2023 28 October 2023 79% 69 59 on stock 29 8 -21
Revisi Jadwal
GWA 11 MEDIUM 25/09/2023 14 Stuffing 30 October 2023 18 November 2023 20 October 2023 8 November 2023 83% 35 25 on stock 29 19 -10
BALIAGA URGEN Sesuai Jadwal
31/10/2023 8 MINGGU Stuffing 23 November 2023 6 December 2023 23 0 wt. kiln dry 45266 ONPROCES HARI 0
PD T
Sesuai Jadwal
AWR MEDIUM 26/09/2023 12 MINGGU Stuffing 23 October 2023 30 October 2023 23 October 2023 1 November 2023 100% 27 27 on stock 7 9 2
Revisi Jadwal
JPN 05 MEDIUM 21/08/2023 12 MINGGU Stuffing 23 October 2023 7 November 2023 30 October 2023 42% 63 70 8 ONPROCES HARI 0
Sesuai Jadwal
KURT 09 MEDIUM 27/06/2023 12 MINGGU Stuffing 21 October 2023 4 November 2023 23 November 2023 6 November 2023 22% 116 149 -19 -17 2
Sesuai Jadwal
KURT 13 MEDIUM 21/09/2023 12 MINGGU Stuffing 31 October 2023 30 November 2023 6 November 2023 10% 40 46 24 ONPROCES HARI 0
URGEN Sesuai Jadwal
KURT 15 T
30/10/2023 4 MINGGU Stuffing 31 October 2023 6 November 2023 31 October 2023 6 November 2023 1 1 6 6 0
URGEN Sesuai Jadwal
KURT 16 T
30/10/2023 8 MINGGU Stuffing 27 November 2023 9 December 2023 28 0 45269 ONPROCES HARI 0
URGEN Sesuai Jadwal
DECORAMA T
06/10/2023 12 MINGGU Stuffing 8 November 2023 29 November 2023 23 October 2023 33 17 kurang bahan 37 ONPROCES HARI 0
Sesuai Jadwal
DND 02 MEDIUM 31/10/2023 12 MINGGU Stuffing 15 November 2023 8 December 2023 6 November 2023 0% 15 6 wt. kiln dry 32 ONPROCES HARI 0
Sesuai Jadwal get sawmill on
TLM 05 LOW 01/11/2023 12 MINGGU Stuffing 17 November 2023 8 December 2023 9 November 2023 16 8 monday 29 ONPROCES HARI 0
URGEN Sesuai Jadwal
IFFEX T
31/10/2023 Stuffing 1 November 2023 15 November 2023 1 November 2023 74% 1 1 on stock 14 ONPROCES HARI 0
Sesuai Jadwal get sawmill on
HOF ART MEDIUM 08/11/2023 12 MINGGU Stuffing 28 November 2023 11 December 2023 20 0 monday ONPROCES HARI 0
Sesuai Jadwal
DVT 07 LOW 13/11/2023 12 MINGGU Stuffing 8 November 2023 23 November 2023 -5 0 on stock ONPROCES HARI 0
Sesuai Jadwal
KRT 17 LOW 14/11/2023 9 MINGGU Stuffing -45244 0

Insert new rows above this one

[42]

https://www.vertex42.com/ExcelTemplates/task-list-template.html Project Task List Template © 2017 by Vertex42.com


Work OKTOBER 2023
NO QTY KETERANGAN MIN KE-40 MIN KE-41 MIN KE-42 MIN KE-43 MIN KE-44
OR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1

1 GWA 07 PEMBAHANAN (2-18 OKTOBER) 102 DL R


GWA 07 PROSES TUKANG BORONG (Sampai
DL
30 OKTOBER)
LAPPA DRESSOIR PROSES PEMBAHANAN (2-9
B 16 DL
OKTOBER)
LAPA DRESSOIR PROSES TUKANG(10-18
16 IP BORONG DL
OKTOBER)
WARU SIDEBOARD 3 DOOR PEMBAHANAN (3-9
C 10 DL
OKTOBER)
WARU SIDEBOARD 3 DOOR PROSES
10 IP BORONG DL
TUKANG(10-17 OKTOBER)
2019 HARPER ADDITION CONSULE (4-6
D 10 DL
OKTOBER)
2019 HARPER ADDITION CONSULE PROSES
10 IP BORONG DL
TUKANG(7-13OKTOBER)
2019 HARPER RECTENGLE CT PEMBAHAN (7-
E 5 DL
11 OKTOBER)
2019 HARPER RECTENGLE CT PROSES
5 IP BORONG DL
TUKANG (11-20 OKTOBER)
F PIQUE ROUND CT PEMBAHAN (6-14 OKTOBER) 5 DL
PIQUE ROUND CT PROSES TUKANG (14-23
5 IP BORONG DL
OKTOBER)
WARU WRITING DESK PEBAHANAN (9-13
G 10 DL
OKTOBER)
WARU WRITING DESK PROSES TUKANG (14-25
10 IP BORONG DL
OKTOBER)
2020 TULLY SIDE TABLE PEMBAHNAN (11-
H 10 DL
14OKTOBER)
2020 TULLY SIDE TABLE PROSES BOROB (17-
10 IP BORONG DL
21OKTOBER)
WARU BEDSIDE PEMBHANAN(12 - 17
I 10 DL
OKTOBER)
WARU BEDSIDE PROSES BORONG (17
10 IP BORONG DL
OKTOBER-28 NOVEMBER)
BEDSIDE WITH LEATHER PEMBAHANAN (16-18
J 30 DL
OKTOBER)
BEDSIDE WITH LEATHER PROSES
30 IP BORONG DL
BORONG(14-20 OKTOBER)
INSPECT GWA 06 & GWA 07 (18 desember)

STUFFING GWA 06 & GWA 07 (26 DESEMBER)

3 ABD 02 PEMBAHANAN (21SEP-20 OKTOBER) 102 DL


REALISASI ABD 02 PEMBAHANAN (21SEP-25
R
OKTOBER)
RETRO SIDE TALE PEMBAHANAN (9-14
C 5 DL
OKTOBER)
RETRO SIDE TALE PROSES TUKANG (14-20
5 IP BORONG DL
OKTOBER)
RETRO ROUND CT 0.7M PEMBAHANAN (7-12
D 4 DL
OKTOBER)
RETRO ROUND CT 0.7M PROSES BORONG (12-
4 IP BORONG DL
18 OKTOBER)
RETRO ROUND CT 0.9M PEMBAHANAN (7-12
E 4 DL
OKTOPBER)
RETRO ROUND CT 0.9M PROSES BORONG (12-
4 IP BORONG DL
18 OKTOPBER)
F KELIMUTU DT PEMBAHANAN (14-16 OKTOBER) 2 DL
KELIMUTU DT PROSES BORONG (16-26
2 IP BORONG DL
OKTOBER)
G ERNIE BENCH PEMBAHANAN (5-9 OKTOBER) 10 DL

ERNIE BENCH PEMBAHANAN (9-21 OKTOBER) 10 IP MESIN DL


ADDARA NEW TEAK SIDE 3DOOR (9-16
H 2 DL
OKTOBER)
ADDARA NEW TEAK SIDE 3DOOR PROSES
2 IP BORONG DL
BORONG (16-23 OKTOBER)
ADDARA MAHONY SIDEBOARD 3DR
I 5 DL
PEMBAHANAN (9-16 OKTOBER)
ADDARA MAHONY SIDEBOARD 3DR
5 IP BORONG DL
PROSESBORONG (16-23 OKTOBER)
ADDARA MAHONY SIDEBOARD 6DR
J 5 DL
PEMBAHANAN (10-7 OKTOBER)
ADDARA MAHONY SIDEBOARD 6DR PROSES
5 IP BORONG DL
BORONG (7-14 OKTOBER)
ADDARA ENTU 8 DR PEMBAHANAN (5-10
K 4 DL
OKTOBER)
ADDARA ENTU 8 DR PROSES BORONG(10-16
4 IP BORONG DL
OKTOBER)
ADDARA ENTU NEWTEAK 8 DR PEMBAHANAN
L 1 DL
(2-11 OKTOBER)
ADDARA ENTU NEWTEAK 8 DR PROSES
1 IP BORONG DL
BORONG (11-18 OKTOBER)
KUMARU CHAIR PEMBAHANAN (10-14
M 18 DL
OKTOBER)
KUMARU CHAIR PROSES IP MESIN (14-21
18 IP MESIN DL
OKTOBER)
ABD ROUND COFFEE TABLE PEMBAHANAN
N 4 DL
(12-16 OKTOBER)
ABD ROUND COFFEE TABLE PEMBAHANAN
4 IP BORONG DL
(16-23 OKTOBER)
JORI RECTANGULAR CT PEMBAHANAN (9-
O 2 DL
12OKTOBER)
JORI RECTANGULAR CT PROSESBORONG(12-
4 IP BORONG DL
20 OKTOBER)
JORI ROUN CT 100 PEMBAHANAN (12-14
P 2 DL
OKTOBER)
JORI ROUN CT 100 PROSES ORONG(16-25
2 IP BORONG DL
OKTOBER)
JORI ROUND CT 80 PEMBAHANAN (13-16
Q 4 DL
OKTOBER)
JORI ROUND CT 80 PROSES BORONG(17-26
4 IP BORONG DL
OKTOBER)
TEAK CONSOLE 2 DRAWER PEMBAHANAN (12-
R 3 DL
17 OKTOBER)
TEAK CONSOLE 2 DRAWER PROSES TUKANG
3 IP BORONG DL
BORONG (17-25 OKTOBER)
CONSULE 2 DRAWER ACASIA PEMBAHNAN(7-
S 2 DL
12 OKTOBER)
CONSULE 2 DRAWER ACASIA PROSES
2 IP BORONG DL
BORONG(12-19 OKTOBER)
CONSULE 2 DRAWER MAHONI PEMBAHNAN (3-
T 3 DL
9 OKTOBER)
CONSULE 2 DRAWER MAHONI PEMBAHNAN (9-
3 IP BORONG DL
17 OKTOBER)
SOFA 3 SEAT LEFT PEMBAHANAN (9-
U 1 DL
14OKTOBER)
SOFA 3 SEAT LEFT(9-14OKTOBER) 1 IP BORONG
SOFA 2 SEAT RIGHT PEMBAHANAN (9-14
V 1 DL
OKTOBER)
SOFA 2 SEAT RIGHT PEMBAHANAN (14-21
1 IP BORONG DL
OKTOBER)
BEDSIDE WITH L MAHONI PEMBAHANAN (4-7
W 10 DL
OKTOBER)
BEDSIDE WITH L MAHONI PEMBAHANAN (4-7
10 IP BORONG DL
OKTOBER)
BEDSIDE WITH L TEAK PEMBAHANAN(14-17
X 10 DL
OKTOBER)
BEDSIDE WITH L TEAK PEMBAHANAN(17-28
10 IP BORONG DL
OKTOBER)
4 ABD 03 PEMBAHANAN (9-21 OKTOBER) 358 DL
REALISASI ABD 03 PEMBAHANAN (3-25
R
OKTOBER)
A LINDI CHAIR PEMBAHANAN(9-12 OKTOBER) 194 DL

LINDI CHAIR PEMBAHANAN(12-24 OKTOBER) 194 IP MESIN DL


LINDI SADDLE STOOL PEMBAHANAN (11-17
B 144 DL
OKTOBER)
LINDI SADDLE STOOL PROSES MESIN(16-25
144 IP MESIN DL
OKTOBER)
C ERNIE BENCH PEMBAHANAN (13-14 OKTOBER) 2 DL
ERNIE BENCH PROSES MESIN (14-
2 IP MESIN DL
26OKTOBER)
ADARA BEDSIDE TEAK PEMBHANAN (16-19
D 6 DL
OKTOBER)
ADARA BEDSIDE TEAK PROSES BORONG (19-
6 IP BORONG DL
31 OKTOBER)
E ADARA BEDSIDE MOHONY (14-18 OKTOBER) 12 DL

ADARA BEDSIDE MOHONY (18-30 OKTOBER) 12 IP BORONG DL

INSPECT ABD 02 & ABD 03 (13 DESEMBER)

STUFFING ABD 02 & ABD 03 (22 DESEMBER)


AVC 03 PEMBAHANAN (30 SEPTEMBER-18
5 DL
OKTOBER)
REALISASI AVC 03 PEMBAHANAN (30
R
SEPTEMBER-20 OKTOBER)
BATAVIA CONSULE PEMBAHANAN (2-20
D 20 DL
OKTOBER)
BATAVIA CONSULE PROSES BORONG (20
20 IP BORONG
OKTOBER-2 NOVEMBER)
STUFFING AVC 03 (15 NOVEMBER)
NMH 01 PEMBAHANAN (2 OKTOBER - 17
6 60 DL
OKTOBER)
IRIS FOOTSTOOL PEMBAHANAN (10-12
C 20 DL
OKTOBER)
IRIS FOOTSTOOL PROSES MESIN (12-24
20 IP MESIN DL
OKTOBER)
MODULAR SOFA NO ARM PEMBHANAN (7-12
E 4 DL
OKTOBER)
MODULAR SOFA NO ARM PROSES TUKANG (20
4 IP BORONG
OKTOBER -4 NOVEMBER)
MODULAR SOFA ONE ARM PEMBAHANAN(7-12
F 4 DL
OKTOBER)
MODULAR SOFA ONE ARM PROSES BORONG
4 IP BORONG
(21 OKTOBER- 4 NOVEMBER)
BIG MODULAR SOFA DOBLE ARM
G 4 DL
PEMBAHANAN (12-17 OKTOBER)
BIG MODULAR SOFA DOBLE ARM (21
4 IP BORONG
OKTOBER - 4 NOVEMBER)
STUFFING NMH 01 (22 NOVEMBER)
KRT 09 PEMBAHANAN(23OKTOBER - 4
7 150
NOVEMBER)
NEW ALIAN SEATER DOBLE ARM
A 8
PEMBAHANAN (30 OKTOBER- 3 NOVEMBER)
NEW ALIAN SEATER DOBLE ARM PROSES
8 IP BORONG
BORONG (3-15 NOVEMBER)
NEW ALIAN SEATER SINGLE ARM
B 8
PEMBAHANAN (30 OKTOBER-3 NOVEMBER)
NEW ALIAN SEATER SINGLE ARM PROSES
8 IP BORONG
BORONG (3-15 NOVEMBER)
YUKI STACKING PEMBAHANAN (18 -
C 150 DL
20OKTOBER)
YUKI STACKING PROSES MESIN (3-17
150 IP MESIN
NOVEMBER)
ULU SPINDEL SOFA ONE SEAT PEMBAHANAN
D 30 DL
(21-27 OKTOBER )
ULU SPINDEL SOFA ONE SEAT PROSES
30 IP BORONG
BORONG(20-31 OKTOBER)
ULU SPINDEL SOFA TWO SEAT PEMBAHANAN
E 15 DL
(21-27 OKTOBER)
ULU SPINDEL SOFA TWO SEAT PROSES
15 IP BORONG
BORONG (16-26OKTOBER)
YUKI SOFA TWO SEATER PEMBAHANAN (21-25
F 10 DL
OKTOBER)
YUKI SOFA TWO SEATER PROSES BORONG
10 IP BORONG
(21-25 OKTOBER)
YUKI SOFA THREE SEATER PEMBAHANAN(23-
G 10 DL
28 OKTOBER)
YUKI SOFA THREE SEATER PROSES
10 IP BORONG
BORONG(23-28 OKTOBER)
YUKI SOFA MIDLE NO ARM PEMBAHANAN(25-
H 7 DL
30 OKTOBER)
YUKI SOFA MIDLE NO ARM PROSES
7 IP BORONG
BORONG(30 OKTOBER- 11NOVEMBER)
YUKI ROUND CT 60 PEMBAHANAN(16-20
I 24
OKTOBER)
YUKI ROUND CT 60 PPROSES
24 IP BORONG
BORONG(20OKTOBER-1 NOVEMBER)
YUKI ROUND CT 80PEMBAHANAN(18-21
J 24
OKTOBER)
YUKI ROUND CT 80PROSES BORONG(21
24 IP BORONG
OKTOBER-1 NOVEMBER)
YUKI ROUND CT 100 PEMBAHANAN(25-30
K 24
OKTOBER)
YUKI ROUND CT 100 PROSES BORONG(30
24 IP BORONG
OKTOBER-11 NOVEMBER)
STIFFING KRT 09 (30 NOVEMBER)
KRT 13 PEMBAHANAN (6-30 NOVEMBER)
CONT 1
ULU SOFA MERIDIEN PEMBAHANAN (6- 18
A
NOVEMBER)
ULU SOFA MERIDIEN PR0OSES IP BORONG
24 IP BORONG
(18-25 NOVEMBER)
ULU SOFA CORNER PEMBAHANAN (7-16
B
NOVEMBER)
ULU SOFA CORNER PROSES IP BRONG (16-25
24 IP BORONG
NOVEMBER)
ULU SOFA MIDLE PEMBHANAN (7-16
C
NOVEMBER)
ULU SOFA MIDLE PROSES IP BORONG (16-25
24 IP BORONG
NOVEMBER)
D IRIS LOUNGER PEMBAHNAN (1-4 NOVEMBER) 20
IRIS LOUNGER PROSES TUKANG (1-4
NOVEMBER)
YUKI LOUNGER PEMBAHNAN (8-11
E
NOVEMBER)
YUKI LOUNGER PROSES TUKANG (8-11
NOVEMBER)
NATURAL EDGE 250 OUTDOOR PEMBAHANAN
F 12
(27-30 NOVEMBER)
NATURAL EDGE 250 OUTDOOR PROSES IP
12 IP BORONG
BORONG (30 NOVEMBER-13 DESEMBER)
NATURAL EDGE 300 INDOOR PEMBAHANAN
G 10
(30 NOVEMBER-4 DESEMBER)
NATURAL EDGE 300 INDOOR PROSES IP
10 IP BORONG
BORONG (4-15 DESEMBER)
STIFFING KRT 09 + KRT 13 (29DESEMBER)

KRT 13 PEMBAHANAN (6 DESEMBER) CONT 2

13
NATURAL EDGE 300 INDOOR PROSES IP
13 IP BORONG
BORONG ( 8-16 DESEMBER )
STIFFING KRT 09 + KRT 13 (30 JANUARI)
KRT 15 PEMBAHANAN (31 OKTOBER - 6
1
NOVEMBER)
NATURAL EDGE 180 CM PEMBAHANAN (31
A 1
OKTOBER - 6 NOVEMBER)
NATURAL EDGE 180 CM PROSES TUKANG (7-
18 NOVEMBER)
STIFFING KRT 15 (30 NOVEMBER)
KRT 16 PEMBAHANAN (27 NOVEMBER - 9
61
DESEMBER)
MATURAL EDGE INDOOR 220X3CM
A 3
PEMBAHANAN
MATURAL EDGE INDOOR 220X3CM PROSES
3 IP BORONG
TUKANG
NATURAL EDGE 250X3CM INDOOR
B 3
PEMBAHANAN
NATURAL EDGE 250X3CM INDOOR PROSES
3 IP BORONG
TUKANG
C NATURAL EDGE 300 INDOOR PEMBAHANAN 5

NATURAL EDGE 300 INDOOR PROSES TUKANG 5 IP BORONG

D KURT STACKING PEMBAHANAN 50

KURT STACKING PROSES TUKANG 50 IP BORONG


STIFFING KRT 16 (5 JANUARI 2024)
JPN 05 PEMBAHANAN (23 OKTOBER- 7
8 170
NOVEMBER)
REALISASI JPN 05 PEMBAHANAN (30
OKTOBER- NOVEMBER)
IRIS DC+IRIS DC KRT 09 PEMBAHANAN (2-6 50+80 BERSAMAAN
A DL
OKTOBER) +50 KRT+GWA11
IRIS DC+IRIS DC KRT 09PROSES MESIN (23-10
180 IP MESIN
NOVEMBER)
EASY Lounge Chair PEMBAHANAN(30
B 20 DL
OKTOBER-1)
EASY Lounge Chair PROSES TUKANG BORONG(
20 IP MESIN
1-14 NOVEMBER)
IRIS SUN LONGER PEMBAHANAN (31
C 12
OKTOBER-3 NOVEMBER)
IRIS SUN LONGER PROSES TUKANG(21
12 IP MESIN
NOVEMBER)
ADAN TEAK ROUND LOW TABLE 90 (25-28
D 20 DL
OKTOBER)
ADAN TEAK ROUND LOW TABLE 90 PROSES
20 IP BORONG
BORONG (30 OKTOBER -13 NOVEMBER)
ADAN TEAK COFFEE TABLE PEMBAHANAN (28
E 20
OKTOBER -2 NOVEMBER)
ADAN TEAK COFFEE TABLE PROSES BORONG
20 IP BORONG
(2-16 NOVEMBER)
RONDA COFFEE TABLE PEMBAHANAN (30-
F 20
4NOVEMBER)
RONDA COFFEE TABLE PROSES TUKANG (4-
20 IP BORONG
13NOVEMBER)
ROUND DINING TABLE OUTDOOR
G 20
PEMBAHANAN (28OKTOBER- 3 NOVEMBER)
ROUND DINING TABLE OUTDOOR PROSES
20 IP BORONG
TUKANG ( 3-13 NOVEMBER)
GARBER PLAN BOX ROUND PEMBAHANAN(3
H 20
NOVEMBER)
GARBER PLAN BOX ROUND PROSES
20 IP BORONG
BORONG(6-18 NOVEMBER)
GARBER PLANT BOX SQUARE PEMBAHNAN (3
I 30
NOVEMBER)
GARBER PLANT BOX SQUARE PROSES
30 IP BORONG
BORONG (6-18 NOVEMBER)
PLANT BOX SQUARE PEMBAHNAN (6-8
J 8
NOVEMBER)
PLANT BOX SQUARE PROSES BORONG (6-
8 IP BORONG
20NOVEMBER)
STUFFING JPN 05 (30 NOVEMBER)

9 DVT 05 PEMBAHANAN (19-30 OKTOBER) 145 DL


REALI SASI PEMBAHNAN (23 OKTOBER - 1
R
NOVEMBER)
OR DVT PROSES IP MESIN PADA (27OKTOBER
IP MESIN
-11 NOVEMBER)
A MORETI PEMBAHANAN(14-17 OKTOBER) 20 DL
MORETI PROSES PADA IP MESIN (17-24
20 IP MESIN DL
OKTOBER)
B CLOE OCASIONAL CHAIR (20-21OKTOBER) 35 DL
CLOE OCASIONAL CHAIR PROSES IP MESIN
35 IP MESIN
(24 OKTO BER-4 NOVEMBER)
DETTA DINING CHAIR + DETTA AWR (14-19
C 90 BERSAMAAN AWR DL
OKTOBER)
DETTA DINING CHAIR + DETTA AWR (19-3
90 IP MESIN
NOVEMBER)
INSPECTION DVT 05 (15 DESEMBER)

STUFFING OR DVT 05 (21 DESEMBER)


GWA 09 PEMBAHANAN (30 OKTOBER -18
10 44 R
NOVEMBER)
REALISASI PEMBAHANAN GWA 09
PEMBAHANAN (30 OKTOBER -18 NOVEMBER)
ACTA DRESOIR PEMBAHANAN (30OKTOBER-
A 10
6NOVEMBER)
ACTA DRESOIR PROSES BORORNG
10 IP BORONG
(30OKTOBER - 10 NOVEMBER)
IRIS OCCASIONAL CHAIR PEMBHANAN (6-10
14 BERSAMAAN NMH
OKTOBER)
IRIS OCCASIONAL CHAIR PROSES MESIN (30-5
14 IP MESIN
OKTOBER)
PIQUE ROUND CT PEMBAHAN (31 OKTOBER-
C 10
6NOVEMBER )
PIQUE ROUND CT PROSESTUKANG BORONG
10 IP BORONG
(6-18 NOVEMBER )
D WARU ETU PEMBAHANAN (6-10 NOVEMBER) 10
WARU ETU PROSES BORONG (10-22
10 IP BORONG
NOVEMBER)
GWA 11 PEMBAHANAN (30 OKTOBER- 18
11 164
NOVEMBER)
REALISASI OR GWA 11 PEMBAHANAN (23-28
OKTOBER)
IRIS DC PEMBAHANAN(30 OKTOBER-4
A 50
NOVEMBER)
IRIS DC PEMBAHANAN (25 OKTOBER- ) 50 IP MESIN
BABYLON CONSOL PEMBAHANAN (30
B 10
OKTOBER -4 NOVEMBER)
BABYLON CONSOL PROSES BORONG(4-13
10 IP BORONG
NOVEMBER)
PIQUE ROUND CT PEMBAHANAN(10-14
C 5
NOVEMBER)
PIQUE ROUND CT PROSES BORONG(14-27
5 IP BORONG
NOVEMBER)
PIQUE SUN BED PEMBAHANAN(9-16
D 12
NOVEMBER)
PIQUE SUN BED PROSES BORONG(16-30
12 IP BORONG
NOVEMBERBER)
E ACTA ETU PEMBAHANAN(3-11 NOVEMBER) 10

ACTA ETU PROSES TUKANG (11-24NOVEMBER) 10 IP BORONG


ACTA BEDSIDE PEMBAHANAN (8 -11
F 10
NOVEMBER)
ACTA BEDSIDE PROSES TUKANG (11-24
10 IP BORONG
NOVEMBER)
INSPECT GWA 09 & GWA 11 (11 JANUARI)

STUFFING GWA 09 & GWA 11 ( 15 JANUARI)

12 TLM 04 (19 OKTOBER-7 NOVEMBER) 79

REALISASI PEMBAHNAN (24 - 2 OKTOBER 2023)


WARU ETU 4 DOOR (30 OKTOBER -3
A 2
NOVEMBER)
WARU ETU 4 DOOR PROSES BORONG (3-15
2 IP BORONG
NOVEMBER)
B JORI BEDSIDE PEMBAHANAN (2-6 NOVEMBER) 10
JORI BEDSIDE PROSES BORONG (6-17
10 IP BORONG
NOVEMBER)
JORI ETU NAT PEMBAHANAN (30 OKTOBER -2
C 4
NOVEMBER)
JORI ETU NAT PEMBAHANAN (3-14 NOVEMBER) 4 IP BORONG
JORI SIDEBOARD NAT PEMBAHANAN (27-
E 7 DL
31OKTOBER)
JORI SIDEBOARD NAT PROSES BORONG (1-14
7 IP BORONG
NOVEMBER)
JORI SIDEBOARD BLACK PEMBAHANAN(23-
F 1 DL
27OKTOBER)
JORI SIDEBOARD BLACK PROSES
1 IP BORONG
BORORNG(27OKTOBER-11NOVEMBER)
CABAL BEDSIDE BLACK PEMBAHANAN (24-
G 9 DL
27OKTOBER)
CABAL BEDSIDE BLACK TUKANG BORONG (30
9 IP BORONG
OKTOBER- 13 NOVEMBER)
CABAL BEDSIDE PEMBAHANAN (28- 2
H 8 DL
OKTOBER)
CABAL BEDSIDE PROSES TUKANG BORONG
8 IP BORONG
(1-15 NOVEMBER)
CABAL COFFEE TABLE PEMBAHANAN (30
I 7
OKTOBER - 3 NOVEMBER)
CABAL COFFEE TABLE PEMBAHANAN ( 3 -17
7 IP BORONG
NOVEMBER)
CABAL TV UNIT 4DOOR NAT PEMBAHANAN(1 -
J 2
4NOVEMBER)
CABAL TV UNIT 4DOOR NAT PEMBAHANAN(4-
2 IP BORONG
15NOVEMBER)
CABAL TV UNIT 4DOOR BLACK PEMBAHANAN
K 1 DL
(25-28OKT)
CABAL TV UNIT 4DOOR BLACK PEMBAHANAN
1 IP BORONG
(30 OKTOBER - 11 NOVEMBER)
CABAL CONSULE NAT PEMBAHANAN (27 - 31
L 2 DL
OKTOBER)
CABAL CONSULE NAT PROSES TUKANG (31
2 IP BORONG
OKTOBER-14 NOVEMBER)
CABAL CONSULE BLACK PEMBAHANAN (23-30
M 8 DL
OKTOBER)
CABAL CONSULE BLACK PROSES TUKANG(30
8 IP BORONG
OKTOBER-17 NOVEMBER)
PIQUE SIDE TABLE PEMBAHANAN (1-4
N 12
NOVEMBER)
PIQUE SIDE TABLE PEMBAHANAN (4 -
12 IP BORONG
16NOVEMBER)
PIQUE OVAL TABLE PEMBAHANAN
O 2
(31OKTOBER - 6 NOVEMBER)
PIQUE OVAL TABLE PROSESTUKANG ( 6-
2 IP BORONG
18NOVEMBER)
BEDSIDE WITH LEATHER PEMBAHANAN (6 - 8
P 4
NOVEMBER)
BEDSIDE WITH LEATHER PROSES TUKANG ( 8
4 IP BORONG
-20 NOVEMBER)
STUFFING TLM04 (4 DESEMBER)

16 AWR 01(23-30 OKTOBER) 50 DL R

REALISASI PEMBAHANAN (23OKTOBER -1


R
NOVEMBER)
ANABEL STACKING CHAIR PEMBAHANAN (23- BERTSAMAAN
A 50 DL
30 OKTOBER) DVT 05
ANABEL STACKING CHAIR PROSES MESIN (9-
50 IP MESIN
27 NOVEMBER)
STUFFING AWR(22DESEMBER)

17 DECORAMA PEMBAHANA (9-27 NOVEMBER) 48

REALISASI PEMBAHNAN (23 OKTOBER)

A
EROSI COFFEE TABLE PEMBAHANAN (25- 6
29 NOVEMBER)
EROSI COFFEE TABLE PROSES IP 6 IP BORONG
BORONG (29-12 NOVEMBER)
B
EROSI NEW TV DRESOIR 2 DWR 4
PEMBAHANAN (20-25 NOVEMBER)
EROSI NEW TV DRESOIR 2 DWR PROSES 4 IP BORONG
IP BORONG (27 NOVEMBER-4DESEMBER)
C
EROSI TV DRESSER PEMBAHANAN (18-25 5
NOVEMBER)
EROSI TV DRESSER PROSES IP BORORNG 5 IP BORONG
(25 NOVEMBER-4 DESEMBER)
D
EROSI SIDEBORAD 2D PEMBAHANAN(18-21 8
NOVEMBER)
EROSI SIDEBORAD 2D PROSES IP 8 IP BORONG
BORONG(22 NOVEMBER-2DESEMBER)
E
EROSI SIDEBORAD 4D PEMBAHANAN (13- 5
20 NOVEMBER)
EROSI SIDEBORAD 4D PROSES IP 5 IP BORONG
BORONG(21NOVEMBER-1DESEMBER)
F
EROSI SIDEBORAD 6D PEMBAHANAN (8-16 6
NOVEMBER)
EROSI SIDEBORAD 6D PROSES IP 6 IP BORONG
BORONG(16-28 NOVEMBER)
G
EROSI WINE PEMABHANAN (25-29 8
NOVEMBER)
EROSI WINE PROSES IP BORONG(30 8 IP BORONG
NOVEMBER-12DESEMBER)
STUFFING DECORAMA 01 (29 DESEMBER 2023)
BALIAGA PROJECT DIAMOND (18-29
18
NOVEMBER)
LIO BED QUEEN PEMBAHANAN (28
A
NOVEMBER- 6 DESEMBER)
LIO BED QUEEN PEROSES TUKANG (2-
6 IP BORONG
14DESEMBER)
BEDSIDE 2 DRAWER MAHONI PEMBAHANAN
B
(24-29NOVEMBER)
BEDSIDE 2 DRAWER MAHONI PEMBAHANAN
6 IP BORONG
(29NOVEMBER-9 DESEMBER)
BEDSIDE 2 DRAWER MAHONI PEMBAHANAN
C
(27 NOVEMBER)
BEDSIDE 2 DRAWER MAHONI PEMBAHANAN
6 IP BORONG
(27 NOVEMBER)
STUFFING BALIAGA PROJECT DIAMOND (21
DESEMBER 2023)
DND 02 PEMBAHANAN (15 NOVEMBER - 6
19 168
DESEMBER)
BEDSIDE WITH L AKASIA PEMBAHANAN (20-25
A 21
NOVEMBER)
BEDSIDE WITH L AKASIA PROSES IP BORONG
21 IP BORONG
(25 NOVEMBER-6DESEMBER)
BEDSIDE WITH L AKASIA NATURAL
B 21
PEMBAHANAN (1-6 DESEMBER)
BEDSIDE WITH L AKASIA NATURAL PROSES IP
21 IP BORONG
BORONG(6-16 DESEMBER)
JORI BEDSIDE AKASIA BLACK PEMBAHANAN
C 21
(16-23 NOVEMBER)
JORI BEDSIDE AKASIA BLACK PROSES IP
21 IP BORONG
BORONG (23 NOVEMBER-5DESEMBER)
JORI BEDSIDE AKASIA NATURALPEMBAHANAN
D 21
(27 NOVEMBER -4 DESEMBER)
JORI BEDSIDE AKASIA NATURAL PROSES IP
21 IP BORONG
BORONG (4-14 DESEMBER)
LAPA BEDSIDE ONE DRAWER MAHONI
E 21
PEMBAHANAN(22-30 NOVEMBER)
JORI BEDSIDE AKASIA NATURAL PROSES IP
21 IP BORONG
BORONG (30 NOVEMBER-12 DESEMBER)
LAPA BEDSIDE ONE PUTIH PEMBAHANAN(22-
F 21
30 NOVEMBER)
JORI BEDSIDE AKASIA NATURAL PROSES IP
21 IP BORONG
BORONG (30 NOVEMBER-12 DESEMBER)
JAGGER BEDSIEDE AKASIA BLACK
G 21
PEMBAHANAN (15-21 NOVEMBER)
JAGGER BEDSIEDE AKASIA BLACK PROSES IP
21 IP BORONG
BORONG (21 NOVEMBER 4 DESEMBER)
JAGGER BEDSIEDE AKASIA
H 21
PEMBAHANAN(27NOVEMBER-6DESEMBER)
JAGGER BEDSIEDE AKASIA PROSES IP
21 IP BORONG
BORONG(6-18 DESEMBER)
STIFFING DND 02 ( 10 JANUARI 2024)
TLM 05 PEMBAHANAN (17 NOVEMBER - 8
20
DESEMBER)
A CALI WARU ETU 5 DOOR black 2
CALI WARU ETU 5 DOOR black PROSES
2 IP BORONG
TUKANG()
CALI WARU SIDEBOARD 4 DOOR
B 4
PEMBAHANAN (21-25 OKTOBER)
CALI WARU SIDEBOARD 4 DOOR
4 IP BORONG
PEMBAHANAN (25NOVEMBER- 6 DESEMBER)
ZARA JORI ETU NAT PEMBAHANAN (17-
C 4
22NOVEMBER)
ZARA JORI ETU NAT PEMBAHANAN (22-
4 IP BORONG
31NOVEMBER)
CABAL VERONA BEDSIDE BLACK
D 8
PEMBAHANAN (30 NOVEMBER -2 DESEMBER)
CABAL VERONA BEDSIDE BLACK
8 IP BORONG
PEMBAHANAN (2-14 DESEMBER)
CABAL VERONA BEDSIDE PEMBAHANAN (4-6
E 8
DESEMBER)
CABAL VERONA BEDSIDE PEMBAHANAN (4-6
8 IP BORONG
DESEMBER)
CABAL VERONA RECTENGLE CT PEMBAHAN
F 4
(27-29 NOVEMBER)
CABAL VERONA RECTENGLE CT PEMBAHAN
4 IP BORONG
(29 NOVEMBER-9 DESEMBER)
VERONA CONSULE 2DRWR BLACK
G 2
PEMBAHANAN (21-23 NOVEMBER)
VERONA CONSULE 2DRWR BLACK
2 IP BORONG
PEMBAHANAN (24 NOVEMBER-1 DESEMBER)
VERONA CONSULE 3 DRAWER PEMBAHANAN
H 4
(20-24 NOVEMBER)
VERONA CONSULE 3 DRAWER PROSES
4 IP BORONG
TUKANG(20-24 NOVEMBER)
VERONA CONSULE 3 DRAWER BLACK
I 2
PEMBAHANAN (17-21 NOVEMBER)
VERONA CONSULE 3 DRAWER BLACK
PROSES TUKANBG (21 NOVEMBER- 2 IP BORONG
2DESEMBER)
VERONA SIDE BOARD BUFFET PEMBAHNAN
J 2
(29 november- 4 Desember)
VERONA SIDE BOARD BUFFET PROSES
2 IP BORONG
TUKANG (4-13 Desember)
PIQUE SIDE TABLE PEMBAHANAN (27
K 6
NOVEMBER-1DESEMBER)
PIQUE SIDE TABLE PEMBAHANAN (1-
6 IP BORONG
14DESEMBER)
PIQUE SIDE TABLE BLACK PEMBAHANAN (22-
L 12
27 NOVEMBER)
PIQUE SIDE TABLE BLACK PROSES TUKANG
12 IP BORONG
(27 NOVEMBER -9 DESEMBER )
PIQUE ROUND CT NAT PEMBAHAN (1-6
M 4
DESEMBER)
PIQUE ROUND CT NAT PEMBAHAN (6-16
4 IP BORONG
DESEMBER)
PIQUE OVAL TABLE NAT PEMBAHANAN (21-25
N 1
NOVEMBER)
PIQUE OVAL TABLE NAT PROSES TUKANG (25
1 IP BORONG
NOVEMBER-5DESEMBER)
PIQUE OVAL TABLE BLACK PEMBAHANAN (17-
O 1
21 NOVEMBER)
PIQUE OVAL TABLE BLACK PROSES TUKANG
1 IP BORONG
(21 NOVEMBER-1DESEMBER)
HUXLEY BEDSIDE PEMBAHANAN (2-6
P 10
DESEMBER)
HUXLEY BEDSIDE PROSES TUKANG (6-16
10 IP BORONG
DESEMBER)
STIFFING TLM 05 (26 JANUARI 2024)
OR IFFEX PEMBAHNAN TANGGAL 1-14
21 19
NOVEMBER
OR IFFEX PROSES TUKANG IP BORONG
TANGGAL 3-25 NOVEMBER
OR IFFEX PROSES TUKANG IP MESIN
LUCIA SOFA MIDDLE SEAT PEMBAHNAN (2-3
A 1 IP MESIN
NOVEMBER )
LUCIA SOFA MIDDLE SEAT PROSES MESIN ( )
LUCIA SOFFA CORNER DOUBLE SEAT
IP MESIN
PEMBAHANAN(13-14 NOVEMBER)
LUCIA SOFFA CORNER DOUBLE SEAT
LUCIA SOFA MERIDIENNE PEMBAHANAN (13-14
IP MESIN
NOVEMBER)
LUCIA SOFA MERIDIENNE
NEW YUKI SOFA 1 PEMBAHANAN (1-2
B 1 IP MESIN
NOVEMBER)
NEW YUKI SOFA 1 PROSES MESIN ()
NEW YUKI CHAIR PEMBAHANAN (1-2
C 1 IP MESIN
NOVEMBER)
NEW YUKI CHAIR MESIN (1-2 NOVEMBER)

D LUCIA DC PEMBAHANAN (6-7 NOVEMBER) 1 IP MESIN

LUCIA DC PROSES MESIN (6-7 NOVEMBER)

E DRESSER MARQUERTY (Tunggu Konfirmasi) 1 IP BORONG

BEDSIDE MARQUERTY PEMBAHANAN (8-9


F 1 IP BORONG
NOVEMBER)
BEDSIDE MARQUERTY PROSES IP BORONG (9-
11 NOVEMBER)
DINING TABLE LAMINA PEMBAHANAN (6-8
G 1 IP MESIN
NOVEMBER)
DINING TABLE LAMINA PROSES MESIN()

H NEW DINING CHAIR PEMBAHANAN 1 IP MESIN

i BUFFET RO (Tunggu Konfirmasi) 1

J BEDSIDE RO (Tunggu Konfirmasi) 1

BEDSIDE MUKA CNC PEMBAHANAN (6-7


K 1 IP BORONG
NOVEMBER)
BEDSIDE MUKA CNC PROSES IP BORONG (7-10
NOVEMBER)
BEDSIDE KAKI CUNGKRING PEMBAHANAN (4-6
L 1 IP BORONG
NOVEMBER)
BEDSIDE KAKI CUNGKRING PROSES MESIN (6-
8NOVEMBER)
BEDSIDE LACI CNC PEMBAHANAN (4-6
M 1 IP BORONG
NOVEMBER)
BEDSIDE LACI CNC PROSES IP BORONG (6-8
NOVEMBER)
BEDSIDE LACI HARPER PEMBAHANAN (3-6
N 1 IP BORONG
NOVEMBER)
BEDSIDE LACI HARPER PROSES BORONG (6-8
NOVEMBER)
BEDSIDE TOP OVER HANGE PEMBHANAN (4-6
O 1 IP BORONG
NOVEMBER)
BEDSIDE TOP OVER HANGE PROSES BORONG
(6-8 NOVEMBER)
BEDSIDE LENGKUNG PEMBAHANAN (4-6
P 1 IP BORONG
NOVEMBER)
BEDSIDE LENGKUNG PROSES BORONG (6-8
NOVEMBER)
NEW OCCASIONAL CHAIR PEMBAHANAN (9-10
Q 1 IP MESIN
NOVEMBER)
NEW OCCASIONAL CHAIR PEMBAHANAN (9-10
NOVEMBER)
NEW DINING CHAIR PEMBAHANAN (9-10
R 1 IP MESIN
NOVEMBER)
NEW DINING CHAIR PROSES MESIN ()
NEW DINING CHAIR MR ELY PEMBAHANAN (10-
S 1 IP MESIN
11 NOVEMBER)
NEW DINING CHAIR MR ELY PROSES IP MESIN
()
KIRIM KE JAKARTA
OR HOF ART PEMBAHANAN (28 NOVEMBER-11
22 5
DESEMBER)
ACAK TABLE PEMBAHANAN (28 NOVEMBER - 8
DESEMBER)
ACAK TABLE PROSES BORNG (8-23
DESEMBER)
STUFFING HOF ART 30 JANUARI 2024

23 OR DVT 07 PEMBAHANAN (8-23 DESEMBER)


BRINDA DINING CHAIR SET OF 2
PEMBAHANAN (8-12 DESEMBER)
CHLOE CCASIONAL CHAIR PEMBAHANAN (12-
16 DESEMBER)
BIDEN OCCASIONAL CHAIR PEMBAHNAN (12-
15 DESEMBER)
STUFFING DVT 07 TANGGAL 2 FEBRUARI
2024
24 OR KRT 17 PEMBAHANAN ()
KETERANGAN

STIFFING DATE : STF

INSPECTION : INS

PERJALAN PROSES PEMBAHANAN : PEMBAHANAN

PERJALAN PROSES BORONG : BORONG

PERJALAN PROSES MESIN : MESIN

DEAD LINE : DL

REALISASI ;R
SCHADULE PEMBA
NOVEMBER 2023
MIN KE-44 MIN KE-45
2 3 4 5 6 7
DL

DL

DL

DL

DL

DL

DL
DL

DL

DL

DL

DL

DL

DL
DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL
DL

DL

DL

DL

DL

DL

DL

DL
DL
DL

DL

DL

DL

DL

DL

DL

DL

DL
SCHADULE PEMBAHANAN
NOVEMBER 2023 DESEMBER 2023
MIN KE-45 MIN KE-46 MIN KE-47 MIN KE-48 MIN KE-49 MIN KE-50 MIN KE-51 MIN KE-52
8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

INS STF

INS STF
STF

STF

STF

DL
DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL STF

DL

DL DL

DL

DL

DL
STF

DL

DL

DL

DL

DL

DL

DL

DL

DL

STF

INS

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL
DL

DL

DL

DL

DL

DL

STF

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

STF

DL

DL

DL

DL

DL

DL

DL
DL

DL

DL

DL

DL

DL

DL

DL

DL

DL DL STF

DL

DL

DL

DL

DL

DL

DL DL

DL

DL

DL
DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL STF

DL
DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL
AN
JANUARI 2024
MIN KE-52 MIN KE-53
28 29 30 31 1 2 3 4 5 6
STF
DL

STF
STF
DL
JANUARI 2024 FEBRUARI2024
MIN KE-54 MIN KE-55 MIN KE-56 MIN KE-53 MIN KE-54 MIN KE-55 MIN KE-56
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
STF
INS STF
STF
STF
DL STF
Signature
KE-56 TANGGAL CATATAN KETERANGAN ExecutorCollaborativeInspector
confirmation
26 27 28 29
SCHA
Work NOVEMBER 2023 DESEMBER
NO QTY KETERANGAN MIN KE-44 MIN KE-45 MIN KE-46 MIN KE-47 MIN KE-48 MIN KE-49 MIN KE-50
OR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
KRT 09 PEMBAHANAN(23OKTOBER
7 150 DL DL STF
- 4 NOVEMBER)
STIFFING KRT 09 (30 NOVEMBER)
KRT 13 PEMBAHANAN (6-30
DL
NOVEMBER) CONT 1
STIFFING KRT 09 + KRT 13
(29DESEMBER)
BACK ORDER KRT PEMBAHANAN
DL DL
(6 DESEMBER) CONT 2
STIFFING KRT 09 + KRT 13 (30
JANUARI)
KRT 15 PEMBAHANAN (31
1 DL DL STF
OKTOBER - 6 NOVEMBER)
STIFFING KRT 15 (30 NOVEMBER)
KRT 16 PEMBAHANAN (27
61 DL
NOVEMBER - 9 DESEMBER)
STIFFING KRT 16 (5 JANUARI 2024)
JPN 05 PEMBAHANAN (23
8 170 DL DL STF
OKTOBER- 7 NOVEMBER)
STUFFING JPN 05 (30 NOVEMBER)
GWA 11 PEMBAHANAN (30
11 164 DL
OKTOBER- 18 NOVEMBER)
ACTA BEDSIDE PEMBAHANAN (8 -11
F 10 DL
NOVEMBER)
ACTA BEDSIDE PROSES TUKANG
10 IP BORONG DL
(11-24 NOVEMBER)
INSPECT GWA 09 & GWA 11
(18DESEMBER)
STUFFING GWA 09 & GWA 11 ( 26
DESEMBER)
DECORAMA PEMBAHANA (9-27
17 48 DL
NOVEMBER)
STUFFING DECORAMA 01 (29
DESEMBER 2023)
BALIAGA PROJECT DIAMOND (18-
18 DL DL
29 NOVEMBER)
STUFFING BALIAGA PROJECT
DIAMOND (21 DESEMBER 2023)
DND 02 PEMBAHANAN (15
19 168 DL
NOVEMBER - 6 DESEMBER)
STIFFING DND 02 ( 10 JANUARI
2024)
TLM 05 PEMBAHANAN (17
20 DL
NOVEMBER - 8 DESEMBER)
STIFFING TLM 05 (26 JANUARI 2024)

KETERANGAN
STIFFING DATE : STF
INSPECTION : INS
PERJALAN PROSES PEMBAHANAN : PEMBAHANAN
PERJALAN PROSES BORONG : BORONG
PERJALAN PROSES MESIN : MESIN
DEAD LINE : DL
REALISASI ;R
SCHADULE PEMBAHANAN
ESEMBER 2023 JANUARI 2024
50 MIN KE-51 MIN KE-52 MIN KE-53
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6

STF

DL STF

DL STF

STF

DL

DL
JANUARI 2024
Signature
MIN KE-54 MIN KE-55 MIN KE-56 TANGGAL CATATAN KETERANGAN ExecutorCollaborativeInspector
confirmation
7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

STF

STF

STF
Work OKTOBER 2023
NO QTY KETERANGAN MIN KE-40 MIN KE-41 MIN KE-42 MIN KE-43 MIN KE-44 MIN KE-45
OR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9
GWA 07 PEMBAHANAN (2-18
1 102 DL R INS STF
OKTOBER)
GWA 07 PROSES TUKANG BORONG
DL
(Sampai 30 OKTOBER)
LAPPA DRESSOIR PROSES
B 16 DL
PEMBAHANAN (2-9 OKTOBER)
LAPA DRESSOIR PROSES
16 IP BORONG DL
TUKANG(10-18 OKTOBER)
WARU SIDEBOARD 3 DOOR
C 10 DL
PEMBAHANAN (3-9 OKTOBER)
WARU SIDEBOARD 3 DOOR PROSES
10 IP BORONG DL
TUKANG(10-17 OKTOBER)
2019 HARPER ADDITION CONSULE (4-
D 10 DL
6 OKTOBER)
2019 HARPER ADDITION CONSULE
10 IP BORONG DL
PROSES TUKANG(7-13OKTOBER)
2019 HARPER RECTENGLE CT
E 5 DL
PEMBAHAN (7-11 OKTOBER)
2019 HARPER RECTENGLE CT
5 IP BORONG DL
PROSES TUKANG (11-20 OKTOBER)
PIQUE ROUND CT PEMBAHAN (6-14
F 5 DL
OKTOBER)
PIQUE ROUND CT PROSES TUKANG
5 IP BORONG DL
(14-23 OKTOBER)
WARU WRITING DESK PEBAHANAN (9-
G 10 DL
13 OKTOBER)
WARU WRITING DESK PROSES
10 IP BORONG DL
TUKANG (14-25 OKTOBER)
2020 TULLY SIDE TABLE PEMBAHNAN
H 10 DL
(11-14OKTOBER)
2020 TULLY SIDE TABLE PROSES
10 IP BORONG DL
BOROB (17-21OKTOBER)
WARU BEDSIDE PEMBHANAN(12 - 17
I 10 DL
OKTOBER)
WARU BEDSIDE PROSES BORONG (17
10 IP BORONG DL
OKTOBER-28 NOVEMBER)
BEDSIDE WITH LEATHER
J 30 DL
PEMBAHANAN (16-18 OKTOBER)
BEDSIDE WITH LEATHER PROSES
30 IP BORONG DL
BORONG(14-20 OKTOBER)
INSPECT GWA 06 & GWA 07 (6
NOVEMBER)
STUFFING GWA 06 & GWA 07 (10
NOVEMBER)
ABD 02 PEMBAHANAN (21SEP-20
3 102 DL DL
OKTOBER)
RETRO SIDE TALE PEMBAHANAN (9-
C 5 DL
14 OKTOBER)
RETRO SIDE TALE PROSES TUKANG
5 IP BORONG DL
(14-20 OKTOBER)
RETRO ROUND CT 0.7M
D 4 DL
PEMBAHANAN (7-12 OKTOBER)
RETRO ROUND CT 0.7M PROSES
4 IP BORONG DL
BORONG (12-18 OKTOBER)
RETRO ROUND CT 0.9M
E 4 DL
PEMBAHANAN (7-12 OKTOPBER)
RETRO ROUND CT 0.9M PROSES
4 IP BORONG DL
BORONG (12-18 OKTOPBER)
KELIMUTU DT PEMBAHANAN (14-16
F 2 DL
OKTOBER)
KELIMUTU DT PROSES BORONG (16-
2 IP BORONG DL
26 OKTOBER)
ADDARA NEW TEAK SIDE 3DOOR (9-
H 2 DL
16 OKTOBER)
ADDARA NEW TEAK SIDE 3DOOR
2 IP BORONG DL
PROSES BORONG (16-23 OKTOBER)
ADDARA MAHONY SIDEBOARD 3DR
I 5 DL
PEMBAHANAN (9-16 OKTOBER)
ADDARA MAHONY SIDEBOARD 3DR
5 IP BORONG DL
PROSESBORONG (16-23 OKTOBER)
ADDARA MAHONY SIDEBOARD 6DR
J 5 DL
PEMBAHANAN (10-7 OKTOBER)
ADDARA MAHONY SIDEBOARD 6DR
5 IP BORONG DL
PROSES BORONG (7-14 OKTOBER)
ADDARA ENTU 8 DR PEMBAHANAN (5-
K 4 DL
10 OKTOBER)
ADDARA ENTU 8 DR PROSES
4 IP BORONG DL
BORONG(10-16 OKTOBER)
ADDARA ENTU NEWTEAK 8 DR
L 1 DL
PEMBAHANAN (2-11 OKTOBER)
ADDARA ENTU NEWTEAK 8 DR
1 IP BORONG DL
PROSES BORONG (11-18 OKTOBER)
ABD ROUND COFFEE TABLE
N 4 DL
PEMBAHANAN (12-16 OKTOBER)
ABD ROUND COFFEE TABLE
4 IP BORONG DL
PEMBAHANAN (16-23 OKTOBER)
JORI RECTANGULAR CT
O 2 DL
PEMBAHANAN (9-12OKTOBER)
JORI RECTANGULAR CT
4 IP BORONG DL
PROSESBORONG(12-20 OKTOBER)
JORI ROUN CT 100 PEMBAHANAN (12-
P 2 DL
14 OKTOBER)
JORI ROUN CT 100 PROSES
2 IP BORONG DL
ORONG(16-25 OKTOBER)
JORI ROUND CT 80 PEMBAHANAN (13-
Q 4 DL
16 OKTOBER)
JORI ROUND CT 80 PROSES
4 IP BORONG DL
BORONG(17-26 OKTOBER)
TEAK CONSOLE 2 DRAWER
R 3 DL
PEMBAHANAN (12-17 OKTOBER)
TEAK CONSOLE 2 DRAWER PROSES
3 IP BORONG DL
TUKANG BORONG (17-25 OKTOBER)
CONSULE 2 DRAWER ACASIA
S 2 DL
PEMBAHNAN(7-12 OKTOBER)
CONSULE 2 DRAWER ACASIA
2 IP BORONG DL
PROSES BORONG(12-19 OKTOBER)
CONSULE 2 DRAWER MAHONI
T 3 DL
PEMBAHNAN (3-9 OKTOBER)
CONSULE 2 DRAWER MAHONI
3 IP BORONG DL
PEMBAHNAN (9-17 OKTOBER)
SOFA 3 SEAT LEFT PEMBAHANAN (9-
U 1 DL
14OKTOBER)
SOFA 3 SEAT LEFT(9-14OKTOBER) 1 IP BORONG
SOFA 2 SEAT RIGHT PEMBAHANAN (9-
V 1 DL
14 OKTOBER)
SOFA 2 SEAT RIGHT PEMBAHANAN
1 IP BORONG DL
(14-21 OKTOBER)
BEDSIDE WITH L MAHONI
W 10 DL
PEMBAHANAN (4-7 OKTOBER)
BEDSIDE WITH L MAHONI
10 IP BORONG DL
PEMBAHANAN (4-7 OKTOBER)
BEDSIDE WITH L TEAK
X 10 DL
PEMBAHANAN(14-17 OKTOBER)
BEDSIDE WITH L TEAK
10 IP BORONG DL
PEMBAHANAN(17-28 OKTOBER)
ABD 03 PEMBAHANAN (3-21
4 358 DL R
OKTOBER)
ADARA BEDSIDE TEAK PROSES
6 IP BORONG DL
BORONG (19-31 OKTOBER)
ADARA BEDSIDE MOHONY (14-18
E 12 DL
OKTOBER)
ADARA BEDSIDE MOHONY (18-30
12 IP BORONG DL
OKTOBER)
INSPECT ABD 02 & ABD 03 (10
NOVEMBER)
STUFFING ABD 02 & ABD 03 (15
NOVEMBER)
AVC 03 PEMBAHANAN (30
5 DL R DL
SEPTEMBER-18 OKTOBER)
BATAVIA CONSULE PEMBAHANAN (2-
D 20 DL R
20 OKTOBER)
BATAVIA CONSULE PROSES BORONG
20 IP BORONG DL
(20 OKTOBER-2 NOVEMBER)
STUFFING AVC 03 (15 NOVEMBER)
NMH 01 PEMBAHANAN (2 OKTOBER -
6 60 DL DL
17 OKTOBER)
MODULAR SOFA NO ARM
E 4 DL
PEMBHANAN (7-12 OKTOBER)
MODULAR SOFA NO ARM PROSES
4 IP BORONG DL
TUKANG (20 OKTOBER -4 NOVEMBER)
MODULAR SOFA ONE ARM
F 4 DL
PEMBAHANAN(7-12 OKTOBER)
MODULAR SOFA ONE ARM PROSES
BORONG (21 OKTOBER- 4 4 IP BORONG DL
NOVEMBER)
BIG MODULAR SOFA DOBLE ARM
G 4 DL
PEMBAHANAN (12-17 OKTOBER)
BIG MODULAR SOFA DOBLE ARM (21
4 IP BORONG DL
OKTOBER - 4 NOVEMBER)
STUFFING NMH 01 (22 NOVEMBER)
KRT 09 PEMBAHANAN(23OKTOBER -
7 150 DL
4 NOVEMBER)
NEW ALIAN SEATER DOBLE ARM
A PEMBAHANAN (30 OKTOBER- 3 8 DL
NOVEMBER)
NEW ALIAN SEATER DOBLE ARM
8 IP BORONG
PROSES BORONG (3-15 NOVEMBER)
NEW ALIAN SEATER SINGLE ARM
B PEMBAHANAN (30 OKTOBER-3 8 DL
NOVEMBER)
NEW ALIAN SEATER SINGLE ARM
8 IP BORONG
PROSES BORONG (3-15 NOVEMBER)
ULU SPINDEL SOFA ONE SEAT
D 30 DL
PEMBAHANAN (21-27 OKTOBER )
ULU SPINDEL SOFA ONE SEAT
30 IP BORONG DL
PROSES BORONG(20-31 OKTOBER)
ULU SPINDEL SOFA TWO SEAT
E 15 DL
PEMBAHANAN (21-27 OKTOBER)
ULU SPINDEL SOFA TWO SEAT
15 IP BORONG DL
PROSES BORONG (16-26OKTOBER)
YUKI SOFA TWO SEATER
F 10 DL
PEMBAHANAN (21-25 OKTOBER)
YUKI SOFA TWO SEATER PROSES
10 IP BORONG DL
BORONG (21-25 OKTOBER)
YUKI SOFA THREE SEATER
G 10 DL
PEMBAHANAN(23-28 OKTOBER)
YUKI SOFA THREE SEATER PROSES
10 IP BORONG DL
BORONG(23-28 OKTOBER)
YUKI SOFA MIDLE NO ARM
H 7 DL
PEMBAHANAN(25-30 OKTOBER)
YUKI SOFA MIDLE NO ARM PROSES
BORONG(30 OKTOBER- 7 IP BORONG
11NOVEMBER)
YUKI ROUND CT 60 PEMBAHANAN(16-
I 24 DL
20 OKTOBER)
YUKI ROUND CT 60 PPROSES
24 IP BORONG
BORONG(20OKTOBER-1 NOVEMBER)
YUKI ROUND CT 80PEMBAHANAN(18-
J 24 DL
21 OKTOBER)
YUKI ROUND CT 80PROSES
24 IP BORONG
BORONG(21 OKTOBER-1 NOVEMBER)
YUKI ROUND CT 100
K 24 DL
PEMBAHANAN(25-30 OKTOBER)
YUKI ROUND CT 100 PROSES
BORONG(30 OKTOBER-11 24 IP BORONG
NOVEMBER)
STIFFING KRT 09 (30 NOVEMBER)
KRT 13 PEMBAHANAN (6-30
NOVEMBER) CONT 1
ULU SOFA MERIDIEN PEMBAHANAN
A
(6- 18 NOVEMBER)
ULU SOFA MERIDIEN PR0OSES IP
24 IP BORONG
BORONG (18-25 NOVEMBER)
ULU SOFA CORNER PEMBAHANAN
B
(7-16 NOVEMBER)
ULU SOFA CORNER PROSES IP
24 IP BORONG
BRONG (16-25 NOVEMBER)
ULU SOFA MIDLE PEMBHANAN (7-16
C
NOVEMBER)
ULU SOFA MIDLE PROSES IP
24 IP BORONG
BORONG (16-25 NOVEMBER)
NATURAL EDGE 250 OUTDOOR
F 12
PEMBAHANAN (27-30 NOVEMBER)
NATURAL EDGE 250 OUTDOOR
PROSES IP BORONG (30 NOVEMBER- 12 IP BORONG
NATURAL13 DESEMBER)
EDGE 300 INDOOR
G PEMBAHANAN (30 NOVEMBER-4 10
DESEMBER)
NATURAL EDGE 300 INDOOR PROSES
10 IP BORONG
IP BORONG (4-15 DESEMBER)
STIFFING KRT 09 + KRT 13
(29DESEMBER)
KRT 13 PEMBAHANAN (6 DESEMBER)
CONT 2
NATURAL EDGE 300 INDOOR
PEMBAHANAN (30 NOVEMBER-8 13
DESEMBER)
NATURAL EDGE 300 INDOOR PROSES
13 IP BORONG
IP BORONG ( 8-16 DESEMBER )
STIFFING KRT 09 + KRT 13 (30
JANUARI)
JPN 05 PEMBAHANAN (23 OKTOBER-
8 170 DL
7 NOVEMBER)
ADAN TEAK ROUND LOW TABLE 90
D 20 DL
(25-28 OKTOBER)
ADAN TEAK ROUND LOW TABLE 90
PROSES BORONG (30 OKTOBER -13 24 IP BORONG
NOVEMBER)
ADAN TEAK COFFEE TABLE
E PEMBAHANAN (28 OKTOBER -2 20 DL
NOVEMBER)
ADAN TEAK COFFEE TABLE PROSES
24 IP BORONG
BORONG (2-16 NOVEMBER)
RONDA COFFEE TABLE PEMBAHANAN
F 20 DL
(30-4NOVEMBER)
RONDA COFFEE TABLE PROSES
24 IP BORONG
TUKANG (4-13NOVEMBER)
ROUND DINING TABLE OUTDOOR
G PEMBAHANAN (28OKTOBER- 3 20 DL
NOVEMBER)
ROUND DINING TABLE OUTDOOR
24 IP BORONG
PROSES TUKANG ( 3-13 NOVEMBER)
GARBER PLAN BOX ROUND
H 20 DL
PEMBAHANAN(3 NOVEMBER)
GARBER PLAN BOX ROUND PROSES
24 IP BORONG
BORONG(6-18 NOVEMBER)
GARBER PLANT BOX SQUARE
I 30 DL
PEMBAHNAN (3 NOVEMBER)
GARBER PLANT BOX SQUARE
24 IP BORONG
PROSES BORONG (6-18 NOVEMBER)
PLANT BOX SQUARE PEMBAHNAN (6-
J 8 DL
8 NOVEMBER)
PLANT BOX SQUARE PROSES
24 IP BORONG
BORONG (6-20NOVEMBER)
STUFFING JPN 05 (30 NOVEMBER)
GWA 09 PEMBAHANAN (30 OKTOBER
10 44
-18 NOVEMBER)
ACTA DRESOIR PEMBAHANAN
A 10 DL
(30OKTOBER-6NOVEMBER)
ACTA DRESOIR PROSES BORORNG
10 IP BORONG
(30OKTOBER - 10 NOVEMBER)
PIQUE ROUND CT PEMBAHAN (31
C 10 DL
OKTOBER-6NOVEMBER )
PIQUE ROUND CT PROSESTUKANG
10 IP BORONG
BORONG (6-18 NOVEMBER )
WARU ETU PEMBAHANAN (6-10
D 10
NOVEMBER)
WARU ETU PROSES BORONG (10-22
10 IP BORONG
NOVEMBER)
GWA 11 PEMBAHANAN (30 OKTOBER-
11 164
18 NOVEMBER)
BABYLON CONSOL PEMBAHANAN (30
B 10 DL
OKTOBER -4 NOVEMBER)
BABYLON CONSOL PROSES
10 IP BORONG
BORONG(4-13 NOVEMBER)
PIQUE ROUND CT PEMBAHANAN(10-
C 5
14 NOVEMBER)
PIQUE ROUND CT PROSES
5 IP BORONG
BORONG(14-27 NOVEMBER)
PIQUE SUN BED PEMBAHANAN(9-16
D 12
NOVEMBER)
PIQUE SUN BED PROSES
12 IP BORONG
BORONG(16-30 NOVEMBERBER)
ACTA ETU PEMBAHANAN(3-11
E 10
NOVEMBER)
ACTA ETU PROSES TUKANG (11-
10 IP BORONG
24NOVEMBER)
INSPECT GWA 09 & GWA 11
(18DESEMBER)
STUFFING GWA 09 & GWA 11 ( 26
DESEMBER)
12 TLM 04 (19 OKTOBER-7 NOVEMBER) 79 DL
WARU ETU 4 DOOR (30 OKTOBER -3
A 2 DL
NOVEMBER)
WARU ETU 4 DOOR PROSES BORONG
2 IP BORONG
(3-15 NOVEMBER)
JORI BEDSIDE PEMBAHANAN (2-6
B 10 DL
NOVEMBER)
JORI BEDSIDE PROSES BORONG (6-
10 IP BORONG
17 NOVEMBER)
JORI ETU NAT PEMBAHANAN (30
C 4 DL
OKTOBER -2 NOVEMBER)
JORI ETU NAT PEMBAHANAN (3-14
4 IP BORONG
NOVEMBER)
JORI SIDEBOARD NAT PEMBAHANAN
E 7 DL
(27-31OKTOBER)
JORI SIDEBOARD NAT PROSES
7 IP BORONG
BORONG (1-14 NOVEMBER)
JORI SIDEBOARD BLACK
F 1 DL
PEMBAHANAN(23-27OKTOBER)
JORI SIDEBOARD BLACK PROSES
BORORNG(27OKTOBER- 1 IP BORONG
11NOVEMBER)
CABAL BEDSIDE BLACK
G 9 DL
PEMBAHANAN (24-27OKTOBER)
CABAL BEDSIDE BLACK TUKANG
BORONG (30 OKTOBER- 13 9 IP BORONG
NOVEMBER)
CABAL BEDSIDE PEMBAHANAN (28- 2
H 8 DL
OKTOBER)
CABAL BEDSIDE PROSES TUKANG
8 IP BORONG
BORONG (1-15 NOVEMBER)
CABAL COFFEE TABLE PEMBAHANAN
I 7 DL
(30 OKTOBER - 3 NOVEMBER)
CABAL COFFEE TABLE PEMBAHANAN
7 IP BORONG
( 3 -17 NOVEMBER)
CABAL TV UNIT 4DOOR NAT
J 2 DL
PEMBAHANAN(1 -4NOVEMBER)
CABAL TV UNIT 4DOOR NAT
2 IP BORONG
PEMBAHANAN(4-15NOVEMBER)
CABAL TV UNIT 4DOOR BLACK
K 1 DL
PEMBAHANAN (25-28OKT)
CABAL TV UNIT 4DOOR BLACK
PEMBAHANAN (30 OKTOBER - 11 1 IP BORONG
NOVEMBER)
CABAL CONSULE NAT PEMBAHANAN
L 2 DL
(27 - 31 OKTOBER)
CABAL CONSULE NAT PROSES
TUKANG (31 OKTOBER-14 2 IP BORONG
NOVEMBER)
CABAL CONSULE BLACK
M 8 DL
PEMBAHANAN (23-30 OKTOBER)
CABAL CONSULE BLACK PROSES
8 IP BORONG
TUKANG(30 OKTOBER-17 NOVEMBER)
PIQUE SIDE TABLE PEMBAHANAN (1-4
N 12 DL
NOVEMBER)
PIQUE SIDE TABLE PEMBAHANAN (4 -
12 IP BORONG
16NOVEMBER)
PIQUE OVAL TABLE PEMBAHANAN
O 2 DL
(31OKTOBER - 6 NOVEMBER)
PIQUE OVAL TABLE PROSESTUKANG
2 IP BORONG
( 6- 18NOVEMBER)
BEDSIDE WITH LEATHER
P 4 DL
PEMBAHANAN (6 - 8 NOVEMBER)
BEDSIDE WITH LEATHER PROSES
4 IP BORONG
TUKANG ( 8 -20 NOVEMBER)
STUFFING TLM04 (4 DESEMBER)
DECORAMA PEMBAHANA (9-27
17 48
NOVEMBER)
EROSI COFFEE TABLE PEMBAHANAN
A 6
(25-29 NOVEMBER)
EROSI COFFEE TABLE PROSES IP
6 IP BORONG
BORONG (29-12 NOVEMBER)
EROSI NEW TV DRESOIR 2 DWR
B 4
PEMBAHANAN (20-25 NOVEMBER)
EROSI NEW TV DRESOIR 2 DWR
PROSES IP BORONG (27 NOVEMBER- 4 IP BORONG
4DESEMBER)
EROSI TV DRESSER PEMBAHANAN
C 5
(18-25 NOVEMBER)
EROSI TV DRESSER PROSES IP
BORORNG (25 NOVEMBER-4 5 IP BORONG
DESEMBER)
EROSI SIDEBORAD 2D
D 8
PEMBAHANAN(18-21 NOVEMBER)
EROSI SIDEBORAD 2D PROSES IP
BORONG(22 NOVEMBER- 8 IP BORONG
2DESEMBER)
EROSI SIDEBORAD 4D PEMBAHANAN
E 5
(13-20 NOVEMBER)
EROSI SIDEBORAD 4D PROSES IP
5 IP BORONG
BORONG(21NOVEMBER-1DESEMBER)
EROSI SIDEBORAD 6D PEMBAHANAN
F 6
(8-16 NOVEMBER)
EROSI SIDEBORAD 6D PROSES IP
6 IP BORONG
BORONG(16-28 NOVEMBER)
EROSI WINE PEMABHANAN (25-29
G 8
NOVEMBER)
EROSI WINE PROSES IP BORONG(30
8 IP BORONG
NOVEMBER-12DESEMBER)
STUFFING DECORAMA 01 (29
DESEMBER 2023)

KETERANGAN
STIFFING DATE : STF
INSPECTION : INS
PERJALAN PROSES PEMBAHANAN : PEMBAHANAN
PERJALAN PROSES BORONG : BORONG
PERJALAN PROSES MESIN : MESIN
DEAD LINE : DL
SCHADULE PEMBAHANAN
NOVEMBER 2023 DESEMBER 2023
KE-45 MIN KE-46 MIN KE-47 MIN KE-48 MIN KE-49 MIN KE-50 MIN KE-51 MIN KE-52 MIN KE-53
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4

INS STF
INS STF

STF

STF

DL STF STF

DL

DL

DL

DL

DL DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL
DL

DL

DL STF

DL

DL
DL

DL

DL

DL

DL

DL DL INS STF

DL

DL

DL

DL

DL DL

DL

DL

DL

DL

DL

DL

DL

DL STF

DL

DL

DL

DL

DL
DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL DL STF

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL

DL
JANUARI 2024
KE-53
5 6 7