UGRD-IT6208 System Integration and Architecture 1 MIDTERM EXAM
UGRD-IT6208 System Integration and Architecture 1 MIDTERM EXAM
UGRD-IT6208 System Integration and Architecture 1 MIDTERM EXAM
State Finished
Completed on Friday, 18 November 2022, 2:46 PM
Time taken 17 mins 47 secs
Marks 50.00/50.00
Grade 100.00 out of 100.00
Question 1
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Acronym: CAE
Computer-Aided Engineering
Answer:
Question 2
Correct
Mark 1.00 out of 1.00
Flag question
Question text
It is assumed that, translation from human needs to final design invariably involves the
experience, intuition, skill, and creativity of the designer or design team.
Select one:
True
False
Question 3
Correct
Mark 1.00 out of 1.00
Flag question
Question text
2nd System Integration Life Cycle
Select one:
a.
Feasibility analysis
b.
System architecture development
c.
Management plan:program and project plan
d.
Requirements definition and specification
Feedback
Your answer is correct.
Question 4
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Shows major system components
Select one:
a.
Relationships Model
b.
Static Structural Model
c.
Interface Model
d.
Dynamic Process Model
Feedback
Your answer is correct.
Question 5
Correct
Mark 1.00 out of 1.00
Flag question
Question text
5th System Integration Life Cycle
Select one:
a.
Command
b.
System
c.
Systems design: logical and physical design
d.
Design
Feedback
Your answer is correct.
Question 6
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Design is the essence of engineering.
Select one:
a.
Design Synthesis
b.
System Integration
c.
System Design
d.
Problem Definition
Feedback
Your answer is correct.
Question 7
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Is the creative process by which our understanding of logic and science is joined with our
understanding of human needs and wants to conceive and refine artifacts that serve specific
human purposes.
Select one:
a.
Design
b.
CAE
c.
CAD
d.
CAM
Feedback
Your answer is correct.
Question 8
Correct
Mark 1.00 out of 1.00
Flag question
Question text
No distinctions made between clients and servers
Select one:
a.
Client/Server
b.
Dynamic Process model
c.
Distributed Object
d.
Personal System
Feedback
Your answer is correct.
Question 9
Correct
Mark 1.00 out of 1.00
Flag question
Question text
May run on a single processor
Select one:
a.
Interface Model
b.
Embedded System
c.
Relationship Model
d.
System
Feedback
Your answer is correct.
Question 10
Correct
Mark 1.00 out of 1.00
Flag question
Question text
It should be noted that, no single realization of the design process is just the fight style for all.
Select one:
True
False
Question 11
Correct
Mark 1.00 out of 1.00
Flag question
Question text
The result of design synthesis is the selection of a promising set of preliminary or conceptual
designs for the system.
Select one:
a.
Analysis
b.
Design Synthesis
c.
Problem Definition
d.
Parameterization
Feedback
Your answer is correct.
Question 12
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Acronym: MAR
Memory Address Register
Answer:
Question 13
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Acronym: CIM
Computer-Integrated Manufacturing
Answer:
Question 14
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Acronym: CAM
Computer-Aided Manufacturing
Answer:
Question 15
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Is the design upon which many general purpose computers are based.
Select one:
a.
Blaise Pascal Architecture
b.
Blase Pascal Architecture
c.
Von Neuman Architecture
d.
Von Neumann Architecture
Feedback
Your answer is correct.
Question 16
Correct
Mark 1.00 out of 1.00
Flag question
Question text
The design process begins with the identification of a human need and the reduction of this
need to a precise set of specifications for the system to be built.
Select one:
a.
Problem Definition
b.
Analysis
c.
Parameterization
d.
Design Synthesis
Feedback
Your answer is correct.
Question 17
Correct
Mark 1.00 out of 1.00
Flag question
Question text
The ultimate step in the design process involves the fabrication and testing of a prototype or
system.
Select one:
a.
Parameterization
b.
Prototype and Testing
c.
Problem Definition
d.
Design Synthesis
Feedback
Your answer is correct.
Question 18
Correct
Mark 1.00 out of 1.00
Flag question
Question text
The ranking of design alternatives and the ultimate selection of the most preferred design
involves the selection of the best parameterization of the best conceptual design.
Select one:
a.
Design Synthesis
b.
Problem Definition
c.
Parameterization
d.
Ranking and Selection
Feedback
Your answer is correct.
Question 19
Correct
Mark 1.00 out of 1.00
Flag question
Question text
This gives the detail of the structure of the system including the size, shape, materials, and
quantities of components and the interrelationships among these design elements together.
Select one:
True
False
Question 20
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Shows process structure of the system
Select one:
a.
Relationship Model
b.
Interface Model
c.
Control Modeling
d.
Dynamic Process Model
Feedback
Your answer is correct.
Question 21
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Design is universally understood to be a creative, iterative, decision-making process since there is
no unique solution to a given design problem.
Select one:
True
False
Question 22
Correct
Mark 1.00 out of 1.00
Flag question
Question text
These design concepts need to be converted into detailed designs for all components and
subsystems.
Select one:
a.
Analysis
b.
Design Synthesis
c.
Parameterization
d.
Problem Definition
Feedback
Your answer is correct.
Question 23
Correct
Mark 1.00 out of 1.00
Flag question
Question text
6th System Integration Life Cycle
Select one:
a.
Evaluation
b.
Implementation: design implementation, system tests, and operational deployment
c.
Feasibility Analysis
d.
Design
Feedback
Your answer is correct.
Question 24
Correct
Mark 1.00 out of 1.00
Flag question
Question text
4th System Integration Life Cycle
Select one:
a.
feasibility
b.
program
c.
system
d.
Management plan: program and project plan
Feedback
Your answer is correct.
Question 25
Correct
Mark 1.00 out of 1.00
Flag question
Question text
The concept of the design is understood to involve: the conceptualization and
parameterization of alternative candidate designs that meet or surpass specifications;
Select one:
True
False
Question 26
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Refers to the use of modem computing hardware and software in converting the initial idea for
a product into a detailed engineering design.
Select one:
a.
CAM
b.
Computer-Aided Design
c.
CIM
d.
CAD
Feedback
Your answer is correct.
Question 27
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Is essential to the development of large, complex engineered systems.
Select one:
a.
CAE
b.
System Integration
c.
CAM
d.
CIM
Feedback
Your answer is correct.
Question 28
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Acronym: CIR
Current Instruction Register
Answer:
Question 29
Correct
Mark 1.00 out of 1.00
Flag question
Question text
This involves generating alternative designs, or design options, that might reasonably satisfy
system specifications.
Select one:
a.
Analysis
b.
Problem Definition
c.
Parameterization
d.
Design Synthesis
Feedback
Your answer is correct.
Question 30
Correct
Mark 1.00 out of 1.00
Flag question
Question text
The concept of the design is understood to involve: finally, the selection, implementation, and
testing of the most preferred alternative
Select one:
True
False
Question 31
Correct
Mark 1.00 out of 1.00
Flag question
Question text
7th System Integration Life Cycle
Select one:
a.
Feasibility Analysis
b.
Evaluation: system review and plan for replacement/retirement
c.
System Design
d.
Problem Definition
Feedback
Your answer is correct.
Question 32
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Requires the coordination of preexisting and coexisting system components with newly
developed ones
Select one:
a.
System Integration
b.
Parameterization
c.
Ranking and Selection
d.
Problem Definition
Feedback
Your answer is correct.
Question 33
Correct
Mark 1.00 out of 1.00
Flag question
Question text
The concept of the design is understood to involve: the analysis and ranking of design
alternatives;
Select one:
True
False
Question 34
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Acronym: SDLC
System Development Life Cycle
Answer:
Question 35
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Defines subsystem interfaces
Select one:
a.
Control Modeling
b.
Dynamic Process Model
c.
Interface Model
d.
System Structuring
Feedback
Your answer is correct.
Question 36
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Data flow or control flow diagrams
Select one:
a.
Interface Model
b.
Relationship Model
c.
Dynamic Process Model
d.
System
Feedback
Your answer is correct.
Question 37
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Description of the system output by architectural design
Select one:
a.
Software Architecture
b.
Architectural Design
c.
System Structuring
d.
Control Modeling
Feedback
Your answer is correct.
Question 38
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Acronym: MDR
Memory Data Register
Answer:
Question 39
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Identified subsystems decomposed into modules
Select one:
a.
Software Architecture
b.
System Structuring
c.
Modular Decomposition
d.
Control Modeling
Feedback
Your answer is correct.
Question 40
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Ensures that specific hardware/software components fit together smoothly in a stated
configuration
Select one:
a.
System Integration
b.
Computer-Integrated Manufacturing
c.
Computer-Aided Engineering
d.
Computer-Aided Manufacturing
Feedback
Your answer is correct.
Question 41
Correct
Mark 1.00 out of 1.00
Flag question
Question text
1st System Integration Life Cycle
Select one:
a.
System architecture development
b.
Requirements definition and specification
c.
Management plan:program and project plan
d.
Feasibility analysis
Feedback
Your answer is correct.
Question 42
Correct
Mark 1.00 out of 1.00
Flag question
Question text
The concept of the design is understood to involve: the specification of measurable goals,
objectives, and constraints for the design
Select one:
True
False
Question 43
Correct
Mark 1.00 out of 1.00
Flag question
Question text
System decomposed into several subsystems
Select one:
a.
Control Modeling
b.
Architectural Design
c.
Software Architecture
d.
System Structuring
Feedback
Your answer is correct.
Question 44
Correct
Mark 1.00 out of 1.00
Flag question
Question text
3rd System Integration Life Cycle
Select one:
a.
System architecture development
b.
System
c.
Management plan:program and project plan
d.
System design: logical and physical design
Feedback
Your answer is correct.
Question 45
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Offer distributed services which may be called by clients
Select one:
a.
Dynamic System
b.
Client/Server
c.
Personal System
d.
System
Feedback
Your answer is correct.
Question 46
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Characteristics of Distributed System
Select one:
a.
Resource Sharing, Personal System, Concurrency, Scalable, Fault Tolerant and Transparent
b.
System, Openness, Concurrency, Scalable, Fault Tolerant and Transparent
c.
Resource Sharing, Openness, Concurrency, Scalable, Fault Tolerant and Transparent
Feedback
Your answer is correct.
Question 47
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Designed to run on a single user system
Select one:
a.
Interface Model
b.
Personal System
c.
Personal Integrated System
d.
Dynamic Process Model
Feedback
Your answer is correct.
Question 48
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Process for identifying the subsystems that make up a system
Select one:
a.
Architectural Design
b.
Control Modeling
c.
Software Architecture
d.
System Structuring
Feedback
Your answer is correct.
Question 49
Correct
Mark 1.00 out of 1.00
Flag question
Question text
System software runs on loosely integrated group of cooperating processors linked by a
network
Select one:
a.
Distributed System
b.
Embedded System
c.
Personal System
d.
System
Feedback
Your answer is correct.
Question 50
Correct
Mark 1.00 out of 1.00
Flag question
Question text
Model of control relationships among system components is established
Select one:
a.
Modular Decomposition
b.
Software Architecture
c.
System Structuring
d.
Control Modeling
Feedback
Your answer is correct.