This document outlines the methodology for shifting a 30V DC system at a substation in Oman. It involves 10 steps including: 1) receiving a permit to work, 2) setting up a temporary DC supply source, 3) disconnecting cables from existing supply, 4) terminating cables at a new supply, 5) providing temporary power, 6) shifting the DC charger and distribution board, 7) terminating cables, 8) shifting cables to the new board, 9) cancelling the permit to work. The work requires various teams including distribution control personnel, test engineers, supervisors and technicians and takes place over a scheduled 4 hour period.

Uploaded by

bala
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views2 pages

Annexure 2

This document outlines the methodology for shifting a 30V DC system at a substation in Oman. It involves 10 steps including: 1) receiving a permit to work, 2) setting up a temporary DC supply source, 3) disconnecting cables from existing supply, 4) terminating cables at a new supply, 5) providing temporary power, 6) shifting the DC charger and distribution board, 7) terminating cables, 8) shifting cables to the new board, 9) cancelling the permit to work. The work requires various teams including distribution control personnel, test engineers, supervisors and technicians and takes place over a scheduled 4 hour period.

Uploaded by

bala
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Annexure – 2 30V DC System shifting methodology

Project : Construction of Upgrading 132/33kV Thumrait Grid Station From 2x30 MVA to 2x63MVA
Client : Oman Electricity Transmission Company S.A.O.C. (OETC)
Client Consultant : Dawood Engineering Consultancy L.L.C. (DEC)
Contractor : United Engineering Projects Company L.L.C. (UEP)
Required
S. No. Activity Description Start Time End Time Required Manpower Remarks
Duration
1 PTW Receiving 15 Mins 08:00 AM 08:15 AM DISC CEP-1
DISC CEP-1
DCRP Testing Engineer-1
2 Setup temporary DC supply Source kit 15 Mins 08:15 AM 08:30 AM
Electrical Supervisor-1
Electrical Technication-2
Switch OFF the following,
DISC CEP-1
1. 30V DC Charger-1 & 2 MCB in LVAC Panel.
DCRP Testing Engineer-1
3 2. 30V DC Fuse box-1 & 2. 15 Mins 08:30 AM 08:45 AM
Electrical Supervisor-1
3. 30V DCDB Outgoing MCB's
Electrical Technication-2
Check and confirm no voltage
Dis-connect DC Supply incoming / outgoing cables
from
DISC CEP-1
1. 11kV Switchgear Bus-A & Bus-B.
DCRP Testing Engineer-1
4 2. 20MVA Tx. RTCC-1 & 2. 15 Mins 08:45 AM 09:00 AM
Electrical Supervisor-1
3. 30V DC Fuse box-1 & 2 (Charger cable only).
Electrical Technication-5
4. 30V DC Charger-1 & 2.
5. 30V DC DB.
CEP-1
Cable Glanding & Termination of new cables in
Testing Engineer-1
5 1. 11kV Switchgear Bus-A & Bus-B. 15 Mins 09:00 AM 09:15 AM
Electrical Supervisor-1
2. 20MVA Tx. RTCC-1 & 2.
Electrical Technication-5

Contractor: Client Consultant:


United Engineering Projects Company L.L.C. Dawood Engineering Consultancy L.L.C.
Page 1 of 2
Required
S. No. Activity Description Start Time End Time Required Manpower Remarks
Duration
CEP-1
Providing 30V DC supply from temporary DC supply Testing Engineer-1
6 15 Mins 09:15 AM 09:30 AM
Source kit Electrical Supervisor-1
Electrical Technication-5
DISC CEP-1
DCRP Testing Engineer-1
7 Shifting 30V DC Charger & DCDB 120 Mins 09:30 AM 11:30 AM Electrical Supervisor-1
Electrical Technication-5
Fabricator-2
CEP-1
Cable Glanding & Termination in 30V DC Charger & Testing Engineer-1
8 45 Mins 11:30 AM 12:15 PM
DCDB (LV AC/DC Supply & Interpanel cables) Electrical Supervisor-1
Electrical Technication-5
Shifting of following DC supply cables from DISC CEP-1
Temporary DC source kit to 30V DCDB, DCRP Testing Engineer-1
9 45 Mins 12:15 PM 01:00 PM
1. 11kV Switchgear Bus-A & Bus-B. Electrical Supervisor-1
2. 20MVA Tx. RTCC-1 & 2. Electrical Technication-5
10 Cancel PTW 15 Mins 01:00 PM 01:15 PM DISC CEP-1