BORANG HIRARC
Lokasi / Kawasan G19 House Kota Damansara Nama Jabalradzman bin Rabidin
Existing Risk
PIC
No Activity Hazard Effect Control Likelihood Severity Risk Recommendation Control
(if any)
PPE -Wear h
Cuts/Hand
Embroidery Pinch point Safe work procedure 1 1 1 Administrative control - Safe
1 injury
process work procedure to be review
Administrative control
-
Heatpress to Caught in or
Machine Work Briefing 1 3 3
transfer design between
3 PPE -
powered by air Wear safety shoes
compressor
POLITEKNIK BANTING SELANGOR (PBS)
BORANG HIRARC
Lokasi / Kawasan G19 House Kota Damansara Nama Jabalradzman bin Rabidin
PIC
No Activity Hazard Effect Risk Control Likelihood Severity Risk Additional Control
Sharp edges Cut/ Hand injury Administrative control - 1 1 1 PPE -Wear hand glove while handling the
Work Briefing material
Administrative control - Administrative control - Safe work procedure to
Demonstration before work start be review
Administrative control -
Read the manual/safe work
procedure before using the
machine
Operate machine without safe operating procedure Machine damage Administrative control - 1 3 3
Work Briefing
Material cutting using
1 Administrative control -
Hacksaw Machine
Demonstration before work start
Administrative control -
Read the manual/safe work
procedure before using the
machine
'Administrative control -
Schedule maintenance provided
Lokasi / Kawasan G19 House Kota Damansara Nama JABALRADZMAN BIN RABIDIN
Dilaksanakan oleh
Proses Making of sticker/Embroidery NO.MATRIX 24DAM23F1032
1. Hazard Identification 2. Risk Assessment 3. Risk Control
Existing Risk
PIC
No Activity Hazard Effect Control Likelihood Severity Risk Recommendation Control
(if any)
PPE-Wear a glove
Cuts/Hand Administrative control-warning sign
Pinch point Safe work procedure 1 1 1
injury Engneering control-Install fixed guard
PPE-Wear a glove
1 Embroidery process Safe work Administrative control-warning
procedure,avoid sign,provide machine usage procedures
Automated Machinery Hand injury 1 3 3
working when
fatigue,always be alert
PPE-Wear a glove
Turn-on switch after Administrative control-Fire Safety
using,put back tools at Training,Fire Drills
Heat(fire) Fire the stand,keep away 1 4 4 Engneering control- Install automatic
from flammable sprinkler systems
materials
PPE-Wear a glove
Administrative control-warning sign
Caught in or Follow safe work Engneering control-install fixed guard
Machine 1 3 3
between procedure
Heatpress to
transfer design Eliminate-move away from work area
3
powered by air PPE-Wearing an ear protector
compressor Administrative control-schedule time of
usage limits
Air compressor noise Hearing loss Avoid prolonged use 1 3 3 Engneering control-put at sound
absorbent chamber
Making of
5
sticker(printing) PPE-Wear a glove
Administrative control-warning sign
Cuts/Hand Follow safe work Engneering control-Install fixed guard
Pinch point 1 1 1
injury procedure
PPE-Wear a glove
Administrative control-warning
Safe work sign,provide safety training,keep the
Caught in or procedure,avoid machine always under maintenance
Rotating part 1 3 3
between working when Engneering control-apply
fatigue,always be alert fence,automatic braking system
PPE-Wear a glove
Safe work Administrative control-provide machine
procedure,avoid usage procedures,machine manuals
Automated Machinery Entangled 1 3 3
working when
fatigue,always be alert
PPE-Wear a glove
Making of Cuts/Hand Peform a safe work
7 Sharp object 5 1 5
sticker(cutting) injury practise
POLITEKNIK BANTING SELANGOR
BORANG HIRARC
1. Pengenalpastian Hazard
Yang Boleh
No Aktiviti Kerja Hazard Mengakibatkan /
Kesan
Menggunakan Angle
1 Mata alat tercabut Terkena anggota
Grinder
badan / cedera parah
BORANG HIRARC
Nama
Kawalan Risiko
Kemungkinan Keterukan Risiko
(Jika Ada)
Pegawai Bertugas
Langkah Kawalan Disarankan
(Tarikh Tamat / Status)