Class Lecture # 1
Class Lecture # 1
“Pakistan Railways”
Operation Of Railways
Railway Track
Rails
Sleepers
Ballast
Gauge
Rail X-Section
Railway Track
Railway Traffic
z Passenger Traffic
• Pakistan railways daily operates 228 mail express
& passenger trains.
• Pakistan railways carry 65 million passengers
annually.
• Daily passengers carried are 178,000.
• Passengers earnings comprises of 50% of the
railway total revenue.
• During 1999-2000 this amounted to 4.8 billion Rs.
Railway Traffic
z Freight Traffic
• The freight business unit with 12000 personnel,
operates over 200 freight stations on the railway
network.
• The unit serves two major ports of Karachi & Bin
Qasim as well as all the four provinces of the
country.
• About 39% of the revenue is generated from the
transportation of POL products, 19% from
imported wheat, fertilizer & rock phosphate,
remaining 42% is earned from domestic traffic.
• The Freight Rates structure is based on market
trends particularly of the road transport which is
Railways main competitor.
• Total Freight carried by Pakistan Railways during
2001-2002 was 5.9 million tons.
A Free sample background from www.powerpointbackgrounds.com © 2004 By Default!
Slide 12
Rail Switches/Turnouts
Rail Switches/Turnouts
Points
Railway Signaling
Classification Of Signals
z According to function:
• Stop signal/Semaphore signals
• Warner signals
• Disc or ground signals
• Colored light signals
z According to location:
• Outer signals
• Home signals
• Starter signals
• Advance starter signals
z According to their specific purpose:
• Routing signals
• Repeater signals
• Call on signals
• Shunting signals
SEMAPHORE SIGNAL
Semaphore
Arm
Lamp
Spectacles
7.676m
Lever
Signal
Post
Signal Indications
z Automatic signaling.
Automatic Signaling
Track Length
Lahore Wahgah 23
Ab-i-Gum Kolpur 37
Gulistan Chaman 60
1,043
ELECTRIFIED SECTIONS TRACK KMS
Lahore
Lahore Cantt 22.78
Mughalpura
544
A Free sample background from www.powerpointbackgrounds.com © 2004 By Default!
Slide 29
5,253
Performance Of Pakistan
Railways
Number of
Freight carried
passengers Locomotives Freight wagons
Year (million
carried (No.) (No.)
tons)
(million)
Future Projects
Estimated Cost
Development Plans
Rs. Billion
Upgradation and improvement of track from Khanpur to Lalamusa 3.5
Dualization of Track from Khanewal to Raiwind and Shahdara to Lalamusa. 7
Setting up of a railway yard and railway linkage from Gwadar port to container yard. 2.5
Rail link from Gwadar Port to existing rail link at Ahmad wall on Quetta Taftan section. 12
Up-gradation of Rohri – Quetta – Taftan section 15
Provision of Railway link on remaining portion of right bank of Indus for connectivity upto
6
Peshawar via Kohat
Rail link from Quetta – Bostan – Zhob to D.I. Khan for provision of direct connectivity from
6
Baluchistan to NWFP.
Upgradation of Mirpur Khas – Khokhrapar section from meter gauge to broad gauge upto
1.8
international boarder.
Feasibility study for provision of rail link from Rawalpindi to Muzaffarabad AJK 0.1
Feasibility Study for provision of rail link from Dina to Mirpur AJK. 0.05
Procurement/ manufacture and assembling of 100 locomotives (75 diesel and 25 electric). 16
Procurement/ manufacturing and assembly of 1000 freight wagons. 4.8
Procurement/ manufacturing and assembly of 100 passenger coaches. 4.1
Electrification of Lahore – Khanewal double line section with rehabilitation of existing single
5.6
line Lahore – Khanewal section (285 Kms). And extension upto Samasatta (163 Kms).
Provision of road over bridge at Chowrangi Chowk Export Processing Zone Karachi. (50%
0.125
of the cost is to be borne by EPZ).
Improvement and rehabilitation of old and obsolete signaling system on Karachi –
15
Peshawar section in phases.
Other minor projects. 1
For completion of on going schemes. 23