0% found this document useful (0 votes)
498 views15 pages

IT Project Management Assignment

This document provides instructions for an IT project management assignment at the University of Sindh. It outlines 10 requirements for the assignment, including submitting individually, the deadline, formatting guidelines, and inclusion of key sections like a title cover, table of contents, assignment question, and references. Students are advised to be precise, avoid plagiarism over 20%, and submit by the deadline of November 10th, 2023 for the assignment to be graded.

Uploaded by

hamza raza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
498 views15 pages

IT Project Management Assignment

This document provides instructions for an IT project management assignment at the University of Sindh. It outlines 10 requirements for the assignment, including submitting individually, the deadline, formatting guidelines, and inclusion of key sections like a title cover, table of contents, assignment question, and references. Students are advised to be precise, avoid plagiarism over 20%, and submit by the deadline of November 10th, 2023 for the assignment to be graded.

Uploaded by

hamza raza
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

UNIVERSITY OF SINDH

FACULTY OF ENGINEERING AND TECHNOLOGY


IT PROJECT MANAGEMENT BS(IT) PART III
MORNING

Instructions

1. This assignment contains 10 marks, and each student should submit it


Individually.
2. You are instructed to submit the assignment on or before the 10th of
Novemebr, 2023.
3. Assignment should be quoted properly, and references should be addressed
at the end of the assignment.
4. You may take help from any resources, but written material should be in
your own words.
5. You should follow the following formatting for the assignment
Font = times new roman Font size=12 heading=bold, underline
line space=1.5 Format=.docx
6. Each page contains your roll number as a footer.
7. Assignment must include
i) Title cover
ii) Table of contents
iii) Assignment question
IV) References
8. Assignment should be precise. Do not add extra irrelevant material.
9. Assignments submitted after the deadline will not be entertained.
10. Assignment will not be entertained if plagiarized more than 20 %.

Good luck
IT Project Management – Assignment

“Project Name”

Project Plan

Submitted By:

Date Due:

Teacher: Dr. Faheem Ahmed Abbasi

Good luck
“”– Project Plan

Table of Contents

1. DOCUMENT PURPOSE 6
2. PROJECT BACKGROUND 6
2.1 Project Goals or Objectives 6
3. PROJECT STAKEHOLDERS 7
4. THE MEASURABLE ORGANIZATIONAL VALUE 8
5. THE PROJECT SCOPE 8
5.1 Scope Objectives 8
5.2 In Scope Items 9
5.3 Constraints 9
6. WORK BREAKDOWN STRUCTURE 9
7. PROJECT SUCCESS CRITERIA 13
8. SUMMARY 14
9. RECOMMENDATIONS 14

Page 2
“”– Project Plan

Executive Summary

Page 3
“”– Project Plan

Signatory Page

Page 4
“”– Project Plan

Page 5
“”– Project Plan

1. Document Purpose

Page 6
“”– Project Plan

2. Project Background

2.1 Project Goals or Objectives

Page 7
“”– Project Plan

3. Project Stakeholders

Page 8
“”– Project Plan

4. The Measureable Organizational Value

Page 9
“”– Project Plan
5. The Project Scope

5.1 Scope Objectives

5.2 In Scope Items

5.3 Constraints

Page 10
“”– Project Plan

6. Work Breakdown Structure

Page 11
“”– Project Plan

7. Project Success Criteria

Page 12
“”– Project Plan

8. Summary

Page 13
“”– Project Plan

9. Recommendations

Page 14