SCHEDULE Q CONTRACT NO.

6600045860

effective and that the WORK is completed in strict compliance with all
provisions of Schedule "B" of this Contract and the Scope of Work in the
individual Release P.O. where applicable.

3.2 CONTRACTOR shall prepare a narrative project specific Quality Plan


including when applicable, the Construction Inspection & Test Plans (ITPs)
and procedures, covering as applicable, design, procurement, construction
and pre-commissioning activities in accordance with the latest version of
ISO 10005 (Quality Management Systems - Guidelines for Quality Plans)
and this Schedule and submit it to the Company Representative for review
and approval no later than twenty one (21) calendar days after the effective
date of this Contract. The minimum requirements for the content of the
Construction Inspection and Test Plans are specified in Attachment IV of
this Schedule "Q". CONTRACTOR may adopt any pre-approved Saudi
Aramco Typical Inspection and Test Plan (SATIP) and associated Saudi
Aramco Inspection Checklists (SAIC) in lieu of its own Inspection and Test
Plans and Procedures. CONTRACTOR may customize the SATIP and
SAIC to suit the scope of WORK, with the approval of Company
Representative.

3.3 CONTRACTOR shall submit Vendors' Inspection and Test Plans in


accordance with Attachment Ill to this Schedule "Q". Pending COMPANY
approval of the Inspection and Test Plans, CONTRACTOR shall not permit
fabrication to begin on any item required to have ITP's.

3.4 CONTRACTOR shall not commence WORK prior to COMPANY approval


of the applicable ITP.

3.5 If CONTRACTOR adopts the COMPANY Typical Inspection Plans (SATIP)


and COMPANY Inspection Checklists (SAIC) in its Quality Plan, it shall
include a list of applicable SATIPs for execution of the scope of the WORK
in accordance with Schedule "B" of this Contract. When any part of the
scope of WORK is not supported by a SATIP(s), CONTRACTOR shall
prepare an Inspection and Test Plan(s) and supporting checklists and
submit to COMPANY for approval a minimum of 30 days prior to the start
the activity.

3.6 CONTRACTOR shall modify its Quality Plan(s) and ITPs or SATIPs, when
applicable, to reflect any significant changes identified by CONTRACTOR
or COMPANY. CONTRACTOR's revised Quality Plan(s) or SATIPs shall
then be resubmitted for COMPANY's approval within seven (7) calendar
days from date of submittal.

3. 7 The latest revision of CONTRACTOR's Quality Manual and applicable


Quality Plans and all referenced documentation shall be available for
Q-3
MP-LSTK, MP-IK-LSTK, MP-OK-LSTK, MP-IK-LS, MP-IK-LSPB,
OFF-IK-LSPB, OFF-OK-LSPB, OFF-IK-LS, OFF-OK-LS, C/R
Revised 12/16