SLOVED EXAMPLES
PART 2
WIRE
STRAND
TENDON
CABLE
Notes
In Case of Cantilevers
1) At Transfer Stage There is only one Case of Loading
D.L. D.L. D.L.
5) e = (+ ) (Center Line )
In Case OF +ve Moment
e = (- ) (Center Line )
e = (+ ) (Center Line )
In Case OF -ve Moment
e = (- ) (Center Line )
1
Example 8
1.0 m
gw= (o.w.+25) kN\m pw=20 kN\m 0.20
18.0 m
= 8
18
= = 0.80 m
0 23
Take h = 1.4 X h0
h = 1.20 m
Fc w = 0.40 Fcu = 0.40 40 = 16 N\m2 = 16000 kN\m 2
+
Pi = Pe =
3600
= 4000 kN Pi = 4000 kN
1-losses 1- 0.10
2
Properties Of X- Section:
A =1.0 0.2 + 1.0 0.25 = 0.45 m 2
+
+
Table Page 91 1.0
b -4 0.20
= 0.25 = 0.25 = 356 10 C.G
yt
+
B 1.00
1.20
-3
ts = 0.20 = = 360 10 yb
+
0.17
t 1.20
3 0.25
I= Bh
-4 3 4
I = ( 356 10 ) (1.0 ) (1.2 )= 0.062 m
+
A= 0.45 m2
Z= h
-3
Z = 360 +10 +1.2 = 0.432 m
3
2
MD = 36.25 (18 ) = 1468.2 kN.m
+
8
g + p = 36.25+ 20 = 56.25 kN\m
2
M = 56.25 +(18 ) = 2278.2 kN.m
D+ L 8
MD Zt 1468.2 0.144 = 0.687 m
emax.= + = +
Pi A 4000 0.45
Zb
e = 0.45 m
MD+L 2278.2- 0.081 0.45
emin. = - = 0.45 = m
Pe A 3600
Check For Normal Stresses :
Transfer Stage :
0.45 F
cu = 0.45 40 = 18000 kN/m
2
P P e M +
4000 + 4000 0.45 - 1466.25
Ftop = - Ai + Zi - Z D = - 0.45
+
+
t t 0.144 0.144
2
= - 6571 kN/m < 0
Pi
Fbott= - - Pi e + MD = - 0.45
4000 - 4000 0.45 1466.25
+ 0.081
+
+
A Zb Zb 0.081
2 2
= - 13009 kN/m < 18000 kN/m
Working Stage :
0.40 F
cu = 0.40 40 =16000 kN/m
2
+
P P M
Ftop = - Ae + Ze +e - ZD+L= - 3600+ 3600 0.45 - 2278.2
+
+
Distribution Of Stresses Along Beam Length inTransfer Stage
Pi
8.88 -
6.57 A
( ) -
( )
-
( ) -
( )
-
( )
8.88 -
( ) -
( )
Pi
A
13.00
12.57
Pe
8.00 -
( ) ( )- A
-
( ) -
( ) -
( )
-
( ) -
( )
8.00 Pe
0.126 A
tens.
5
P = 40 kN P = 80 kN P = 40 kN
G = 60 kN G = 110 kN G = 60 kN
Question 3
g = 25 kN/m g = 25 kN/m
g = 25 kN/m g = 25 kN/m
1720
1
2
430 1720
Working Stage 2360
P = 40 kN P = 80 kN P = 40 kN
G = 60 kN G = 110 kN G = 60 kN
2360
590 6
Fcall= 0.40 Fcu = 0.40 50 = 20.0 MPa
+
Mmax= 2360 kN.m MD.L = 1720 kN.m
M M
Z = max - D.L = 2360 - 1720 = 0.032 m 3
0.40 Fcu 20000
2 2
Assume b=0.30 m Z= bh 0.3 h = 0.032
+
6 = 6
h = 1.0 m
h = 0.80 m Take it 1.0 m
Pe = 21 A(0.4Fcu )= 1 0.3 1.0 20000 = 3000 kN Pe = 3000 kN
+
+
+
2
Pi = Pe 0.9 = 3000 0.9 = 3375 Pi = 3375 kN
+
0.8 0.8
2 2
Z = bh = 0.3 1.0 = 0.05 A = 0.3 1.0 = 0.3 m 2
+
+
6 6
h - cover 1.0 - 0.15 0.35 m
2 = 2 =
Note : we can use the new height with the same forces
2 2 2
Z = bh = 0.3 1.3 = 0.0845 A = 0.3 1.3 = 0.39 m
+
6 6
Pe = 21 A(0.4Fcu )= 1 0.3 1.3 20000 = 3900 kN Pe = 3900 kN
+
+
+
2
Pi = Pe 0.9 = 3900 + 0.9 = 4387.5 Pi = 4390 kN
+
0.8 0.8
emax.= MD + Z t = 1720 +0.0845 = 0.608 m
Pi A 4390 0.39
e = 0.50 m
e Mmax Zb 2360 -0.0845 0.388 m
min. = - =
Pe A 3900 0.39 =
h - cover = 1.3 - 0.15 = 0.50 m
2 2
7
Check For Normal Stresses : Sec 1
Transfer Stage :
Fcall= 0.45 Fcui = 0.45 40 == - 18.0 MPa
+
FTall = 0.22 Fcui= 0.22 40 = + 1.39 MPa
+
Ftop =-4390 - 4390 +0.5 + 1720 = - 16.88 MPa
0.39 0.0845 0.0845
0.0845 + =
0.39 0.0845
Fbott= - 3900+ 3900 0.5 - 2360 = - 14.85 MPa
+
0.39 0.0845 +
Fbott= - 3300 + 3300 0.5 - 1720 = - 9.29 MPa
+
0.0845
8
Sec 2
h = 1.3 m ( Pi e )1
+
( Pi e )2
+
Pe = 1 A(0.4Fcu ) - Min Normal Force
2
Pe = 1 +0.3 +1.3 20000 - 430 = 3470 kN
+
2
Pi = Pe 0.9 = 3470 0.9 = 3900 kN
+
+
0.8 0.8
(Pi e )1 = (Pi e )2
+
+
0.39 0.0845
0.39 0.0845
Final Stage :
FRight=- 590 - 3470 - 3470 0.42+ 2360 = + 0.271 MPa
+
0.39 0.0845
0.39 0.0845
Final Stage :
FRight=- 590 - 2930 - 3470 0.5 + 2360 = + 1.57 MPa
+
9
P = Pi = 3300 = 3666.7 kN PJ = 3667 kN
J 0.9 0.9
3
Aps = PJ 3667 10
= 0.75 1860 = 2829 mm 2
+ +
Fpj
Use 4 Cables each one ( 7 12
(
1
1
4 16 2 2
2 12
2 12
1.30
2 12
2 12
4 12
sec. 1-1 0.30
4 16
0.30
2 12
4 12
2 12
2 12
2 12
1.30
sec. 2-2
10
Example 8
Figure 1 shows the plan and cross section of a prestressed concrete shed
with overall dimensions of 12 24 meters.The slab is prestressed in y-direction
+
and supported on two beams and two lines of columns as shown in the figure .
The 8.0 meter cantilever slab has a varying thickness from 180 to 400 mm.
The slab carries a superimposed dead load (floor cover) of 2.0 kN/m2and live
load of 1.0 kN/m2. It is required to :
1- Calculate the bending moment at the transfer and working stages .
2- Estimate the prestressing force and eccentricity of the cables at the
critical sections .
3- Check the stresses at both the transfer and working stages and draw the
stress distribution at the critical sections .
4- Draw the stress distribution along the top and bottom fibers of the
beam at both the transfer and working stages .
5- Calculate the area of the prestressing steel .( jacking stress = 0.75% Fpu)
11
1 2 3 4 5
4.0
Y
8.0
A
6.0 6.0 6.0 6.0
Plan
180
400
4.0 8.0
Section A-A
Figure 1
12
o.w.= 0.40 +25 = 10 kN/m 2
o.w.= (0.40+0.18 ) 25 = 7.25 kN/m 2
+
2
Transfer Stage
D.L D.L
D.L = o.w. 10 kN\m 7.25 kN\m
232
96
Working Stage
D.L = o.w.+ F.C. = 10 + 2 = 12 kN/m 2
D.L = o.w.+ F.C. = 7.25 + 2 = 9.25 kN/m 2
Mmax -ve
D.L T.L
12 kN\m 10.25 kN\m
328
140
Mmax +ve
T.L D.L
13 kN\m 9.25 kN\m
296
122
13
Prestressing Force:
To get prestressing force check the stresses on the small section at
transfer and working stage
Transfer Stage :
Fcall= 0.45 Fcui = 0.45 +30 = 13.5 N/mm2 = 13500 kN/m 2
Pi = F Pi = A F = (0.18 1.0 ) 13500
call
+
A call
+
A
= 2880 kN
Take Pi = 2430 kN Pi = 2430 kN
PJ = P i = 2430= 2700 kN PJ = 2700 kN
0.9 0.9
Pe = PJ 0.8 = 2700 0.8 = 2160 kN Pe = 2160 kN
+
+
Eccentricity: Sec 1
2 2
Z t = Zb = b h 1.0 +(0.4 ) 0.027 m 3
= =
+
6 6
A= b h = 0.4 1.0 = 0.4 m 2
+
+
+
0.4
= - 6.48 MPa
Pi
Fbott= - 2430 2430 0.10- 232 = - 5667 kN/m 2
+
+
Final Stage :
Max -ve
Fcall= 0.40 Fcu = 0.40 40 = 16.0 N/mm2= 16000 kN/m 2
+
Final Stage :
Max +ve
2160- 2160 0.10 + 296 = - 2437 kN/m 2 = - 2.437 MPa
Ftop =- 0.4
+
0.027 0.027
Fbott= - 2160 2160 0.10 - 296 = - 8363 kN/m 2 = - 8.363 MPa
+
+
15
Sec 2
Transfer Stage :
Ftop = -2430 - 2430 0.04 96 2 Pi e
0.027 + 0.027 = - 6119.4 kN/m
+
0.4
= - 6.119 MPa
Pi
2430 0.04- 96 2
Fbott= - 2430 + = - 6030.5 kN/m
+
0.4 0.027 0.027
= - 6.03 MPa MD
Final Stage :
Max -ve
Fcall= 0.40 Fcu = 0.40 +40 = 16.0 N/mm2= 16000 kN/m 2
Ftop =- 2160 - 2160 0.04 140 - 3414.8 kN/m 2 = - 3.414 MPa
+
Final Stage :
Max +ve
2160 -2160 0.04
Ftop =- 0.4 122 - 4081.5 kN/m 2
= - 4.08 MPa
+
0.027 + 0.027 =
Fbott= - 2160 2160 0.04 - 122 = - 6718.5 kN/m 2 = - 6.718 MPa
+
+
16
Distribution Of Stresses Along Beam Length inTransfer Stage
6.48 13.5
6.07 6.11
-
( ) -
( )
13.5
-
( ) -
( ) -
( ) -
( )
-
( ) -
( )
6.07 5.67 13.5
6.03
Distribution Of Stresses Along Beam Length inWorking Stage
Case of Max-ve Bending Moment
-
( ) -
( ) -
( ) -
( )
-
( ) -
( )
5.4 12.0
7.385 9.548
-
( ) (- -
( ) -
( )
-
( ) -
( )
5.4 12.0
6.718 8.363
17
A
6 12 /m 10- Strand
A
0.40
1.0 m
6 12 /m
Sec. A-A
18
Example 11
p = 20 kN/ m
P = 50 kN
G = 80 kN
P = 40 kN
G = 60 kN
g = 30 kN/m
3.0
1.5
8.0m 4.0 m
4.0
19
Transfer Stage :
80 kN D.L D.L
60 kN
g = 30 kN/m
1 2
M 1-1 = (30 8.54 +8.0 ) + (80 +8 )
+
2 8.54
= 1664.8 kN.m 4.27
3
+
+
2
= 496.2 kN.m
1664.8
496.2
M 3-3 = M 1-1 - M 2-2
1168.6
= 1664.8 - 496.2 = 1168.6 kN.m
R= 524.3 kN.m
2 60 kN
2
g = 30 kN/m
+ (20 8.0 )= 2704.8 kN.m
+
2 1 2
8.54
4.27
M 2-2 = (30 4.27 4.0 ) + (60 4.0 )
+
+
2 3
= 496.2 kN.m
20
2704.8
M 3-3 = M 1-1 - M 2-2 496.2
= 2704.8 - 496.2 = 2208.6 kN.m
2208.6
R =734.3
30 k 100 kN
M 1-1 = ( 30 +8.54 + 8 )+ (80 8 ) N/m
+
2 1 2
k N/m
30
= 1664.8 kN.m 8.54
4.27
M 2-2 = (30 +4.27 +4.0 )+ (100 4.0 ) 3
+
2
2
+ ( 20 4 )= 816.2 kN.m
+
1664.8
M 3-3 = M 1-1 - M 2-2 816.2
R =644.3
21
1 Design the critecal sections.
Sec 1 M = 2704.8 kN.m MD.L = 1664.8 kN.m
max
0.40 F
cu = 0.40 +30 = 12000 kN/m
2
M M
Z = max - D.L = 2704.8 - 1664.8 = 0.087 m 3
0.40 F
cu 12000
2 2
Z = bh = 0.3 h = 0.087
+
6 6
h = 1.32 m Take it 1.6 m h = 1.6 m
Prestressing Force:
0.85
For R- section Zt Zb h
A = A = 6
emax.= MD + Z t = 1664.8+ 1.60 = 0.813 m
Pi A 3050 6
M Z
emin. = D+L - b = 2704.8- 1.6 = 0.673 m
Pe A 2880 6
Take eact = 0.70 m
Sec 2
Mmax= 816.2 kN.m MD.L = 496.2 kN.m
Mmax - MD.L 816.2 - 496.2 3
Z = = = 0.027 m
0.40 F
cu 12000
2 2
Z = bh = 0.3 h = 0.027
+
6 6
h = 0.73 m Take it 1.0 m h = 1.0 m
22
Prestressing Force:
Pe = 1 A(0.4Fcu )= 1 0.3 +1.0 12000= 1800kN Pe = 1800 kN
+
2 2
Pi = Pe = 1800 0.9 = 1905.84 1906kN Pi = 1906 kN
w
+
0.85
emax.= MD + Z t = 496.2 + 1.0 = 0.43 m
Pi A 1906 6
eact = 0.34 m
M Z
emin. = D+L - b = 816.2 - 1.0 = 0.287m
Pe A 1800 6
Sec 3 Mmax= 2208.6 kN.m Mmin = 848.6 kN.m
Mmax - Mmin 2208.6 - 848.6
Z = = = 0.1133 m3
0.4Fcu 12000
2 2
Z = bh = 0.3 +h = 0.1133 h = 1.51 m Take 1.7 m
6 6
Prestressing Force: h = 1.7 m
2
Pi = Pe = 2536 +0.9 = 2685.15 2686 kN Pi = 2686 kN
w 0.85
(Pi e )1= ( Pi e )2 + ( Pi e )3 ( Pi e )1 ( Pi +e )2
+
+
e3 = 0.55 m
23
Check For Normal Stresses : Sec 1
Transfer Stage :
2
A = 0.3 1.60 = 0.48 m2 Z t = Z b = 0.3 1.60 = 0.128 m 2
+
+ 6
P P e MD
Ftop = - A - Z + Z
i i Pi e
+
+
t t
3050 3050 0.70 1664.8
= - 0.48 - 0.128 + 0.128
+ Pi
2 2
= - 10028 kN/m < 13500 kN/m
P P i +e M
Fbott= - A + Z - ZD < Zero
i
MD
b b
3050 3050 0.70 - 1664.8
=- 0.48 + 0.128
+
0.128
= - 2681 kN/m 2 < 0
Working Stage:
Pe - Pe e
Mtotal
Zt + Z t <
-
Ftop = A 0
+
0.128
< 12000 kN/m2
24
Sec 2
Transfer Stage :
2
A = 0.3 1.0 = 0.30 m2 Z t = Z b = 0.3 1.0 = 0.05 m2
+
+ 6
P Pi e
MD
+
Ftop = - Ai -
Zt
+ Z
t
1906 1906 0.34 496.2 Pi e
= - 0.3 - 0.05
+
+ 0.05
+
2 2
= - 9390 kN/m < 13500 kN/m Pi
Pi + Pi e - MD
Fbott= - A < Zero
+
Zb Zb
1906 1906 0.34 - 496.2 MD
=- 0.30 + 0.05
+
0.05
2
= - 3317 kN/m < 0
Working Stage:
Pe - Pe +e
Mtotal
Zt + Z t <
-
Ftop = A 0
1800 0.34 816.2 = - 1916 kN/m 2
Ftop = - 0.30 - 1800 +
+
0.05 0.05
- Pe Pe +e - Mtotal
Fbott = A + Zb Zb
Fbott= - 1800 + 1800 0.34 - 816.2 = - 10084 kN/m2
+
25
Sec 3
Transfer Stage :
2
A = 0.3 1.7 = 0.51 m2 Z t = Z b = 0.3 1.70 = 0.145 m 2
+
+ 6
Pi - Pi e MD
+
-
Fright= A + Z
Zt t
(2686 +524.3 )- 2686 +0.55 1168.6 Pi
= - 0.51 0.145 + 0.145 Pi e
+
2 2
= - 8424 kN/m < 13500 kN/m MD
Pi Pi e - MD
Zb <
+
-
Fleft = A + Z Zero
b
(2686 + 524.3 ) 2686 0.55 - 1168.6 - 4166 kN/m 2
- + 0.145 = <0
+
= 0.51 0.145
Working Stage:
Pe - Pe e Mtotal 0
< Case 1
+
-
Fright= A Zt + Z t
- (2536 +734.3 ) - 2536 +0.55 2208.6 = - 800 kN/m 2
= 0.51 0.145 + 0.145
Pe Pe e-
Mtotal
-
Fleft = A + Zb
+
Zb
(2536 +734.3 ) 2536 0.55 - 2208.6 - 12025 kN/m 2
=- + 0.145 =
+
0.51 0.145
Case 2 < 12000 kN/m2
P
e P e e M
Fright= - A - Zt + Ztotal <
+
0
t
(2536 + 644.3 )- 2536 +0.55 848.6 = - 10003 kN/m2
=- 0.51 0.145 + 0.145
Pe Pe e Mtotal
+
-
Fleft = A + Zb -
Zb
- (2536+ 644.3 ) 2536 0.55 - 848.6 - 2469 kN/m2 26
+ 0.145 =
+
= 0.51 0.145
Stress distribution at Transfer Stage
10.1
7
9
3.050
10.5
0.30 12.5 1.906
8 0.18
3
11.5
10.1
7
A = (0.3 1.0 )
+
2 15.33
= 0.3 m 10.5
9
2.58
A = (0.3 0.6 )
+
2
= 0.18 m
2.88
0.30 10.0
1.80
9.60 6 0.18
19.01
.619
10.0
8
10.0
11.3
8
12.02 0.80
27
For Sec 1
P = Pi = 3050= 3389 kN
J 0.9 0.9
For Sec 3
P = Pi = 2686= 2985 kN
J 0.9 0.9
28
1 2
4 25
4 22
2 12
2 12
2 12
2 12 1.0
1.60 1 2
2 13 2 12
4 19
2 12
3 3 0.30
4 19
sec. 1-1 0.30 sec. 2-2
0.30
4 25
2 12
4 22
2 12
2 12
2 12
1.70
29
sec. 3-3