Fitness Time - Material Approval Log
Fitness Time - Material Approval Log
Fitness Time - Material Approval Log
1 A : Approved = #REF! B : Approved with Comments = #REF! C : Revise and Re-submit = #REF!
Consultant Response
Submittal Submission Date To OWNER Response Return Date to
SN Submittal no. Submittal Type Description Date Actual Duration Status Comments
Discipline OWNER Contractor
(If Required)
1 Plumping Material Approval Pipes for drainage inside building (APPLACO - NEPRO) 10-Sep-23 B
CENTERAL WATER
8 Plumping Material Approval
HEATERS (A.O SMITH)
14 long lead item Others Material Approval WATER BOOSTER PUMP ( Groundfos )
33 long lead item Fire Fighting Material Approval Fire Fighting Pumps (SFFECO) 1-oct-2023
1 A : Approved = #REF! B : Approved with Comments = #REF! C : Revise and Re-submit = #REF!
Consultant Response
Submittal Submission Date To OWNER Response Return Date to
SN Submittal no. Submittal Type Description Date Actual Duration Status Comments
Discipline OWNER Contractor
(If Required)
Total Submission 1