0% found this document useful (0 votes)
105 views3 pages

DCPT SPT

1. The document contains the results of a standard penetration test (SPT) carried out at a test point with the given easting and northing coordinates. 2. The SPT was performed from a depth of 0.0m to 3.0m, recording blow counts in 0.3m intervals and the corresponding penetration in mm per blow. 3. The results show an increase in resistance with depth, from 0 blows between 0-0.25m to a maximum of 15 blows between 1.46-1.79m depth.

Uploaded by

Solomon Mehari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
105 views3 pages

DCPT SPT

1. The document contains the results of a standard penetration test (SPT) carried out at a test point with the given easting and northing coordinates. 2. The SPT was performed from a depth of 0.0m to 3.0m, recording blow counts in 0.3m intervals and the corresponding penetration in mm per blow. 3. The results show an increase in resistance with depth, from 0 blows between 0-0.25m to a maximum of 15 blows between 1.46-1.79m depth.

Uploaded by

Solomon Mehari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

Date

Project:
GPS Co-ordinate
DCP test point Easting
No Northing

Zero reading 60
From 0.0m - 3.0m depth
No. of Cummulative Meter reading, adjusted depth,
Penetration mm/blow
blows Blows mm (B) mm
0 0 60 0 0
1 1 85 25 25
1 2 105 45 20
1 3 108 48 3
2 5 155 95 47
2 7 186 126 31
2 9 191 131 5
3 12 233 173 42
3 15 274 214 41
3 18 312 252 38
3 21 344 284 32
3 24 352 292 8
5 29 405 345 53
5 34 461 401 56
5 39 472 412 11
10 49 553 493 81
10 59 635 575 82
10 69 709 649 74
10 79 775 715 66
10 89 790 730 15
15 104 895 835 105
15 119 971 911 76
15 134 1056 996 85
15 149 1130 1070 74
15 164 1206 1146 76
15 179 1216 1156 10

2BR 79500
85
Fully Fin. 6,757,500
30% 2,027,250

5-6mo 25% 1,689,375


SPT Rship

10.69
13.27
83.04
5.81
8.69
50.68
6.48
6.63
7.13
8.42
32.17
5.17
4.90
23.65
3.43
3.39
3.75
4.18
17.52
2.67
3.65
3.28
3.75
3.65
25.93
14
Qall= N x Kd B < F4

N55 N'70 F1
F1 0.05 0.04
F2 0.08 0.06
F3 0.3 0.3
F4 1.2 1.2
2
Qall= N x B+F3 Kd B > F4
F1 B

For So = 25mm K d=1+0.33(D/B) < 1.33

N=adjusted SPT blow count


B=width of foundation

Enter the following: Allowable settlement (s,mm) ,width of foundation(w,m) , N-count

Tower No S width, B Depth Avg SPT F1 F2 F3 Kd Qall Qall-F3


4 25 1 3 14 0.04 0.06 0.3 1.33 466 155

You might also like