T & G

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 47

LAHORE ELECTRIC SUPPLY COMPANY LIMITED

TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]

Subject: PROFILE AND PLAN TABLING OF 132 KV F/F PROPOSED CONSUMER


GRID STATION BLACK GOLD INDUSTRIES BHOGIWAL BUNDROAD
LAHORE (COST DEPOSIT WORK)

Reference: 1. Your letter No. PD/GSC/Lhr./DW-24/BGI/8279-84 dated 22-11-2004.


2. Chief Engineer Design (NTDC) letter No. CED/NTDC/MTL/L-
133/32877-80 dated 1-12-2004.

The requisite information asked vide Chief Engineer Design (NTDC) letter
referred at Sr. No. 2 above may please be supplied to the office of Chief Engineer Design
(NTDC) WAPDA House, Lahore in order to proceed in the matter.

Senior Manager (P&D)


Ch. Abdul Ghafoor
To: Project Director, GSC Lahore
NTDC, Gulberg-III, Lahore

Info: 1. Chief Executive Officer LESCO ) for information please.


2. Chief Engineer/Tech. Director LESCO )
3. Chief Engineer Construction (N) 220/132 kV System NTDC Lahore.
4. Sr. Manager O&M (T&G) LESCO.
5. Manager, GSO Circle, LESCO Lahore.
6. M/s Black Gold Industries, Bhogiwal Bund Road, Lahore.
7. Master file.

No.____________/SM(P&D)DMP(T&G)/BG-I Dated______/12/2004

Hamid / T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]

Subject: CONSTRUCTION OF NEW GRID STATION AND


TRANSMISSION LINES UDNER STG PROJECT – APPROVAL OF
PC-1 FOR 6TH STG PROJECT

Reference: 1. This office letter No. 4647-52 dated 37-20-3004


2. Your telephonic discussion dated 6-11-2004.

It has been mentioned in para-11 of the above cited subject Proforma that most of
the material shall be procured from local market, hence F.E. component shall not be required.
In this regard it is submitted that emphasis shall be made to procure all the equipment /
material from local firms, however, the equipment like 132 kV C.Bs, 132 kV Isolators,
Transmission line and Grid Station hardware, transmission line C.Ts and TRF C.TS, if not
available from local market shall have to be imported for which F.E component shall be
required.

Keeping in view of above mentioned facts, anticipatory approval for an amount


of Rs. 405 Million in F.E.C. has been requested for the first year of 6th STG Project LESCO.

Senior Manager (P&D)


Ch. Abdul Ghafoor
To: Mr. Zia-ul-Hassan,
Assistant Chief,
Ministry of Water & Power,
Safdar Mansion Blue Area Islamabad.
(Fax # 051-9203187)

Info: 1. General Manager (O) WAPDA House, Lahore.


8. Chief Executive Officer NTDC, 414-WAPDA House, Lahore.
9. General Manager (Planning) Power NTDC, WAPDA House, Lahore.
10. Chief Engineer, ELR, 410-WAPDA House, Lahore.
11. Master file.

No.____________/SM(P&D)DM(T&G)/PC-1 Dated______/11/2004
T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]

III-REMINIDER

Subject: FINALIZATION OF PROPOSALS OF INTEGRATED MASTER PLAN


FOR LAHORE

Reference: 1. This office letter No. 16503-9 dated 12-6-2004.


2. This office letter No. 17038-45 dated 23-6-2004.
3. This office letter No. 17474-78 dated 05-7-2004.

The requisite information is still awaited from your end. You are once again
advised to send the same without further loss of time.

Senior Manager (P&D)


Ch. Abdul Ghafoor

To: Managers (Op.)


Central, Southern and GSO Circle LESCO.

Info: 1. Manger Easten Circle LESCO with reference to his letter No. 5245 dated
10-7-2004.

2. Master file.

No.____________/ Dated______/7/2004
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]

Subject: ADDITION OF 3RD 66/11 KV, 10/13 MVA POWER TRANSFORMER AT 66 KV


GRID STATION EMCO

Reference: 1. This office letter No. 13958-64/SM(P&D)DMP(T&G)/Aug. dated 16-4-2004.


2.Your office letter No. CEDES/NTDC/MGS/10499-500 dated 5-5-2004.

(1) In this regard, it is submitted that, as per findings of joint visit by NTDC and
LESCO Engineers at 66 kV EMCO Grid Station on 30-4-2004:

(i) The 3rd 66/11 kV 10/13 MVA Power Transformer can be added in the
switch yard and a 9-meter wide 11 kV switch room can be constructed to
accommodate 11 kV panels for this transformer.

(ii) In order to accommodate relay and control panel of 3 rd transformer in the


existing control room, the space of adjacent bath room can be included in
the control room and new bath room / toilet can be constructed for which
space is available.

(2) As far as loading position of 66 kV system feeding the EMCO grid station is
concerned, it is submitted that the loading conditions of 66 kV Attabad-Emco transmission line
and 40 MVA 132/66 kV Power Transformer at Attaabad Grid Station (feeding EMCO) were
analyzed for the months of 5/2003 to 4/2004 by allowing 80% loading of 3x10/13 MVA
Power Transformers at EMCO and it was found that expected loading of 66 kV Attabad-
EMCO transmission lines comes out 102.6% and the same for 40 MVA, 132/66 kV power
transformer at Attabad Grid station comes out to 81%.

(3) In the light of recommendations of Committee and the analyses of loading


conditions of the 66 kV system it is requested that:-

i) 3rd 10/13 MVA, 66/11 kV Power Transformer may kindly be added at 66 kV


EMCO grid station with the condition that loading of 3x10/13 MVA power
transformers be restricted to 60 %, to avoid damaging of power transformer due
to over loading / jerky furnace load and to keep the 66 kV feeding system within
permissible limit.

ii) A nine-meter wide 11 kV switch room may also be constructed to accommodate


11 kV panels for 3rd 66/11 kV, 10/13 MVA Power Transformer.
Chief Engineer / Tech. Dir.
(Muhammad Akram Arain )
To: Chief Engineer Design (NTDC)
WAPDA House, Lahore.

Info: 1. Chief Executive NTDC WAPDA House, Lahore.


2. General Manager (Op.) WAPDA House, Lahore.
3. Chief Executive NTDC WAPDA House, Lahore.
4. Chief Engineer R&ELR WAPDA House, Lahore
5. Sr. Manager O&M (T&G) LESCO.
6. Manager GSO Circle LESCO.
7. Master file.
No.____________/SM(P&D)/DMP(T&G)/14 Dated____/6/2004
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]

Subject: ADDITION OF 3RD 66/11 KV, 10/13 MVA POWER TRANSFORMER AT 66 KV


GRID STATION EMCO

Reference: 1. This office letter No. 13958-64/SM(P&D)DMP(T&G)/Aug. dated 16-4-2004.


2.Your office letter No. CEDES/NTDC/MGS/10499-500 dated 5-5-2004.

(1) In this regard, it is submitted that, as per findings of joint visit by NTDC and
LESCO Engineers at 66 kV EMCO Grid Station on 30-4-2004:

(i) The 3rd 66/11 kV 10/13 MVA Power Transformer can be added in the
switch yard and a 9-meter wide 11 kV switch room can be constructed to
accommodate 11 kV panels for this transformer.

(ii) In order to accommodate relay and control panel of 3 rd transformer in the


existing control room, the space of adjacent bath room can be included in
the control room and new bath room / toilet can be constructed for which
space is available.

(2) As far as loading position of 66 kV system feeding the EMCO grid station is
concerned, it is submitted that the loading conditions of 66 kV Attabad-Emco transmission line
and 40 MVA 132/66 kV Power Transformer at Attaabad Grid Station (feeding EMCO) were
analyzed for the months of 5/2003 to 4/2004 by allowing 80% loading of 3x10/13 MVA
Power Transformers at EMCO and it was found that expected loading of 66 kV Attabad-
EMCO transmission lines comes out 102.6% and the same for 40 MVA, 132/66 kV power
transformer at Attabad Grid station comes out to 81%.

(3) In the light of recommendations of Committee and the analyses of loading


conditions of the 66 kV system it is requested that:-

iii) 3rd 10/13 MVA, 66/11 kV Power Transformer may kindly be added at 66 kV
EMCO grid station with the condition that loading of 3x10/13 MVA power
transformers be restricted to 60 %, to avoid damaging of power transformer due
to over loading / jerky furnace load and to keep the 66 kV feeding system within
permissible limit.

iv) A nine-meter wide 11 kV switch room may also be constructed to accommodate


11 kV panels for 3rd 66/11 kV, 10/13 MVA Power Transformer.
Chief Engineer / Tech. Dir.
(Muhammad Akram Arain )
To: Chief Engineer Design (NTDC)
WAPDA House, Lahore.

Info: 1. Chief Executive NTDC WAPDA House, Lahore.


2. General Manager (Op.) WAPDA House, Lahore.
8. Chief Executive NTDC WAPDA House, Lahore.
9. Chief Engineer R&ELR WAPDA House, Lahore
10. Sr. Manager O&M (T&G) LESCO.
11. Manager GSO Circle LESCO.
12. Master file.
No.____________/SM(P&D)/DMP(T&G)/14 Dated____/6/2004
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]

Subject: SITE FOR PROPOSED 132 KV GRID STATION SHERANWALA


GATE LAHORE

1. The Secretary to Govt. of Punjab Colonies Dep’t through DC Lahore (Collector of


Lahore) sold a piece of land, measuring 4K, 4M at a cost of Rs. 92,40,000/- in
pursuance of orders contained in Memo no. 1980-90/4920 CSI dated 21-02-1995 to
WAPDA for setting–up of grid station, located outside Sheranwala Gate Lahore at
Circular Gardens.

2. The PHA staff created hindrance during soil investigation and eventually the transfer of
said land was withdrawn on 1-1-2001 by Secretary (Colonies Department) Government
of Punjab.

3. The matter was taken up with B.O.R. Punjab to reconsider the decision and allow
construction of the grid station but the request was regretted on 13-2-2002.

4. Efforts were made to find some alternate piece of land but in vain as suitable land of
required size was not available in the vicinity.

5. The matter was taken up with the Governor of Punjab who visited the site of proposed
grid station on 4-8-2002 and was briefed by Chief Engineer (GSC) NTDC WAPDA.
He, in turn, instructed the District Government Lahore and PHA to conduct Survey in
order to find out alternate site.

6. The matter was again taken up by Chairman WAPDA with Governor of Punjab and
accordingly Governor of Punjab directed the concerned Department to hand over the
site to LESCO for the construction of proposed 132 kV Sheranwala Gate grid station.
The temporary possession, however, was taken but the documentation for the transfer of
land in the name of LESCO could not be completed.

7. Demarcation was given at site on 10-1-2004 by the Patwari and Tehsildar concerned but
Tehsildar (Najul) refused to sign the papers of possession/demarcation in the light of
contents of the Secretary (Colonies Department) Government of Punjab Lahore, letter
No. 2785-2001/2273-C.S. (1) dated 1-10-2001 and D.O. (Revenue) Lahore letter No.
Nazul/69-c/192 dated 18-9-2001 issued for non-construction of the grid station.

8. It is pertinent to mention here that, 132 kV grid station near Sheranwala Gate was
proposed to provide the continuous supply to walled City of Lahore and area around it.
Moreover, this grid station will have to provide relief to already overloaded 132 kV
Bhatti Gate, Fort and Badami Bagh Grid Stations.
(Cont’ on Page 2)

(2)

9. The matter has delay to a such extent that if this grid station is not constructed within
next few months, then it is apprehended that LESCO will not be able to avoid forced
load shedding in walled City of Lahore and area around it.

10. Foregoing in view, it is requested that Secretary (Colonies Department)-I and District
Officer (Revenue) may kindly be advised to issue necessary amendment in the orders,
mentioned in para-7 above, so that possession formalities could be completed and
construction activities of 132 kV grid station Sheranwala Gate, Lahore could be started
without further delay.

Chief Engineer / Tech. Director


(Muhammad Akram Arain)

To: District Coordination Officer,


City Distt. Govt. Lahore.

Info: 1. Mian Muhammad Aamer, District Nazim, City Distt. Govt. Lahore.
2. PSO to Governor of Punjab, Lahore.
3. The Secretary (Colonies Department)-I Govt. of Punjab, Lahore.
4. The Chief Executive Officer (NTDC) 414-WAPDA House, Lahore.
5. The GM (Operation) WAPDA, WAPDA House, Lahore.
6. The District Officer(Revenue) Government of Punjab, Lahore.
7. The G.M (GSC) NTDC,413-WAPDA House, Lahore.
8. The Chief Engineer Construction (North) 220/132 kV System NTDC, Lahore.
9. The Project Director GSC NTDC,Lahore.
10. Sr. Manager O&M (T&G), LESCO H/Q Lahore.
11. Manager, GSO Circle LESCO, Lahore.
12. Deputy Manager (Op.) Data Darbar Divn. LESCO Lahore to pursue the matter.
13. Master file.

No.__________/ SM(P&D)/DMP(T&G)/AUG Dated______/6/2004

T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]

Subject: IMPLEMENTATION OF CHAIRMAN’S DECISION / DIRECTIVES DATED


19-4-2003 ( CONSTRUCTION OF A NEW 132 KV RAIWIND-II GRID
STATION)

Reference: Your office letter No. 4374-75/DMO/RND dated 12-5-2004

You are advised to make hectic efforts for selection / pinpointing of the
appropriate / suitable location for newly proposed Grid Station for further submission to
Purchase Committee.

Senior Manager (P&D)


Ch. Abdul Ghafoor

To: Deputy Manager (Op.) Model Industrial Divn. LESCO


Manga Mandi.

Info: 1. Manager (Operation) Central Circle LESCO.


2. Master file.

No.____________/ SM(P&D)/CPP/114/ Dated______/6/2004


LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]

Subject: PROGRAMME ON ECNEC DECISIONS OF 18-02-2004

Reference: 1. Your office letter No. 10776-78/FD/LESCO/Budget dated 19-5-2004.


2. Deputy Director (Budget) O/O GM (Operation) letter No.
2115-31/GMO/BS/B-45 dated 12-5-2004 alongwith enclosure.

1. In this regard, it is intimated that to furnish the desired information to GM


(C&M) Power, WAPDA, the complete enclosure alongwith letter at reference No. 2 is required
which is missing.

2. It is requested to obtain the copy of Director Finance (Budget) Power WAPDA’s


letter No. 2230-40/DBP/D-6 (Misc)/2003-2004 dated 8-4-2004 alongwith complete enclosure
(containing the Ministry of Water & Power Islamabad letter No. 15(4)2000-1 & C dated 20 th
March, 2004 and prescribed proformae) so that requisite reply could be furnished.

Senior Manager (P&D)


Ch. Abdul Ghafoor
To: Finance Director LESCO

Info: 1. Director (Power) office of GM (C&M) WAPDA House, Lahore.


2. Deputy Director (Budget) O/O GM (Operation) WAPDA, WAPDA House,
Lahore.
3. Master file.

No.____________/SM(P&D)/DMP(T&G)/PC-1 Dated______/6/2004
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]

Subject: CONVERSION OF 33 KV AND 66 KV GRID STATIONS AND LINES INTO 132 KV

Reference: 1. Telephonic discussion of the undersigned with Mr. Saleem Imtiaz, Dir.
Planning (STG) on 3-4-2004.
3. GM (Op.) WAPDA letter No. 9988-99/GMO/CEHQ/4-DISCO dated 21-
07-2003.

1. Through the letter referred at Sr. No.2 above, a programme was worked out in
coordination with Distribution Companies to achieve the target for loss reduction by
converting 33 kV and 66 kV grid stations and transmission lines into 132 kV.

2. For this purpose, the under mentioned LESCO grid stations were selected being a
th
part of 6 STG:-
i) 66 kV Emco
ii) 66 kV U.I.S
iii) 66 kV Hujra

3. Kindly refer to Chief Engineer (R&ELR) letter No.2627/CECELR)/P.D. dated


24-2-2004, wherein prioritized list of grid stations for conversion under DOP/ELR Programme
for the year 2003-04 has been intimated.

4. It is intimated that not a single LESCO grid station has been included in the
above-mentioned list.

5. In view of the situation explained above, it is requested that at least 66 kV Emco


grid station may be converted into 132 kV through DOP/ELR Programme and scope of PC-I
for 6th STG may also be retained as it is .

Senior Manager (P&D)


Ch. Abdul Ghafoor
To: The General Manager Planning (Power)
WAPDA House, Lahore.
Atten:Director Planning (STG)

Info: 1. Chief Engineer (R&ELR) WAPDA House, Lahore.


2. Chief Engineer Design (NTDC) WAPDA House, Lahore.
3. Manager, GSO Circle LESCO.
4. Master file.
No.____________/ Dated____/4/2004
Hamid
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]

Subject: EXTENSION WITH 132 / 11KV, 10/13 MVA POWER TRANSFORMER AT


ATTABAD GRID STATION

1. It is intimated that loading position of both 20/26 MVA Power Transformers


installed at 132 kV Grid Station, Attabad are rapidly increasing. The loading position of both
the Power Transformers is given below:

Sr. No. Power Transformer Capacity Loads (A) %age Month


Code (MVA)
1. T-1 20/26 1170 89.66 6/2003
T-2 20/26 1140 87.36
2. T-1 20/26 1110 85.06 7/2003
T-2 20/26 1090 83.52
3. T-1 20/26 1080 82.76 8/2003
T-2 20/26 1200 91.95
4. T-1 20/26 1050 80.46 9/2003
T-2 20/26 1090 83.52

2. In view of the loading situation explained above and growing industrial load
demand of the area, it is requested that extension with one No. 10/13 MVA Power Transformer
may please be carried out at 132 kV Grid Station, Attabad to avoid any untoward situation due
to over loading and to meet with the g rowing future load requirement.

Senior Manager (P&D)


Ch. Abdul Ghafoor
To: The Chief Engineer (Design) NTDC Lahore

Info: 1. Chief Executive NTDC, WAPDA House, Lahore.


2. Senior Manager O&M (T&Gs) LESCO H/Q Lahore.
3. Manager (GSO) LESCO
4. Deputy Manager (SS&T) Divn. (North) ESCO Shalamar Lahore to be vigilant to
avoid over loading during summer peak.
5. Master file.

No. Mgr./GSO/LESCO/DRW/____________/ Dated____/4/2004


Hamid
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]

Subject: THE PROJECTS COMPLETED BY WAPDA

Reference: Ministry of Water & Power Fax Message No. 56 dated 4-3-2004, endorsed vide
your office Endst. No. Nil dated 20-3-2004.

The requisite information in respect of LESCO may please be considered as


Nil.

Senior Manager (P&D)


Ch. Abdul Ghafoor

To: The Chief Engineer (Headquarters),


O/O GM (Operation) WAPDA House,
Lahore.

Info: Master file.

No.____________/ Dated____/4/2004
Hamid
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]

Subject: PC-1 FOR STG, DOP, ELR & RE

Reference: 1. This office letter No. 12579/P&D/T&G dated 13-3-2004.


2. This office letter No. 13013-16/SM (P&D)/DMP(T&G)/PC-1/80 dated 25-3-04.
3. Your letter No. 7638-46/CE(ELR) dated 25-3-2004.

1. The list of PC-I (STG, DOP, ELR, RE), those have been submitted to Ministry of
Water & Power, Government of Pakistan for processing to obtain the approval of
CDWP/ECNEC, were sent to your good office vide this office letter referred at Sr. No. 1
above.

2. In order to know the latest progress of the PC-Is, Chief Planning & Development
Division, Government of Pakistan has already been requested vide this office letter No. 13013-
14 dated 25-3-2004 with copy to your office as well.

3. Moreover, the matter was also discussed on telephone with Mr. Ashfaque
Mahmood, Deputy Chief Planning & Development Division, Islamabad on 27-3-2004 to know
the latest status of subject PC-Is in respect of LESCO, who informed that all the PC-Is are
under process in P&D Division Government of Pakistan for obtaining the approval of
CDWP/ECNEC.

4. Submitted for your kind information please.

Senior Manager (P&D)


Ch. Abdul Ghafoor
To: Chief Engineer (ELR)
WAPDA House, Lahore.

Info: 1. General Manager (Op.) WAPDA House, Lahore.


13. Sr. Manager O&M (T&G) LESCO.
14. Master file.

No.____________/ Dated____/4/2004
Hamid
To,
The Secretary,
WAPDA Employees Cooperative Housing Society,
Lahore.

Subject: WATER SUPPLY CONNECTION AT PLOT NO. 41-K-1 WAPDA


EMPLOYEES COOPERATIVE HOUSING SOCIETY LAHORE

1. It is submitted that I want to construct my house at the subjected plot for which I
have already submitted the submission drawings to LDA for approval through your good office
letter No. CE/41K1/206 dated 19-3-2004, which is under process (copy enclosed.).

2. It is, therefore, requested to kindly get installed water supply connection at the
earliest.

3. It is further added that I have already paid all the dues outstanding including
maintenance of the plot and late construction charges (copy of the receipt is attached).

Yours truly,

(Ch. Muhammad Anwar)


Deputy Manager (Operation) / XEN
Okara Divn. LESCO Okara.
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]

Subject: EXTENSION WITH 3RD POWER TRANSFORMER AT 132 KV 32 KV GRID


STATION SHADMAN LAHORE

1. It is submitted that loading condition of both the Power Transformers, installed at


132 kV Grid Station Shadman has became critical as shown on the enclosed statement.

2. This grid station is feeding important domestic / commercial consumers and load
is growing rapidly.

3. In order to providing relief to already over loaded Power Transformers and to


meet with growing future demand of the area, it is requested that extension with 3 rd 10/13
MVA Power Transformer may kindly be carried out at 132 kV Grid Station Shadman Lahore.

Senior Manager (P&D)


Encl. As above Ch. Abdul Ghafoor
To: Chief Engineer Design (NTDC) Lahore.

Info: 1. General Manager (Op.) WAPDA House, Lahore.


15. Chief Executive (NTDC) WAPDA House, Lahore.
16. Sr. Manager O&M (T&G) LESCO.
17. Manager GSO Circle LESCO.
18. Manager Central Circle LESCO.
19. Deputy Manager SS&T (South) LESCO to be vigilant and coordinate with
Deputy Manager (Operation) concerned to avoid over loading.
20. Master file.

No.____________/ Dated____/3/2004
Hamid
RECONNECTION OF AYAZ TEXTILE MILLS LTD.

1. M/s Ayaz Textile Mills Ltd. became WAPDA / LESCO consumer on 24-3-1992 with
sanctioned load 1066 kW under tariff B-3. The consumer was being fed through 11 kV
independent Ayaz feeder 9.69 KM long.

2. The connection was disconnected on 10-5-1999 on account of default in payment worth


Rs. 3.7 Millions.

3. An amount of Rs. 1 Million was recovered upto 8/2002.

4. The remaining amount of Rs. 23,70,067/- was outstanding upto 8/2002.

5. The RCO was effected on 5-9-2002 under Incentive Package for Industries after
recovering 25% down payment of arrears Rs. 23,70,067/- and allowing 12 installments
of remaining amount.

6. The consumer connection was again disconnected on 23-8-2003 due to non-payment of


Rs. 25,07,776/-.

7. The consumer paid the defaulting amount of Rs. 8,36,025/- upto January 2004.

8. In January 2004, the consumer requested for reconnection and installments of arrears
worth Rs. 16,71,751/-.

9. Chief Executive LESCO had allowed to pay down payment Rs. 6,63,591/- and
remaining in 3-installemtns on 15-1-2004 for reconnection.

10. The AM (CS) City Divn. Kasur has issued the D.N. / Bills to consumer for reconnection
as follows:-

(i) First installment Rs. 6,72,474/-


(ii) Fix charges Rs. 7,84,968/-
(iii) Installment of security of balance amount Rs. 6,63,591/-

11. Since the consumer had already availed the facility of Incentive Package for Industries
during 9/2002, so he is entitled to avail this facility again as per policy in vogue.

12. Interim report is submitted for further necessary action please.


LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]

Subject: 132 KV GRID STATION LAHORE CANTT.

Reference: 1. Manager GSO Circle LESCO letter No. 10674-83 dated 22-12-03.
2. Deputy Manager Property Management Cell LESCO letter No.
5906-10 dated 28-1-2004.

1. The matter regarding the transfer of land in the name of LESCO was forwarded
to you by Deputy Manager Property Management Cell vide letter at Reference-2 above.

2. You are advised to take up the matter with Lahore Cantonment Board /
Authorities for the transfer of land of 132 kV Lahore Cantonment Grid Station in the name of
LESCO and intimate the latest status / outcome without further delay.

Senior Manager (P&D)


Ch. Abdul Ghafoor

To: Deputy Manger (Operation),


Sadar Divn. LESCO.

Info: 1. Chief Engineer (Design) NTDC WAPA House Lahore.


21. P.D, GSC, NTDC, Lahore.
22. Sr. Manager O&M (T&G) LESCO
23. Manager GSO Circle LESCO.
24. Manager (Op.) Eastern Circle LESCO.
25. Deputy Manager (PMC) LESCO.
26. XEN TLC Divn. NTDC Lahore.
27. Master file.

No.____________/ Dated____/3/2004
Hamid
MATTER WAS DISCUSSED WITH MR. SULTANS, SSO,
INCHARGE 132 KV ATTABAD GRID STATION ON 3-4-2004

1. 1280-Amp. Maximum load of T-1 (20/26 MVA) Power Transformer has been recorded
in 10/2003. The matter was got investigated from Grid Station Staff, who intimated that
due to damage of Power Transformer at 132 kV Grid Station ICI (Public), the load of 11
kV New Rupali feeder (Approximately 120-Amp.) emanating from ICI (Public) Grid
Station was shifted on 21-10-2003 to this Power Transformer, in emergency. The actual
maximum load of this power Transformer is about 1170-Amps.

2. 1300-Amps. Load was recorded in 3/2003 when the load of 11 kV Flaying Paper
increased rapidly. In order to avoid tripping due to over loading at T-2, the 11 kV Flying
Paper feeder (300-Amps.) was shifted to T”-1 Power Transformer at spare panel of
Sunshine Factory (closed). By this arrangement load of T-2 came down to around 1200-
Amps.
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
34-Nicholson Road, Lahore P.O. Box 2261
Ph:/Fax # 9200933 PBX: 9200134-37 (Ext.311)
E-mail: [email protected]

Subject: EXTENSION WITH 3RD POWER TRANSFORMER AT 132 KV 32 KV GRID


STATION SHADMAN LAHORE

1. It is submitted that loading condition of both the Power Transformers, installed at


132 kV Grid Station Shadman has became critical as shown on the enclosed statement.

2. This grid station is feeding important domestic / commercial consumers and load
is growing rapidly.

3. In order to providing relief to already over loaded Power Transformers and to


meet with growing future demand of the area, it is requested that extension with 3 rd 10/13
MVA Power Transformer may kindly be carried out at 132 kV Grid Station Shadman Lahore.

Senior Manager (P&D)


Encl. As above Ch. Abdul Ghafoor
To: Chief Engineer Design (NTDC) Lahore.

Info: 1. General Manager (Op.) WAPDA House, Lahore.


28. Chief Executive (NTDC) WAPDA House, Lahore.
29. Sr. Manager O&M (T&G) LESCO.
30. Manager GSO Circle LESCO.
31. Manager Central Circle LESCO.
32. Deputy Manager SS&T (South) LESCO to be vigilant and coordinate with
Deputy Manager (Operation) concerned to avoid over loading.
33. Master file.

3. No.____________/ Dated____/3/2004
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 9204820-30 (Ext. 200) Ph./Fax: 9204818
E-mail: [email protected]

Subject: ELECTRICITY DISTRIBUTION AND TRANSMISSION IMPROVEMENT


PROJECT (EDTIP) LOAN 7565-PK, CREDIT 4463-PK AND CREDIT 4464-PK

Reference: Your office letter No. Ent-D.S(P.IV)/2013 dated 12-2-2013

Latest position of the subject has been explained by Chief Engineer


(Development) PMU LESCO vide letter No. 1038-42/Dev/Proc dated 20-2-2013.
A copy of the same is being enclosed for ready reference please.

DA / As above

GM / Technical Director
( Muhammad Saleem )

To: Deputy Secretary (P.IV)


Ministry for Water & Power,
Islamabad.

Info: 1. Section Officer (Gencos), Ministry for Water Power, Government of Pakistan,
Islamabad with reference to his office letter No. GPII 15(35)/2013 dated 27-2-
2013 alongwith a copy of above referred letter of CE (Development) PMU
LESCO

2. Chief Engineer (Development) PMU LESCO.

3. Master file.

No._____________/ Dated______/2/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]

Subject: AUGMENTATION OF 20/26 MVA POWER TRANSFORMER WITH 40 MVA


POWER TRANSFORMER AT 132 KV DEPALPUR GRID STATION

A copy of Noting Sheet containing 02 pages, duly approved by worthy Chief


Executive Officer LESCO, regarding augmentation of 20/26 MVA Power Transformer with
40 MVA Power Transformer at 132 kV Depalpur Grid Station is sent herewith for taking
immediate necessary action under intimation to all concerned.

DA / As above

Chief Engineer (P&D)


(Muhammad Arshad Rafiq)

To: Chief Engineer (Development)


PMU LESCO, Lahore

Info: Master file.

No._______________/ Dated______/2/2013

Hamid / dak-h6
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]

Subject: ENERGIZATION / COMMISSIONING OF 40 MVA POWER TRANSFOREMR


AT 132 KV WARBURTON GRID STATION

Extension of load from 2553 kW to 3353 kW of M/s Shadman Cotton Mills Ltd.
was approved vide this office letter No. 10782-91/DRW/SKP/555 dated 4-4-2013 subject to
energization / commissioning of 40 MVA / addition of 3 rd MVA 20/26 MVA Power
Transformer at 132 kV Warburton grid station.

Latest status in this regard may please be intimated to this office in order to
proceed further in the matter.

Chief Engineer (P&D)


(Rao Zamir-ud-Din)

To: Chief Engineer (Development)


PMU LESCO, Lahore

Info: Master file.

No._______________/DRW/SKP/555 Dated______/9/2014

Hamid /T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]

Subject: EXTENSION OF LOAD FROM 2553 KW TO 3353 KW OF M/S SHADMAN


COTTON MILLS LTD. UNIT NO. III, 3.5 KM FEROZE WATTOWAN-
WARBURTON ROAD DISTT. NANKANA

Reference: Your letter No. L-82/2014/4914 dated 9-9-2014.

Due to critical loading condition of 132 kV Warburton grid station, the


implementation of your extension of load from 2553 kW to 3353 kW was approved subject to
energization/commissioning of 40 MVA or addition of 3 rd MVA 20/26 MVA Power
Transformer at the said grid station which was clearly mentioned in the approval letter issued
by this office vide No. 10782-91/DRW/SKP/555 dated 9-9-2014. As the work in this regard is
not yet carried out, therefore needful will be done after completion of work.

Chief Engineer (P&D)


(Rao Zamir-ud-Din)

To: M/s Shadman Cotton Mills Ltd. Unit-3,


3.5 KM Feroze Wattowan-Warburton Road,
Distt. Nankana

Info: 1. Chief Engineer (Development) PMU LESCO to let this office know about latest
stats of work as already requested vide this office letter No. 3080 dated 9-9-2014.

2. Master file.

No._______________/DRW/SKP/555 Dated______/10/2014
Hamid /T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]

Subject: AUGMENTATION / ADDITION OF 20/26 MVA POWER


TRANSFORMER AT BHIKHI GRID STATION

While processing Reconnection case of M/s Zaman Paper & Board Mills, it has
been observed that loading condition of existing 03 No. 20/26 MVA Power Transformers,
at 132 kV Bhikhi Grid Station has became critical as shown on the enclosed statement.

This grid station is feeding to domestic, commercial as well as industrial


consumers and load is growing rapidly.

In order to providing relief to already over loaded Power Transformers and to


meet with growing future demand of the area, augmentation of any existing 20/26 MVA with
40 MVA or addition of 20/26 MVA Power Transformer may please be included in feasible
future Plan.

Chief Engineer (P&D)


Encl. As above ( Rao Zamir-ud-Din )

To: Chief Engineer (Development) PMU


LESCO, Lahore.

Info: 1. PD (GSC) LESCO, Lahore.


2. Master file.

No.________________/ Dated______/10/2014

Hamid/T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]

Subject: AUGMENTATION / ADDITION OF 20/26 MVA POWER


TRANSFORMER AT BHIKHI GRID STATION

While processing Reconnection case of M/s Zaman Paper & Board Mills, it has
been observed that loading condition of existing 03 No. 20/26 MVA Power Transformers,
at 132 kV Bhikhi Grid Station has became critical as shown on the enclosed statement.

This grid station is feeding to domestic, commercial as well as industrial


consumers and load is growing rapidly.

In order to providing relief to already over loaded Power Transformers and to


meet with growing future demand of the area, augmentation of any existing 20/26 MVA with
40 MVA or addition of 20/26 MVA Power Transformer may please be included in feasible
future Plan.

Chief Engineer (P&D)


Encl. As above ( Rao Zamir-ud-Din )

To: Chief Engineer (Development) PMU


LESCO, Lahore.

Info: 1. PD (GSC) LESCO, Lahore.


2. Master file.

No.________________/ Dated______/10/2014

Hamid/T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]

Subject: AUGMENTATION / ADDITION OF 20/26 MVA POWER


TRANSFORMER AT 132 KV WARBURTON GRID STATION

While processing the case of extension of load of M/s Hassan Limited, it has
been observed that loading condition of existing 02 No. 20/26 MVA Power Transformers,
at 132 kV Warburton Grid Station found critical.

As the said grid station is feeding to domestic, commercial as well as big


industrial consumers and load is growing rapidly, therefore in order to provide relief to already
over loaded Power Transformers and to meet with growing future demand of the area,
augmentation of any existing 20/26 MVA with 40 MVA or addition of 20/26 MVA Power
Transformer is necessary.

Please let this office know whether any augmentation or addition of Power
Transformer at the above grid station has been proposed in near future plan or otherwise.

Chief Engineer (P&D)


( Rao Zamir-ud-Din )

To: Chief Engineer (Development) PMU


LESCO, Lahore.

Info: Master file.

No.________________/ DRW/276/Skp. Dated______/2/2015

Hamid/T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]

Subject: UGRADATION OF 66 KV TRANSMISSION LINE AND GRID STATION


EMCO INTO 132 KV

Latest status of work of up-gradation of 66 kV transmission line & Grid Station


Emco into 132 kV as well as installation of 2x20/26 MVA Power Transformers may please be
intimated to this office for the information of high ups.

Chief Engineer (P&D)


( Rao Zamir-ud-Din )

To: PD (GSC) LESCO

Info: 1. Chief Engineer (Development) PMU LESCO.


2. Master file.

No.____________/DRW/129/LESCO Dated______/9/2015
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]

FAX MESSAGE

Subject: UGRADATION OF 66 KV TRANSMISSION LINE AND GRID STATION


EMCO INTO 132 KV

Reference: This office letter No. 3607-08 dated 18-9-3015.

As desired by CEO LESCO, latest status of work of up-gradation of 66 kV


transmission line & Grid Station Emco into 132 kV as well as installation of 2x20/26 MVA
Power Transformers may please be intimated to this office immediately.

Chief Engineer (P&D)


( Rao Zamir-ud-Din )

To: PD (GSC) LESCO

Info: 1. Chief Engineer (Development) PMU LESCO for necessary action.


2. Master file.

No.____________/DRW/129/LESCO Dated______/10/2015
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]

Subject: ALLOCATION OF LAND FOR EXTENSION OF 132 KV GRID STATION


CHAH MIRAN

Reference: Chief Engineer (Development) LESCO letter No. 6894-99 / CE (Dev) / M (P&S)
/ 237 dated 20-12-2016 addressed to your with its copies to Additional Secy.
Ministry of Water & Power, Commissioner Lahore and others (copy enclosed for
ready reference).

As requested in the above refer letter, allocation and transfer of land for
extension at 132 kV Chah Miran Grid Station may please got made in order to meet the load
requirement of the area.

DA/As above

Chief Engineer (P&D)


( Mazhar-ul-Ibad )

To: EDO Works,


City District Government,
Town Hall Lahore

Info: 1. Additional Secy. Ministry of Water & Power, Government of Pakistan,


Islamabad
2. Commissioner Lahore Division for information and necessary action please.
3. Chief Engineer (Development) PMU LESCO to follow up and get the needful
done.
4. Master file.

No._______________/DRW/11170/Ist Dated______/1/2017

Hamid / T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]

Subject: ACQUIRING / PURCHASE OF LAND FROM M/S EMCO INDUSTRIES


LIMITED FOR EXTENSION OF SWITCHYARD OF EXISTING 132 KV
EMCO GRID STATION

LESCO intends to acquire / purchase a piece of land from M/s EMCO Industries
Limited adjacent to 132 kV EMCO Grid Station for extension of existing switchyard in order
to accommodate the load of nearby Industrial Consumers.

In this regard LESCO taken up matter with M/s EMCO Industries Limited but
they are willing to give land on lease on market based prices. It is further added that the said
land is mortgaged by a Bank.

In the above mentioned circumstances, necessary advice regarding acquiring of


land on lease basis may please be imparted in order to proceed further in the matter.

Chief Engineer (P&D)


( Mohsin Raza Khan )

To: M/s Cornelius, Lane & Mufti,


Nawai-Waqat Building,
4-Shahra-e-Fatima Jinnah Lahore

Info: 1. Chief Engineer (Development) PMU LESCO.


2. PD (GSC) LESCO.
3. Master file.

No._______________/DRW/411/Ist Dated______/4/2017

Hamid / T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]

Subject: AUGMENTATION OF EXISTING 2X20/26 MVA POWER TRANSFORMERS


WITH 40 MVA POWER TRANSFORMERS AT 132/11 KV ATTABAD GRID
STATION

It is intimated that after incorporating the load of already approved cases of


industrial connections, 132 kV Attabad grid station feeding the area of Lahore & Sheikhupura
Districts has reached its maximum capacity. Therefore in order to meet with the load
requirement of the area especially during coming summer season worthy Chief Executive
Officer LESCO has approved augmentation of existing 2x20/26 MVA Power Transformers
with 40 MVA Power Transformers at 132 kV Attabad grid station.
A copy of Noting Sheet containing 02 pages, duly approved by worthy Chief
Executive Officer LESCO, regarding augmentation of 2x20/26 MVA Power Transformers
with 40 MVA Power Transformers at 132 kV Attabad Grid Station is sent herewith for taking
immediate necessary action and execution of work on priority basis under intimation to all
concerned.

DA / As above

Chief Engineer (P&D)


LESCO, Lahore

To: Chief Engineer Development)


PMU LESCO, Lahore.

Info: 1. General Manager (Technical) LESCO Lahore.


2. Operation Director LESCO.
3. Chief Engineer (T&G) LESCO.
4. PD (GSC) LESCO, Lahore.
5. SE (GSO) LESCO.
6. Master file.

No._______________/ Dated______/11/2017
Hamid/T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]

Subject: AUGMENTATION OF EXISTING 1X20/26 MVA POWER TRANSFORMER


WITH 40 MVA POWER TRANSFORMER AT 132/11 KV EMCO GRID
STATION

It is intimated that after incorporating the load of already approved cases of


industrial connections, 132 kV EMCO grid station feeding has reached its maximum capacity.
Therefore in order to meet with the load requirement of the area especially during coming
summer season worthy Chief Executive Officer LESCO has approved augmentation of
existing 1x20/26 MVA Power Transformer with 40 MVA Power Transformer at 132 kV
EMCO grid station.
A copy of Noting Sheet containing 02 pages, duly approved by worthy Chief
Executive Officer LESCO, regarding augmentation of 1x20/26 MVA Power Transformer with
40 MVA Power Transformer at 132 kV EMCO Grid Station is sent herewith for taking
immediate necessary action and execution of work on priority basis under intimation to all
concerned.

DA / As above

Chief Engineer (P&D)


LESCO, Lahore

To: Chief Engineer (Development)


PMU LESCO, Lahore.

Info: 1. General Manager (Technical) LESCO Lahore.


2. Operation Director LESCO.
3. Chief Engineer (T&G) LESCO.
4. PD (GSC) LESCO, Lahore.
5. SE (GSO) LESCO, Lahore.
6. Master file.

No._______________/ Dated______/11/2017
Hamid/T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]

FAX MESSAGE

Subject: AUGMENTATION OF EXISTING 1X20/26 MVA POWER TRANSFORMER


WITH 40 MVA POWER TRANSFORMER AT 132/11 KV EMCO GRID
STATION

Reference: This office letter No. 34836-41/P&D dated 23-11-2017.

Approval of the competent authority regarding augmentation of existing


1x20/26 MVA Power Transformer with 40 MVA Power Transformer at 132/11 kV EMCO
Grid Station was conveyed to your office vide above referred letter.

The Chief Executive Officer LESCO has directed to give time line / target date
for completion of augmentation work as mentioned above.

The needful may be done without further loss of time.

Chief Engineer (P&D)


( Mohsin Raza Khan )

To: Chief Engineer (Development)


PMU LESCO, Lahore.

Info: 1. General Manager (Technical) LESCO Lahore.


2. PD (GSC) LESCO, Lahore.
3. Master file.

No._______________/ DRW/446/Ist Dated______/03/2018


Hamid/T&G
LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]

FAX MESSAGE

Subject: AUGMENTATION OF EXISTING 1X20/26 MVA POWER TRANSFORMER


WITH 40 MVA POWER TRANSFORMER AT 132/11 KV EMCO GRID
STATION

Reference: This office letter No. 3567-69 dated 22-3-2018.

As desired by worthy CEO LESCO, time line / target date regarding


augmentation of existing 1x20/26 MVA Power Transformer with 40 MVA Power Transformer
at 132/11 kV EMCO Grid Station may please be intimated to this office without further loss of
time.

Chief Engineer (P&D)


( Mohsin Raza Khan )

To: Chief Engineer (Development)


PMU LESCO, Lahore.

Info: 1. General Manager (Technical) LESCO Lahore.


2. PD (GSC) LESCO, Lahore.
3. Master file.

No._______________/ DRW/446/Ist Dated______/04/2018

Hamid/T&G
INFORMATION REGARDING TRANSMISSION LINE

Type of Poles Normal


132 kV SPA SPD SPG
0-1 2-30 31-60
SP stands for steel pole.

Type of Towers ZM1 ZM30 ZM60


132 kV

Type of conductor * Lynx (Mostly for remote and small grid station)
Used for 132 kV * Rail (Mostly in use) ACSR (Al. cond. Steel reinforced)
* Greely (Off and On)

 Span length for Poles Maximum 180m


 Span length for Towers Maximum 240m
 Sometimes at elevated bridges / crossing 220 type towers used
EA ED EG
Normal 30 60
With rail conductor and max. Span length 320m or according to clearance (required)

 For some more height than 132 kV pole, 220 kV poles types SPBM & SPBH are being
used (especially in Cities space constraints. Normally used heights and clearance.
 Maximum height in route use without extensions 92-feet
(Otherwise extensions can be used)
3m, 6m etc.
 Horizontal clearance (for safe point of view) Not less than 5m
 Vehicle clearance Not less than 7.5m

 Road clearance Better if more than 8.5m

Design point of view:


Two type:

(1) Route plan (shows route)


(2) Profile (shows clearance)
Approving authority : Chief Engineer (Design)
INFORMATION REGARDING GRID STATION

Main Drawings (1) GLO (General layout) (2) S/Line (Connection Scheme)

Approving authority Chief Engineer (Design)

Other Drawings (1) Foundation plan (Foundation of TRF, CTs, Gantries column etc.)

(2) Switch yard layout (Jumper dropper connections)

(3) Earthing layout (Earthing of equipments


(4) Control House building panel (relay+controlling+11 kV panels
etc.)

Type of grid station


 Solid T-off 5 to 6 Kanals
For Textile Industries

 Standard In & Out Grid Station 32 Kanals (12 to 16 for grid station and
Within 48 meters Bus Bar remaining for Colony)
4 No. L/Bays 57m x 63m standard yard
4 No. T/Bays with 12 x 30m CHB
1 No. P.T. Bay

 Radial feeder For Steel Furnaces


LAHORE ELECTRIC SUPPLY COMPANY LIMITED
TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]

Subject: AUGMENTATION OF EXISTING 1X20/26 MVA POWER TRANSFORMER WITH


40 MVA POWER TRANSFORMER AT 132/11 KV EMCO GRID STATION

Reference: Your letter No. 4229-31/CE (Dev,)/M(P&S)/14 dated 5-4-2018.

Due to critical loading condition of 132 kV EMCO grid station and in order to meet
with rapidly increasing load growth in the area, augmentation of existing 1x20/26 MVA Power
Transformer with 40 MVA Power Transformer was approved by the Chief Executive Officer LESCO
and you were advised to take immediate steps for execution of work on priority basis vide this office
letter No. 34836-41 dated 23-11-2017.

Since in the light of instructions of Department, installation of industrial connections


cannot be rejected due to over-loading of Grid Stations / Power Transformers, feeders etc. therefore
extension of load of M/s Hafeez Industries from 490 kW to 1390 kW and new connection of M/s
Metro Tech Pipe Industries for a load of 950 kW have been approved by this office subject to
augmentation of existing 1x20/26 MVA with 40 MVA Power Transformer as mentioned above while
extension of load case of M/s Al-Fateh Steel from 3200 kW to 4000 kW is also under process . But
your letter under reference reveals that no action has so far been taken regarding already approved
augmentation.

The matter has been discussed with Chief Executive Officer explicitly and it has been
decided that in order to resolve the matter and meet with the load requirement of the area 1 No. 40
MVA Power Transformer may immediately be allocated for above mentioned augmentation from
existing available stock and compliance be reported to this office within one week positively.

( Khalid Saeed Akhtar )


General Manger (Technical)

To: Chief Engineer (Development) PMU LESCO


Info: 1. Chief Executive Officer LESCO for kind information please.
2. Chief Engineer (P&D) to process the case of EOL of M/s Al-fateh Steel subject to
augmentation of existing 20/26 MVA with 40 MVA Power Transformer at 132 kV
Emco Grid Station.
3. PD (GSC) LESCO, Lahore.
4. Master file.

No._________________/ Dated______/04/2018
Hamid/T&G

LAHORE ELECTRIC SUPPLY COMPANY LIMITED


TECHNICAL DIRECTORATE
22-A QUEENS ROAD LAHORE
PBX: 99204820-30 (Ext. 201) Ph./Fax: 99204818-19
E-mail: [email protected]

FAX MESSAGE

Subject: AUGMENTATION OF EXISTING 20/26 MVA WITH 40 MVA AND ADDITION


OF 20/26 MVA POWER TRANSFORMER AT 132 KV BOGHIWAL GRID
STATION

Latest status of work and time line / target date to complete the work of
augmentation of existing 20/26 MVA with 40 MVA Power Transformer as well as addition of
20/26 MVA Power Transformer at 132 kV Boghiwal grid station may please be intimated to
this office.

Chief Engineer (P&D)


( Mohsin Raza Khan )

To: Chief Engineer (Development),


PMU LESCO, Lahore.

Info: 1. General Manager (Technical) for kind information please.


2. PD (GSC) LESCO, Lahore for necessary action as above.
3. Master file.

No._______________/ DRW/556/3rd Dated______/04/2018

Hamid/T&G

You might also like