Muzaffarpur Power Grid 07-Nov-2023
Muzaffarpur Power Grid 07-Nov-2023
Muzaffarpur Power Grid 07-Nov-2023
ERTCC/CS/20-21/1-248/T-181/ AFSS/NOA/Service.
Revision No: 000 Dated-18,01.2021.
POWERGRID
POWER GRID CORPORATIONOF INDIALIMITED
CF-17,Action Area-1C, New Town, Kolkata-700156
Submitted By:
GLYPTIC
Time Will Change Tomorrow
GLYPTIC
Raipur, Bhita,Burdwan, 713102, W.B
GLYPTIC
Time Will Change Tomorrow
POWERGRID
NAME.Kamanngingon Mohya
DESIGNATION:
NAME:oun Kum
DESIGNATION:
Date: 07:0|1o3 Date:
Page 1
Documents No: GL/PGCIL-MFP/AMC-001 Ref NOA No:
ERTCC/CS/20-21/1-248/T-181/AFSS/NOA/Service.
Revision No: 000
Dated-18.01.2021.
PROJECT:
SITE LOCATION:
GLYPTIC
Time WIli Change Tomorrow POWERGRID
NAME VAHKuma Metkya NAME:
fassen kuns
DESIGNAT*ON:
Date:
noer DESIGNATION:
Date:
le g
Page2
Documents No: GL/PGCIL-MFP/AMC-001 Ref NOA No:
ERTCC/CS/20-21/1-248/T-181/ AFSS/NOA/Service.
Revision No: 000 Dated - 18.01.2021.
From:
06-I1-9093
To:
GLYPTIC
Time WIII Change Tomorrow
POWERGRID
NAME:
NAME:oHKurnouS DESIGNATION:
DESIGNATION: EgRA
Date: 07 093 Date:
Page 3
Documents No: GL/PGCIL-MEP/AMC-001 Ref NOA No:
Revision No: 000 ERTCCICS/20-21/-248/T-181/AFSS/NOA/Service.
Dated-18.01.2021.
GLYPTIC
Time WIIChange Tomorrow POWERGRID
NAME:akumaMehya
DESIGNATION: ngingon
NAME:
DESIGNATION:
auan
d
Kumah
Date: U: Dos. Date:
Page 4
Documents No:GL/PGCIL-MFP/AMC-001 Ref NOA No:
ERTCCICS/20-21/1-248/T-181AFSS/NOA/Service.
Revision No: 000
Dated-18.01.2021.
A. Introduction
Novec1230 gas suppression system:
Maintenance of Novec1230 gas sUppression system following its installation is of utmost
importance. Maintenance of fire safety systems, if not done properly and thoroughly, can have
disastrous implications.
Maintenance of fire and life safety systems may be the periodical operational test of the system
and alarms before there is an event requiring the system (i.e. fire) to function. Proper maintenance
will always keep the system ready for each and every events/lincident may/willoccur.
This Checklist outlines general requirements for maintenance of Clean Agent Fire Extinguishing
Systems. Information contained herein applies to typical instances.
The approved drawings and documentation for clean agent Fire Extinguishing System shall
maintain and compare with the present condition of the system or system availability at site to
compare the system error if any at site. Maintenance shall be scheduled in advance.
For GLYPTIC
For POWER GRID CORPORATION OF INDIA
LIMITED
e
GLYPTIC
Time WilChange Tomorrow POWERGRID
NAME:akumatMeya
DESIGNATION: Ehingen
NAME:
DESIGNATION:
Date: 0 D6N3 Date:
Page5
Documents No: GL/PGCIL-MEP/AMC-001 ERTCCICS/20-21/1-248/T-181/AFSSINOAService.
Ref NOA No:
Revision No: 000
Dated-18.01.2021.
1. Visual Check
Aim: The aim of visual check is to check for proper system availability/ damage of equipment as per
guidelines of manufacturer/OEM for their satisfactory operatlon.
Parameters to be checked:
1. ldentification and verification of items Installed at site as per BOQ.
2. Check for physical damage or faulty if any.
3. If any device / parts the faulty immediately repair / replace.
4. Periodic cleaning of detectors have to do during preventive maintenance.
GLYPTIC
Time Wil Change Tomorrow POWERGRID
NAME:aiuna
DESIGNATION: ngine
Mattyo NAME:
DESIGNATION:
awen Kumn
Date: O7I12023 Date:
Page 6
Documents No: GL/PGCIL-MFP/AMC-001 Ref NOA No:
ERTCCICS/20-21/-248/T-181/AFSSINOAService.
Revision No: 000
Dated-18.01.2021.
Mafya
M/s GLYPTIC POWERGRID CORPORATION OF INDIA
LIMITED
GLYPTIC
Time WIIIChange Tomorrow POWERGRID
NAME: oKuno MGkya NAME:
Hajkuamon Maiy
POWERGRID CORPORATION OF INDIA
LIMITED
M/s GLYPTIC
For GLYPTIC
For POWER GRID CORPORATION OF INDIA
LIMITED
GLYPTIC
Time Will Change Tomorrow POWERGRID
NAME: NAME: Yaeun kumes
DESIGNATION: hginoot DESIGNATION: Helel
Date: Date:
Page 8
Documents No: GL/PGCIL-MEP/AMC-001 Ref NOA No:
ERTCCICS/20-21/-248/T-181/AFSS/NOA/Service.
Revision No: 000 Dated - 18.01.2021.
2. The electrical actuator can now be placed on the master cylinder and System is made
operational.
For GLYPTIC
For POWER GRID CORPORATION OF INDIA
LIMITED
GLVPTIC
Time Will Change Tomorrow POWERCRID
NAME: aikanan Memya NAME:
fawnkums.
DESIGNATION: Aginler DESIGNATION: lad Engg
Date: Date: 07ul23
Page 9