An Investigation of Subgrade Differential Settlement On The Dynamic Response of The Vehicle Slab Track System
An Investigation of Subgrade Differential Settlement On The Dynamic Response of The Vehicle Slab Track System
An Investigation of Subgrade Differential Settlement On The Dynamic Response of The Vehicle Slab Track System
DOI:
10.1177/0954409715613538
License:
None: All rights reserved
Document Version
Peer reviewed version
General rights
Unless a licence is specified above, all rights (including copyright and moral rights) in this document are retained by the authors and/or the
copyright holders. The express permission of the copyright holder must be obtained for any use of this material other than for purposes
permitted by law.
•Users may freely distribute the URL that is used to identify this publication.
•Users may download and/or print one copy of the publication from the University of Birmingham research portal for the purpose of private
study or non-commercial research.
•User may use extracts from the document in line with the concept of ‘fair dealing’ under the Copyright, Designs and Patents Act 1988 (?)
•Users may not further distribute the material nor use it for the purposes of commercial gain.
Where a licence is displayed above, please note the terms and conditions of the licence govern your use of this document.
If you believe that this is the case for this document, please contact [email protected] providing details and we will remove access to
the work immediately and investigate.
Republic of China
2
School of Civil Engineering, University of Birmingham, UK
Mailing address:
Room 438
Jiading District
Shanghai
China.
1 / 25
Abstract: The construction of non-ballasted slab railway track on existing subgrade soils, or on
standards for the allowable amount of subgrade differential settlement which takes into account the
dynamic response of the train-track system is one of a number of issues that need to be addressed. To
inform the development of such standards, a model based on the theory of vehicle-track coupling
dynamics, which considers the self-weight of the track structure, was built to investigate how
differential settlement, in terms of the amplitude, wavelength and position of the settlement along the
track can affect various railway performance related criteria including ride quality, stability, vehicle
safety and potential damage to the train wheel and the rail (i.e. forces at the wheel/rail contact and in
the fasteners). The performance of the model was compared favorably with other widely used
models described in the literature. The analysis of the study to inform design standards using the
developed model demonstrated that the magnitude of the differential settlement influences passenger
comfort the most compared to the other performance criteria. There exists for the CRTS I
track-form considered a particular wavelength (8m for the specific conditions considered) which
results in all measures of performance being at their maximum values. Further, the longitudinal
position of the settlement waveform in relation to the joints between two concrete slabs, a factor
which is not considered in design standards, was shown to influence component deterioration,
passenger comfort and safety. The greatest propensity to cause component damage occurs when
the beginning or end of the differential settlement waveform corresponds with the inter-slab joint of
a concrete base. Accordingly, it is recommended that current design standards should be modified
2 / 25
Key words: CRTS I slab-track; subgrade differential settlement; vehicle-track coupling dynamics;
1 INTRODUCTION
China has embarked on an extensive programme of building high speed railway lines and the current
length of its high speed network of approximately 11,000 km (with a similar length planned),
accounts for about half of the world’s total. The majority of these lines have been built using
slab-track because of its superior stability and low maintenance requirements also is increasingly
becoming the track-form of choice in China for many other lower speed lines. However because of
the expense required to build slab-track on engineered structures, less expensive solutions are being
investigated including constructing the slab-track directly on the existing subgrade soils or on
embankments where necessary. However, a major issue for such slab-track systems, no matter the
line speed, concerns the allowable amount of differential settlement as this directly affects safety,
passenger comfort and damage to the wheel-rail. Differential settlement can occur in slab-track
particularly on soft subgrade soils due to changes in track support condition. Japan has developed
the differential settlement control standards for non-ballasted railway, of 12.5mm for a 20 m length
[1]
of track (i.e. a chord length of 20m) .In China, the Suining-Chongqing railway sets 20mm for a
A number of authors have undertaken studies using numerical models of the train-track system to
determine the limits of differential settlement (as a function of the amplitude and wavelength of the
settlement) of slab track systems according to a number different limiting performance criterion (e.g.
safety). For example, from the point of view of the concrete base, Zhou [3] and Chen P [4] utilizing a
3 / 25
three-dimensional finite element model (FEM) suggested that for an assumed settlement waveform
of wavelength of 20m, the differential settlement should be limited to less than 15mm, depending on
[5]
the tensile strength of the concrete slab. On this basis, Chen RP considered the effect of
temperature change on the deformation and tensile stress of the track plate and concrete base, and
[3]
suggested a stricter limiting value for subgrade differential settlement. However Zhou , Chen P [4]
and Chen RP [5] did not consider functional aspects of the track such as safety and passenger comfort.
[6]
Liu developed an FEM using beam, shell and spring elements to simulate a train traversing a
foundation subject to differential settlement, but their model is unable to consider track geometry
[7]
irregularities. In terms of passenger comfort, Cai CB for an assumed settlement waveform of
wavelength of 20m, utilizing a conventional vehicle and slab track coupled model and found that
amplitudes not greater than 20mm would keep the vertical acceleration of the vehicle body to within
acceptable limits. By means of a similar method, Cai XP [8] analyzed the dynamic characteristics of
[7]
the train-track system due to subgrade differential settlement. However, both t Cai CB and Cai
XP [8] did not consider the effect of the train speed on the differential settlement limits. Utilizing a
numerical dynamic model of the train slab-track system which assumed that the subgrade differential
[9]
settlement was entirely translated into the rail surface differential settlement, Han related
differential settlement limits to train speed. However, the assumption made by Han regarding
subgrade settlement and rail surface settlement results in track support conditions which differ
[10-11]
significantly from those found in practice. Xu developed a train-track model in which the
vehicle was represented as a numerical multi-rigid vehicle system, and the track support system was
represented as a three-dimensional FEM. Using this model Xu calculated the dynamic response of
different kinds of non-ballasted track systems and suggested standards for the subgrade differential
4 / 25
A limitation of the studies described above is that they focus on limits of differential settlement
solely as a function of the amplitude of the differential settlement and do not consider other
potentially important parameters associated with settlement such as the wavelength and position of
the differential settlement in relation to the slabs which make up many non-ballasted track systems.
In addition, conventional train slab-track coupled dynamic analysis methods assume that the
subgrade stiffness and damping is zero in the area where the differential settlement takes place. In
such cases where the self-weight of the track structure is not considered, the track structure settles
only when the train arrives (see Figure 1(a)). In reality the differential settlement already exists
before the train arrives (see Figure 1(b)). Consequently, modeling the track in this way results in an
incorrect dynamic response of the system and can therefore lead to incorrect estimates of allowable
differential settlement.
Fig.1 Track structure diagram before the train arrives: (a) model that doesn’t consider self-weight, (b) reality
To address the issues described above apparent in the identified existing studies, a model based on
[12]
the theory of vehicle-track coupling dynamics , which considers the self-weight of the track
structure, was developed to investigate allowable subgrade differential settlement as a function of the
amplitude and wavelength and position of the settlement waveform. To determine the allowable
settlement limiting performance criteria which consider stability, safety and potential damage to the
5 / 25
2 THE VEHICLE SLAB-TRACK COUPLED MODEL
The vehicle dynamics model is based on multi-rigid system dynamics theory described in the
literature [12]. The rail is modeled as a simply supported Euler beam with self-weight; the track plate
and the concrete base are modeled as the free-free Euler beam with self-weight; the emulsified
cement asphalt mortar (CA mortar) and the subgrade are regarded as discrete spring-damping
systems. In real environments under cyclic and environmental (temperature) loading, the CA mortar
may tear from the track plate and the concrete base. Therefore to account for this, the stiffness and
damper values in the proposed model were set to zero when subjected to tension. Through
mechanical analysis, the Euler beam oscillation differential equation in the vertical direction
EI
∂ 4 y ( x, t )
∂x 4
+ mr
∂ 2 y ( x, t )
∂t 2
= F ( x, t ) + mr g (1)
where y( x, t ) is the vertical displacement of the Euler beam; mr is the mass of per unit length of the
Euler beam; EI is the flexural rigidity of the Euler beam cross section and F ( x, t ) is the external
force.
The partial differential equations of the vertical vibration of rail, track plate and concrete base can
be obtained by determining the external forces of the structures. Solving the fourth order partial
[13]
differential equations requires the Ritz method , and the basic form of second order ordinary
differential equations of the modal coordinates of rail, track plate and concrete base can be obtained.
Rail:
6 / 25
Er I r k π 4
()
N 4
g
qɺɺk (t ) + ( ) qk (t ) = -∑ Frsi (t )Yk ( xi )+∑ Pj (t )Yk ( xwj ) + 2mrr lr (1 − cos kπ ) k = (1 ~ NM )2
mrr lr i =1 j =1 kπ
Track plate:
(3)
n0 n0
Es I s ls β sk4 Tk (t ) + ms lsTɺɺk (t ) = ∑ Frsi (t ) X k ( xsi ) − ∑ Fcai (t ) X k ( xsi ) + ms gGS (k ) k = (1 ~ NS )
i =1 i =1
Concrete base:
(4)
m0 m0
ɺɺ (t ) = ∑ F (t ) D ( x ) − ∑ F (t ) D ( x ) + m gGB(k ) k = (1 ~ NB)
Eb I b lb β bk4 Bk (t ) + mb lb B k cai k bi fdi k bi b
i =1 i =1
where N , n0 and m0 are respectively the number of fasteners, the number of coordinate nodes of one
track plate, and the number of coordinate nodes of one concrete base; Frsi (t ) , Fcai (t ) and Ffdi (t ) are
respectively the fastener force, the CA mortar reaction force and the subgrade reaction force; Pj (t )
is the wheel-rail contact force of the wheel j ; qk (t ) , Tk (t ) and Bk (t ) are respectively the regular modal
coordinates of the rail, the track plate and the concrete base; Yk , X k and Dk are respectively the
orthogonal function department of simply supported Euler beam of the rail, free-free Euler beam of
the track plate and free-free Euler beam of the concrete base; β sk and β bk are respectively the
constants of the track plate and the concrete base; NM , NS and NB are respectively the modal
orders of the rail, the track plate and the concrete base; GS (k ) and GB(k ) are respectively the
additional functions of self-weight of track plate and concrete base, and their values are:
ls (k = 1)
0 (k = 2)
GS (k ) =
ls β sk
(5)
− e − ls β sk sin ls β sk els β sk + e − ls β sk cos ls β sk
e + − Ck − (k > 2)
2β sk β sk 2β sk β sk
7 / 25
lb (k = 1)
0 (k = 2)
GB(k ) =
lb βbk
(6)
− e − lb βbk sin lb βbk elb βbk + e − lb βbk cos lb β bk
e + − Ck − (k > 2)
2 βbk β bk 2 βbk βbk
The wheel-rail contact force is solved using the nonlinear elastic contact theory developed by
Hertz [12]. The fastener force and the CA mortar reaction force can be obtained as follows:
Frsi (t ) = C pi [ Z r ( xi , t ) − Z s ( xi , t )] + K pi [ Z r ( xi , t ) − Z s ( xi , t )]
(7)
ɺ ɺ
Fcai (t ) = Cai [ Zɺ s ( xi , t ) − Zɺb ( xi , t )] + K ai [ Z s ( xi , t ) − Zb ( xi , t )]
where Zɺ r ( xi , t ) and Z r ( xi , t ) are respectively the vertical velocity and displacement of the rail;
Zɺ s ( xi , t ) and Z s ( xi , t ) are respectively the vertical velocity and displacement of the track plate;
Zɺ b ( xi , t ) and Z b ( xi , t ) are respectively the vertical velocity and displacement of the concrete base;
C pi and Cai are respectively the damping of the fastener system and the damping of the CA mortar;
K pi and K ai are respectively the stiffness of the fastener system and the stiffness of the CA mortar.
In the model suggested herein, the differential settlement is simulated through the subgrade
reaction force:
C Zɺ ( x , t ) + K fi [ Z b ( xi , t ) − z ( xi )] else
Ffdi (t ) = fi b i
0 when Zb ( xi , t ) ≤ z ( xi )
(8)
where Zɺb ( xi , t ) and Z b ( xi , t ) are respectively the vertical velocity and displacement of the concrete
base; z ( xi ) is the subgrade differential settlement value; C fi is the damping of the subgrade; K fi is
8 / 25
Solutions of the vehicle model and the proposed slab track structure dynamics model considering
self-weight all adopt the explicit integration method suggested in the literature [14].
The model suggested herein was verified by a comparative analysis of the outputs calculated by the
model with that: (1) computed by the railway vehicle and slab track vertical coupled software VICT
for the vibration responses produced by a dipped welded joint excitation[12]; (2) computed by an
FEM model for the static responses due to subgrade differential settlement regardless of wheel-rail
contact force; (3) recorded in the literature[11] for the vibration responses due to subgrade differential
(1) VICT
Figure 2(a) shows the comparison of the wheel-rail contact force of the proposed model (with
self-weight) and the VICT model (without self-weight) due to a dipped welded joint (5º) for a train
travelling at a speed of 100km/h (i.e. without differential settlement). Note the stiffness of the
fastening system is the dynamic stiffness from field test on the existing high speed railway lines. The
difference in the wheel-rail contact force between the two models illustrates that the wheel-rail
contact force is relatively unaffected by the structure’s self-weight when there is no subgrade
differential settlement. Figure 2(b) shows the comparison of the fastener force at the time when the
wheel-rail contact force reaches a peak value. The lower part of Figure 2(b) shows that the difference
in the resulting forces between the two models is approximately equal to 370 N per fastener, which
is equal to the weight of the rail per fastener. Accordingly, this illustrates that the model proposed is
9 / 25
as accurate as the widely used VICT model, but at the same time can take into account of
self-weight.
Fig.2 Comparison of the vibration responses of the case with no differential settlement: (a) wheel-rail contact force,
(2) FEM
The static responses due to subgrade differential settlement regardless of wheel-rail contact force can
be calculated by assuming the wheel-rail contact force to be zero because the self-weight of the track
structures and the concrete base is taken into consideration in the proposed model. Figure 3(a) shows
the vertical displacement of the rail computed using the proposed model and an FEM suggested in
[3]
the literature due to differential settlement (assumed to be a cosine curve with a wavelength of
30m and an amplitude of 45mm) without train loading. By inspection of Figure 3(a), the vertical
displacements in the two models show good agreement with a maximum difference of less than 5%.
Figure 3(b) compares the fastener force of the two models in the area where the differential
settlement takes place, in which the value that is greater than zero means the compressive force and
the value that is less than zero means the tensile force. By inspection of Figure 3(b) the fastener
forces computed by the two models show good agreement in magnitude and frequency. For example,
the fastener forces in both models increase in magnitude rapidly at the inter-slab joints between
10 / 25
Fig.3 Comparison of the static responses: (a) rail vertical displacement, (b) fastener force
A comparison of the maximum forces and accelerations experienced by the vehicle body and track
structural components due to subgrade differential settlement under a moving train load was made
[11]
between the proposed model and that calculated by a FEM described in the literature . The
comparison is shown in Table 1 for a train travelling at a speed of 350km/h, with a differential
settlement wavelength of 20m and amplitude of 20mm. In both models track irregularities were
The differences in the dynamic responses are within 15%. The difference may be partly
explained by the fact that the models are unlikely to have exactly the same track irregularity function
and this would have resulted in different dynamic responses. The possible differences in track
irregularity functions between the two models results from the randomized process associated with
converting a railway track irregularity from the frequency to the time domain for use within the
model.
11 / 25
It is evident from the above comparisons with the other models available in the literature that the
proposed model suggested herein can calculate with a sufficient degree of accuracy the dynamic
response of the railway vehicle and track structure components due to subgrade differential
settlement. Compared to the VICT, the model takes the effect of track structure self-weight into
consideration, which is more representative of the actual situation when the differential settlement
occurs, and compared to the 3D FEM model, the model is much more efficient computationally but
is still capable of computing the dynamic response of the railway vehicle and the track structures
In order to inform construction and maintenance standards and to suggest limits of differential
settlement., a study was undertaken to determine functional performance criteria associated with
train stability, safety and wheel-rail damage as a function of (i) the amplitude of differential
settlement, (ii) the wavelength of differential settlement, and (iii) the position of differential
settlement along the length direction of the track. The track was modeled as a straight section
without any radius of curvature and the differential settlement was represented as a cosine function
(a). Stability: The maximum vertical acceleration of the train in keeping with a number of railway
organizations was used as a measure of stability. In Chinese design standards, an upper limit of the
(b). Safety: The likelihood of the derailment of a train is commonly measured by the axle load
decrement ratio (PD) and an upper limit of 0.6 for the PD is specified in Chinese standards [15].
12 / 25
(c). Wheel and rail damage: The likelihood of excessive wheel or rail deterioration can be
measured by the wheel-rail contact force and the maximum allowable value is suggested to be
In order to study the influence of differential settlement on the three measures of track performance
four values of the amplitude of the differential settlement, 10mm, 20mm, 30mm and 40mm were
used together with three train speeds of 100km/h, 200km/h and 300km/h. The wavelength of the
settlement profile was maintained at 20m. Note a wavelength of 20m is specified in a number of
Figure 4 shows the computed vertical acceleration for the four amplitudes chosen. It can be seen
from the figure that the differential settlement causes the vehicle body to accelerate through two and
half cycles. For all amplitudes the wavelengths of the first two complete cycles of acceleration are
nearly constant with the speed of the vehicle, whilst the wavelength of the last half cycle (i.e. △)
increases with speed, i.e. the distance that the vehicle body requires its acceleration to return to its
Figure 5 shows the maximum vertical acceleration of the vehicle body as a function of the
amplitude of the modeled differential settlement from which it can be seen that the maximum of the
vertical acceleration increases with amplitude as expected, with a corresponding decrease in stability.
The maximum acceleration for amplitudes of 10mm and 20mm for all three train speeds considered
13 / 25
is well below the maximum allowable limit stipulated in the Chinese standards (i.e.0.13g). However,
for differential settlement amplitudes of 30mm and 40mm the stipulated limit is exceeded for speeds
shown in Figure 6, the maximum PD value increases with the amplitude of the differential settlement,
although the value in all cases is less than that stipulated in the Chinese standards.
Figure 7 shows the wheel-rail contact force for vehicle speeds of 100km/h and 300km/h. From
Figure 7, the variation of the wheel-rail contact force, in the 20m section where the differential
settlement has been modeled, increases with the amplitude of differential settlement and the
fluctuation of the wheel-rail contact force is generally greater at a speed of 300km/h compared to a
speed of 100km/h, although the maximum values in all cases however is much less than the 250kN
As the concrete base in general has a higher stiffness than the soil subgrade, it resists to an extent
subgrade settlement, and therefore prevents the rail from settling as much as the subgrade. The
14 / 25
wavelength of the differential settlement can affect this difference to a large extent and, ultimately,
therefore the dynamic response of the system. Therefore to better understand the effect of the
wavelength of the differential settlement, the functional performance of the system was investigated
for 8 different wavelengths (5m, 6m, 7m, 8m, 10m, 15m, 20m and 30m) with an amplitude of 20mm
Figure 8 shows the maximum vertical acceleration as a function of the wavelength of subgrade
differential settlement for train speeds of 200km/h and 300km /h. For a train speed of 200km/h it can
be seen that the maximum vertical acceleration exceeds that stipulated in Chinese standards for
wavelengths between 8m to 15m. When the train speed is 300km/h, the maximum vertical
acceleration is equal to or exceeds the upper limit of 0.13g for the wavelengths investigated between
8m to 20m.
In terms of the overall trend, the maximum vertical acceleration at the two train speeds considered
increases rapidly with wavelength up to a maximum value of 8m. Thereafter at both speeds the
acceleration decreases. The reason for the increase and then decrease of acceleration with
wavelength of the differential settlement seen in Figure 8 may be explained as follows. When the
wavelength of the differential settlement is small, the deflection of the concrete base is less than the
magnitude of the differential settlement because of the flexure rigidity of the concrete base, resulting
in a gap between the concrete base and the subgrade. As the wavelength of the differential settlement
increases, the deflection of the concrete base increases correspondingly, and with it the vertical
acceleration, until the base contacts the surface of the subgrade. However, the wavelength of the rail
15 / 25
deflection increases with the wavelength of the subgrade differential settlement and results in the
dynamic response reducing correspondingly. The increase in vertical acceleration due to the former
effect on the increase in the wavelength of the rail deflection on reducing the vertical acceleration
predominates.
From the analysis above, at a wavelength of 8m is the wavelength the base contacts the surface of
the subgrade (i.e. the gap between the concrete base and the subgrade is zero). Because the height of
the gap depends on the flexure rigidity of the concrete base cross section, the length of the concrete
base and the track structure design, the particular wavelength (8m for the specific conditions
considered) which results in the acceleration being at its maximum can be considered to depend in
part at least on the design of the track structure and the concrete base.
Figure 9 shows the axle load decrement ratio (PD) as a function of the wavelength of the
differential settlement for train speeds of 200km/h and 300km/h. As is shown in the Figure 9, the
change of the axle load decrement ratio with wavelength is similar to that of the vertical acceleration,
and both reach a peak value at wavelengths of 8m. For a train speed of 200km/h the axle load
decrement ratio exceeds the limit of 0.6 (i.e. the Chinese standards) for wavelengths of between 8m
and 10m. When the vehicle speed is 300km/h, the axle load decrement ratio exceeds the limit of 0.6
16 / 25
Figure 10 shows the wheel-rail contact force for a train speed of 300km/h for all wavelengths
considered. It can be seen that the impact of subgrade differential settlement on wheel-rail contact
force has a process of weakness after a first enhancement. The maximum of the wheel-rail contact
force of 221kN occurs when the wavelength is 8m which is less than that of 250kN suggested by
British Rail.
CRTS I slab track consists of discrete concrete sections (see Figure 11) and therefore the
longitudinal position of the differential settlement waveform with respect to these sections may
In order to study the impact of the longitudinal position of the differential settlement waveform, 8
different positions of the simulated differential settlement waveform were considered within the
model. The first position is such that the start of the settlement waveform corresponds to the
beginning of a concrete base section and the last position of the waveform corresponds to the end of
the section. It should be noted that there is a horizontal gap between any two adjacent concrete bases,
so the first position of the waveform and the last position do not correspond. The other 6 positions of
the waveform were arranged at equidistant intervals as shown in Figure 11. For each case the
maximum amplitude of the settlement was 20mm and the wavelength of the waveform was 20m (to
match the existing Chinese railway standards for differential settlement). Excitation was provided by
17 / 25
a train travelling at a speed of 300km/h and the track was modeled as being smooth to simply the
analysis (i.e. the track irregularity spectrum was not taken into consideration).
Figure 12 shows the vertical acceleration of the vehicle body and the axle load decrement ratio for
the eight different cases as the train passes the position where the subgrade differential settlement
occurs. For all eight cases it can be seen that the waveform and the magnitude of the acceleration
curves do not change appreciably, and that the computed axle load decrement ratios in all cases are
within a range of between 0.23 and 0.29 (i.e. there is approximately a 20% difference in the
decrement ratio depending on the location of the settlement waveform). Whilst values of the
decrement ratios are less than that stipulated in the Chinese standard (i.e. 0.6) it should be noted that
the Chinese standard includes the effects of track irregularities and therefore any corresponding
dynamic effects.
Fig.12 Dynamic responses: (a) vertical acceleration of vehicle body, (b) axle load decrement ratio
Figure 13(a) shows the wheel-rail contact force for each of the eight positions considered. As
shown in the Figure 13(a), the minimum and maximum values of the wheel-rail contact force are
relatively unchanged for the eight cases, but the waveforms of the contact force in each case are
significantly different. Further it may be seen that the wheel-rail contact forces change markedly at
the inter-slab joint between two adjacent concrete bases because the rail support condition changes at
these locations. This may be further understood with reference to Figure 13(b) which shows the
18 / 25
forces within the rail fasteners due to differential settlement alone (i.e. without train loading) and
Table 2 which shows the maximum compressive and tensile forces in the fasteners with and without
train loading.
Fig.13 Wheel-rail contact force and fastener force: (a) wheel-rail contact force (b) fasteners force without train
loading
settlement
Compressive force /kN Tensile force /kN Compressive force /kN Tensile force /kN
waveform
For all positions of the settlement waveform the maximum compressive force in a fastener is
greater than the tensile force without train loading. The magnitudes of the compressive and tensile
forces experienced by the fasteners are respectively greatest in case 1 and case 8 where the start of
the settlement waveform corresponds to the inter-slab joint as described above. As the train passes
through, the maximum compressive force in case 1 experienced by the fastener is between 13% and
19 / 25
22% greater than that in the other cases and the maximum tensile force in case 8 is 35% to 65%
greater than that in the other cases. Further analysis shows that some of the fasteners within the
area of differential settlement are always in compression with and without train loading (see Figure
14(a)), whilst some fasteners experience both compressive and tensile forces as shown in Figure
14(b). Those that experience both compressive and tensile cyclic loading forces are likely to have
lower service lives than those which are subject to compressive forces alone [18].
Fig.14 Fastener forces of (a) fasteners subject to compressive forces alone (b) fasteners subject to both compressive
4 Concluding discussion
A railway vehicle and slab track vertical coupled dynamics numerical model was described in this
paper and was shown to give similar results to three different existing railway vehicle/ track dynamic
models in terms of the forces and accelerations experienced by the vehicle body and track structural
components. The proposed model has an advantage over these and other existing widely used
dynamic models of the train track system in that it is more computationally efficient and therefore
can be used in environments which do not have access to the computing facilities which are required
Nevertheless, it is recognized that further refinement of the developed model is both desirable and
necessary. The construction of non-ballasted slab railway track on existing subgrade soils, or on
20 / 25
embankments, is at an early stage of development in Chinese railways, so it was not possible to
compare the outputs of the model directly with field measurements. However, when such data
becomes available verification of the model via the comparison of predicted settlements with those
measured in the field should help to refine the model and the parameters adopted. Additional work
is also required to refine the way in which the rail-sleeper fastening system has been modeled, since
although the fastener force model has been developed according to the literature, whereby the
fastener force is the same in tension and compression, the fastener force in reality exhibits some
Subgrade dynamics, which may impact the dynamic response of the slab track system, have not been
accounted for in the proposed model since the emphases of the paper is on the ride quality, stability,
vehicle safety and potential damage to the train wheel and the rail (rather than the subgrade). For
this purpose, the literature suggests that a model, such as that proposed, can still give sufficient
accuracy for the task at hand, albeit not including subgrade dynamics. However, further
investigation is recommended to ascertain both how the dynamic response due to differential
settlement can be incorporated and how the impact of including subgrade dynamics may affect the
The developed model was used to carry out a number of studies to inform railway design
standards with respect to allowable subgrade differential settlement under CRTS I type slab track
systems. These studies investigated the influence of the settlement waveform, in terms of its
amplitude, wavelength and position on measures of track performance associated with passenger
21 / 25
ride quality, railway vehicle safety and track component damage. The following findings may be
(1) The dynamic response of the train-track system increases with the amplitude of the
differential settlement and the train speed. Whilst the amplitude of the differential settlement
affects all of the criteria investigated, its greatest influence is on passenger comfort (vertical
acceleration of the vehicle body). When the differential settlement amplitude is greater than 20mm
for a wavelength of 20m the limit stipulated in Chinese design standards is exceeded for speeds of
(2) The dynamic response of the system, in terms of stability, safety and damage to the wheel-rail,
was shown to be a function of the wavelength of the subgrade settlement and that there exists for the
slab-form considered a particular wavelength at which the measures of response are at their
maximum values. Therefore, for any particular slab-track form, the combinations of wavelength
and settlement amplitude which cause the stability, safety and damage criteria to be at their
maximum values should be used as design criteria, rather than the current situation where standards
suggest a maximum allowable settlement amplitude for one wavelength only (e.g. 20 mm for a 20 m
wavelength).
(3) CRTS I slab track consists of a number of discrete lengths of concrete slab and it was shown
that the position of the settlement waveform in relation to the joints between two slabs influences
greatly the wheel-rail and the fastener forces. The position can also effect the magnitude of the
measures of safety (PD) and passenger comfort by up to 20%. The greatest potential to cause
fatigue damage (and therefore possible early failure of track components) occurs when the beginning,
or end, of the differential settlement waveform corresponds with the inter-slab joint of the concrete
base. Since such areas may be subject to water ingress and thereby softening of the underlying
22 / 25
subgrade promoting settlement, it is suggested that particular attention should be given to these areas
It may therefore be seen that when developing design standards for slab-track it is necessary to
stipulate maximum values of the allowable settlement, in terms of its amplitude, wavelength and
position (in relation to jointed slab-track) and that the allowable values should also be a function of
train speed.
Acknowledgements
The work described in this paper was supported by the National Natural Science Foundation of
China (51478353) and the Research Fund for the Doctoral Program of Higher Education of China
The authors are also most grateful for the support of Tongji University and the University of
Birmingham is also thanked for facilitating this research through an exchange programme.
References:
[1] Zhou M. The Influence of Slab Track and Train Operation Safety on Subgrade's Uneven Settlement. Master
[2] Ministry of Railways of the People’s Republic of China. The design and technical condition of the
23 / 25
[3] Zhou M, Gong QM, Wang BL, and Zhou SH. Effect of differential settlement of subgrade on dynamic
[4] Chen P, Gao L and Ma MN. Limited value of subgrade settlement and its influence on mechanical
characteristics of ballastless track in high-speed railway. Construction & Design for Project, 2008, 05, 63-66.
[5] Chen RP, Wang ZZ, Jiang HG and Bian XC. Control standard of differential settlement in high-speed
railway slab based on bending fatigue strength. Journal of Zhejiang University (Engineering Science), 2013, 05,
796-802.
[6] Liu RB. Analysis of Differential Settlement of Subgrade Effecting on Slab Track Dynamics. Master Thesis,
[7] Cai CB, Zhai WM, and Wang KY. Calculation and Assessment Analysis of the Dynamic Performance for
Slab Track on Sui-Yu Railway. China Railway Science, 2006, 27, 17-21.
[8] Cai XP. Dynamic characteristics of train-ballastless track under the conditions of differential settlement of
[9] Han YT and Yao L. Analysis of the dynamic performance for slab track settlement on embankment. Journal
[10] Xu QY, Li B, and Zhou ZH. Study on the limited value for the differential settlement of subgrade under
CRTS-I type slab track. China Railway Science, 2012, 33, 1-6.
[11] Xu QY, Li B, and Fan H. Influence of differential settlement of subgrade on dynamic characteristic of
train-ballastless track on subgrade coupling system. Journal of Railway Science and Engineering, 2012, 9,
13-19.
[12] Zhai WM. Vehicle-Track Coupling Dynamics (Third Edition), 2007 (The Science Press, China)
[13] Li DX. Advanced Structure Dynamics (Second Edition), 2010 (The Science Press)
[14] Zhai WM. Two simple fast integration methods for large-scale dynamic problems in engineering.
24 / 25
[16] Clark RA, Dean PA, Elkins JA and Newtons SG. An investigation into the dynamic effects of railway
vehicle running on corrugated rails. J Mech Engng Sci, 1982, 24, 65-76.
[17] Ministry of Railways of People’s Republic of China. Design specification of the integrated test section of
[18] Shi J, Burrow M P N, Chan A H, et al. Measurements and simulation of the dynamic responses of a
bridge–embankment transition zone below a heavy haul railway line [J]. Proceedings of the Institution of
Mechanical Engineers, Part F: Journal of Rail and Rapid Transit, 2013, 227, 254-268.
25 / 25