METHOD STATEMENT
FOR
11 October 2023
CONTENTS
BUILDING MANAGEMENT SYSTEM
1. Purpose................................3
2. Project Details.....................3
3. Working Location...............3
4. Method of Installation.........3
4.1 ACMV Subcon (Kilowatts) Scope........................................
4.2 VAV Box Supplier (Aire-Max)
Scope...........................................................................................
4.3 BMS (Honeywell) Scope (In Field
Side)............................................................................................
5. Work Preparation................5
6. Responsibilities...................6
7. Test Instruments / Tools
required.......................................6
8. Work Procedures
(Honeywell)................................6
8.1 Visual Inspection...................................................................
8.2 Electrical Check....................................................................
8.3 Control Function Check........................................................
9. Safety Aspect......................7
10. Housekeeping......................8
BUILDING MANAGEMENT SYSTEM
1. Purpose
The Purpose of this Method Statement is to define the work procedure for testing
& commissioning of Variable Air Volume (VAV) system with Air Handling Unit
(AHU). The variable air volume boxes are provided with a room thermostat in each
room to maintain the room temperature set point. The room thermostat set point will be
maintained by regulating the supply air flow into the rooms.
2. Project Details
3. Working Location
4. Method of Installation
Scope demarcation between ACMV Sub-Con/VAV Box Supplier/ BMS Contractor)
Install the VAV Controller & 230 Vac Transformer in the VAV Box
Provide Cabling work between VAV Controller & Transformer
Connect the Pressure Tubing (Red & Yellow) from Air Duct to VAV Controller
Labeling the VAV Box no and cable tagging for Visual check
5. Work Preparation
Honeywell supply the VAV Controller, Thermostat and 25VA Transformer to VAV
box supplier Aire-Max.
Aire-Max mount and install the VAV Controller and 25VA transformer in the VAV
Box. Provide the cable between controller and transformer and connect the pressure
tube from Duct to VAV controller. Provide Labeling for each VAV Box no and
proper name tagging for cable termination.
Honeywell ensure that all the VAV controller box have correct label name and
respective wiring name tag as per the corresponding located place.
After all complete setup VAV Controller box hand over to Kilowatts.
Kilowatts install the VAV controller box in the field side confirming located place of
Air Duct area and also provide the power point for the each VAV box. Power point
max 4 VAV box per loop.
After Complete the VAV Controller setup in the located Duct Area Honeywell do the
cabling work for power point to 230vac transformer in VAV Box.
BUILDING MANAGEMENT SYSTEM
Honeywell provide the cable work for VAV controller to room thermostat and field
equipment. Download the VAV Program according to the VAV Name and do the
testing and commissioning work based on the air flow design.
6. Responsibilities
Engineer in-charge is responsible for ensuring the Testing and commissioning for the
Variable Air volume is carried out as per method statement and in a safe manner.
Check that the works are carried out according to the technical and engineering
specifications.
To test together with the Mechanical T & C team to ensure the testing are in line with
Mechanical requirements.
The following test instrumentation & tools will be required to undertake the
equipment testing & commissioning detailed with in this procedure.
Thermometer
Vane Anemometer
Multi Meter
Programmable laptop
Using the Multi Meter to check and measured that the correct supply voltage is
available to operate a VAV (24 Volts AC) and that the correct polarity is adhered
to when connected
Check the cable continuity wiring of the local thermostat for the VAV is
terminated correctly and tested.
Check and ensure that all VAV power point incoming voltage and DB electrical
connections are tight and the wiring is secured before turn on VAV controller.
Ensure all BMS wire connection is terminated and tested at the VAV Controller
and field devices.
9. Safety Aspect
Pay attention when working at height, look out for any person passing or working
below.
Always use hand gloves, when handling materials.
Always use personal protective equipment (PPE) for personal safety and protection.
(Safety helmet, safety shoes and Safety belt / Safety Harness).