Shell Asgard Basement 3 CCTV

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

3rd

PROPOSED IT / ITES BUIDING AT #2 PALLAVARAM DURAPPAKKAM

CAR
ARCHITECT:
CA/83/7687
A.VENKATAKRISHNAN
NO:
REGISTRATIONRADIAL ROAD

PALLIKKARANAI
BASEMENT FLOOR
TWO PARKING

CHENNAI
PLAN
81
WHEELER: :177
76 Nos
Nos.
Sttack.
Standard.
STAIR-04 UP

R
75
0
11 13
S1 FFL = -3.900 M
S8
STAIR
10 12 14
SSL = -4.300 M PRESS
SHAFT

R4
FIRE LIFT
3000x2500

00
PUZZLE PARKING

0
SPARE SHAFT FIRE
[Up to STILT]
S79 S2
SHAFT ELECT
SHAFT
S9
TENANT ELV ELV LOBBY PRESS
SHAFT
S3 SHAFTS4S5 SHAFT S6 SHAFT

S7 ELECT
SHAFT

(Slope 1:8)
RAMP UP
(1in12)
15

RAMP UP
17
-4.000 M 19 18 16
PUZZLE PARKING
08 PARKING
FFL = -4.000 M
09
SSL = -4.300 M

FFL = -4.000 M
SSL = -4.300 M
01 02 03 04 05 06 07
EXHAUST
(B3-EA-1)
S12
SHAFT
RAMP DOWN ABOVE
(SLOPE=1in10)

DRIVEWAY DRIVEWAY
FFL = -4.000 M FFL = -4.200 M
SSL = -4.300 M SSL = -4.300 M

(ZONE-1
-B3-FA)
S48 140 139 PUZZLE PARKING
SHAFT
141 20
99 21 23 25
138 137 100 24 26
22

GF.M1.1.46
142 136 101 98

Exit.360 - 130.2
PUZZLE PARKING
33 31 29 27

INCHNCOM.B3.Parking
32 30 28
143 135 102

STAIR

Camera Provision
PRESS
S45 FFL = -4.000 M 97
SHAFT 144 134 103
SSL = -4.300 M
35 37 39
100mm RISE
36 38 40
STAIR-1
34
FFL = -3.900 M
SSL = -4.300 M
145 133 104 96 PUZZLE PARKING
FIRE
SHAFT
S44

Up S43
CHW
SHAFT
S42
45 43 41
ELV
S41
SHAFT 132 105 95 47 46 44 42
ELV
SHAFT

S40
LOBBY
PRESS
SHAFT
131 106
STORE PARKING
FFL = -3.900 M
SSL = -4.300 M FFL = -4.000 M
SSL = -4.300 M
RAMP UP
(1in12)

130 107 RAMP UP


LIFT LOBBY-01
FFL = -3.900 M
[SLOPE 1:10]
SSL = -4.300 M

ELECT.
S39
SHAFT 129 108
SPARE
SHAFT
S38
DRIVEWAY DRIVEWAY DRIVEWAY
FFL = -4.000 M FFL = -4.000 M FFL = -4.200 M
SSL = -4.300 M SSL = -4.300 M SSL = -4.300 M

S37
FIRE
SHAFT
128 109 94

STORE
FFL = -3.900 M
SSL = -4.300 M RAMP UP
127 110 93
(1in12)
GF.M1.1.45

LIFT LOBBY-2
FFL = -3.900 M
SSL = -4.300 M
INCHNCOM.B3.Parking

126 111
Runing Way.360 - 130.4

LOBBY
92
PRESS
SHAFT
S36 PUZZLE PARKING
PARKING 48
ELV FFL = -4.000 M
SHAFT 51 53
S35 SSL = -4.300 M 49
ELV 52 54
SHAFT
S34 50
125 112 91
S33
SPARE
SHAFT

STAIR-2
S32
FFL = -3.900 M
SSL = -4.300 M 59 57 55
FIRE
S31
SHAFT
60 58 56
61
Up
146 124 113 90
100mm RISE
PUZZLE PARKING
PARKING
STAIR
PRESS
FFL = -4.000 M 147 123 114 89
S30 SSL = -4.300 M
SHAFT

63 65 67
64 66 68
148 122 115 62
PUZZLE PARKING

149 121 116 88


GF.M1.2.46

75 PUZZLE PARKING
71 69
entry.360 - 130.3

S27 150 117 73


120 87 72 70
(ZONE-2 74
-B3-FA)
INCHNCOM.B3.Parking

SHAFT
152 151

DRIVEWAY DRIVEWAY DRIVEWAY


FFL = -4.000 M FFL = -4.000 M FFL = -4.200 M
RAMP DOWN
SSL = -4.300 M SSL = -4.300 M (SLOPE=1in10) SSL = -4.300 M
FFL = -4.000 M
SSL = -4.300 M

ZONE-2-B3-EA
CUTOUT AT
S15
CEILING.

153 154 155 156 157 119 118

86
-4.000 M PARKING PUZZLE PARKING
FFL = -4.000 M
-3.913 M SSL = -4.300 M
76 77 79
78 80
RAMP UP
(Slope 1:8)
(1in12)

ELECT SHAFT
RAMP UP

S19

TENANT ELV ELV LOBBY PRESS


SHAFT.
S22 SHAFT. SHAFT.
S21S20 S18 SHAFT.

ELECT
PUZZLE PARKING
SHAFT 83 81
FFL = -3.900 M
S16 85
SSL = -4.300 M 84 82
FIRELIFT
3000x2500 STAIR
FIRE PRESS
+2.788 M

SPARE
S17
SHAFT.
S23 SHAFT.
S24
SHAFT

UP

STAIR-3

FFL = -3.900 M
SSL = -4.300 M
Camera Provision

R0
REV

CLIENT:
SYMBOL

JOB NO:
DATE
06-11-2023

PROJECT:

APPROVED:

DRAWING NO:
DRAWING TITLE:

DATE: 06-11-2023
DRAWN: BHARATH
SYSTEM INTEGRATOR:
DESCRIPTION
360' CAMERA
DESCRIPTION

REV: 0
SHELL ASGARD
SUBMITTING FOR APPROVAL

PROJECT ENGINEER: ANABARASU


Convergint

PROJECT MANAGER: VELLAISWAMY


ASBUILT DRAWING

BASEMENT-3CCTV LAYOUT
Unit 303 and 304,
DRAWN

2nd floor (level III),


BHARATH

Fax: 91-80-4289-8099
No.1 Prestige Atrium,

SCALE:- NTS
QTY

Tel: 91-80-4289-80000
Bengaluru 560001,India
3 NO'S

A1
www.convergint.com/apac
CHK.

Central street Shivajinagar,

THE INFORMATION, DATA AND DRAWINGS EMBODIED IN THIS DOCUMENT ARE STRICTLY CONFIDENTIAL AND ARE SUPPLIED WITH THE UNDERSTANDING THAT THEY WILL NOT BE DISCLOSED TO THIRD PARTIES WITHOUT PRIOR CONSENT OF CONVERGINT.
COPYRIGHT © CONVERGINT. ALL RIGHTS RESERVED.

You might also like