Agricultural Finance Review: Article Information
Agricultural Finance Review: Article Information
Agricultural Finance Review: Article Information
Transformation
Transformation of agriculture of agriculture
risk management risk
management
The new horizon of regulatory compliance in
farm credits
Ahmad Raza Bilal Received 17 May 2018
Department of Business Administration and Management, Revised 30 August 2018
Accepted 17 September 2018
Superior University, Lahore, Pakistan, and
Mirza Muhammad Ali Baig
Superior University, Lahore, Pakistan
Downloaded by INSEAD At 21:53 06 November 2018 (PT)
Abstract
Purpose – The purpose of this paper is to investigate the balanced role of internal and external compliance in
risk evaluation process of specialized agriculture financing. The authors examine the adaptive behavior of
risk managers to determine the role of proposed transformation for risk monitoring (RM) and control process
in risk mitigation and avoidance of agriculture credit failure.
Design/methodology/approach – A self-administered survey was conducted to collect data from 353
risk-related officers and managers in Zarai Taraqiati Bank Limited (ZTBL) Pakistan. The authors used a
previously tested scale for the main constructs. The descriptive analyses were used to gauge the model
capacity for determining the strength of proposed risk patterns in agriculture risk management.
Findings – The results reveal that risk evaluation process in ZTBL is reasonably efficient in mitigating risks.
Given the sensitive nature of farm credit, there is a need of fundamental reforms in risk policy manuals in line
with central bank’s agriculture prudential regulations and Basel-III standards. The results fully support H1
and H2, while H3 is partially validated. The result patterns indicate serious issues in risk evaluation process
in agriculture finance that is causing higher delinquency in farm credit.
Research limitations/implications – Based on highlighted issues, the authors recommend valuable
guidelines in the RM review system for agriculture financing products at ZTBL.
Practical implications – The authors propose remodeling of agriculture risk management and offer
valuable insights to the agriculture financial regulators and government in taking policy initiatives in the
pre-and-post agriculture risk evaluation process. The proposed model enables RM process to improve farm
credit delinquency, particularly in ZTBL and other agriculture banking networks in commercial banks.
Originality/value – This is the first study to empirically investigate RM evaluation process in agriculture
risk management of ZTBL in Pakistan, thus, offers new horizon of farm credit regulatory compliance in
agricultural sector of Pakistan.
Keywords Basel regulations, Nonperforming loans, Agriculture risk management, Delinquency ratio,
Risk evaluation process
Paper type Research paper
1. Introduction
Agricultural productivity is critical to farmers’ ability to build and maintain financial
strength and contribute to Pakistan’s economy (Saqib et al., 2016). Farm credit plays an
important role in well-timed cultivation processes while maintaining adequate supplies of
agriculture inputs to its buyers (Wang et al., 2009). In Pakistan, the government has
emphasized domestic agriculture as a means to manage valuable foreign reserves. The
Central Bank of Pakistan has been instructed to formulate a certain portion of banks’
investments in the agriculture sector. For this purpose, commercial banks in Pakistan have
established specialized agriculture divisions to facilitate farm credit for crops in all three
seasons (Ullah et al., 2015). However, a report on agriculture credit support programs in the Agricultural Finance Review
quarterly performance review of the Central Bank of Pakistan (2017) indicated an increasing © Emerald Publishing Limited
0002-1466
default ratio in the agricultural sector that is creating serious challenges for farm credit risk DOI 10.1108/AFR-05-2018-0038
AFR management and deteriorating delinquency ratio of commercial banks. The underlining of
agriculture risk is mainly responsible for the failure in the repayments of farm credit. In this
regard, Saqib et al. (2016) revealed main sources for systematic agriculture risks i.e. crop
diseases, temperature volatility, variability in the supplies and prices of agricultural inputs,
pollution, natural disasters and instable market conditions. Complex financing mechanism
for agriculture credit and uncertainty in market receivables pose major financial constraints,
resulting in a long cash conversion cycle that places undue stress on working capital.
Additionally, distinct risk aversei attitude of farmers are also indicated as the main reason
of higher agriculture credit risk (Ayaz et al., 2011; Binici et al., 2003). Consequently,
internal agricultural credit policies of the banks should devise certain risk management
policies for efficient evaluation and monitoring of farm credit. However, limited literature is
available on the adoption of agriculture risk management in pre-and-post credit evaluation
and monitoring process.
Agriculture is a leading sector in Pakistani economy and its credit share along with
related finance in the investment of commercial banks is on continual rise (Ullah et al., 2015);
but still banks are following conventional methods of risk management by extending farm
Downloaded by INSEAD At 21:53 06 November 2018 (PT)
credit against fixed or liquid assets as primary collateral (Saqib et al., 2016). Nonetheless, a
plethora of literature has explored the various challenges in agricultural risk management
including land as primary security (Hussain and Thapa, 2012), risk coverage through liquid
assets including jewelry (Akram et al., 2008) and personal guarantees of farmers or
guarantors (Winter-Nelson and Temu, 2005). Moving the field forward, we attempt to
remodel agricultural risk management by extending important risk factors including
understanding of risk management (URM), risk assessment and analysis (RAA), risk
identification (RI), risk monitoring and review (RMR), credit risk assessment (CRA),
operational risk assessment (ORA), liquidity risk assessment (LRA) and risk management
practices (RMPs). Findings of this study can be used to guide financial regulators and
government in taking policy initiatives toward efficient risk management for pre-and-post
agriculture risk evaluation in order to reduce farm credit delinquency.
The remainder of this paper is organized by offering review of literature, which describes
the research propositions to be evaluated and then explains transformation of agriculture
risk management. The methodology section describes the population, sampling and the
analyses of data to provide empirical evidences. Thereafter, the results, based on analyses
and a discussion of the results, are presented. This study concludes with the discussion of
the policy implications and guidelines for agriculture credit risk analysts and
recommendations for farmers, risk analysts, policy makers and researchers.
2. Literature review
Bilal et al. (2013) differentiated risk and uncertainty, and defined risk as an imperfect knowledge
where the possible outcomes of an event can be known and estimated. Risk management is an
efficient set of managing risk strategies and credit decision making for identification of events in
broader classes of operational, credit, liquidity, market and other risks. This process is further
divided into the valuation of data, their reporting, supervision, assessments and control of
certain risks. The RMP of commercial credit is mainly comprised of five fundamental pillars.
Ngathou et al. (2006) outlined the hierarchy of these specialized agriculture RMPs as risk
identification, risk measurement, risk mitigation, monitoring and reporting of risk.
The theory of credit risk highlights three major banking risks including hazard or pure
risk, financial risk and nonfinancial risk. The financial risk is segregated into market, credit,
liquidity, interest rate, foreign exchange, solvency and capital adequacy risks. The
nonfinancial risk is deemed as an operational risk. The conceptualization of RMP is
theorized by Rosman (2009) who defined it as a four-stage risk evaluation process including
URM, RI, RAA and risk monitoring (RM).
2.1 Development in agriculture finance in Pakistan Transformation
The economy of Pakistan mainly relies on agriculture and its related products (Ullah et al., of agriculture
2015). Since its inception, agriculture policy in Pakistan has focused on providing risk
agriculture credit to farmers. In post-independence phase of Pakistan, Agricultural
Development Finance Corporation (ADFC) was established in 1952 through a central act of management
the Parliament for the purpose of enhancing monetary facilities and support to the
development and modernization of agriculture sector in Pakistan. With recommendations of
the Parliamentary committee on agriculture development, in 1957, the first formal
agriculture bank was established in Pakistan named The Agricultural Bank of Pakistan
(ABP), which was awarded mandate to grant short-, as well as long-term agriculture loans to
the farmers. On February 1961, ADFC and ABP were merged and named as the
Agricultural Development Bank of Pakistan (ADBP). Owing to agriculture-focused
strategies of the government, ADBP has significantly contributed to meet the agriculture
credit needs of farmers across Pakistan. Finally, on December 14, 2002, ADBP was again
renamed into Zarai Taraqiati Bank Limited (ZTBL) with new ambitions of the government
to support inclusive agriculture growth in Pakistan. In recent years, ZTBL as the sole
Downloaded by INSEAD At 21:53 06 November 2018 (PT)
The reliability of the scale was tested by using Cronbach’s α, while Spearman’s
correlation was used to investigate the strength and direction of relationship among
predictors, and between predictors and endogenous variables. To examine the existence of
multicollinearity among predictors, the data were tested using multicollinearity test. All the
descriptive tests to measure the role of explanatory variables, i.e. URM, ARA, RI, RMR, CRA
and ORA with RMPs were conducted using SPSS-21.
4. Empirical findings
Previous studies have identified eight attributes of RMP, as summarized in Table II. Our
overall objective was to determine the extent to which bank’s risk compliance staff weighed
these attributes, and the relevant importance of these attributes for evaluation and decision
making of specialized agriculture credit risk. Table II represents the values derived from
descriptive statistics, which reveal that our proposed model has a tendency to reframe
agriculture RMP using seven influential and prudent risk functions. In addition, LRA is
required to be done through liquidity stress testing and scenario analysis. Similarly, the
implications of risk-averse mechanism and Basel-III regulations should be implemented
through efficient risk evaluation system.
Is there a common understanding of risk management in ZTBL across the bank? 3.71 0.76
Responsibility of risk management is precisely set out and understood throughout the bank 4.17 1.03
Risk management policy is communicated down the line and well understood by all concerned
parties (risk takers, risk reviewers, etc.) 3.89 0.84
Risk management’s accountability is precisely set out and understood throughout ZTBL 4.01 0.90
Risk management is important for the success and performance of the ZTBL 5.78 1.07
Most sophisticated techniques have vital application in risk management 5.49 1.01
ZTBL aims at expanding applications of the modernized risk management technique 4.57 0.82
This is important for ZTBL to accentuate on incessant review and assessment of the techniques
used in risk management 5.32 1.06
Table III. Costs or expected losses would be reduced by the full compliance of risk management in all
Understanding of risk credit reviews 5.69 1.03
management (URM) Average 4.74
Downloaded by INSEAD At 21:53 06 November 2018 (PT)
the nine questions. The lowest mean is 3.71 for question 1, concerning the common URM
across ZTBL. The highest mean is 5.78 for question 5, in which respondents viewed that the
risk management is important for the success and performance of ZTBL. The answers of
respondents indicate a common URM throughout ZTBL. The consolidated response of URM
gives obvious indication that ZTBL staff have enough capabilities and knowledge of risk
management that gives them prudent direction to manage the risk. In addition, the standard
deviations of nine questions have small values that show data points are closer to the mean
values. These findings supported the results of past studies in which similar pattern of risk
management in commercial, Islamic and foreign banks has been revealed for URM (Bilal
et al., 2013; Hassan, 2009; Rehman, 2016).
Questions Mean SD
signifying a difficulty in RI and ranking at ZTBL. It reveals that ZTBL staff is assertive about
their capabilities to recognize risks relevant to agriculture finance products. The results of
standard deviation shown in Table V indicated the lowest value of 0.86; it shows that data
points are close to the mean of 4.05. The highest standard deviation value of 1.13 for question
6 demonstrated that the data points are far from the mean value of 4.40. This higher
dispersion shows that the development and application procedure for systematic
identification of investment opportunities at ZTBL is not up to the mark as per regulatory
requirements. Hence, the management should improve it for the effective RI process. In
consolidation, the results of questions related to RI are consistent with the extant literature
that deems RI to be a prime element in effective RMP (Rehman, 2016; Hassan, 2009).
Questions Mean SD
Comprehensive and systematic identification of risk is carried out at ZTBL with risk relating to
each of its affirmed goals and objectives 4.70 1.08
Risk identification is a continuous process in ZTBL at transactional and portfolio levels 4.78 1.11
The ZTBL finds it difficult to identify, and rank its main risk 4.05 0.86
Changes in risk are recognized and identified with ZTBL’s roles and responsibilities 4.71 1.02
ZTBL is completely aware about the strengths and weaknesses of other banks risk
management system 4.34 0.91
ZTBL has developed and applied procedures for the systematic identification of investment
opportunities 4.40 1.13 Table V.
Average 4.49 Risk identification (RI)
AFR Questions Mean SD
to avoid nonperforming assets. The lowest standard deviation value of 0.88 signifies that
the data points have less variation and are close to the mean value of 4.80. Question 1
showed the highest standard deviation value of 1.09, indicating that the effectiveness of
risk management (ERM) is an integral part of routine management reporting and
monitoring in ZTBL. These results are consistent with the findings of Al-Tamimi and
Al-Mazrooei (2007) who concluded that banks in the UAE are somewhat efficient in risk
management but still lag behind the foreign banks. The results also confirm the findings
of Rehman (2016) who found risk analysis to be an equally important element in the RMP
of conventional and Islamic banks in Pakistan.
Questions Mean SD
Questions Mean SD
For management of operational risk, proper set of guidelines and rules are in-practice in ZTBL 5.40 0.94
Board and executive management of the bank recognizes, understands and has defined all
categories of operational risk applicable to their institution 5.46 0.98
Strategic directions are transformed by the higher management given by the board through the
management of operational risk 5.17 1.13
Contingency and business continuity plans are there in ZTBL to ensure its ability to operate as
going concern in order to minimize losses regarding event of severe business disruption 5.02 1.08 Table VIII.
Periodic reports are regularly prepared and reviewed regarding operational risk in ZTBL 4.96 0.84 Operational risk
Average 5.20 assessment (ORA)
AFR recommended in Basel-III. The overall findings shown in Table VIII support the theoretical
conception of Bilal et al. (2013) who recommended more focus on ORA in order to have better
compliance of regulatory requirements in domestic, foreign and Islamic banks.
management staff on key risk investigation tools, i.e. stress testing and scenario analysis to
manage liquidity in ZTBL. Question 5 indicated the highest standard deviation value of
1.24, having greatest dispersion from the mean value of 4.75. This trend indicates that ZTBL
lacks flexible options to offer attractive profit rates to depositors in case of unusual liquidity
pressure. It creates inability for ZTBL to divert capital from other banks in order to offer
competitive deposit rates. In this case, ZTBL has the only option to borrow high cost capital
from money market that subsequently increases its COC. In presence of existing
unattractive liability procurement system, management of ZTBL should overcome this
sensitive issue by hiring of professional liability team to procure low-cost deposits from the
market. In addition, ZTBL should regularly evaluate liquidity risk in order to maintain
lower COC and optimal weighted average cost of capital (WACC).
Questions Mean SD
Prime determinant of the soundness of banking sector is considered liquidity in ZTBL 5.81 1.15
The “Management Board” defines liquidity risk strategy, and in particular, bank’s tolerance for
liquidity risk based on recommendation made by Treasury and Risk Committee 5.20 1.06
Management of ZTBL gives due consideration to external and internal factors posing liquidity
risk while formulating the liquidity policy 5.03 1.02
ZTBL’s policy defines general liquidity strategy (short and long term) 4.93 0.69
To deal with the unusual liquidity pressures, ZTBL uses flexible policy to procure market deposit 4.75 1.24
Board of directors and senior management closely monitor and regularly review liquidity policy
in ZTBL 4.93 1.11
Asset Liability Management Committee comprises higher management from each prime area of
operations in ZTBL 4.84 1.01
Asset Liability Management Committee is responsible for reviewing and recommending
liquidity risk policies in ZTBL 4.99 1.06
ZTBL has identified the means and ways to meet its funding requirements 4.81 0.92
Stress testing and scenario analysis plays a central role in liquidity risk management framework
Table IX. of ZTBL 4.00 0.56
Liquidity risk ZTBL applied stress test based on value at risk (VaR) technique as market risk management tool 4.27 0.73
assessment (LRA) Average 5.05
This leads to a prudent risk evaluation process for developing a secure credit portfolio with Transformation
available agriculture financing products. Despite the URM, and adoption of sophisticated of agriculture
risk assessment and analysis procedures, the staff of ZTBL is not fully equipped for the risk
accurate implementation of efficient RMPs in the process of credit approval. Table X
indicates the mean value of all 16 questions related to RMPs i.e. 4.65. This inclination shows management
that relevant risk staff in ZTBL is making effort to follow RMPs in all banking functions.
Question 16 showed the lowest mean value of 4.24, which indicates that respondents realize
the need of improvement in “RMPs at ZTBL to make it more competitive in compliance of
regulations. Question 2 had the highest mean value of 5.29, which signifies effective risk
management as one of the most important objectives in ZTBL. Table X shows a minimal
difference among the mean values of all 15 questions related to RMPs indicating somewhat
identical response of participants regarding each question. Question 16 showed the lowest
variation in standard deviation with the value of 0.70, which indicates that data points are closer
to the mean value 4.24. On the other hand, question 6 showed the highest standard deviation by
having the value of 1.28. This higher dispersion shows that risk policy of ZTBL needs revision
and it should have more focus on regular and modern risk management training programs for
Downloaded by INSEAD At 21:53 06 November 2018 (PT)
its concerned staff in order to mitigate the current challenges in risk evaluation process.
Questions Mean SD
Risk management policy of ZTBL clearly defined the roles and responsibilities of various
functions of the bank 4.97 1.01
The effective risk management is one of the important objectives in ZTBL 5.29 1.16
ZTBL is highly effective in continuous review/feedback on risk management strategies and
performance 4.54 0.79
Executive management of ZTBL regularly reviews bank’s performance to manage its business risk 5.05 1.05
ZTBL’s risk management procedures and processes are documented and provide guidance to
staff about managing risks 4.72 0.98
It is policy of ZTBL to regularly conduct modern risk management training programs for all of
its concerned staff 4.81 1.28
ZTBL emphasizes the recruitment of highly qualified people with relevant knowledge of risk
management 4.32 0.73
Risk management policy is communicated from top to down level in ZTBL on regular basis 4.36 1.12
ZTBL has a comprehensive risk management process (including board and senior management)
oversight to identify, measure, evaluate, monitor, report and control of all types of risks on
time-to-time basis 4.74 1.10
ZTBL finds it too risky to invest funds in one specific sector of the economy 4.33 0.89
Risk management strategy of ZTBL is flexible enough to deal swiftly and adequately with all risks 4.87 1.01
Application of Basel-II and Basel-III Accord will improve the efficiency and risk management
practices in the ZTBL 4.67 0.92
ZTBL is successfully implementing the regulatory guidelines of Basel agreements and central
bank’s prudential regulations with regard to risk management 4.36 1.05
ZTBL assesses the adequacy of their capital, liquidity, funding and leverage in relation to their
risk profiles, market and macro-economic conditions in the country 4.55 0.97 Table X.
I consider the level of risk management practices of ZTBL to be excellent 4.24 0.70 Risk management
Average 4.65 practices (RMPs)
AFR (3) RI;
(4) RMR;
(5) CRA;
(6) ORA; and
(7) LRA.
Following the conception of Hassan (2009), the function of RMPs in agriculture credit is
mentioned as follows:
RMPs : eðURM; ARA; RI; RMR; CRA; ORA; LRA; bank typeÞ: (1)
The descriptive statistics used to investigate Equation (1) have been presented in
Tables III–X. The results indicate that all predictors have positive relationship with RMPs
at ZTBL. However, descriptive facts revealed important insights, which might contribute
to minimize the high delinquency ratio caused by increasing nonperforming loans in
Downloaded by INSEAD At 21:53 06 November 2018 (PT)
consecutive reduction in net profit after tax in audited financials of ZTBL from FY 2015 to FY
2017. Based on these findings, it is recommended for ZTBL’s policy makers to develop more
flexible options for the low-cost depositors in order to offer them attractive and bankable
packages including free operational services like cheque books, pay orders, banker’s drafts,
ATM, locker facilities, etc., so that they can attract and retain their low-cost deposits at ZTBL.
The most important issue highlighted in RMPs at ZTBL was lack of focus on regular
training programs for all concerned risk staff to improve their capabilities for better
regulatory compliance. We suggest that ZTBL should administer regular training program
with specific emphasis on credit screening through five credits Cs, i.e. character, capital,
creditworthiness, cash flows and collateral against farm credit. Further training programs
should be comprised of advance courses including handling of systematic and unsystematic
risks. Farmers’ awareness sessions should also be arranged by credit officers regarding
H1: risk evaluation practices, i.e. Accepted Though mean values of all six predictors for RMPs reveal
URM, ARA, RI, RMR, CRA, ORA variation but in consolidation, positive relationship is traced
and LRA have significant among URM, ARA, RI, RMR, CRA, ORA, LRA and RMPs
relationships with RMPs in ZTBL in ZTBL
H2: review of RMPs has a Accepted During review of ZTBL’s risk evaluation process, acceptable
consequential influence on average mean values of URM (4.74), ARA (4.68), RI (4.49), RMR
potential RM policies in ZTBL (4.85), CRA (5.41), ORA (5.20), LRA (5.05) and RMPs (4.65)
were obtained. Based on this, the consequential influence of
risk evaluation factors i.e. URM, ARA, RI, LRA, ORA and
RMR is traced with RMPs and its instigated RM policies in the
short-term and long-term agriculture products in ZTBL
H3: ZTBL has adequate Partially In response to our questions on implementation of regulatory
regulatory compliance and accepted guidelines and Basel obligations in ZTBL, partially supports
follows Basel-III standards that H3 as mean values of responses are not viewed strong with
have subsequent effect on regard to ZTBL’s policy manuals. In line with results, we
reframing RMPs recommend to the management of ZTBL for implementation
of “facility risk rating (FRR) score card” for all short-term and
long-term financial facilities and ensure regulatory compliance
by the risk reviewers. In addition, approval of risk for Table XI.
agriculture facilities and its pricing should be in accordance Responses of study
with assigned FRR facility rating scores hypotheses
AFR technological innovation in cultivation and livestock up-gradation to gain maximum yields.
Marketing staff should do field surveys for identification of real agriculture borrowers and
the purposeful utilization of financing for agriculture needs only. We find another important
post-risk evaluation credit “C”, in agriculture financing i.e. “covenant” (covenants against
approved credit) that must be taken into consideration in all risk approvals in accordance to
the retrieved credit scores from “facility risk rating (FRR) score card.” Thus, we propose
transformation of agriculture risk review process through six pre-and-post-risk evaluation
credit Cs rather than reliance on the five conventional credits Cs. Through our proposed
“post-risk evaluation” credit C, we recommend to evaluate facility-wise farm credit, rather to
evaluate the customer on composite risk scoring. Each short-term credits (running finance,
cash finance, import, post import, export-related facilities), and long-term agriculture credits
have unique characteristics and inherent risks. Thus, in ZTBL, each facility is recommended
to evaluate independently. As per evaluated risk scores, said facility should be enclosed
with “specific covenants,” rather to impose combined covenants on overall farm credits. All
the above-mentioned results substantiate H1, and a positive relationship is found among
URM, ARA, RI, RMR, CRA, ORA, LRA and RMPs in ZTBL.
Downloaded by INSEAD At 21:53 06 November 2018 (PT)
support vibrant risk policies. Based on our results as shown in Table XII, we recommend
regular training to the bank staff for the risk compliance process as well as system automation
with modern information technology software and advance hardware to support real-time
online system. These improvements would have direct influence on the bank’s liquidity and
credit risks, since real-time online banking system invigorates customer’s trust on banking
services, particularly farmers. These findings are also supported by the extant research
studies that deem on-time payment realization against commodity supplies, which is an
important function in credit risk management (Ayaz and Hussain, 2011; Velandia et al., 2009).
The respondents substantiate that key banking risks are related to operations, liquidity,
credit, compliance and regulation, reputation, interest rate, repayment, settlement, law and
technology, which are currently managed through interrelated RMPs in risk evaluation
process at ZTBL. Nonetheless, the result pattern in our analysis indicates that still there is a
need to improve risk management infrastructure in ZTBL. This would be used as a shield to
avoid nonperforming assets and improve delinquency ratio.
priced in accordance to the given risk rating in FRR score card that may be varied
due to unsystematic risks.
• All farm credit proposals should be filtered through six credit Cs along with
enclosure of integral “credit covenants” for respective facility.
• The front desk officers in ZTBL should have adequate knowledge in agriculture and
livestock businesses in order to evaluate and assess actual financing needs of the
farmers. Moreover, they should be capable to guide farmers about procedural
documentation of the collateral for convenient disbursement of facilities.
• For agriculture credit decisions, the credit risk committee should include members
from front desk relationship managers to analyze MR, crop or livestock experts to
analyze real working capital needs, risk analysts and regulatory compliance officers
to evaluate credit risk, regulatory and compliance risk, interest rate risk, repayment
risk, legal risk, settlement risk, etc.
• As per feedback from respondents, a “one-size-fit-all” package should be offered to the
farmers to meet their specialized agriculture and commercial banking needs on real-time
online banking system under one roof. This offer will sustain farmers’ relationship with
ZTBL as a sole financial service provider for all of their farm-related banking needs.
• Though the current policy manuals of ZTBL are integrated with the central bank’s
prudential regulations for agriculture finance and Basel-III regulatory compliance for
management of assets and liabilities, however bank’s policy guideline lacks their full
compliance in operational and financial decision making. Employees’ weak training
infrastructure, non-availability of advance software and its supportive hardware,
along with weak post-approval RM system causes the poor compliance of standards
at ZTBL that needs further improvement.
• In present scenario, bank’s liquidity mainly relies on government funds, external
high cost deposits and expensive money market borrowings. ZTBL management
should offer flexible deposit options to attract low-cost deposits from the farmers and
general public. This would improvise the bank’s ability to negotiate credit pricing at
competitive offers alike peer banks.
• It is strongly recommended that ZTBL should transform existing RM framework
with efficient risk review system to offer better facilities to its customers for building
competitive position in the market.
References Transformation
Aimin, H. (2010), “Uncertainty, risk aversion and risk management in agriculture”, Agriculture and of agriculture
Agricultural Science Procedia, Vol. 1 No. 2010, pp. 152-156. risk
Akram, W., Hussain, Z., Sial, M.H. and Hussain, I. (2008), “Agricultural credit constraints and management
borrowing behavior of farmers in rural Punjab”, European Journal of Scientific Research, Vol. 23
No. 2, pp. 294-304.
Al-Tamimi, H. and Al-Mazrooei, M. (2007), “Banks’ risk management: a comparison study of UAE
national and foreign banks”, The Journal of Risk Finance, Vol. 8 No. 4, pp. 394-409.
Ayaz, S. and Hussain, Z. (2011), “Impact of institutional credit on production efficiency of farming
sector: a case study of district Faisalabad”, Pakistan Economic and Social Review, Vol. 49 No. 2,
pp. 149-162.
Ayaz, S., Anwar, S., Sial, M.H. and Hussain, Z. (2011), “Role of agricultural credit on production
efficiency of farming sector in Pakistan – a data envelopment analysis”, Pakistan Journal of Life
Social Sciences, Vol. 9 No. 1, pp. 38-44.
Bilal, A.R., Noraini, Bt A.T. and Khan, M.N.A. (2013), “Remodeling of risk management in banking:
Downloaded by INSEAD At 21:53 06 November 2018 (PT)
evidence from the sub-continent and gulf”, The Journal of Risk Finance, Vol. 14 No. 5,
pp. 468-489.
Binici, T., Koc, A.A., Zulauf, C.R. and Bayaner, A. (2003), “Risk attitude of farmers in terms of risk
aversion: a case study of lower Seyhan plain farmers in Adana province, Turkey”, Turkish
Journal of Agriculture and Forestry, Vol. 27 No. 2003, pp. 305-312.
Dadzie, S.K.N. and Acquah, H.D. (2012), “Attitudes toward risk and coping responses: the case of food
crop farmers at Agona Duakwa in Agona East District of Ghana”, International Journal of
Agriculture and Forestry, Vol. 2 No. 2, pp. 29-37.
Featherstone, A.M., Roessler, L.M. and Barry, P.J. (2006), “Determining the probability of default and
risk-rating class for loans in the seventh farm credit district portfolio”, Review of Agricultural
Economics, Vol. 28 No. 1, pp. 4-23.
Hassan, A. (2009), “Risk management practices of Islamic banks of Brunei Darussalam”, The Journal of
Risk Finance, Vol. 10 No. 1, pp. 23-37.
Hussain, A. and Thapa, G. (2012), “Smallholders’ access to agricultural credit in Pakistan”,
Food Security, Vol. 4 No. 1, pp. 73-85, doi: 10.1007/s12571-012-0167-2.
Khalid, S. and Amjad, S. (2012), “Risk management practices in Islamic banks of Pakistan”, The Journal
of Risk Finance, Vol. 13 No. 2, pp. 148-159.
Ngathou, I.N., Bukenya, J.O. and Chembezi, D.M. (2006), “Managing agricultural risk: examining
information sources preferred by limited resource farmers”, Journal of Extension, Vol. 44 No. 6,
pp. 1-13.
Niinimaki, J.P. (2004), “The effects of competition on Banks’ risk taking”, Journal of Economics, Vol. 81
No. 3, pp. 199-222.
Rehman, A.A. (2016), “A comparative study of risk management practices between Islamic and
conventional banks in Pakistan”, doctoral dissertation, Cardiff Metropolitan University, Wales.
Rosman, R. (2009), “Risk management practices and risk management processes of Islamic banks:
a proposed framework”, International Review of Business Research Papers, Vol. 5 No. 1,
pp. 242-254.
Ruane, J.M. (2005), Essentials of Research Methods: A Guide to Social Science Research, Blackwell
Publishers, Oxford.
Saqib, S., Ahmad, M.M., Panesai, S. and Ali, U. (2016), “Factors influencing farmers’ adoption of
agricultural credit as a risk management strategy: the case of Pakistan”, International Journal of
Disaster Risk Reduction, Vol. 17 No. 2016, pp. 67-76.
Shafiq, A. and Nasir, M. (2009), “Risk management practices followed by the commercial banks in
Pakistan”, masters of science dissertation, COMSATS Institute of Information Technology,
Islamabad.
AFR Shafiq, A. and Nasr, M. (2010), “Risk management practices followed by the commercial Banks in
Pakistan”, International Review of Business Research Papers, Vol. 6 No. 2, pp. 308-325.
State Bank of Pakistan (2017), “Report for agriculture credit support program in quarterly performance
review of Central Bank of Pakistan – May, 2017”, available at: www.sbp.org.pk
Ullah, R., Jourdain, D., Shivakoti, G.P. and Dhakal, S. (2015), “Managing catastrophic risks in
agriculture: simultaneous adoption of diversification and precautionary savings”, International
Journal of Disaster Risk Reduction, Vol. 12 No. 2015, pp. 268-277.
Velandia, M., Rejesus, R.M., Knight, T.O. and Sherrick, B.J. (2009), “Factors affecting farmers’
utilization of agricultural risk management tools: the case of crop insurance, forward
contracting, and spreading sales”, Journal of Agricultural and Applied Economics, Vol. 41 No. 1,
pp. 107-123.
Wang, E., Cresswell, H., Bryan, B., Glover, M. and King, D. (2009), “Modelling farming systems
performance at catchment and regional scales to support natural resource management”, NJAS-
Wageningen Journal of Life Sciences, Vol. 57 No. 1, pp. 101-108.
Winter-Nelson, A. and Temu, A.A. (2005), “Liquidity constraints, access to credit and pro- poor growth
in rural Tanzania”, Journal of International Development, Vol. 17 No. 7, pp. 867-882.
Downloaded by INSEAD At 21:53 06 November 2018 (PT)
Further reading
Adrian, B.W. and Paul, A. (2010), “Thinking beyond Basel III: necessary solutions for capital and
liquidity”, OECD Journal: Financial Market Trends, Vol. 1 No. 2010, pp. 1-23.
Al-Tamimi, H.A.H. (2002), “Risk management practices: an empirical analysis of the UAE commercial
banks”, Finance India, Vol. 16 No. 3, pp. 1045-1057.
Angelopoulos, P. and Mourdoukoutas, P. (2001), Banking Risk Management in a Globalizing Economy,
Greenwood Publishing Group, Quorum Books, Westport, CT and London.
Ayub, M. (2006), “Risk management in the banking environment: a rating agency perspective”, paper
presented at the Seminar on Risk Management in Islamic Financial Services, Kuala Lumpur,
April 25-26.
Burki, S. (2007), “Risk management in agricultural finance”, research report, Institute of Management
Sciences Peshawar.
Burt, B.A. (2001), “Definitions of risk”, Journal of Dental Education, Vol. 65 No. 10, pp. 1007-1008.
Calem, P. and Rob, R. (1999), “The impact of capital-based regulation on bank risk-taking”, Journal of
Financial Intermediation, Vol. 8 No. 4, pp. 317-352.
Carey, A. (2001), “Effective risk management in financial institutions: the Turnbull approach”, Balance
Sheet, Vol. 9 No. 3, pp. 24-27.
Drollette, S.A. (2009), Managing Financial Risk in Agriculture, Department of Applied Economics Utah
State University, UT.
Economist Intelligence Unit (2010), “After the storm: a new era for risk management in financial
services”, EIU, New York, NY, available at: www.sas.com/resources/whitepaper/wp_9196.pdf
Ejan, A. (2005), “Computational aspects and realization in s-plus with applications”, Preprint, available
at: www. vitrum. md/andrew/MScWrwck/TWinSplus. pdf
Fauziah, H., Tafri, R., Rahman, A. and Normah, O. (2011), “Empirical evidence on the risk management
tools practiced in Islamic and conventional banks”, Qualitative Research in Financial Markets,
Vol. 3 No. 2, pp. 86-104.
Financial Times (2012), “Fitch attempts to tally the cost of Basel III”, Financial Times, available at:
http://ftalphaville.ft.com/blog/2012/05/17/1003371/fitch-attempts-totally-the-cost-of-basel-iii/
(accessed May 25, 2012).
Fissha, J.A.A.A. (2009), “Managing risk in financing agriculture”, paper presented at the Managing
Risk in Financing Agriculture, Johannesburg.
Hakim, S. and Neaime, S. (2005), “Profitability and risk management in banking: a comparative Transformation
analysis of Egypt and Lebanon”, Money and Finance in the Middle East: Missed Opportunities or of agriculture
Future Prospects?, Emerald Group Publishing Limited, pp. 117-131.
risk
Hardaker, J.B. (Ed.) (2004), Coping with Risk in Agriculture, Cabi, University of New England, Armidale.
management
Hussein, A. and Al-Tamimi, H. (2008), “Implementing Basel II: an investigation of the UAE banks’
Basel II preparations”, Journal of Financial Regulation and Compliance, Vol. 16 No. 2, pp. 173-187.
Hussein, A., Hassan, Al-Tamimi, Faris, M. and Al-Mazrooei, F.M. (2007), “Banks’ risk management: a
comparison study of UAE national and foreign banks”, The Journal of Risk Finance, Vol. 8 No. 4,
pp. 394-409.
IBM SPSS Missing Values 22 Manual (2013), “Sussex website”, updated April 21, 2014, available at:
www.sussex.ac.uk/its/pdfs/SPSS_Missing_Values_22.pdf; Statistics How To (www.
statisticshowto.com/kaiser-meyer-olkin/) (accessed June 15, 2012).
Iqbal, M., Ahmad, M. and Abbas, K. (2003), “The impact of institutional credit on agricultural
production in Pakistan”, The Pakistan Development Review, Vol. 42 No. 4, pp. 469-485.
Jessop, R. and Harms, J. (2012), “Creating access to agricultural finance creating access: based on a
Downloaded by INSEAD At 21:53 06 November 2018 (PT)
horizontal study of Cambodia, Mali, Senegal, Tanzania, Thailand, and Tunisia. to Agricultural
Finance”, International Journal of African and Asian Studies- An Open Access International Journal.
Khambata, D. and Bagdi, R.R. (2003), “Off-balance-sheet credit risk of the top 20 Japanese banks”,
Journal of International Banking Regulation, Vol. 5 No. 1, pp. 57-71.
Kozarevic, E., Nuhanovic, S. and Nurikic, M.B. (2013), “Comparative analysis of risk management in
conventional and Islamic Banks: the case of Bosnia and Herzegovina”, International Business
Research, Vol. 6 No. 5, pp. 180-193.
Nair, A. (2009), “Risk management by banks financing agriculture and rural enterprise: African and
Asian experience”, working paper, Proceedings of the Expert Meeting on Managing Risk in
Financing Agriculture, Johannesburg, available at: www.ruralfinance.org
Naveed, A. and Kashif, U.R. (2013), “Risk management practices and attitude of Pakistan Islamic Banking
System employees”, African Journal of Business Management, Vol. 7 No. 33, pp. 3202-3211.
Nazir, M.S., Daniel, A. and Nawaz, M.M. (2012), “Risk management practices: a comparison of
conventional and Islamic Banks in Pakistan”, American Journal of Scientific Research, Vol. 68
No. 68, pp. 114-122.
Oldfield, G.S. and Santomero, A.M. (1997a), “The place of risk management in financial institutions”,
working papers, Center for Financial Institutions, The Wharton School, University of
Pennsylvania.
Oldfield, G.S. and Santomero, A.M. (1997b), “Risk management in financial institutions”, Sloan
Management Review, Vol. 39 No. 1, pp. 33-46.
Paul, E. and Marius, H. (2011), “Practices and issues in operational risk modeling under Basel-II”,
Lithuanian Mathematical Journal, Vol. 51 No. 2, pp. 180-193.
Rehman, A., Jingdong, L., Du, Y. and Khatoon, R. (2015), “Banking role and loan schemes for
agricultural development in China & Pakistan”, Global Journal of Human-Social Science, Vol. 5
No. 7, pp. 56-68.
Salas, V. and Saurina, J. (2002), “Credit risk in two institutional regimes: Spanish commercial and
savings banks”, The Journal of Financial Services Research, Vol. 22 No. 3, pp. 203-16.
Singla, S. and Sagar, M. (2012), “Integrated risk management in agriculture: an inductive research”, The
Journal of Risk Finance, Vol. 13 No. 3, pp. 199-214.
Tahir, H. and Madiha, L. (2014), “Credit risk management practices used by banks in agricultural
finance: a case study of Pakistan”, International Journal of African and Asian Studies, Vol. 5
No. 2014, pp. 31-39.
Tanninen, M. (2013), “Determinants of credit risk in secured loans – evidence from the auto loan
industry”, thesis, Lappeenranta University of Technology.
AFR Wetmore, J.L. (2004), “Panel data, liquidity risk, and increasing loans-to-deposits ratio of large
commercial bank holding companies”, American Business Review, Vol. 22 No. 2, pp. 99-107.
ZTBL (2017), “ZTBL statistic”, available at: www.ztbl.com.pk
Mirza Muhammad Ali Baig is PhD researcher at the Superior University Lahore. He teaches
agriculture risk management, advance financial management and behavioral finance. His areas of
research are risk management, financial challenges in farm credit and risk attitude in farmers.
For instructions on how to order reprints of this article, please visit our website:
www.emeraldgrouppublishing.com/licensing/reprints.htm
Or contact us for further details: [email protected]