NR467 Rules for Steel Ships – Main Changes – Edition July 2020
Main changes in BV Rules for Steel Ships
Main changes in Bureau Veritas Rules for the Classification of Steel Ships July 2020 edition, into force on July
1, 2020, regarding the previous edition (January 2020) are described as follows.
Rules History
July 2020 edition Previous edition: January 2020
into force on July 1, 2020 into force on January 1, 2020
Contents Contents
Amendments to Parts A, B, C, D, E and F
[NR 467 DT Amd 016 E July 2020]
Part A - Classification and Surveys Part A - Classification and Surveys
[NR 467.A1 DT R17 E January 2020] [NR 467.A1 DT R17 E January 2020]
Part B - Hull and Stability Part B - Hull and Stability
[NR 467.B1 DT R12 E January 2020] [NR 467.B1 DT R12 E January 2020]
Part C - Machinery; Electricity, Automation Part C - Machinery; Electricity, Automation
and Fire Protection and Fire Protection
[NR 467.C1 DT R12 E January 2020] [NR 467.C1 DT R12 E January 2020]
Part D - Service Notations Part D - Service Notations
[NR 467.D1 DT R12 E January 2020] [NR 467.D1 DT R12 E January 2020]
Part E - Service notations for Part E - Service notations for
Offshore Service Vessels and Tugs Offshore Service Vessels and Tugs
[NR 467.E1 DT R03 E January 2020] [NR 467.E1 DT R03 E January 2020]
Part F - Additional Class Notations Part F - Additional Class Notations
[NR 467.F1 DT R12 E January 2020] [NR 467.F1 DT R12 E January 2020]
1/6
NR467 Rules for Steel Ships – Main Changes – Edition July 2020
PART A – Classification and Surveys
IACS Unified Requirements, Unified Interpretations & Recommendations
UR/UI Revision Title Reference
UR Z3 Rev.8 Periodical survey of the outside of the ship's bottom Ch 4, Sec 5
and related items
UR Z7 Rev.28 Hull Classification Surveys Ch 2, Sec 2; Ch 3, Sec 2
UR Z7.1 Rev.15 Hull Surveys for General Dry Cargo Ships Ch 2, Sec 2; Ch 2, App 3;
Ch 4, Sec 7
UR Z7.2 Rev.8 Hull Surveys for Liquefied Gas Carriers Ch 2, Sec 2; Ch 2, App 3;
Ch 4, Sec 5
UR Z10.1 Rev.24 Hull Surveys of Oil Tankers Ch 2, Sec 2
UR Z10.2 Rev.36 Hull Surveys of Bulk Carriers Ch 2, Sec 2
UR Z10.3 Rev.19 Hull Surveys of Chemical Tankers Ch 2, Sec 2
UR Z10.4 Rev.16 Hull Surveys of Double Hull Oil Tankers Ch 2, Sec 2
UR Z10.5 Rev.19 Hull Surveys of Double Skin Bulk Carriers Ch 2, Sec 2
UR Z20 Rev.2 Planned Maintenance Scheme (PMS) for Machinery Ch 2, App1
UI SC182 Rev.1 Bulk carriers not complying with SOLAS XII/9 as Ch 3, Sec 1; Ch 4, Sec 2;
of 1 January 2004 – deletion of the UI Ch 6, Sec 2
Rec. 148 Rev.1 Survey of liquefied gas fuel containment systems Ch 4, Sec 9, [5.5.2]
Service notations
Existing service notation
Service notation Description Reference
anchor handling Possibility to assign also the service notation alone, outside the Ch 1, Sec 2 [4.8.2]
offshore support vessel( ) service notation
As a rule, the service notation tug is also to be assigned in
combination with the service notation anchor handling
Additional service features
New additional service features
Service feature Description Reference
standardized Introduction of the new additional service feature Ch 1, Sec 2 [4.7.1];
design bollard pull standardized design bollard pull = [TBP/9,81] t for ships Ch 4, Sec 8, [6.2]
= [TBP/9,81] t assigned with tug, escort tug or salvage tug service notation
SMART() Introduction of the SMART additional feature covering 1st tier Ch 1, Sec 2 [4.17.8]
of smart functions relative to hull, machinery & navigation
2/6
NR467 Rules for Steel Ships – Main Changes – Edition July 2020
Additional class notations
New additional class notations
Class notation Description Reference
CYBER Introduction of the CYBER MANAGED PREPARED notation to Ch 1, Sec 2 [6.14.44]
MANAGED reflect compliance, at shipyard level, with a set of requirements
PREPARED dealing with system integration and the management of critical
equipment and remote access
CYBER Introduction of the CYBER SECURE PREPARED notation to Ch 1, Sec 2 [6.14.44]
SECURE reflect compliance with a set of requirements dealing with cyber
PREPARED management, equipment hardening and vessel secure by
design
Existing additional class notations
Class notation Description Reference
ULEV Updating conditions of assignment and survey requirements, in Ch 1, Sec 2, [6.8.15];
line with ULEV notation re-engineering, see Pt F Ch 4, Sec 7, [3.3.1]
DYNAPOS Clarifying applicability of annual surveys at sea for DYNAPOS Ch 5, Sec 10, [5.1.2]
vessels
CEMS Removing intermediate surveys for “CEMS” Ch 5, Sec 7, [3.3.2]
Other Changes
Topic Description Reference
Condition monitoring & Updating the applicability of CBM survey Ch 2, Sec 2, [4.4.7]
condition based maintenance
Condition of Class
Updating the word “recommendation” by Ch 2, Sec 2; Ch 2, Sec 3;
“condition of class” Ch 3, Sec 4; Ch 3, App 1;
Ch 5 Sec 2
PART B – Hull Structure and Stability
IACS Unified Requirements, Unified Interpretations & Recommendations
UR/UI Revision Title Reference
UR W35 Rev.0 Requirements for NDT Suppliers Ch 11, Sec 1 [1.4.4] and [6.2]
(See also NR669)
UR S2 Rev.2 Definition of ship's length L and block coefficient Cb Ch 1, Sec 2
Other Changes
Topic Description Reference
Mooring Update of the breaking loads of synthetic fibre Ch 9, App 2 [2.5.3]
mooring ropes according to IACS Rec. 10 Rev.3
3/6
NR467 Rules for Steel Ships – Main Changes – Edition July 2020
PART C – Machinery, Electricity & Fire Safety
Chapter 1 – Machinery
IACS Unified Requirements, Unified Interpretations & Recommendations
UR/UI Revision Title Reference
UR M80 Rev.0 Requirements for AC Generating sets Ch 1, Sec 9 [3]
UR W35 Rev.0 Requirements for NDT Suppliers Ch 1, Sec 1 [2.2]
(See also NR669)
UI SC242 Rev.2 Arrangements for steering capability and function on ships Ch 1, Sec 11 [4]
fitted with propulsion and steering systems other than
traditional arrangements for a ship’s directional control
Chapter 2 – Electrical installations
IACS Unified Requirements, Unified Interpretations & Recommendations
UR/UI Revision Title Reference
UR M80 Rev.0 Requirements for AC Generating sets Ch 2, Sec 4 [2.3]
Other Changes
Topic Description Reference
Battery Clarification of the requirements applicable for Li-ion batteries Ch 2, Sec 7 [1.4.1]
Chapter 4 – Fire Safety
IMO Regulations
IMO Instrument Description Reference
MSC.1/Circ.1616 Unified Interpretations of SOLAS Chapter II-2 – Categorization of Ch 4, Sec 5, [1.3]
spaces for the storage of urea or sodium hydroxide solutions tanks and [1.4]
Other Changes
Topic Description Reference
Type-approval Clarification of the list of items for which type-approval is required Ch 4, Sec 1, [2.5.1]
Fire-fighting Dimensioning of the fire pumps when they feed fixed fire- Ch 4, Sec 6, [1.3.4]
systems extinguishing systems in addition to the fire main
Fuel for auxiliary Clarifications and wording improvements Ch 4, Sec 11
vehicles
4/6
NR467 Rules for Steel Ships – Main Changes – Edition July 2020
PART D – Service Notations
Chapter 4 – Bulk Carriers
IACS Unified Requirements, Unified Interpretations & Recommendations
UR/UI Revision Title Reference
UR S17 Rev.10 Longitudinal strength of Hull Girder in flooded condition for single Ch 4, Sec 3 [3.2]
side skin Bulk Carriers
UR S18 Rev.10 Evaluation of Scantlings of Corrugated Transverse Watertight Ch 4, Sec 3 [3.3]
Bulkheads in Bulk Carriers considering hold flooding
Chapter 9 – Liquefied Gas Carriers
IACS Unified Requirements, Unified Interpretations & Recommendations
UR/UI Revision Title Reference
UI GC23 Corr.1 Cargo tank structure heating arrangement power Ch 9, Sec 4 [6.2.6]
supply
UI GC20 New Tee welds in type A or type B independent tanks Ch 9, Sec 4 [7.2.1]
UI GC21 New Welds of type C independent bi-lobe tank with Ch 9, Sec 4 [7.2.2]
centreline bulkhead
UI GC25 Rev.1 Cargo piping insulation Ch 9, Sec 5 [12.1.4]
UI GC26 Corr.1 Type testing requirements for valves Ch 9, Sec 5 [13.3.1]
UI GC28 Rev.1 Guidance for sizing pressure relief systems for Ch 9, Sec 8 [2.1.3]
interbarrier spaces
UI GC22 June 2019 Water spray system Ch 9, Sec 11 [1.3.2] and
[1.3.5]
UI GC27 Corr.1 Level indicators for cargo tanks Ch 9, Sec 13 [2.1.2]
UI GC29 New Integrated systems Ch 9, Sec 13 [9.1.3]
IMO Regulations
IMO Instrument Description Reference
MSC.1/Circ.1617 Unified interpretations of the IGC Code Ch 9, Sec 11 [1.3.8] and
[1.4.9]
Other Changes
Topic Description Reference
Classes of gas fuel Clarification of the piping classes applicable for gas Ch 9, Sec 16 [4.1.6] and
piping fuel piping Tab.1
5/6
NR467 Rules for Steel Ships – Main Changes – Edition July 2020
PART E – Service Notations for OSV and Tugs
Chapter 1 – Tugs
Topic Description Reference
Bollard Pull Trials Introduction of the new additional service feature Ch 1, Sec 1; Ch 1 Sec 5;
standardized design bollard pull = [TBP/9,81] t and new Ch 1 App 1
test procedure for bollard pull trials
PART F – Additional Class Notations
Class notation Description Reference
AVM-DPS Clarification of how blackout cases are to be considered Ch 2, Sec 2 [2.2.3]
BATTERY Various updates regarding battery certification and installation Ch 11, Sec 21
SYSTEM on board, including:
• Requirement for a gas analysis during battery
certification
• Update of fire safety requirements for batteries,
especially Li-ion batteries
UNSHELTERED Introduction of the possibility to perform alternative testing Ch 11, Sec 23 [2.4.3]
ANCHORING method when the water depth is insufficient
ULEV Complete revision of ULEV notation Ch 11, Sec 26
6/6