Septic I
Septic I
AMENDMENTS
AMENDMENTS
AMENDMENTS
AMENDMENTS
50x50mm timber purlin. AMENDMENTS
AMENDMENTS
AMENDMENTS
AMENDMENTS
NOTE;
NOTE;NOTE;
NOTE;
NOTE;
NOTE;
NOTE;
NOTE;
1.
1.1. 1.
Use
Use only
Useonly the
onlythe
the written
written
written
Use dimensions
dimensions
only dimensions
the written dimensions
1.Use only the
1.
1.
1. Use
Use only
only the
the written
written dimensions
dimensions
Use only the written dimensions
written dimensions
2.2.
2. 2.
All the
Allthe
All dimensions
thedimensions
dimensions are
areinin
All the are millimeters
inmillimeters
dimensionsmillimeters
are in millimeters
2.Contractor
2.
2.
2. All
All the dimensions
All the
the dimensions
are in
dimensions are
are in
millimeters
in millimeters
All the dimensions are in millimeters
millimeters
Contractor to check and verify all dimensions
3.3.
3. Contractortotocheck
check andverify
and verifyall
alldimensions
dimensions
2,897
3.Contractor Contractor to check and verify all dimensions
3.
3. Contractor to
to check
check
on and
and
the verify
verify all
site alldimensions
dimensions
3.Any
ononthe
thesite
site
Contractor to site
check and verify all dimensions
3. Contractor to check and verify on the site
all dimensions
on
on the
the site
site
on
to the site
on the
4.4.
4. 4.
Anydescrepancies
descrepanciesto
Any descrepancies tobe
bereported
reportedto
to be reported
Any descrepancies tothe
to theArchitect
be the Architect
Architect
reported to the Architect
4.
4.
4.
Any
Any descrepancies to be reported to the Architect
4. Any descrepancies
descrepancies to
to be
be reported
immediately
immediately
immediately to
to the
the Architect
immediately
reported Architect
Any descrepancies
immediatelyto be reported to the Architect
immediately
immediately
CLIENT: immediately
CLIENT:
CLIENT:
CLIENT:
CLIENT: CLIENT:
MGOSICLIENT:
ODETHA BAKIGA
JULIUS MGESI AMINIEL MAKUNDI
NYANGWE
LILIAN ABDUL MUKASA
............................................
YOHANA MR.P.O
NGUMA'S SIMEON
BOX 75570
FAMILY
BESTY
& KAMUNDE P.O WILLIAM
BOX 6954 SHABANI
150 450
PROJECT
PROJECT
PROJECT TITLE:
TITLE:
TITLE:
PROJECT TITLE:
PROJECT
PROJECT
PROJECT TITLE:
TITLE:
TITLE:
PROJECT TITLE:
PROPOSED PROPOSED
PROPOSED RENTAL
RESIDENTIAL
RESIDENTIAL
PROPOSED RESIDENTIAL
PROPOSED
BUILDINGPROPOSED
APARTMENTS
PROPOSED AT RESIDENTIAL
RESIDENTIAL
AT KIMARA PLOT
BUILDING BUILDING KISARAWE
ATRESIDENTIAL
........
AT PLOT PLOT
MPIJI MAGOE PLOT
PROPOSED RESIDENTIAL
N.O
N.O BUILDING
BUILDING
.......BLOCK
.......BLOCK
BUILDING AT
AT AT TUANGOMA
MBEZI
'.......' IN
'.......' INDAR JUU ES
KIGAMBONI
.................... PLOT PLOT
SALAAM
N.O .......BLOCK .............
'.......' IN UBUNGO
BUILDING'.......' INAT KIBADA PLOT
N.O .......BLOCK
N.O .......BLOCK
N.O .......BLOCK '.......' IN
'.......' DAR
IN ES
KINONDONI SALAAM
.......................
N.O 198 BLOCK 11 IN TEMEKE
MUNICIPAL
MUNICIPALITY
CONSULTANTS:
CONSULTANTS:
CONSULTANTS: CONSULTANTS:
3,100
CONSULTANTS:
CONSULTANTS:
CONSULTANTS:
ARCHBOARD
ARCHBOARD
ARCHBOARD ARCHBOARDINTERNATIONAL:
INTERNATIONAL:
INTERNATIONAL: INTERNATIONAL:
CONSULTANTS:
ARCHBOARD
ARCHBOARD INTERNATIONAL:
ARCHBOARD INTERNATIONAL:
INTERNATIONAL:
2,500
2,437
ARCHBOARD INTERNATIONAL:
(Architects,Planners,Interior
(Architects,Planners,Interior
(Architects,Planners,Interior
(Architects,Planners,Interior Designers,
Designers,
Designers, Designers,
(Architects,Planners,Interior
(Architects,Planners,Interior
(Architects,Planners,Interior
Landscape
Landscape Designers
Designers and
and Project Designers,
Designers,
Designers,
Managers)
Landscape Designers
Landscape andProject
Designers Projectand Managers)
Managers)
Project Managers)
Landscape
Landscape Designers
Landscape Designers and
Designers and Project
and Project Managers)
Project Managers)
(Architects,Planners,Interior Designers,
Managers)
P.O
P.O
P.OBOXBOX
BOX 78732
78732
78732
P.OLandscape ESDesigners
SALAAM and Project Managers)
P.O BOX 78732
P.O
P.O
DAR
DAR BOX
BOX
ES
ES BOX 78732
78732
78732
SALAAM
SALAAM
DAR ES SALAAM
DAR
DAR
DAR ES
DAR ES SALAAM
ES SALAAM
P.O BOX 78732
SALAAM
DAR ES SALAAM
DRAWING
DRAWING
DRAWING TITLE:
TITLE:TITLE:
TITLE:
DRAWING
DRAWING
DRAWING TITLE:
DRAWING TITLE:
TITLE:
SEPTIC
SEPTIC TANK
SEPTICTANK SECTION
AND
AND SOAKAWAY
SOAKAWAY PIT
PIT PIT
SECTION
DRAWING TITLE:
SEPTIC TANK
TANKAND
SECTIONSOAKAWAY
AND SOAKAWAY PIT
SEPTIC TANK AND SOAKAWAY PIT
Designed
Designed by:
Designedby:
by: BRIAN
BRIAN
BRIAN
Designed HAULE
HAULE
by: HAULE
BRIAN HAULE
by: ALEX
BRIANNYAKI
by: BRIAN HAULE
SOAKAWAYPIT AND SEPTIC TANK
Designed
Designed
Designed by:
concrete floor finish Checked
Checked by:
by: BRIAN
BRIAN
BRIAN
Checked by:Checked
HAULE
HAULE
HAULE
by: HAULE
BRIAN HAULE
200mm concrete. Checked
Checked by: ALEX
Checked by: BRIANNYAKI
by: BRIAN HAULE
HAULE
200mm hardcores. Drawing
Drawing Designed
by:
Drawingby:
by: BRIAN
BRIAN
Drawing by:
ALEX BRIAN
by: HAULE
BRIAN HAULE
HAULE
BRIAN .M. HAULE
HAULE
Drawing
Drawing by:
Drawing by: BRIANNYAKI
by: BRIAN HAULE
HAULE SCALE:
BRIAN.M.HAULE
well compacted soil. DATE:
DATE:
DATE: DATE: JULY,
JUNE,
OCT,
Checked
2018
20182018
by: 2018
OCT,2018
JULY, 2018SCALE:
SCALE: 1:100
1:100
1:100
SCALE:1:100
AUG, SCALE:1:100
1:100
DATE:
DATE: SCALE:
SCALE:
SEPTIC TANK AND SOAKAWAY PIT OCT,2018 1:100
DATE:
5
GSPublisherEngine
GSPublisherEngine 0.33.100.100
0.15.100.100
GSPublisherEngine 0.20.100.100
GSPublisherEngine 0.50.100.100
Drawing No:
GSPublisherEngine
GSPublisherEngine
GSPublisherEngine 0.30.100.100
0.44.100.100
0.36.100.100
GSPublisherEngine 0.36.100.100