QAS - Shutdown Maint - Test Case - 05

1. A shutdown maintenance notification was created from a notification for equipment Z1301-BL-M-A. 2. A maintenance order was generated from the notification and operations were planned and confirmed. Goods movement of spares was also done against the order. 3. The order was settled at period end and the actual costs were transferred to the defined cost center, completing the business process for the shutdown maintenance order.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
32 views4 pages

QAS - Shutdown Maint - Test Case - 05

1. A shutdown maintenance notification was created from a notification for equipment Z1301-BL-M-A. 2. A maintenance order was generated from the notification and operations were planned and confirmed. Goods movement of spares was also done against the order. 3. The order was settled at period end and the actual costs were transferred to the defined cost center, completing the business process for the shutdown maintenance order.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

Unit Test/Intergartion test

Test ID: QASPM:05

SCENARIO: Shutdown Maintenance Module: Plant Maintenance

DESCRIPTION Shutdown Maintenance order is created from notification. Goods Movement done if spares used & Order activities are confirmed. Technical
completion and settlements are subsequent process

RUN# REVISION: 1.0

LEGACY SYS: ECC6.0EHP7 RUN DATE: 10.01.2023 STATUS: -OK

SETUP DATA 1

DATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES

1 Company Code 1100 SBPL

2 Plant 3000

3 Profit Center

Page 1
Unit Testing/Integration Testing

TRANSACTIONAL STEPS
N BUSINESS PROCESS STEPS/ O
TRANSACTION INPUT DATA / SPECIAL INFORMATION EXPECTED RESULTS ACTUAL RESULTS TESTER
o BPP NUMBER K
Notification type – Z7(Shutdown Notification number
notification) Description: Shut down Notification to - 7000000000 Manish
maintenance Process _QAS be created
Notification creation Equipment - Z1301-BL-M-A
1. IW21 Breakdown - Check box tick ok

Priority -Medium,

Change Notification Notification number -7000000000 Change views Change required


Main Work center: MG-BRUTL fields
2. IW22 Manish ok
Select object codes and codes/iTEMS
Notification Status :NAPR
Notification No: 7000000000. -
Notification list Notification type – Z7 Output list Output list
3. IW28 displayed Manish ok
Outstanding/In process - Check
Order type – ZM07
Order creation Planning Plant - 3000 Order operation Order number -
assignments. 7100000000
Maintenance Work center - Priority -
4. IW31 Order created Manish ok
Medium
Notification user status: APR(By
Manager)
IW32 CCkey: Calculate work
5. Change order & Release Duration Unit : H Order operation Orders number- Manish ok
order assignments. Cost calculated
Operation tab : 10
Plan cost=432
operation 1-Activity type: PMTECH.
Duration in H for each operation

Page 2
Unit Testing/Integration Testing

Reservation: 82522
Component/Spare – 20000532
Doc type : Goods issue against order Doc:
Goods Movement Order: Good to be 4900113807
6. MIGO moved & doc Manish ok
posted
Order no. 7100000000 Operation All the operations
Overall completion nos.010 confirmed. Order confirmed
confirmation: Order Personal number: 10822 Order status: CNF with status CNF
operations’ time IW41/IW42 Actual Time data for order (confirmed) Plan cost =Actual
7. Manish ok
confirmation operations. Cost= 432

TECO command.
Technical completion of 1) Order closing Order completed
Order Confirm the actual completion date- with status TECO
for next schedule calculation together with.

8 IW32 2) Order will only be Manish ok


saved after status
TECO when all the
operations have
been confirmed
(status CNF).
-Controlling area1100
Period end Settlement -Order Number : ORD 7100000000 Costs in the order TOTAL ACTUAL COST
of Order -Settlement period:10 settled to the cost OF ORDER SETTLED TO
-Fiscal year:2022 center defined in CTR 30001100=632
9 -Processing type the settlement rule. Manish ok
Actual cost of order
became zero. Cost
element: 520001
-Plant
10 Business completion of -Select indicator “w/ plant maint.. -All the Order business Manish ok

Page 3
Unit Testing/Integration Testing

tasks”
orders at period end -Residence time=0 maintenance order completed (status
with status TECO CLSD)
closed/business
completed.

-No further actual


cost can be posted
to the closed
orders.

Date: 10.01.2022

Name of Consultant: Manish Gujarathi

Page 4