QAS Calibration Process Test Case-07

1. A calibration maintenance order was scheduled through calibration plans. Results were recorded and usage decisions were made. Order activities were confirmed and technical and financial completion occurred. 2. Maintenance plans were created for equipment with calibration task lists. Plans were scheduled and calibration orders were generated. Order operations were assigned, results recorded, and the order was confirmed and completed. 3. At period end, costs from completed calibration orders were settled to the defined cost centers, and the actual costs of orders became zero and were moved to the relevant cost elements.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
100 views4 pages

QAS Calibration Process Test Case-07

1. A calibration maintenance order was scheduled through calibration plans. Results were recorded and usage decisions were made. Order activities were confirmed and technical and financial completion occurred. 2. Maintenance plans were created for equipment with calibration task lists. Plans were scheduled and calibration orders were generated. Order operations were assigned, results recorded, and the order was confirmed and completed. 3. At period end, costs from completed calibration orders were settled to the defined cost centers, and the actual costs of orders became zero and were moved to the relevant cost elements.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

Unit Test/Intergartion test

Test ID: QASMaint-07

SCENARIO: Calibration Process Module: Plant Maintenance

DESCRIPTION Calibration Maintenance order is scheduled through calibration plans. Results recording & Usage Decision done, Order activities are confirmed.
Technical completion and settlements are subsequent process

RUN# REVISION: 1.0

LEGACY SYS: ECC6.0EHP7 RUN DATE: 11.01.2023 STATUS: -OK

SETUP DATA 1

DATA OBJECT VALUE/CODE DESCRIPTION COMMENTS AND NOTES

1 Company Code 1100 SBPL

2 Plant 3000

3 Profit Center

Page 1
Unit Testing/Integration Testing

TRANSACTIONAL STEPS
N BUSINESS PROCESS STEPS/ O
TRANSACTION INPUT DATA / SPECIAL INFORMATION EXPECTED RESULTS ACTUAL RESULTS TESTER
o BPP NUMBER K
Task list type – A(general) Task List Gr: CALTL1
Description: Calibration Task Task lists to be GRCR:1 Manish
lists_QAS created
Create General task lists Usage :4 , Status :4
creation
1. IA05 Inspection points :300 ok
Strategy: SBPL
MIC: PMMIC1,
Main Work center : MG_CGNES
Maint. plan cat: Order
Create Maintenance Equipment: Z200-TT-1309 Plan should Calibration
plans Order Type:ZM05 create . Plan:1256
Call horzon:100%
IP42/IP41 Shift factor Early& late compl.:100%
2. Manish ok
Factory Calendar: S1
Scheduling period:365 days
Task list: A, Gr: CALTL1,Grcr:1

Calibration plan:1256 Plan dates vs


Schedule calibration IP10 Outstanding/In process - Check Plan should get call date list
3. Manish ok
plans scheduled displayed
Order type – ZM05
Calibration Order Planning Plant - 3000 Scheduled call Order number -
creation objects (Order) 4000184
IW31/IP10 Maint. Work center : MG_CGNES
4. should get Manish ok
Priority - Medium generated

IP24 Maint.Plan-1256
5. Scheduling Over view Maintenance List display with

Page 2
Unit Testing/Integration Testing

Plant -3000
list plan with call objects
scheduling dates
CCkey: Calculate work
Change order & Release Duration Unit : H Order operation Change required
order assignments. field and save
operation 010-Activity type:
PMTECH. Duration in H for each
6. IW32 operation Manish ok
Inspection lot: 1400000000000
Equipment: Z200-TT-1309,
Cntrl Key: Pm01
Results Recording & UD QA32 Date range Results are
7. List setting: Select Only inspection Results accepted Manish ok
Lot Without UD Recording & UD
Inspection lot: 1400000000000
Results :250.00
UD: PM-Calib:” Results are accepted

IW41/IW42 Order no. 4000184 All the operations
8. Overall completion Operation nos.0010, confirmed. Order confirmed Manish ok
confirmation: Order Personal number: 10807. Order status: CNF with status CNF
operations’ time (confirmed)
Actual Time data for order
confirmation
operations.

IW32 TECO command.


9 Technical completion of 1) Order closing Order completed Manish ok
Order Confirm the actual completion date- with status TECO
for next schedule calculation together with.

2) Order will only be


saved after status

Page 3
Unit Testing/Integration Testing

TECO when all the


operations have
been confirmed
(status CNF).
-Controlling area1100
Period end Settlement -Order Number Costs in the order TOTAL ACTUAL COST
of Order -Settlement period:10 settled to the cost OF ORDER SETTLED TO
-Fiscal year:2022 center defined in CTR 30002000=632
9 K088/KO8G -Processing type the settlement rule. Manish ok
Actual cost of order
became zero. Cost
element: 520001

Date: 11.01.2022

Name of Consultant: Manish Gujarathi