Woven Pant Consumption Formula
Woven Pant Consumption Formula
Woven Pant Consumption Formula
Woven Pant
Mathematical formula to calculate the fabric consumption of Woven pant in yard is as follows:
Formula : (Length X Width) / (Fab width X 36)
Note: We must add sewing allowance 2" and 3% wastage. Also We need to know the width of the fabric roll.
=[{(34+46)/2}+{(28+18)/2}X44]/(56*36)
=3082/2016
=1.52
=1.57 yds/pc
=19.46 yds/dzn
Note:
**Why 36?
Ans: 1yard=36 inch. To convert inch into yard.
**Why 56?
Ans: The width of fabric roll. It may vary.
1 Foot = 30.48 cm
1 inch = 2.54 cm
1 CM = 0.032 Foot
1 CM = 0.393 Inch
Neck/Rib : 175-180
Measurement Chart:
Formula:
Cpd = L x W x 12 x GSM kg
10000000
L = Length
W = Width
10000000
= 70 x 102x 12 x 150 kg
10000000
= 1.28 kg
10000000
= 25 x 49 x 12 x 2 x 150 kg
10000000
= 0.44 kg
10000000
= 61 x 7 x 12 x 180 kg
10000000
= 0.092 kg
= 1.81 kg
= (1.81 + 7%)
= 1.94 kg
So, the fabric consumption for men’s T-shirt is 1.94 kg per dozen.
c) Wastage % 7%
a) Chest 96 cm 102 cm
b) HPS 65 cm 70 cm
c) Sleeve length 20 cm 25 cm
d) Arm hole 46 cm 49 cm
e) Collar length 46 cm 46 cm
f) Collar width 7 cm 10 cm
g) Cuff length 26 cm 10 cm
10000000
= 70 x 102x 12 x 150 kg
10000000
= 1.28 kg
B) Cpd (Sleeve) = L x W x 12 x 2 x GSM kg
10000000
= 25 x 49 x 12 x 2 x 150 kg
107
= 0.44 kg
107
= 46 x 10 x 12 x 400 kg
107
= 0.22 kg
107
= 46 x 10 x 12 x 400 kg
107
= 0.22 kg
107
= 30 x 5 x 12 x 2 x 300 kg
107
= 0.108 kg
= 2.05kg
Actual Cpd = 2.05 kg + 7%
= 2.19 kg
c) Wastage % 7%
c) Thigh (width 66 cm 72 cm
d) Front rise 28 cm
e) Back rise 36 cm
Measurement Chart:
Cpd = L x W x 12 x GSM kg
107
= 114 x 2 x 72 x 12 x 200 kg
107
= 3.93 kg
Pre-requisites:
Total $14
= $2.8
= $16.8
= $17.64
= $18
3. CM $4-6/dz $5
Total $21
= $21 x 20%
= $4.2
= $21 + $4.2
= 25.2
C) Profit at 5% = $25.2 x 5%
= $26.46
= $26.5
The total cost for 1 dozen polo shirt is $26.5
3. CM $4-6/dz $5
Total $29.5
= $21 x 20%
= $4.2
= $21 + $4.2
= $33.2
C) Profit at 5% = $33.5 x 5%
= $35.18
= $35.18
Seeking for you kind permission, would you pls allow me to share in details about the “Woven bottom consumption ”
for those who send request regarding this issue in your blog
In Apparel sector there are 2 types of Merchandise, One is Woven merchandise ( Such as Shirt , Pant , Blouse etc )
& the other one is Knit merchandise ( Circular Knit :- Tee shirt , Polo shirt ,Fashion knit :- Sweater Etc ) .
Merchandiser is the key person of this sector, who communicates with Buyer or Buying house to get an Order. The
procedure of getting an order from a buyer, merchandiser got an inquiry directly from a Buyer or from a Buying
house. In that inquiry buyer ask for price of his desired garments, it may be in Woven fabric or In Knit fabric. For
quote a price, merchandiser must calculate fabric consumption first, coz fabric price cover more than 60 % of that
quoted Price.
As a Merchandiser, for any type of Garments Consumption calculation, first we have to know what type of garments
we are going to make. For that, we need to know the specific parts name & the measurement of that particular
garments parts. Measurement may be in inch or in centimeter (Measurement in Inch for American order & Centimeter
for European order). That’s need to calculate consumption. For accurate measurement we need to make a “Paper
pattern “ or “CAD pattern “ first . pattern is the sketch combination of different parts of a garments .
We all know every part of garments have its LENGTH & WIDTH measurement. Basically on woven garments, we
calculate the consumption in Yard/ Doz (2.54 Cm= 1 inch & 36 inch = 1 Yds,). In that case we also need to know the
Width of that particular fabric which we are going to use. Now we will calculate each of the separate part based on
this Length & Width. to have the total consumption, for this we can use Separate part formula as below:-
(LENGTH X WIDTH) X Number of Parts pcs or Panels / Fabric Width (Pls consider suitable sewing allowance with
each length & width for each application.)
After calculate the consumption of all t part this way, now we will add all that separate parts consumption tighter ,than
we will add wastage percentage based on the fabric nature which we are going to use for that particular garments.
We can also workout the consumption of a bottom item by using the below “Solid formula for calculate consumption"
(Total LENGTH X Total WIDTH ) X Number of Parts pcs or Panels / Fabric Width X36 inch = (Total + 5 % Wastage)
X 12 Pcs= Result in ..Yds / Doz .
In here
Total Length = Inseam (Length) + Back rise (Including West band ) + Sewing Allowance (S.A )
Total Width = ½ Thai + Sewing Allowance
To be continueReply
Seeking for you kind permission, would you pls allow me to share in details about the “Woven bottom consumption ”
for those who send request regarding this issue in your blog
Inseam = 34 inch,
½ Thai= 13 inch,
Back rise (Under West Band) =15 Inch
Waist band width =1.5 inch,
Back pocket length = 7 inch,
Back pocket Width = 6.5 inch
Belt Loop length =1.5 inch,
Belt Loop Width = 1/2 inch
Pocket Bag Length = 7.5 inch
Pocket Bag Width = 6.5 inch
The Formula is :- ( Length X Width ) X No of panel / ( Fabric Width X 36 inch ) + Wastage Percentage = Result X12
Pcs
Calculation: - In Here
Total Bottom Length = Inseam + Back rise + Wbw + Sewing allowance.( Wbw =West band width )
Say the actual Fabric Width is 58 inch, but when sewing a garments as we can’t use the edge of a fabric , so at the
time of calculation we must deduct 1 Inch from the fabric width . I.e. fabric width will be 57 Inch.
= Result + 5 % Wastage
= Yds / Doz
Main Fabric Consumption :- (55 Inch X 15 Inch) X 4 Pcs /57 inch X 36 Inch + Wastage 5% X 12 Pcs
Back Pocket Consumption = (7”X 6.5 )=44.5 X 2 pc / 57 X 36 =91 /2052 =.044 +.0022=.047 X12 Pcs
= 0.56 Yds / Dz
Belt loop Consumption = (1.5”X .5 ) = .75 X 6 pc / 57 X 36 =4.5 /2052 =.0022 +.0001=.0023 X12 Pcs
= 0.028 Yds / Dz
For Pocketing Fabric :- Length =7 .5 inch X 2 Ply +1 inch (SA )=( 15+1) inch = 16 inch
So we can say, based on above measurement we need 20.84 Yds main fabric & 3.65 Yds pocketing fabric to make
12 Pcs Basic long pant. this way we can calculate fabric consumption for any quantity
Caution :- Friends pls keep in mind that as market is so competitive now a days , so when a buyer ask for a price
quotation no matter how experience you are but pls don’t take any risk. Always figure out practical consumption by
the help of your Pattern master & believe me that will be the perfect for your organization.
Thanking you on be half of Mr.Bipul
(The owner of this Blog )
Hi Bipul,
can you pls advise the woven bottom consumption details formula. i'm confused on several way of making
consumption as i knew the below like as;
Consumption example:
Inseam = 58
Back rise= 27
-------------------------------------
= 0000
(+) W/b 4x2+allowance = 12
--------------------------------------
= 0000 ÷ 2.54(convert to inch) = result 40”
Thigh = 20 × 4(part) =80 ÷ 2.54(convert to inch) = result 37”
Total: L × W= ans ÷ 36 yds ÷ 56/58//60 (fab width) × 12 dzs × extra 10% = result Fab consumption
Replies
Asking for you kind permission to solve Mr. Tanin confusion regarding his computed Woven Bottom item formula on
your blog comments box .....
Hi Bipul,
can you pls advise the woven bottom consumption details formula. i'm confused on several way of making
consumption as i knew the below like as;
Consumption example:
Inseam = 58
Back rise= 27
-------------------------------------
= 0000
(+) W/b 4x2+allowance = 12
--------------------------------------
= 0000 ÷ 2.54(convert to inch) = result 40”
Thigh = 20 × 4(part) =80 ÷ 2.54(convert to inch) = result 37”
Total: L × W= ans ÷ 36 yds ÷ 56/58//60 (fab width) × 12 dzs × extra 10% = result Fab consumption
Reply of Mr.Tanin
Thigh = ½ thai of one leg 20cm × 4(part.. as Two leg has 4 pc ½ Thai ) =80 cm ÷ 2.54(convert to inch) = result not 37”
it will be 31.496 we can consider it 32 inch
Total: L = 38 inch × W = 32 inch = ans 1216 squre inch ÷ 36 inch ÷ say it is 56 inch (fab width) × 12 pcs +
extra(wastage as per nature of fabric ) 10% = result Fab consumption
Total: 1216 square inch ÷ ( we can calculate it like this 36 inch X 56 inch (fab width)= total × 12 pcs + extra(wastage
as per nature of fabric ) 10% = result Fab consumption
Total: 1216 square inch ÷ 2016 square inch = 0.60 yds per pc × 12 pcs = 7.24 yds /doz + extra 10% .72 yds = final
result for Fab consumption is 7.96 (7.24+.72) Yds /Dz .
First of all I'd like to thank you very much for your reply as well for below correction....
Can you pls advise me the actual formula for woven fabrics consumption with details example.
Thanks/ Tanin