Abstract
Autonomous docking operations are a critical aspect of unmanned satellite servicing missions. Tender
spacecraft must be able to approach the client spacecraft, maneuver into position, and then attach to
facilitate the transfer of fuel, power, replacement parts, etc.
The philosophical approach to the docking system design is intimately linked to the overall servicing
mission. The docking system functionality must be compatible with the maneuvering capabilities of both
of the spacecraft involved. This paper describes significant features and functionality of the docking
system that was eventually chosen for the Orbital Express (OE) mission. Key analysis efforts, which
included extensive dynamic modeling, are also described. Zero-g simulation tests were performed to
validate the dynamic analyses.
The docking system was flown and operated on the Orbital Express mission. The system performed as
intended and has contributed to demonstrating the feasibility of autonomous docking and un-docking of
independent spacecraft.
Introduction
Once on orbit, typical spacecraft have limited lives. The harsh environment and lack of access make any
type of external support or maintenance nearly impossible. Anything from simply running out of fuel to
failure of a significant component can end the life of an otherwise useful spacecraft. If some type of
servicing capability were possible, flight operators could potentially get more out of their flight systems.
While limited servicing capability has been available through the Space Transportation System, or
Shuttle, high cost has limited its use to very expensive systems within the Shuttle’s orbital reach, notably
the Hubble Space Telescope. Over the past decade there has been a push to develop the capability of
autonomous servicing of orbiting spacecraft. The intent is to create autonomous, un-manned, tender
spacecraft that might provide services such as spare propellant, or new or replacement parts to already
orbiting client spacecraft.
The company began working on a docking mechanism concept and prototype docking system on an Air
Force Research Laboratory (AFRL) Small Business Innovative Research (SBIR) program in 1999. As the
docking mechanism design matured, the Orbital Express program was developing requirements for
docking hardware. These eventually converged and our docking system was chosen for the flight
demonstration.
Proceedings of the 39th Aerospace Mechanisms Symposium, NASA Marshall Space Flight Center, May 7-9, 2008
207
Docking Mechanism Evolution
Evaluation of existing designs revealed a myriad of related technology. Most available technology related
to extra-vehicular activity (EVA) interfaces, robotic boom end-effector configurations, or impact docking
mechanisms. Much of this technology, by nature, required manned intervention. Most of these systems
were primarily intended for large spacecraft and impact docking applications, and were not well suited for
the more precise requirements of autonomous soft docking and alignment of fluid and electrical
couplings. A critical component in identifying design requirements involved defining the eventual use and
application of the intended mechanical docking system. Further research did not yield any definitive
mission scenarios, but did present general ideas regarding potential applications. Two mission scenarios
were conceived:
Client (on-orbit spacecraft needing service) / microsat (spacecraft servicing the client): A microsat
could be launched on an as-needed basis to directly service an orbiting client. This would provide
very specific refurbishment based on the individual needs of the client. Response time would include
arranging a specific launch for the re-supply microsat.
Various client satellites and a microsat base station (both on-orbit): The client calls on the microsat
base as needed. This could provide faster service, but would be limited to common, more generic
types of refurbishment or repair.
In either of these scenarios, the tender would need to approach the client, match velocity and orientation,
establish initial mechanical contact, pull together to rigidize, establish electrical contact, and finally, the
pair must fly together as a single unit while docked.
1. “Harpoon”
2. A telescoping probe
3. Impact docking with a large conical guide
4. “Claw-type” linkages interfacing with a trefoil
The harpoon configuration, in which a probe is launched at a target, latches on, and is reeled back into
guide features, seemed unpredictable and presented complications concerning the alignment of fluid and
electrical couplings. A telescoping probe, where a telescoping pole extends to the mating spacecraft,
engages a target feature, and retracts to join the two, turned into a complicated multi-mechanism
apparatus not well suited for the direction and vision taking form. Impact docking was eliminated as an
option because soft docking seemed safer for the two spacecraft and better suited to precisely align fluid
and electrical couplings and prevent potential damage of components.
After extensive evaluation, SRC selected a three arm grapple design (Figure 1). The design would
consist of two main subassemblies: an active mechanism and a passive structure. The active mechanism
would consist of a motor driven lead screw that would actuate three individual linkages. The linkages
would engage the passive structure, whose geometry would allow it to be constrained by the linkages.
Further retraction of the linkages would seat the passive structure into a three point kinematic mount,
208
establishing a rigid interface. Release of the structure would be achieved by reversing these steps, with
separation velocity provided by the spring loaded kinematic mounts. Construction on the prototype
developed under the Phase I SBIR was completed in the early part of 2000. Figure 2 shows a picture of
the completed design.
Prototype Testing
Beginning in early 2000, SRC began extensive testing on the prototype hardware in order to evaluate its
effectiveness and limitations. The test program included two significant components:
x In-house off-load testing: An off-load fixture was designed and manufactured to assist in
understanding various dynamics of docking as well as to prove system ability to dock and
transfer cryogenic fluids (LN2).
x Micro-gravity flight: A test plan was developed and executed to test the prototype in a micro-
gravity environment.
209
Figure 3: Off-load setup Figure 4: Micro-g flight
Micro-gravity Testing
The second component of testing included a flight on NASA’s modified KC-135 aircraft flown from
Ellington Field near Johnson Spaceflight Center (JSC), Houston (Figure 4). The experiments focused on
the grappling and capture events that could be accomplished within the 25-second micro-g window each
parabola. The experiment was designed to have two separate, free-floating simulators that represent the
relative mass and inertia of a client and a servicing satellite (approximately 2:1, client to servicing). The
active and passive halves of the prototypes were each mounted to their respective mass/inertia simulator.
With JSC crew assistance, the two halves were positioned within capture range. The active docking
mechanism was immediately powered in an attempt to demonstrate “zero” gravity docking. Because of
the limited time in micro-gravity, consecutive phases of the docking sequence were performed throughout
a series of parabolas. Despite these limitations, the micro-gravity tests proved instrumental in
demonstrating the mechanism behavior. The basic functionality of the docking system was demonstrated.
Observations of dynamic behavior during the test led to improvements of the design prior to the next
prototype build.
nd
Development of 2 Prototype and Orbital Express Flight Design
The OE program was intended to develop an industry-wide standard architecture to perform cost effective
autonomous satellite servicing. To demonstrate the technology, OE planned to use two spacecraft: the
client vehicle, referred to as NEXTSat, and the servicing vehicle, referred to as ASTRO. An illustration of
the OE vehicles is shown in Figure 5. The demonstration mission launched both vehicles together and
performed a series of mating and servicing operations on-orbit.
210
Figure 5: Orbital Express vehicles, conceptual drawings
MDS Testing
Computer Simulation
Latch arm stiffness measurement was one of the several tasks undertaken on the MDS hardware. The
lateral and radial stiffness of the linkage assemblies had been measured in both the deployed and
captured position. By considering these measured stiffness values together with analysis of dynamic
211
simulation results, higher fidelity results and conclusions were produced. Dynamic Analysis and Design
System (DADS) software was used to model the capture and retraction features of the MDS. The model
included complete mass properties of two satellites, a zero gravity environment, and contacting features
of the MDS.
In excess of 400 cases were simulated to explore performance issues using a uniform distribution of
initial condition parameters. The analysis concluded that the mechanism was always capable of positive
captures given reasonable limits of relative initial test conditions.
Parameter Value
Axial Capture Distance: 15 cm
Angular Capture Misalignment Tolerance
Pitch/Yaw ±5 degrees
Roll ±5 degrees
Lateral Misalignment Tolerance: ±5 cm
Linear Contact Velocity Tolerance: 3 cm/s
Preload: 11250 N
Capture Time: < 10 s
Capture and Latch Time: < 240 s
Interface Outer Diameter: < 46 cm
Active Side Mass: < 23 kg
Passive Side Mass < 11.5 kg
212
start the test at a user-specified set of relative initial conditions between the active and passive halves.
Once the test was started, software simulated the complete relative dynamics of the two vehicles due to
the real contact between the active and passive halves during the capture sequence. The test results
were then compared to the dynamic model simulation predictions. Comparison of the test data confirmed
the model accurately depicted the capture dynamics. The information gained from the MDS tests was
critical to the flight design effort.
Following are more detailed descriptions of some of the significant features of the docking mechanism
final design as it was flown on the Orbital Express program.
Figure 8: Docking system major components and schematic layout, as configured for Orbital
Express
213
Orbital Express Capture System (OECS)
The capture system consists of an active side and a passive side. The active side contains the grappling
arms and the drive system; this side would normally be part of the supply spacecraft. The passive side
provides capture features and a sensor to indicate proper engagement of the grappling arms; this side
would normally be a part of the client spacecraft. Figure 8 shows a general schematic of the system
configuration.
Capture Sequence
To understand the OECS unit, a description of its functionality is necessary. Figure 9 displays the typical
steps involved in a capture operation.
1. The linkages of the active mechanism begin in a deployed (open) state. The passive structure is
held in a station keeping envelope within the capture capability of the active mechanism.
2. Upon receipt of command, the motor begins to actuate a ball screw which translates an internal
piston along the length of the active mechanism canister. The piston moves three separate four-bar
linkages that make up the grappling linkages. The linkages then move downward over a roller feature.
The camming action of the roller causes the linkages to constrict, engaging the passive structure. The
wedge shaped architecture of the passive structure guides the tips of the linkages into center grooves.
Capture is achieved as the passive structure is constrained within the bounds of the linkages.
3. As the linkage tips move down along the grooves, they engage a shelf feature, allowing the active
and passive structures to be drawn together. As retraction proceeds, alignment occurs in stages.
Continued motion of the linkages causes the interface plate of the passive structure to contact push-off
rod struts that act as a three point alignment mount on the active mechanism. The alignment features
each consist of a spring loaded pin with conical ends that seat into tapered cups on the passive structure.
These features provide a gross alignment. With further retraction, additional features align the electrical
couplers within their allowable tolerance.
4. At the final stages of retraction, the passive structure becomes fully constrained by a final set of
cup/cone features. Rigidization then occurs as the motor applies the necessary preload to provide the
required interface stiffness.
1 2 3 4
214
Cone Mount, 3Plcs
Canister Assembly
Active Mechanism
The Active mechanism is composed of a top plate assembly to which the canister assembly is attached
(Figure 10). Within the canister assembly is a drive train consisting of a motor, ball screw, and
radial/thrust bearings which transfer load into the housing. All three linkages are fixed to a piston, which is
connected to a ball screw via a ball screw nut. The linkages consist of one upper grappling linkage and
two lower linkages which make up a four bar connection. Mounted to the canister is a reaction roller that
guides the linkages through deployment. Alignment occurs via two separate features: push-off rods, and
alignment pins. The three push-off rods are spring loaded features that seat into alignment cups on the
passive end to provide gross alignment. The cone mounts are hard mounted features that also seat into
cup features on the passive side. This geometry provides a statically determinate final position after mate.
Passive Damping
The need for passive damping was identified during simulation and prototype testing. Concerns had been
raised regarding difficulties that could arise during capture; specifically, the passive half impacting the
push-off mount and rebounding. While it was agreed that the passive side would need to be held within a
station keeping envelope during capture, a non-zero relative velocity would likely exist between the two
spacecraft. This could result in slight amounts of contact between the two faces of the active and passive
halves, making it difficult to maintain the passive structure in the required envelope. Also of great concern
was unintentional impact involving even larger than nominal velocity deltas, and the possibility of damage
to the mechanism.
Another motivation to introducing damping involved oscillations occurring during the capture event.
Testing of the prototype in a micro-g environment exhibited a tendency for the passive structure to
oscillate within the constraints of the linkage tips and the push-off mounts. Computer simulations
performed by Boeing confirmed this behavior. In order to address this issue, a spring damper system was
added to the push-off struts on the active mechanism. Figure 11 depicts a cross section view of the push-
off mounts with the spring damper system.
215
D amper R od
Bushing
D am per R od Spring
H igh Stiffness Piston
M ounting Flange
H ousing
Passive Assembly
The passive assembly (Figure 13) is a three wedge shaped trefoil. The faces of each wedge terminate at
a center groove that runs along its length. The passive interface consists of an interface plate that is
mounted to the three trefoils. Part of this geometry includes retention lips, or shelves, which provide the
linkage with a positive feature to grapple. The interface also includes kinematic cup features which help to
align the structure and institute preload. The OE program required a sensor to confirm that capture had
been successfully accomplished (Figure 9, step 2). Light Emitting diodes (LED’s) located on the passive
assembly detect when the active assembly arms are in the captured position (Figure 14)
216
Piston
Limit Switches
Compression Spring
Preload Adjuster
Motor Lever Arms
Bearing
Interface Plate
217
IR LED
3pl
Light beam
Sensor
Electronics
Housing
Photo Transistor
3 pl
Figure 14: Proximity sensor detail
Acceptance Testing
Based on the experience gained with the two prototypes, SRC developed and performed comprehensive
acceptance test program. In-house testing included many of the same elements that were present in the
prototype and MDS testing: mate and de-mate verification, stiffness characterization, and off-load testing.
In addition, thermal, thermal vacuum, and vibration testing were performed.
Computer Simulation
Dynamic models were updated to include all modifications incorporated after development. Significant
load cases were analyzed to verify that mechanism performance met the Orbital Express requirements.
The same software and methodology were used as for the development unit design effort.
6 DOF Testing
The final phase of qualification and flight testing included 6-DOF testing similar to that which was
performed on the MDS. Although the MDS and OECS mechanism features important for capture and
alignment are almost identical, small changes were made to the design based on the results of 6 DOF
testing of the MDS. Furthermore, the manufacturing fidelity of the OECS qualification components was
flight-identical, unlike the MDS which was of engineering development unit quality. For these two main
reasons, a second 6-DOF test of the qualification unit was performed. The goal was to once again
confirm that the dynamic modeling accurately depicted the dynamics encountered during capture and
alignment.
218
Orbital Express Mission
NEXTSat
Astro
OECS
Overall, all mission goals were successfully completed. The two spacecraft have since been
decommissioned.
219
Conclusions
The OECS flight mechanism performed as expected and has supported demonstration of the
effectiveness of the soft docking approach enabled by the design. The blending of technology and vision
yielded a simple and effective concept. Through a series of design trades and system testing, the
application of minimal mechanisms, and the use of common proven technology (i.e. motors, lead screws,
and linkages), a highly functional design resulted. What began, during the primary phase, as a well
developed concept quickly evolved into a commercially viable product.
References
1. Shane Stamm and Pejmun Motaghedi, “Orbital Express Capture System: concept to reality,” SPIE
Conference, May 2004.
220