Eoi WS
Eoi WS
Eoi WS
Expression of Interest: LOAN-4214 TIM: Dili West Water Supply Project - 54429-001 Project Management Consultant (PMC ) - Dili west Water Supply Project (54429-001)
Status: Forwarded to Executing Agency Date Submitted: 03-Nov-2023 11:59 PM Manila local time Printable Page Close
* Present the rationale for and benefits of working as a joint venture or with sub-consultant entities, rather than undertaking the assignment independently
(as appropriate). Describe the proposed management and coordination approach and the role of each entity.
AAA CONSULTANT, as the lead firm of the Joint Venture based in AAA COUNTRY, is a recognized top-tier engineering consultant in
AAA COUNTRY and in international scene based on its outstanding track records in multi-disciplinary engineering
services of all sectors, especially in water supply and sanitation projects. Kunhwa will be responsible for and
be fully committed to planning, organizing, securing, managing, leading and controlling resources to achieve
the unique goals and objectives of Water Supply and Sanitation Investment Project.
I confirm that:
Documentation regarding our corporate structure including beneficial ownership has been attached into ADB's CMS.
Documentation regarding our Board of Directors has been attached into ADB's CMS.
A written intent to enter a joint venture or subcontracting agreement for the purpose of this expression of interest has been signed between the entities involved.
ADB may reject a Proposal if the Consultant drops a shortlisted joint venture partner without ADB's prior consent, which is given only in exceptional circumstances, e.g., when a JV
partner is sanctioned or has been declared bankrupt.
TIP Your EOI shall demonstrate technical competence and geographical experience based on project references entered in Full registration under your CMS profile.
A. Technical Competence
TIP Cross-referencing the selected from your CMS profile projects, highlight the technical qualifications of your entity/ consortium in undertaking similar assignments.
* Provide details of past experience working with similar project authorities.
AAA CONSULTANT
1) Consulting Services for Detailed Engineering Design of Dili Urban Water Supply
Country: Timor-Leste
Period: Feb. 2020 ~ Feb. 2022 (Ongoing)
Value of Consulting Service: US$ 3.72 Mil
Client: Ministry of Public Works of Democratic Republic of Timor-Leste
Main project features: Preparing Network Map of Existing Pipeline, GPS Survey and Report, Technical Guideline Review, Preparing
Hydraulic Model for Water Resources of Dili, Provide Basic Design, Detailed Design, Technical Report, BOQ, etc.
2) Management & Supervision Consultancy for Distribution Network Improvement, Dhaka Environmentally Sustainable Water Supply
Project (Funded by ADB)
Country : Bangladesh
Period: Apr. 2015 ~ Jun. 2021
Value of Consulting Service: US$ 3,532,929
Client: Dhaka Water Supply and Sewerage Authority
Description:
- Project planning, Filed verification, Survey and Development plan of network model
- Rehabilitation of L=376km water distribution network and 32000 water connections including installation of new meters
- Assistance of capacity development, Supervision of the activities, Resettlement plan
- Establishment of the project criteria for supervision, coordination and management, inspection and monitoring
- Environment and safeguard monitoring
3) Haiphong Water Supply Sub-project – CS1 Consulting Services for Detailed Design and Procurement Assistance of Do Son and An
Duong components
Country : Vietnam
Period: May. 2015 ~ May. 2017
Value of Consulting Service: US$ 3,244,108
Client: Hai Phong City People’s Committee
Description:
- Do Son component:
- Rehabilitation and construction of WTP
- Construction of new Hung Dao WTP Q=25,000m3/day
- Rehabilitation /conversion of existing Do Son WTP into booster pumping station
- Construction of 34km transmission mains and rehabilitation of 20,000 distribution connections
- An Duong component:
- Rehabilitate/upgrade An Duong WTP from Q=100,000m3/day to Q=200,000m3/day (incl. reservoir, pumping system, chemical
building,)
- Transmission pipelines: L=6.0km
4) Consulting Services for Survey, Preparation of Detailed Design and Bidding Documents - Sub-project: Dong Xoai Town Water Supply
System Expansion, Binh Phuoc Province (Funded by WB)
Country : Vietnam
Period: Nov. 2012 ~ Apr. 2014
Value of Consulting Service: US$ 324,559
Client: Project Management Unit of Dong Xoai Town Water Supply System Expansion, Drainage System and Wastewater Binh Phuoc
Province
Description:
- Raw water pumping station : 3 nos, Q = 420m³ / hr each (2 for operation, 1 for stand-by)
- Transmission pipeline : L=3,100m
- Water treatment plant : mixing tanks, flocculator and settling tank, rapid sand filter, treated water storage, pumping stations
- Sludge lagoon : 4 nos.
- Electrical system : standby generator house (400 KVA)
- Distribution Network : D20 ~ D710 mm, L = 78,850 m
- Flow meters : DN15, 4,000 nos
BBB CONSULTANT
1) Consulting Services for Detailed Engineering Design of Dili Urban Water Supply
Country: Timor-Leste
Period: Feb. 2020 ~ Feb. 2022 (Ongoing)
Value of Consulting Service: US$ 2.72 Mil (BBB CONST: $1.36 Mil)
Client: Ministry of Public Works of Democratic Republic of Timor-Leste
Main project features: Preparing Network Map of Existing Pipeline, GPS Survey and Report, Technical Guideline Review, Preparing
Hydraulic Model for Water Resources of Dili, Provide Basic Design, Detailed Design, Technical Report, BOQ, etc.
2) Consulting Services for Feasibility Study of Surface Water Resource Development Project for the Water Supply of Dili Metropolitan Area
(funded by Government of the Democratic Republic of Timor-Leste)
Country: Timor-Leste
Period: Sep. 2019 ~ Oct. 2020 (Ongoing, Suspended)
Value of Consulting Service: US$ 0.46 Mil (BBB CONST: $0.46 Mil)
Client: Directorate General for Water and sanitation of the Ministry Public Work
Main project features: Dam Effective Height: 20~35m, Dam Width: 132~200m, Rock Fill Dam Volume: 250,000m3~530,000m3,
Reservoir Area: 480,000m2~2,300,000m2, Reservoir Capacity: 7,500,000m3~13,000,000m3, Water Transmission: Around 5~18km
(include Tunnel), Relocation of Bridge: 2ea./L=30~100m, Relocation of Road: L=1.5km
3) Feasibility Study for Construction and Rehabilitation of Water Supply in Angeles City, Philippines (funded by KEITI)
Country: Philippines
Period: Mar. 2014 ~ Nov. 2014
Value of Consulting Service: US$ 0.07 Mil (BBB CONST: $0.07Mil)
Client: Angeles City Water District & Alaminos City Water District / KEITI
Main project features: Angeles: Facility capacity 43,000m3/d, Angeles: Facility capacity 8,000m3/d, Design Standard: AASHTO, Public-
Private Partnership (PPP) Project
4) Preparation of Basic & Detailed Design and Bidding Documents for Solano Water Supply System Project
Country: Philippines
Period: Mar. 2013 ~ Oct. 2013
Value of Consulting Service: US$ 0.47 Mil (BBB CONST: $0.47Mil)
Client: MACROASIA Properties Development Corporation
Main project features: Water Treatment Plant: Max Flow=10,500 cu.m/day, Design Standard: AASHTO, Public-Private Partnership
(PPP) Project
5) Basic and Detailed Design for Submerged Pipe Construction between Yoengjong Island and Incheon City
Country: Korea
Period: Jan. 2018 ~ Apr. 2019
Value of Consulting Service: US$ 0.55 Mil (BBB CONST: $0.16Mil)
Client: Water Supply Office of Incheon City
Main project features: Submerged Tunnel Length: L=2,550m, D2400 (in), D2800 (out), Excavation: D3000
* B. Geographical Experience
TIP Cross-referencing the selected from your CMS profile projects, present experience in similar geographic areas.
AAA CONSULTANT
Kunhwa, based in Seoul, Korea has been an active participant in overseas consulting and engineering projects in developing countries of
Asia, Africa and Middle East which have social, geographical and economic conditions similar to those of Timor-Leste. Kunhwa has
successfully completed and is currently providing state-of-art engineering services to the developing countries around the globe. Kunhwa’s
geographical presence is especially strong in developing countries in Asia region including Timor-Leste, Cambodia, Vietnam, Bangladesh,
Nepal, Sri Lanka, providing a number of engineering consultancy services for various water supply and sanitation projects. Hence Kunhwa is
well adjusted to management of multi-cultural teams and will appreciate local cultural sensitivities.
Experience in Timor-Leste and Asia Region:
Kunhwa has so far performed several projects in the form of consulting service funded by ADB, WB, and Government. As of these
experiences, Kunhwa is strongly believed familiar with social, cultural, geographical and economic conditions of Timor-Leste. Below is the
detailed description of AAA CONST experiences performed in Timor-Leste and Asia region.
1) Construction Supervision for the Upgrading and Maintenance of the Dili-Ainaro Road, Lot 2 : Laulara-Solerema Section (12+00 to
34+620) and Post Upgrading Economic Evaluation of the entire Dili-Ainaro Road (Lots 1-5)
Country: Timor- Leste
Period: Apr. 2019 ~ Oct. 2022 (On-going)
Value of Consulting Service: US$ 2.62 Mil.
Client: Ministry of Public Works, Transport & Communications
Description:
Total road length: L=22.62km, Width : B=8.0~10.0m, Design Speed : V=30~70km/h
Construction or reinforcement of slope stabilization structures;
Improvement of drainage structures to meet forecasted rainfall volumes and intensities;
Pavement reconstruction with selective widening;
Management and monitoring Environment, Social, Health and Safety (ESHS);
Possible emergency works during the whole duration of the contract;
Post Upgrading economic analysis and all related surveys for the entire Dili-Ainaro Road (Lots 1-5); and
Services during the Defects Notification Period and Final Statement
3) Basic & Detailed Design and Construction Supervision for Provision of Outside Infrastructure for Korea-Myanmar Industrial Complex
Project (Funded by Korea EDCF)
BBB CONSULTANT
DONGSUNG has in-depth experience in road and bridge projects, both in overseas and domestic settings, which are needed for this
assignment. DONGSUNG has performed more than 1,800 projects involving design and construction supervision services. In addition,
DONGSUNG has a track record of innovative and cost effective design, industry recognition of quality of design, knowledge and experience
of relevant design standards, as well as local knowledge of working in Timor-Leste Region. For overseas projects, BBB CONST also have
performed many overseas experiences in the similar geological region.
Based on the abundant domestic experiences and engineering technologies, BBB CONST obtained many overseas experiences in Timor-
Leste, Bangladesh, Cambodia, Philippines, Myanmar, Lao PDR, Vietnam, Ukraine, Uzbekistan, Tajikistan, Kazakhstan, Afghanistan, Pakistan,
Georgia, Azerbaijan, Tanzania and Bolivia.
Furthermore, DONGSUNG established branch offices in Kazakhstan, Afghanistan, Ukraine, Tanzania, and Timor-Leste to perform the
consulting services more successfully and to make good network in the local. Below is the detailed description of BBB CONST’s experiences
performed in Timor-Leste and Asia region.
1) Construction Supervision for the Upgrading and Maintenance of the Dili-Ainaro Road, Lot 2 : Laulara-Solerema Section (12+00 to
34+620) and Post Upgrading Economic Evaluation of the entire Dili-Ainaro Road (Lots 1-5)
Country: Timor-Leste
Period: Apr. 2019 ~ Oct. 2022
Value of Consulting Service: US$ 2.8 Mil. (BBB CONST: US$ 0.74 Mil)
Client: Ministry of Public Works, Transport & Communications
Main project features: Total road length: L=22.62km, Construction or reinforcement of slope stabilization structures, Improvement of
drainage structures to meet forecasted rainfall volumes and intensities, Pavement reconstruction with selective widening, Management and
monitoring Environment, Social, Health and Safety (ESHS), Possible emergency works during the whole duration of the contract, Post
Upgrading economic analysis and all related surveys for the entire Dili-Ainaro Road (Lots 1-5), and Services during the Defects Notification
Period and Final Statement.
2) Construction Supervision for the Upgrading and Maintenance of Baucau to Lautem, Maubara to Karimbala and Atabae to Mota Ain
Roads (funded by ADB)
Country: Timor-Leste
Period: Aug. 2017 ~ Aug. 2022
Value of Consulting Service: US$ 6.22 Mil. (BBB CONST: US$ 4.98 Mil)
Client: Ministry of Public Works, Transport and Communications (MPWTC)
Main project features: Total Length: L=95.4km, Embankment: Q=286,000m3, Asphalt Pavement: A=439,000m2, Pipe Culvert:
L=2,000m, Baucau to Lautem (km 123+105 to 182+040 with exception), Length: L=57.6km, Embankment: Q=250,000m3, Asphalt
Pavement: A=380,000m2, Pipe Culvert: L=1,600m, Maubara to Karimbala(km 49+700 to 54+100 and km 58+100 to km 62+600) and
Atabae to Mota Ain (Km 85+300 to Km 114+200), Length: L=37.8km, Embankment: Q=36,000m3, Asphalt Pavement: A=59,000m2, Pipe
Culvert: L=400m
3) Consulting Services for Detailed Engineering Design of Dili Urban Water Supply
Country: Timor-Leste
Period: Feb. 2020 ~ Feb. 2022 (Ongoing)
Value of Consulting Service: US$ 2.72 Mil (BBB CONST: $1.36 Mil)
Client: Ministry of Public Works of Democratic Republic of Timor-Leste
Main project features: Preparing Network Map of Existing Pipeline, GPS Survey and Report, Technical Guideline Review, Preparing
Hydraulic Model for Water Resources of Dili, Provide Basic Design, Detailed Design, Technical Report, BOQ, etc.
4) Consulting Services for Feasibility Study of Surface Water Resource Development Project for the Water Supply of Dili Metropolitan Area
(funded by Government of the Democratic Republic of Timor-Leste)
Country: Timor-Leste
Period: Sep. 2019 ~ Oct. 2020 (Ongoing, Suspended)
Value of Consulting Service: US$ 0.46 Mil. (BBB CONST: US$ 0.46 Mil)
Client: Directorate general for Water and sanitation of the Ministry Public work
Main project features: Dam Effective Height: 20~35m, Dam Width: 132~200m, Rock Fill Dam Volume: 250,000m3~530,000m3,
Reservoir Area: 480,000m2~2,300,000m2, Reservoir Capacity: 7,500,000m3~13,000,000m3, Water Transmission: Around 5~18km
(include Tunnel), Relocation of Bridge: 2ea./L=30~100m, Relocation of Road: L=1.5km, Resettlement of Houses: 70 houses, Review of
Relevant Studies, Applicable Regulation and Standards, Site survey, Technical Study, Outline Design, Maintenance and Operation Study,
Rough Cost Estimation and E&F analysis, Initial Environmental Impact Assessment, Social Impact Assessment, Preparation of Check-list of
the Study
6) Preparation of Design for 169km of National Roads (Baucau to Los Palos, Lautem to Com and Baucau to Viqueque) (funded by ADB)
Country: Timor-Leste
Period: Sep. 2014 ~ Oct. 2015
Value of Consulting Service: US$ 2.43 Mil. (BBB CONST: US$ 1.44 Mil)
Client: Ministry of Public Works, Transport and Communications (MPWTC)
Main project features: Total Length: L=164.95km, Width: B=8.0~10.0m (2 lanes), Bridge: 9ea./L=602.5m, Design Speed: 30~70km/h,
Junction: 3ea. (Level Cross-type), Topographic, Traffic, Hydrological Survey, Geotechnical Investigation, Design Standard: AASHTO
7) Construction Supervision for CAREC Corridor 2 Karakalpakstan Road (A380 Kungrad to Daut-Ata Section) Reconstruction Project
(funded by ADB, FIDIC)
Country: Uzbekistan
Period: May 2021 ~ May 2025
Value of Consulting Service: US$ 4.60 Mil.
Client: Republican Road Fund under the Committee for Roads of the Republic of Uzbekistan
Main project features: Total Length: L=240km (2lanes, B=15m & 4lanes, B=25.3m), Design Speed: V=120km/hr, Technical category of
road 1 & 2, Cement Concrete Pavement, Design Standard: SNiP
C. Management Competence (Please answer each question in one paragraph of 3-5 sentences)
* 1. Describe standard policies, procedures and practices that your entity has to assure quality interaction with clients and outputs. Please state if your company is ISO certified.
AAA CONSULTANT
AAA CONSULTANT has established Quality Management System (QMS) for quality control procedures and is ISO 11001, ISO 12001, and ISO 34001
certified. For the management and control of output quality, all members will design a Project Quality Plan specific for every assignment in
accordance with the standard policies and procedures being practiced in the country of the project assignment in close coordination and
consultation with the relevant agencies and authorities concerned.AAA CONST has adopted a progressively improved Quality Management
System (QMS) centering on the standards and procedures to be utilized for correspondence and communication with the Clients. The QMS
basic principles prioritize customer-oriented setting, stakeholder’s involvement, continual monitoring and improvement, and building of
mutually beneficial relationships.
G
BBB CONSULTANT
The quality control of the project is controlled by President & CEO of BBB CONST directly named Mr. JAY who is one of founder members of
BBB CONST since 1996, and has a certificate of Value Engineering and specialized in quality control. Also, BBB CONST has been certified by
the Society of American Value Engineers and Society of Korean Value Engineers as a VE Certified company in the scope of Road and
Railroads, Water Supply and Drainage, Urban Planning, Water Resource and Harbour.
BBB CONST, as a Lead Partner, will apply and lead Value Engineering to improve the value of the project through examination of the
project’s basic function and cost. Value improvement can be attained through enhancement of its function or reducing its cost without
compromising quality, safety, environmental considerations and economic life. Below is the systematic and concrete approach for our Value
Engineering
- Information Phase: Gather information to better understand the project.
- Function Analysis Phase: Analyze the project to understand and clarify the required functions.
- Creative Phase: Generate ideas on all the possible ways to accomplish the required functions.
- Evaluation Phase: Synthesize ideas and concepts to select feasible ideas for development into specific value improvement.
- Development Phase: Select and prepare the “best” alternative(s) for improving value.
- Presentation Phase: Present the value recommendation to the project stakeholders.
BBB CONST is pursuing future-oriented and environment-friendly consulting and engineering services through its own know-how of quality
control and technology development under the entrepreneurial goal of becoming a fully accountable firm willing to fulfill the responsibility
to achieve the ultimate goal of enabling unmatched harmony between the development and protection of the environment with a view to
inheriting pleasant and preserved natural environment to descendants by pursuit of environmentally friendly design schemes.
BBB CONST has also acquired ISO91001 and ISO1001 in the quality control and environment management.
For the management and control of output quality, BBB CONST will design a Project Quality Plan specific for every assignment in
accordance with the standard policies and procedures being practiced in the country of the project assignment in close coordination and
consultation with the relevant agencies and authorities concerned
* 2. How will your firm/consortium handle complaints concerning the performance of experts or quality of the reports submitted for this assignment? What internal controls are in place to address and
resolve complaints?
AAA CONSULTANT
The foremost and general measure to ensure consistency in quality and avoid any complaints from the Client, AAA CONSULTANT is strictly
implementing standard process of review-verification-validation thorough out all stages of the project for prompt correction.
Recommendations from the Client will also be sought at interim stages to ensure that the project is in compliance with the requirements of
the Project.
The Quality Assurance Team comprised of veteran engineers at HQ will monitor on day-to-day basis, all the matters related to
performance of team, quality of output and if any complaints are received, the team leader must take all necessary measures in
consultation with the Client and associates and report to the HQ for further guidance.
If such efforts at the project site are not successful, the Quality Assurance Team in consultation with the team leader and the Client
will replace any such consultants who fail to perform to meet the quality required by the Client.
Decisions including replacement of professionals based on their performance and behavior will be taken by the Director as and when they
become necessary.
BBB CONSULTANT
When our work is commented or questioned and alternative methodologies are suggested, Risk Management Specialists who are involved
in headquarter will be assigned at the site periodically to check the Service Progress minimizing possible risks and losses and problem of
potential possibility, and will remedy a grievance issued by stakeholders. Also, the Specialists will reflect the opinions of client and
stakeholder(s) to solve complaints immediately. Our Specialists will meet with professors or advisory committee in relevant field to discuss
the matter and come up with the optimal solution. We are able to control inner part through proper communication process of each division
team in the organization, following procedures such as a conference, an official document and a board collecting opinions and effectiveness
of qualified managing system. In addition, when the team leader of the our firm faces the complaints concerning the performance of the
staff or the quality of the reports submitted, he will ask to review it in detail to the international and domestic resident consultants on site,
and if it cannot be solved he will ask to the experts and specialist to review those problems at home office in Korea. The nominated
professional engineers for this project, includes highway, bridge, geotechnical, soft ground treatment, hydraulic, cost, material and the
others, will support to solve the complaint from the site. Moreover, home office support system has been already used to the supervision
services have been carried out by our firm.
* 3. How will you ensure the quality of your firm’s/consortium’s performance over the life of this assignment?
AAA CONSULTANT
AAA CONST will implement a Quality Assurance Plan under the matrix control of key professional engineers. We will conduct brainstorming
and project planning session to identify the required major and supporting activities to successfully complete this project, assign time
schedule and resources including the identification and definition of the responsibility of each key engineer during project implementation.
The association will also identify the unique characteristics of the project that are important to the safe and proper operation of the project
while ensuring environment friendliness.
AAA CONST has been certified by the Society of American Value Engineers and Society of Korean Value Engineers for the VE Certified
Company in the scope of Road and Railroads, Water Supply and Drainage, Urban Planning, Water Resource and Harbor. AAA CONST will
apply and lead Value Engineering to improve the value of the project through examination of the project’s basic function and cost. Value
improvement can be attained through enhancement of its function or reducing its cost without compromising quality, safety, environmental
considerations and economic life. Below is the systematic and concrete approach for our Value Engineering
Information Phase: Gather information to better understand the project.
Function Analysis Phase: Analyze the project to understand and clarify the required functions.
Creative Phase: Generate ideas on all the possible ways to accomplish the required functions.
Evaluation Phase: Synthesize ideas and concepts to select feasible ideas for development into specific value improvement.
Development Phase: Select and prepare the “best” alternative(s) for improving value.
Presentation Phase: Present the value recommendation to the project stakeholders
BBB CONSULTANT
BBB CONSULTANT will implement a Quality Assurance Plan under the control of the fully experienced and skilled Team Leader and key
professional engineers who will be selected from a senior management level. The Team Leader will conduct brainstorming and project
planning session to identify the required major and supporting activities to successfully complete this project, assign time schedule and
resources including the identifications and definitions of the responsibility of each key engineer and other professionals during project
implementation. The Team Leader and other key experts will also identify the unique characteristics of the project that are important to the
safe and proper operation of the project while ensuring environment friendliness.
BBB CONST will prepare a Consultant’s Project Quality Assurance Manual based on the Consultant’s Quality Assurance Manual according to
ISO 901011 and ISO 140011 for controlling and monitoring the project. The manual will describe the supervision organization, tasks, and
procedures both technically and financially.
Furthermore, the manual will establish the basis for the approach principle for effective communication, which also will include the
cooperation with the Client.
In the case of non-compliance of the works, BBB CONST will consider and recommend the remedial actions or rejection of the works to the
Client. BBB CONST will as well recommend solutions to the Client regarding disputes with the Contractor.
* 4. Describe standard policies, procedures and practices that your firm has put in place to avoid changes/ replacements of personnel and to ensure the continuity of professional services once
contracted.
AAA CONSULTANT
AAA CONST ensures the continuity of professional services on the assignment as mentioned below.
Selecting personnel who are confident of working in the project location. Personnel must have in-country or regional experience
Personnel must have a track record of working on the project from inception to completion. Personnel with a history of not completing
the assignment are not selected.
Selected personnel must confirm that they are prepared to travel and work away from home as per the work plan; return-to-home
travel arrangement are accommodated in work plan and financial plan when the consultant is in the field for extended durations.
BBB CONSULTANT
To avoid changes/replacements of personnel and to ensure that continuity of professional services once contracted, the BBB CONST will
nominate personnel who have experienced working in similar assignment and conditions, and will be available to complete his task to the
full duration of the assignment.
BBB CONST deploy the manpower among the international experts who is concentrated on this project. Especially we will input the
permanent staff for the Key-position.
In addition, BBB CONST offers a competitive compensation package to its international experts and local staff including group life
insurances, health benefits, leaves and allowances. BBB CONST aims to comply with the statutory requirements of the host country.
In case of unavoidable circumstances such as unexpected health problem of personnel, under the company policy on back-up professionals,
BBB CONST has provided the best alternative candidates, who are equally or better qualified. Once we have a contract, selects the 2nd best
candidates in compliance with firm’s regulation in case the mainly proposed experts are to be replaced due to unavoidable reasons, which
is not specified on the contract. Furthermore, it operates the quality control system and analysis system by the QA/QC task force. Based on
the above process, we can keep the continuity of professional services
Also, we prioritize continuity of discharge of each assignment by most adequate, professional, experienced and dedicated candidate, who
has had geographical familiarity and project awareness in full. Every candidate must maintain a track record in conformity with the
requirements specified in the TOR and he/she must show a strong will as well as sense of responsibility and commitment. We utilize our
own pool of candidates around the globe as well as renowned human resources companies in association for not best yet most suitable
personnel for the assignment.
* 5. Describe what social protection practices you have in place to safeguard the well-being of your proposed experts? Specifically describe arrangements you have in place for medical, accident and
life insurance coverage during the assignment.
AAA CONSULTANT
AAA CONST provides full social protection for its employees that include social security, health and medical insurance, education and training,
paid vacation leave and sick leaves and retirement benefits among others. Furthermore, additional occupational health and safety insurance
will be taken out and an additional incentive pay is normally given to the expert to ensure pleasant working conditions.
BBB CONSULTANT
BBB CONST provides full social protection for its employees that include social security, health and medical insurance, education and
training, paid vacation leave and sick leaves and retirement benefits among others. Furthermore, additional occupational health and safety
insurance will be taken out and an additional incentive pay is normally given to the expert to ensure pleasant working conditions. We, with
no doubt, believe our employees are the most important asset and we will maintain and ensure they will benefit from their rights and
fundamental claims.
Prior to mobilization of the Employee, BBB CONST will join the expert of Korean to life and health insurance, occupational health and safety
insurance and travel’s insurance throughout the duration of his assignment.
BBB CONST adopt necessary insurance such as Professional liability insurance and employer’s liability and workers’ compensation
insurance of all Experts and Sub-Consultants for experts to feel safe, and additional insurance can be made according to the project
conditions and on site.
BBB Engineering Co., Ltd., INDONESIA, is a technology based independent engineering consulting company established in 1991. BBB
CONSULTANT has been providing services for survey, design and consultation on highway, transportation, structure, foundation,
environment and sanitary engineering for clients with high passion and up-to-date technology. “Sustainable Green & Smart Design for the
Future” BBB CONST Engineering's goal is providing the best service to clients beyond their expectation with cutting edge technology. To
follow our goal, our staffs keep concentrate on creating values for our clients through becoming an engineering leader in their professional
fields based on endless study and innovation. Our fields of works cover comprehensive construction procedures including the feasibility
study, planning, basic/detailed design, bidding consultation, construction supervision, and construction management. The ultimate goal of
BBB CONST is the provision for technologies and services of the highest quality. All the members give deep efforts to acquire new
technologies in their own fields and develop themselves. In order to achieve those goals, BBB CONST encourages the discussion, working
party, seminars and re-education on the advanced technology and consultation with domestic and foreign experts
Project References
TIP To see notice and instructions for Project References, click on thi