Pi Fin If C PCP 22 0136
Pi Fin If C PCP 22 0136
02/09/2022
1 Pile Driving Installation Compact Sub-Station
8:00 AM
Reference Documents
Inspection Item
□ Inspec on Passed. The Tes ng / Inspec on is sa sfactory and works may proceed to the next stage
□ Remedial works listed below to be completed and inspec on is required a er remedial works
□ Remedial works listed below to be completed but no further inspec on required
□ Rejected
※ New FIN raised? ☐Yes ☐ No New FIN No.:
REMARKS:
ACKNOWLEDGEMENT OF INSPECTION
PREPARED BY CHECKED BY WITNESSED BY ACKNOWLEDGED BY
(Sub-Contractor) (Contractor/QAQC) (Contractor's Consultant) (Owner's Team)
COMPACT SUB-STATION
RAFT FOUNDATION PLAN AND
SECTION DETAILS
3 4
SFB/PPSB/ST/01