The document is a field inspection notification for a pile driving activity at Pulau Indah CCPP. It notifies that a pile driving installation inspection will take place on February 9th, 2022 at 8:00 AM at the Compact Sub-Station location. It references the relevant drawings and specifications for the pile driving work. The contractor is required to have a consultant witness the inspection and the owner's team will also attend as spot witnesses.

Uploaded by

Aravin Suarez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
43 views2 pages

Pi Fin If C PCP 22 0136

The document is a field inspection notification for a pile driving activity at Pulau Indah CCPP. It notifies that a pile driving installation inspection will take place on February 9th, 2022 at 8:00 AM at the Compact Sub-Station location. It references the relevant drawings and specifications for the pile driving work. The contractor is required to have a consultant witness the inspection and the owner's team will also attend as spot witnesses.

Uploaded by

Aravin Suarez
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

PULAU INDAH CCPP

Field Inspection Notification (FIN)

Activity Pile Driving (On-shore) Contractor PCP


FIN No. PI-FIN-IF-C-PCP-22-0136 Issued Date 01/09/2022
Rev. No. 0 Discipline Civil
Please be invited to attend the following inspection according to the following schedules:
Inspection Details

No. Inspection / Testing Description Location Date / Time

02/09/2022
1 Pile Driving Installation Compact Sub-Station
8:00 AM

Reference Documents

FITP No. 0-WD800-CZ250-10001_Rev.B Drawing No. SFB/PPSB/ST/01

Spec. No. 0-WD800-CC260-00002 Rev. 0 Others NA

Contractor/QAQC Hold Point Witness Spot Witness


Inspection
Contractor's Consultant Hold Point Witness Spot Witness
Mode
Owner's Team Hold Point Witness Spot Witness

Contrator QAQC Owner's Team

Name : Zakiah Farahana Md Rahani Name :


ACKNOWLEDGEMENT OF RECEIVED
Signature : Signature :

Date :1/09/2022 Date :

INSPECTION STATUS (To be completed after the inspection)

Inspection Item

□ Inspec on Passed. The Tes ng / Inspec on is sa sfactory and works may proceed to the next stage
□ Remedial works listed below to be completed and inspec on is required a er remedial works
□ Remedial works listed below to be completed but no further inspec on required
□ Rejected
※ New FIN raised? ☐Yes ☐ No New FIN No.:
REMARKS:

ACKNOWLEDGEMENT OF INSPECTION
PREPARED BY CHECKED BY WITNESSED BY ACKNOWLEDGED BY
(Sub-Contractor) (Contractor/QAQC) (Contractor's Consultant) (Owner's Team)

Name : S.ARAVINTHIRAN Name : Name : Name :

Signature : Signature : Signature : Signature :

Date : Date : Date : Date :

Form No. : 5PG-0701-012-F1 / Rev. 1 / Date : 12 Nov 2021


2

COMPACT SUB-STATION
RAFT FOUNDATION PLAN AND
SECTION DETAILS

3 4
SFB/PPSB/ST/01

POSCO ENC CONFIDENTIAL 장동진(djjang) 2022-09-01 10:39:20 이 문서는 포스코건설의 허락없이 배포할 수 없습니다.