Bill Sheet Format

This document is a bill sheet that lists building items, quantities, rates, and amounts for a construction project. It includes items for site preparation, excavation, foundations, concrete work for floors and structural elements, damp proofing, and boundary walls. The total amount due for all listed items is Rs. 2,395,410.54.

Uploaded by

saptaraqs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views3 pages

Bill Sheet Format

This document is a bill sheet that lists building items, quantities, rates, and amounts for a construction project. It includes items for site preparation, excavation, foundations, concrete work for floors and structural elements, damp proofing, and boundary walls. The total amount due for all listed items is Rs. 2,395,410.54.

Uploaded by

saptaraqs
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Bill Sheet

Actual
Item No. Description Unit Rate Amount
Quantity
A-1 Item allow for Mobilization and demobilization . Item 50% 200,000.00 100,000.00
Site preparation, Clearing site vegetation, removing
B1-1 bushes, shrubs & top soil to a depth not exceeding 6" Item 1.00 25,000.00 25,000.00
and removing all debris away from site.
B1-2 Excavation for basement Cube 41.14 2,250.00 92,574.41
B1-3 Foundation Cube 6.80 2,250.00 15,308.48
B1-4 Column Cube 3.78 2,250.00 8,505.00
Approved hard Earth Supplying spreading , leveling
watering and manual compaction, using standard cast
B1-5 Cube 6.08 4,500.00 27,381.69
iron stamper or equivalent and filling in 150 mm thick
layers (compact volume) in restricted area.

Ant termite-treatment for the new construction with


applying Biflexthrine 10Tc (Biflex ) or approved
equivalent , Diluted chemicals 1:200 ratio with water
B1-6 after supplying the sealed bottle with labels to the site Sq.ft. 1,144.74 35.00 40,065.73
and should be followed the manufacture standards of
application including horizontal & vertical barriers. It
should be 10 years warranty on application.
B2-1 Column footings. Sqr 1.26 12,000.00 15,120.00
B2-2 Wall foundation. Sqr 1.91 12,000.00 22,876.13
B2-3 Retaining wall. Sqr 1.30 12,000.00 15,651.00
75mm thick floor concrete in ground floor with 6mm
B2-4 Cube 1.15 48,000.00 55,094.85
thick expansion joints & edge formwork.
B2-5 Column Footings Cube 1.05 53,000.00 55,427.40
B2-6 Column Shafts Cube 0.16 53,000.00 8,347.50
B2-7 Plinth Beam Cube 0.33 53,000.00 17,440.31
B2-8 Retaining Wall Cube 4.75 53,000.00 251,650.63
B2-9 Column Footings Sqr 1.68 18,500.00 31,080.00
B2-10 Column Shafts Sqr 0.84 18,500.00 15,540.00
B2-11 Plinth Beam Sqr 0.88 18,500.00 16,233.75
B2-12 Retaining Wall Sqr 14.20 18,500.00 262,700.00
B2-13 12mm dia. in column footings. kg 170.56 230.00 39,228.80
B2-14 12mm dia. in column shaft. kg 84.60 230.00 19,458.00
B2-15 12mm dia. in plinth beam. kg 69.85 230.00 16,065.50
B2-16 10mm dia. in retaining wall. kg 347.44 230.00 79,911.20
B2-17 12mm dia. in retaining wall. kg 707.25 230.00 162,667.50
B2-18 6mm dia. in column shaft. kg 10.61 230.00 2,440.30
B2-19 6mm dia. in plinth beam. kg 22.17 230.00 5,099.10
B3-1 Wall Foundation Cube 3.50 32,500.00 113,620.60
3/4" thick D.P.C. in cement sand 1:2 finished with 2
B4-1 Sqr. 1.92 12,200.00 23,457.89
coats of D.P.C. tar and blinded with sand.
Gauge 1000 polythene damp proof membrane with 6"
B4-2 Sqr. 5.01 600.00 3,004.88
laps laid under floors.

Total Upto DPC c/f 1,540,950.64

C1-1 Column Shafts Cube 0.45 53,000.00 23,850.00


C1-2 Slab Cube 2.59 53,000.00 137,078.60
C1-3 Beam Cube 0.85 53,000.00 45,016.88
C1-5 Staircase Cube 0.68 53,000.00 35,778.18
C1-6 Column Shafts Sqr 2.40 18,500.00 44,400.00
C1-7 Slab Sqr 6.69 18,500.00 123,729.27
C1-8 Beam Sqr 1.10 18,500.00 20,393.78
C1-10 Staircase Sqr 1.65 18,500.00 30,432.50
C1-11 12mm dia. in column shaft. kg 97.46 230.00 22,416.59
C1-12 10mm dia. in slab. kg 309.49 230.00 71,182.68
C1-13 12mm dia. in slab. kg 118.45 230.00 27,242.38
C1-14 12mm dia. in beam. kg 156.71 230.00 36,043.38
C1-17 10mm dia. in staircase. kg 74.75 230.00 17,192.98
C1-18 6mm dia. in column shaft. kg 26.32 230.00 6,052.48
C1-19 6mm dia. in beam. kg 37.57 230.00 8,641.59

Total Upto Basement Floor c/f 649,451.28

D1-1 Column Shafts Cube 0.05 53,000.00 2,385.00


D1-6 Column Shafts Sqr 0.72 18,500.00 13,320.00
D1-11 12mm dia. in column shaft. kg 8.66 230.00 1,992.59

Total upto Ground Floor c/f 17,697.59

Manual Excavation for wall foundations in any material


(except rock requiring blasting) up to 5'-0" depth, part
A1-1 Cube 3.08 2,250.00 6,926.68
return fill in and ram and surplus deposited within site as
directed.
A1-2 Under Boundary Wall Sqr 1.17 12,000.00 14,057.81
A1-3 Column Cube 0.48 53,000.00 25,340.63
A1-4 Tie beam Cube 0.17 53,000.00 8,831.58
A1-5 Column Sqr 1.28 18,500.00 23,587.50
A1-6 Tie beam Sqr 0.67 18,500.00 12,455.43
A1-7 10mm dia. in column. kg 55.45 230.00 12,752.55
A1-8 10mm dia. in tie beam kg 60.64 230.00 13,948.10
A1-9 6mm dia. in column kg 22.55 230.00 5,186.95
A1-10 6mm dia. in tie beam. kg 15.16 230.00 3,487.02
4" thick cement sand block wall in cement and sand
A1-12 Sqr 5.06 12,000.00 60,736.80
mortar 1:5.

Total Upto Boundry Wall c/f 187,311.04

Summary
Summary
b/f Upto DPC 1,540,950.64
b/f Upto Basement Floor 649,451.28
b/f Upto Ground Floor 17,697.59
b/f Upto Boundry Wall 187,311.04
Total 2,395,410.54