INSPECTION HISTORY
NO: DESCRIPTION: INSPECTION:
ACCEPTABLE: DATE: COMMENTS:
Quality Control
Chiller type, model number and manufacturer approved
1 Yes No Yes No
for use
2 Chillers not being used are correctly stored Yes No Yes No
Installation
3 Drawings on site are the latest issue Yes No Yes No
Chiller is installed in the correct location as per approved
4 Yes No Yes No
shop drawings
Confirm chiller meets approved equipment details
5 Yes No Yes No
including options specified
Equipment is not damaged in any way, ensure no
6 Yes No Yes No
concealed damage
Chiller is correctly mounted on vibration isolation springs
7 as documented. Confirm springs provided are of the Yes No Yes No
required static deflection and appropriately restrained
Chiller is labelled clearly with number, model and
8 Yes No Yes No
manufacturer
Marine water box provided or removable piping sections
9 Yes No Yes No
put in place for tube cleaning
10 Confirm pipework connection to chiller are correct and Yes No Yes No
1
INSPECTION HISTORY
NO: DESCRIPTION: INSPECTION:
ACCEPTABLE: DATE: COMMENTS:
include all fittings and accessories as documented
11 Confirm correct electrical connection of chiller Yes No Yes No
Confirm all electrical interlocks are in accordance with
12 Yes No Yes No
chiller wiring schematic
Confirm all manufacturer’s installation requirements have
13 Yes No Yes No
been met
Commissioning
Confirm sump heater turned on 12 hours before first start
14 Yes No Yes No
of chiller
Confirm chilled water pump achieve design flow rate
15 Yes No Yes No
through the chiller
Confirm chiller manufacturer has attended site and
16 Yes No Yes No
commissioned the chiller
Confirm high level interface is operational and is
17 Yes No Yes No
communicating all nominated points to the BMCS
Mark alterations and sizes on final locations on AS Built
18 Yes No Yes No
drawings for records
ADDITIONAL COMMENTS: